RE: MASSIH OFFICE BUILDING -REVIEW
Project Information
Permit BUP2004-00297 Construction Type: 5N
Tenant Name: Massih Office Building Occupancy Type: B
Address: 9975 SW Frewing St Occupant Load: ukn
Area: 11,142 Sq Ft Stories: 2
The building permit above was issued in 2005. On December 27,2005 Mr.Hyman submitted a request
to replace 2x6 dug fir#1,wood framing members with 6 inch cold-formed steel stud framing members to
be used on the walls of this project.The request was forwarded to Miller Consulting Engineers (MCE) for
review. MCE generated a plan review letter on January 10 (see attached).The following is correspondence
to date for above permit
1. Miller Consulting reviewed the requested submittal on 1/06,based on the complexity of the building
framing.The review for this change has been based on the 2004 Oregon Structural Specialty Code
(OSSC).
2. 1/10/06,MCE requested the submittal of the following information to complete his review;
"1) calculation for loads to shear walls as required for the seismic&wind controlled directions as
required by sec 1609.1.5& 1620.4&table 1616.5.1.1 #2,
2) submit details for load transfer&connections including Omega as required by sec 2211,
3) Submit details for shear walls including fasteners,spacing&method of proper installation as
required by sec 2211,
4) Submit details &calculations as required as required by sec 2211"
3. During this review MCE noticed that the building was of irregular shape and that there was no
calculation for seismic design based off the shape of the building as required per OSSC 1998, section
1629.5.3.This was brought to City of Tigard Building Department's attention and it was determined
that this permit as noted above was issued in error as the plans are incomplete and need to be
completed OSSC 106.3.3. "Construction documents shall be of sufficient clarity to indicate the
location, nature and extent of the work proposed and show in detail that it will conform to the
provisions of this code and relevant laws, ordinances, rules and regulations",
4. A request was made by the City of Tigard on 1/11/06 by phone conversation with Mr. Hyman
requesting he submit this calculation showing the proposed building design would meet the code
requirements of Section 1629.5.3, OSSC. Mr. Hyman agreed to begin working on that immediately to
13125 SW Hall Blvd., Tigard, OR 97223(503)639-4171 TDD(503)684-2772
f �
maintain the status of the issued permit without revoking it as this department has the authority to do
so as stated per OSSC 105.6 "Suspension or revocation. The building official is authorized to suspend or
revoke a permit issued under the provisions of this code wherever the permit is issued in error or on the basis of incorrect,
inaccurate or incomplete information, or in violation of any ordinance or regulation or any of the provisions of this code."
5. On 2/6/06 a phone conversation was held between Brian Blalock of the City of Tigard,Building
Division and Mr.Hyman of Welkin Engineering.The discussion was documented with a letter dated
2/8/06 from Mr.Hyman reiterating the conversation informing Brian B.that the proposed
construction change to steel studs will not be made at this time.He also explained that he was aware of
MCE's concerns regarding seismic effects of the building shape.Mr.Hyman requested that the
foundation construction be allowed to continue through the beginning of framing.Brian B agreed to
this provided MCE's concerns would be addressed.Brian B.told Mr.Hyman that if MCE did not
recommend approval based on a code complying design,Brian would request no work to be done
after the foundation and slab were complete.Mr. Hyman stated he would have this analysis to this
office by the following week to maintain the approved permit.No design has been received to date.
6. There was a request to change the exterior foundation design. On 2/15/06 this design was approved
based on submitted information with special inspection required for soil compaction on the interior
footing& foundation system.Brian B informed the contractor that no construction above the
foundation and slab was going to be allowed until Mr.Hyman addressed the issues identified in the
1/10/06 plan review letter generated by MCE had been satisfied.
7. Per a conversation with Eric Watson at MCE on 3/9/06,No response has been received.
PLEASE provide the requested design so that the project may proceed without interruption.
When submitting revised drawings or additional information, please attach a copy of the enclosed City
of Tigard,Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and
processing the documents.
Respectfull
Val Henzel,
Senior Plans Examiner
cc. Building Owner
Kamelia Massih
1831 SW Dickinson Ln
Portland,OR 77219
Fax 503-644-8330
Contractor
David Gleason, Fax 503-430-8060
File
Val enzel - Plancheck Review 1-10-06.DOC Page 1
JOB NAME: Pacific Park Plaza CITY OF TIGARD
JOB ADDRESS: 9975 SW Frewing BUILDING DEPARTMENT
DATE: January 10, 2006 13125 HALL BOULEVARD
MCE Project No.: 051333 TIGARD, OR
97223
SHEET 1 OF 1 Tigard Building Permit BUP-2004-
00297
STRUCTURAL PLAN REVIEW#1
(Use of cold-formed steel studs in place of 2x6 wood studs)
Item No. Code Reference Comments
1 Table 1616.5.1.1 #2 Submit calculation for loads to shear walls as required for the
Section 1620.4& seismic and wind controlled directions.
Section 1609.1.5
2 Section 2211 Submit details for lateral load transfer and connections including
Omega.
3 Section 2211 Submit details for shear walls including fasteners,spacing and
method of proper installation.
4 Section 2211 Submit details and calculations as required.
7
•
TRANSMISSION VERIFICATION REPORT
TIME : 03/13/2006 10: 42
NAME : TIGARD BUILDING DEPT
FAX : 5036243681
TEL .
SER. # : BROD4J479592
DATE,TIME 03/13 10:41
FAX NO./NAME 5036448330
DURATION 00:01:02
PAGE(S) 03
RESULT OK
MODE STANDARD
ECM
41111111
March 10,2006 -,,. _�A
CITY OF .TIGARD
OREGON
Welkin Engineering,P.0
Harris Hyman . .
8000 SW Pfaffle St
Portland,OR 97223
RE: MASSIH OFFICE BUILDING -REVIEW
Project Information
Permit BUP2004-00297 Construction Type: 5N
Tenant Name: Massib Office Building Occupancy Type: B
Address: 9975 SW Frewing St Occupant Load: ukn
Area: 11,142 Sq Ft Stories: 2
The building permit above was issued in 2005.On December 27,2005 Mr.Hyman submitted a request
to replace 2s6 dug fir#I,wood framing members with 6 inch cold-formed steel stud framing members to
be used on the walls of this project.The request was forwarded to Miller Consulting Engineers (MCF) for
review.MCE generated a plan review letter on January 10(see attached).The following is correspondence
to date for above permit
1. Miller Consulting reviewed the requestedsubmittal on 1/06,based on the complexity of the building
framing.The review for,this change has been based on the 2004 Oregon Structural Specialty Code
(OSSC).
2. 1/10/06,MCE requested the submittal of the following information to complete his review;
"1) calculation for loads to shear walls as required for the seismic&wind controlled directions as
TRANSMISSION VERIFICATION REPORT
TIME : 03/13/2006 10: 44
NAME : TIGARD BUILDING DEPT
FAX : 5036243681
TEL .
SER. # : BROD4J479592
DATE,TIME 03/13 10:43
FAX NO./NAME 5034308060
DURATION 00:00:39
PAGE(S) 03
RESULT OK
MODE STANDARD
ECM
March 10, 2006 .
CIWOO
OG
ON
Wei Engineering,P.c
Harris Hyman
8000 SW Pfaffle St
Portland,OR 97223
RE: MASSIH OFFICE BUILDING -REVIEW
Project Informatiot
Permit BUP2004-00297 Construction Type: 5N
Tenant Name: Massih Office Building Occupancy Type B
Address: 9975 SW Frewing St Occupant Load: ukn
Area: 11,142 Sq Ft Stories: 2
The building permit above was issued in 2005.On December 27,2005 Mr.Hyman submitted a request
to replace 2x6 dug fir#1,wood framing members with 6 inch cold-farmed steel stud framing members to
be used on the walls of this project.The request was forwarded to Miller Consulting.Engineers (MU ) for
review.MCE generated a plan review letter on January 10 (see attached).The following is correspondence
to date for above permit
1. Miller Consulting reviewed the requested submittal on 1/06,based on the complexity of the building
framing.The review for this change has been based on the 2004 Oregon Structural Specialty Code
(OSSC).
2. 1/10/06,MCE requested the submittal of the follc«wing inform tion to complete his review-,
"1) calculation for loads to shear was as required for the seismic&wind controlled directions as