Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (49)
MC( ; 1 ,6( x • 13 -(-9 y j Commercial Application Checklist RECEIVED E Au. '! ' City of Tigard - �uJ City of Tigard 13125 SW Hall Blvd.,Tigard,OR 97223 t.!��t' O, Phone: (503)639-4171,Fax: (503)598-1960 ��Lili �jlu, , D;t7ISION Internet address: www.ci.tigard.or.us PROJECT INFORMATION Project name: 76, � �i L far k �P��z� Date: (o 12-2/C 4 Address: 30.0 S au At_ City:j aid I State: OR J ZIP: 47223 Scope of work: ?f0 rtc4) an eti ©R-i Le 17CU Ic ih Reference no.: Z� oo p � Map and ta�ot no.: R ^ 5� � 11 Z 5 (Q Z Cig (GtA0f 3,2400 Contact person name: Karn,!?i<t o g 9 1 h Company: M Fi 5 I p , L,C_. Phone: 46 3-5240—!to —1 Fax: 563 -- (044-33 36 Cellular phone: G , 5 y 14_ 1 Gl E-mail: mcg s l' c S 'j r f ' ,a vvi NOTES AND INSTRUCTIONS • The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. • This checklist can be used for all commercial construction projects, including new construction, additions, alterations and tenant improvements. • For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. • It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. • In the checklist, "Required"means that the applicant must provide this information for plan review. • In the checklist, "P"means— • if checked by the applicant—the information is provided for the plan review. • if checked by the plans reviewer—this information is required for the plan review. • In the checklist, "NA"means that the information does not apply. • Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data,"must be included with each •ro'ect submitted. PRE-SUBMITTAL PROCESS An applicant may request a pre-submittal meeting with representatives of the jurisdiction in which the project will be built. The meeting may take place during the conceptual, schematic, or in-progress phase, or when the applicant has completed plans. PP P INDEX OF CHECKLIST SECTIONS 1.0 General project data Page 2 7.0 Mechanical data(Types I and II 2.0 Civil data Page 2 kitchen-hood chen-hood permits) Page 6 3.0 Architectural data Page 3 8.0 Plumbing data Page 7 4.0 Structural data Page 4 9.0 Electrical data Page 8 5.0 Mechanical data (new construction, tenant 10.0 Fire-suppression data Page 9 improvement, gas-piping permits) Page 5 11.0 Fire-detection and fire-alarm data Page 9 6.0 Mechanical data (additional or replacement 12.0 Re-roof installation data Page 10 rooftop-equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10 This checklist is for buildingdepartment rin Clackamas,Multnomah, and Washington P jurisdictions counties. g.eq () i vc Ci 1VA 'FC'-vh4T/0:'1 440-2734(8/01/WEB/COM) i:�Dsts\Fortes\COM-AppChecklist.doc 03/15/02 SECTION 1.0 — GENERAL PROJECT DATA Construction documents Location(sheet number or spec section) 1.1 ® Required No. of sets of plans: New: 1 TI: 2 1.2 ® Required Cover sheet title block 1.3 ® Required Cover sheet vicinity map 1.4 ® Required Cover sheet plan index 1.5 1215 ❑ NA Code summary 1.6 21 0 NA Deferred submittal summary 1.7 0 P ❑ NA Professional stamp and signature 1.8 21 ❑ NA Fire and life-safety plan 1.9 0 P 0 NA Landscape plan 1.10 ❑ P ❑ NA Landscape specifications Supporting documents Notes 1.20 ❑ P ❑ NA Land-use or planning actions 1.21 0 P ❑ NA Required fire-flow calculations 1.22 0iP 0 NA Fire-hydrant flow-test report 1.23 in P 0 NA Fire department or fire district building survey report 1.24 0 P ❑ NA Material safety data sheets(MSDS) SECTION 2.0 — CIVIL DATA Construction documents Location(sheet number or spec section) 2.1 ® Required Site plan 2.2 ® Required Site utility plan 2.3 ® Required Grading plan 2.4 ® Required Erosion-control plan 2.5 ❑ P 0 NA Utility-vault location and details Supporting documents Notes 2.20 0 P ❑ NA Geotechnicalsoil engineer report 2.21 ❑ P ❑ NA Storm-water calculations 2.22 0 P 0 NA Site retaining-wall structural calculations 2.23 0 P ❑ NA "Assurance of Compliance"with environmental rules .... 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 2 For use in building department jurisdictions in Clackamas, Multnomah, and Wash. ton Counties 1:\Dsts\Forms\COM-AppCheckl i st.doc otSECTiON 3.0 — ARCHITECTURAL DATA Construction documents Location(sheet number or spec section) 3.1 ® Required Floor plan(s) 3.2 ® Required Transverse and longitudinal cross sections 3.3 ® Required OSSC Chapter 11 accessibility requirements 3.4 0 P El NA Interior elevations 3.5 ❑ P 0 NA Exterior elevations 3.6 ❑ P ❑ NA Roof plans 3.7 ❑ P 0 NA Exterior wall sections and details 3.8 Fa P 0 NA Reflected ceiling plan(s) Ti lc �3 3.9 " P ❑ NA Fire-rated construction details / 3.10 pc P ❑ NA Energy code compliant construction details and o Y p f U 14"04 U�- specifications r 3.11 /EP P ❑ NA Door schedule CQ v .1...(..... � �' '"9 G(1 c7 15 I •4- 3.12 3.12 P ❑ NA Glazing schedule 3.13 P ❑ NA Furniture plan Supporting documents Notes 3.20 ' P ❑ NA Energy code compliance forms/calculations 3.21 ❑ P 0 NA. Material safety data sheets(MSDS) 3.22 ❑ P ❑ NA Hazardous materials inventory statement (HMIS) 3.23 ❑ P ❑ NA Hazardous materials management plan (LIMP) Ai • 3.24 Fr P ❑ NA Written fire and life-safety evacuation plan for area of rescue assistance 1 to 2 ' 3.25 ❑ P ❑ NA Active and passive smoke-control information -��t) chivCA, f how 5 (neq ua (( a# CIL_ar- e 16,1 u d r keta1( S4, 6 frkda 4-It) //)laces n 0W UJ eve l 4-0-e. or . 'J Click Co 5 -/-v 'ABA - rC5 ( 1 t'1 4-e t 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 3 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties is\Dsts\Fomu\COM-AppCheckl i st.doc SECTION 4.0 — STRUCTURAL DATA �. Construction documents Location(sheet number or spec section) 4.1 ® Required Structural cover sheet 4.2 ❑ P ❑ NA Foundation plan 4.3 ❑ P 0 NA Under-slab mechanical plan 4.4 0 P ❑ NA Under-slab electrical plan 4.5 ❑ P ❑ NA Under-slab plumbing plan 4.6 ! P ❑ NA Floor framing plan 4.7 M P ❑ NA Roof framing plan 4.8 P 0 NA Structural elevations 4.9 N P 0 NA Structural details and cross sections 4.10 ❑ P 0 NA Standpipe information 4.11 ❑ P ❑ NA Special inspector/structural observation matrix Supporting documents Notes 4.20 ❑ P ❑ NA Geotechnical/soil engineer report 4.21 ❑ P ❑ NA Site-specific seismic hazard report 4.22 0 P ❑ NA Design narrative 4.23 0 P 0 NA Structural calculations • • 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 4 For use in building department jurisdictions in Clackamas, Multnomah, and shington Counties I:\Dsts\Fortes\COM-AppCheckl ist.doc eSEC"i-;ON 5.0 — MECHANICAL DATA (New construction, tenant improvement, gas piping permits) (sheet number or spec section) documents Location 5.1 ® Required Floor plan 5.2 ® Required Equipment schedule 5.3 ❑ P ❑ NA Site plan 5.4 ❑ P ❑ NA Under-slab mechanical plan 5.5 ❑ P ❑ NA Roof plan 5.6 0 P ❑ NA Fuel gas piping plan 5.7 ❑ P ❑ NA HVAC equipment and duct plan(s) 5.8 ❑ P 0 NA Roof access details 5.9 ❑ P ❑ NA Duct smoke detector plans 5.10 ❑ P ❑ NA Fire/smoke damper locations 5.11 ❑ P 0 NA Smoke control plan 5.12 ❑ P ❑ NA Outside air(OSA)table 5.13 0 P 0 NA Refrigeration equipment and piping plan 5.14 0 P ❑ NA Kitchen equipment plan 5.15 ❑ P 0 NA Type I and/or Type II kitchen hood plan (see Section 7.0—Mechanical Data) 5.16 ❑ P 0 NA Fume/vapor hood plan 5.17 ❑ P ❑ NA Process piping/product and/or exhaust-conveying duct plan • 5.18 0 P 0 NA Fire-rated construction details 5.19 ❑ P 0 NA Equipment hanger/fastener details Supporting documents Notes 5.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 5.21 0 P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 5.22 ❑ P ❑ NA Outside air(OSA) calculations 5.23 ❑ P ❑ NA Smoke-control calculations 5.24 ❑ P ❑ NA Combustion air calculations 5.25 ❑ P ❑ NA Fuel gas piping sizing calculations 5.26 ❑ P ❑ NA Make-up air calculations 5.27 ❑ P ❑ NA Energy code compliance forms 5.28 0 P ❑ NA Boiler information 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 5 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Dsts\Forms\CO M-AppCheckl i st.doc • SECTION 6.0 — NIECIIANICAL DATA (Additional or replacement rooftop installation permits) Construction documents Location(sheet number or spec section) 6.1 Z Required Roof plan 6.2 0 P 0 NA Roof framing plan 6.3 ❑ P ❑ NA Fuel gas piping plan 6.4 0 P 0 NA Roof access details Supporting documents Notes 6.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 6.21 0 P 0 NA Equipment manufacturers' catalog"cut sheets" or specifications 6.22 0 P 0 NA Fuel gas piping sizing calculations 6.23 0 P 0 NA Energy code compliance forms SECTION 7.0 — MECHANICAL DATA (Type I and Type II kitchen hood permits) Construction documents Location(sheet number or spec section) 7.1 ® Required Site plan 7.2 ® Required Floor plan(s) 7.3 CO Required Kitchen equipment plan 7.4 ® Required Kitchen equipment and hood elevations 7.5 ❑ P ❑ NA Roof plan 7.6 ❑ P 0 NA Cross sections through hoods, ducts and shafts • 7.7 ❑ P 0 NA Fire-rated construction details 7.8 0 P 0 NA Fire suppression details Supporting documents Notes 7.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 7.21 ® Required Make-up air calculations 7.22 0 P 0 NA Equipment manufacturers' catalog"cut sheets" or specifications 7.23 0 P 0 NA Hood/grease extractor listing documentation 7.24 0 P 0 NA Hood/grease duct sizing calculations 7.25 ❑ P 0 NA Fire suppression information 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 6 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Dscs\Fortns\CO M-AppChecki ist.doc .SECTION 8.0— PLUMBING DATA • Construction documents Location(sheet number or spec section) 8.1 ® Required Floor plan(s) 8.2 ® Required Piping and material schedule 8.3 ® Required Equipment layout plan 8.4 ® Required Fixture schedule 8.5 ❑ P ❑ NA Site utility plan 8.6 El P ❑ NA Building cross section 8.7 ❑ P ❑ NA Rise diagram 8.8 ❑ P ❑ NA Roof plan 8.9 0 P ❑ NA Back flow prevention location 8.10 ❑ P ❑ NA Irrigation plan 8.11 ❑ P El NA Fire-rated construction details 8.12 ❑ P ❑ NA Under-slab plumbing plan Supporting documents Notes 8.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 8.21 ❑ P ❑ NA Equipment manufacturers' catalog"cut sheets" or specifications 8.22 ❑ P ❑ NA Utility maintenance agreements 8.23 ❑ P El NA Water supply calculations • 8.24 ❑ P 0 NA Sanitary system calculations 8.25 ❑ P 0 NA Irrigation demand calculations 8.26 ❑ P ❑ NA Roof drain and storm water calculations 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 7 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1:\Dsts\Forms\COM-AppCheckl ist.doc SECTION 9.0 — ELECTRICAL DATA Construction documents Location(sheet number or spec section) 9.1 ® Required No. of sets of plans: 2 9.2 ® Required Floor plan(s) 9.3 ® Required Electrical load calculations 9.4 ® Required One line diagram 9.5 ® Required Feeder riser diagram 9.6 ® Required Available fault current information 9.7 ® Required Panel schedule(s) 9.8 ❑ P ❑ NA Site electrical plan 9.9 ❑ P ❑ NA Fire-rated construction details 9.10 ❑ P ❑ NA Lighting plan 9.11 ❑ P ❑ NA Emergency power system and emergency lighting plan 9.12 ❑ P ❑ NA Under-slab electrical plan Supporting documents Notes 9.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 9.21 ❑ P ❑ NA Energy code compliance forms and calculations for lighting 9.22 ❑ P ❑ NA Emergency power system specifications 9.23 ❑ P ❑ NA Feeder riser information 9.24 ❑ P ❑ NA Lighting equipment manufacturers' catalog "cut sheets"or specifications 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 8 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\Dsts\Forms\COM-AppCheckl ist.doc `SECTION 10.0- FIRE SUPPRESSION DATA Construction documents Location(sheet number or spec section) 10.1 ® Required Floor plan(s) 10.2 ® Required Sprinkler piping plan(s) 10.3 ❑ P ❑ NA Site plan 10.4 ❑ P ❑ NA Standpipe information 10.5 ❑ P ❑ NA Back flow prevention information 10.6 ❑ P ❑ NA Reflected ceiling plan(s) 10.7 ❑ P ❑ NA Transverse and longitudinal cross sections 10.8 ❑ P ❑ NA Fire-rated construction details 10.9 ❑ P ❑ NA Specialty fire suppression system plans and list of systems Supporting documents Notes 10.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 10.21 CO Required Equipment manufacturers' catalog"cut sheets" 10.22 0 P 0 NA Hydraulic calculations 10.23 0 P 0 NA Specialty fire suppression system information SECTION 11.0- FIRE DETECTION AND ALARM DATA Construction documents Location(sheet number or spec section) 11.1 ®Required Floor plan(s) 11.2 ❑ P ❑ NA Site plan 11.3 ❑ P ❑ NA Reflected ceiling plan(s) 11.4 ❑ P 0 NA Transverse and longitudinal cross sections 11.5 0 P ❑ NA Wiring schematic 11.6 ❑ P ❑ NA Elevator recall information 11.7 0 P ❑ NA Operational matrix 11.8 0 P ❑ NA Fire-rated construction details 11.9 0 P 0 NA Standard electrical notes Supporting documents Notes 11.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 11.21 ® Required Equipment manufacturers' catalog "cut sheets" 11.22 ® Required Installer certification information 11.23 0 P ❑ NA Battery calculations 11.24 ❑ P ❑ NA Sample fire alarm log book 11.25 ❑ P ❑ NA Emergency power system specifications 11.26 ❑ P ❑ NA Monitoring station information 11.27 ❑ P ❑ NA Voltage drop calculations 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 9 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties is\Dsts\Fortns\COM-AppCheckl ist.doc • • SECTION 12.0 — RE-ROOF INSTALLATION DATA c Construction documents Location(sheet number or spec section) 12.1 ® Required Site plan or building location map 12.2 ® Required Occupancy classification 12.3 ® Required Type of construction 12.4 ® Required Minimum roof class required 12.5 ® Required Class of roofing to be installed 12.6 ® Required Roof plan 12.7 r P 0 NA Parapet and scupper cross section(s) Supporting documents Notes 12.20 ® Required Pre-re-roof inspection report 12.21 ® Required Roofing system listing information 12.22 ® Required Roofing manufacturer's catalog"cut sheets" 12.23 0 P 0 NA Structural calculations 12.25 ❑ P 0 NA Structural engineer's report SECTION 13.0 — JURISDICTIONAL – SPECIFIC REQUIREMENTS Construction documents Item Location(sheet number or spec section) 13.1 ❑ P ❑ NA ❑Required 13.2 ❑ P ❑ NA ❑Required 13.3 0 P 0 NA ❑Required . 13.4 0 P ❑ NA ❑Required 13.5 0 P 0 NA 0 Required 13.6 0 P 0 NA ❑ Required 13.7 ❑ P 0 NA ❑ Required 13.8 ❑ P 0 NA 0 Required 13.9 0 P ❑ NA ❑ Required 13.10 ❑ P ❑ NA ❑ Required 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 10 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\DstsTomis\COM-AppChecklist.doc