September 12, 2006
City of Tigard, Oregon
13125 SW Hall Blvd.
Tigard, OR 97223
Attention: Val Henzel, Senior Plans Examiner
Brian Blalock,Plans Examination Supervisor
RE: Response to City of Tigard Plan Check Comments of August 9, 2006
for the Grant Street Elite Care Building.
Response Item # 1
Fire Life Safety
New remark 8/9/06
Gates at 2"d floor obstruct landing.
Response from Ownership- Revised 2"d floor plan submitted with gates removed.
Fire Life Safety
New remark 8/9/06
Stair from 2"d to 1st floor has landing that creates a "winder"
Of sorts due to the landing width being too narrow.
Response from Ownership- Revised 1st floor plan submitted with
Stair extended to allow for a "non-winder" landing.
Mail Envelope Properties (450ACD13.14A : 6 : 58187)
Subject: Grant Street Elite Care review response#5- bup2006-00053
Creation Date 9/15/2006 8:56:03 AM
From: Val Henzel
Created By: Val@tigard-or.gov
Recipients Action Date& Time
earthlink.net Transferred 09/15 8:56 AM
monroestreetassociates(Scott Churchill)
OATFIELDESTATES.Com Transferred 09/15 8:57 AM
breed(breed@OATFIELDESTATES.Com)
stdairy.com Transferred 09/15 8:57 AM
Reed (Mark Reed)
Post Office Delivered Route
earthlink.net
OATFIELDESTATES.Com
stdairy.corn
Files Size Date & Time
MESSAGE 508 9/15/2006 8:56:03 AM
TEXT.htm 456
bup06-00053 R5 Elite Care.doc 55296 9/15/2006 8:54:58 AM
Options
Auto Delete: No
Expiration Date: None
Notify Recipients: Yes
Priority: Standard
ReplyRequested: No
Return Notification:
Send Notification when Opened
Concealed Subject: No
Security: Standard
To Be Delivered: Immediate
Status Tracking: All Information
September 15, 2006
Elite Care
Bill Reed
2300 SW 103`d
Portland, OR 97225
RE: GRANT STREET ELITE CARE-NEW BUILDING —REVIEW#5
Project Information
Building Permit: BUP2006-00053 Construction Type: V-A
Tenant Name: Grant Street Elite Care Occupancy Type: SR-1
Address: 12353 SW Grant St. Occupant Load: 394
Area: 31,279 sq ft Stories: 3
The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition;
and the State of Oregon Fire Code (OFC) 2004 edition. For better clarity I have removed issues that have
been resolved. Please provide the following information in order to complete the review. Note (First request
April 5,2006,2tid request 6/30/06,3th request 8/9/06,4th request 8/28/06)
STRUCTURAL
1. The structural review was completed by Miller Consulting. The plan review dated January16 2006,was
E-Mailed to Afghan Associates for response (review doc. attached).
RESPONSE RECEIVED 8/14/06 sent structural to Miller for review—**9/15/06- Ray Miller spoke
with Todd Rowell on 8/16/06,on the requirements to meet the irregularbuildingrequirements and
�l q
not being able to use the simplified analysis approach per 1616.61, 1617.5 has to be designed per sec
1620.2.3 requirements.Therefore,they stated they will be submitting new structural calcs and design
complying with chapter 16.
FIRE LIFE-SAFETY- Please provide the following,
**New remark*8/9/06
A. Gates at 2nd floor exit stairway obstruct landing more than '/Z distance per 1009.4 revise Stairway landings.
RESPONSE NOT ACCEPTED 9/13/06—Removing the doors from the exit enclosure violate the
enclosure intent where as the enclosure shall be separated from other elements to provide a safe exit system
from entry to exit this also means that the third floor stair entry needs protected doors also. This enclosure is
required to protect and separate the vertical exitway from potential fire and products of combustion in other
spaces of the building per OSSC 1019-Interior exit stairways shall be enclosed with fire barriers.
enclosure shall not be used for any purpose other than means of egress. Enclosures shall be constructed
as fire barriers in accordance with Section 706. Fire door assemblies in exit enclosures shall comply with
Section 715.3.4. . Penetrations into and openings through cm exit enclosure are prohibited except for
required exit doors. There shall be no penetrations or communication openings, whether protected or
not, between adjacent exit enclosures.
RESPONSE NOT ACCEPTED 8/24/06—Response received addressed exit separation.This issue is a
doors opening onto a landing where as the door shall not reduce the landing to less than one-half
the required width. When fully open, the door shall not project more than 7 inches into a landing.
3.Required rated wall assemblies chapter 7. 106
RESPONSE NOT RECEIVED 6/28/06—Provide copy of the approved listed UL or other approved
listed agencies rated assemblies for all rated walls,floor/ceiling and roof
6.Construction information of ceiling if rated floor/ceiling assembly. OSSC 106
RESPONSE PARTIALLY ACCEPTED 6/28/06—Construction information received thank you.
Please Provide a copy of the approved listed rated assembly STC 50 system and the TJI designed
floor system used.
9.Shaft enclosure design details at elevator and stairs 707
RESPONSE PARTIALLY ACCEPTED 6/28/06—Construction information received thank you.
Please Provide a copy of the approved listed rated assembly STC 50 system for one hour assemblies
and ESR-1153 and PFC 4354 system information for the two hour assemblies .
11.Fire resistive rated structural member locations and assembly 714, 715
RESPONSE PARTIALLY ACCEPTED 6/28/06—Construction information received thank you.
Please Provide a copy of the approved listed rated assembly STC 50 system for one hour assemblies
and ESR-1153 and PFC 4354 system information for the two hour assemblies .
14.TVF&R Building survey report for water supply 903 ''9/14/06 Can be moved to site review
requirements
RESPONSE PARTIALLY ACCEPTED—6/28/06 to'be separately submitted by owner ok, do you
have a time frame for me?
8/24/06 No information received, forms attached please fill out and return thank you for your assistance in
this.
16. Egress path and occupant load 1004, 1013, 1014 (The construction documents shall show in sufficient detail
the location, construction, size and character of all portions of the means of egress in compliance with the provisions of
this code. The construction documents shall designate the number of occupants to be accommodated on every floor, and
in all rooms and spaces. 106.1.2)
RESPONSE PARTIALLY ACCEPTED 6/28/06—Thank you for your response on the egress path
information and on 8/9/06 the occupant load issue with the corridor. Please provide information on
the exit discharge into the Porte Cochere(exit court) example, is it rated and sprinkled is there
glazing etc. this area needs to comply with section 1023 and section 1023.5.
A. Table 1004.1.2 shall be used for occupant load calculation for I-1 occ. Sleeping area 1/120 etc. B.
Hall/corridor serves more than 10, clam 72"requirement SR10108.2.1, 1005 C. Smoke partition and 1
hour wall design required for corridor confirm assembly complies SR104.2 (note stairs also included in
this enclosure) D. Provide egress path of travel lay out. E.Access discharge at exit court 1023
17. Interior exit enclosure design at exit passageway 707, 1009, 1019
RESPONSE PARTIALLY ACCEPTED 6/28/06—Construction information received thank you.
Please Provide a copy of the approved listed rated assembly STC 50 system for one hour assemblies
and ESR-1153 and PFC 4354 system information for the two hour assemblies .
23.Point of safety 2nd& 31`d floors SR104.3.1, 1021
RESPONSE PARTIALLY ACCEPTED 6/28/06—Thank you for clarifying points of safety areas I
also need to confirm location is adequately sized as required by SR104.3 (10sgft per person) Please
clarify compliance.You also call the 2"d story point of safety a sitting area and an exit passage way,
please Clarify use of exit passageway per 1020.1 this section states this area can not be used for
anything except as an exit..
25. Roof assembly information 2603.2, 2603.3, 2603.4.1.5, 2603.6 and Table 601 (1 hour roof required)
RESPONSE PARTIALLY ACCEPTED 6/28/06—Construction information received thank you.
Please Provide a copy of the listed rated assembly for the one hour roof system.
NOT PART OF THIS REVIEW:
• Electrical, Fire Sprinklers, Fire Alarms, Mechanical System, Site, & Plumbing
SITE—Issues addressed on sit permit#SIT2006-00014
Please provide an item by item response.
When submitting revised drawings or additional information,please attach a copy of the enclosed City of
Tigard, Letter of Transmittal.The letter of transmittal assists the City of Tigard in tracking and processing
the documents.
Respectfully,
Val Henzel,
Senior Plans Examiner
•,;
g...Maivld
; A i
1.i /11W P.fi-e..1)
,
:;{! OW Orartugas ceouP
kit mac._ c =T...?
..,
'17Pczt-t..ogup
c•
,,1 94217,
-",. .t._,
r... t.D@ SrPA >e.IP- Conr\
H
-i
!,I
,!I
116/6
i 1
..i SvoA
ohtfh)L,.,2410y
Sn, I
..1
wJe/I\ / 6 010 gold)
. ;
.,;
i 1 ,
..:
,, 1
i.
-.i .
. . Stefri,H)\9/
s/ . 12 \t" e- k.)..p• '
-c,
A ,1 ',.). ug•cisLiCi\ \„ (
.,I
*14C ‘
ka SO (.7 l•3\0141'
'. \\4\*
'l i
'5
1 \\v\
;.
•,,
,
.;1
,:!
i I
I! J
1 i 1
Site Address: 12 f3, ck -\
lig : " Building Division
TIGARD Transmittal Letter
DATE RECEIVED:
Ta V 1-{ VJL--
DEPT: BUILDING DIVISION t 9,
FROM: tj1, :,�, 2006
COMPANY: 1,t;tf trC0n, ,...,1_1 � a
,
JTnTMr, y YPHONE #.:
`A
RE: l 5 ' 14,14-7- * ---
(Case number,site address,etc.)
t 606
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
Additional set(s) of plans. Revisions:
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
REMARKS: D 18.i 1-- ' 0.,/14________
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: Initials:
Fees Due: ❑ Yes ❑ No Fee Description: _ Amount Due:
$
$
$
. $
Special
Instructions:
Reprint Permit (per PE): ❑ Yes ❑ No ❑ Done
Applicant Notified: Date: Initials:
I:Building\Forms\LetterTransmittal.doc 03/06/06
Site Address:
114 B .
- Building Division OFFICE COPY
lit.;MtD EWfwgzeibibillintittal Transmittal Letter
- t-t,'OP TO: \ MiCEIVED:
DEPT: BUILDING I)1VISION Jjtrsrf :I= r
uktii � 'i7j
II
FROM: /4-17/0/Z.5e,/t..///
� p
VIx1' „ 607
COMPANY: A( d=4/1- -€: "7-/;;A•9 c p : , - . _ ,,c.! i
PHONE: 03 D/6 .�t- r`- t r. _. : :�1 r.
RE: I/�J� J Co 7 13L1f D-CX) do, —a e ,
(Site Address) •erml ase •um•cr J
<----
D Piefrli `off, dei)-5 '146 a- - co 24 7
((project name or subdivision name an number) OFFICE COPY
Valuation of Deferred Submittal: S 2l
ATTACHED IS THE FOLLOWING DEFERRED SUBMITTAL ITEM:
Copies: Description: .
Ae--/60/.•/1 _ 0:-=-- 4kecZ •< /te,/. �s
2 1/0Z4-41,/s s
Remarks:
NOTE: Documents for deferred submittal items shall be submitted to the registered design professional in
responsible charge who shall review them and forward them to the building official with a notation indicating that
the deferred submittal documents have been reviewed and been found to be in general conformance to the design of
the building. The deferred submittal items shall not be installed until the design and submittal documents have been
approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2
FOR OFFICE USE ONLY
_Routed to Permit Technician: Date: Initials:
Fees Due: n Yes L No Fee Description: Amount Due:
,,r,e, ,-i I l,maw 4 +thy' {`' ^ ,; Deferred Submittal Fee: $
' �E 1
'i r tJr 1 ,7: rf ] �1�, 4 t'
b ,��, t , �i ; A Additional fee based on valuation: $
9 v ar J • �
i n>, .:T4 JV � rY' yM1 ., Other: $
4 '' t Total Fees Due: $
_ :;Atr:. br,itIJM,�,..J�Ir !r r 1;;• .
Special _._--___------__..._---------_...__-------W-•--------------------
Instructions:
Reprint Permit(per PE): ❑ Yes 71 No n Done
Applicant Notified: Date: Initials:
PP The fee for processing and reviewing deferred plan submittal shall be an amount equal to 65%of the building based
on the valuation of the particular portion or portions of theproject with a minimum 5200.00 fee.This fee is in
addition to the project plan review fee based on the total project value.