Report (67) c:177c 5 ) ifY-Cct)(
Y of 1.12u:
AMENDMENT TO STRUCTURAL NORVING DJVfsror
PLAN REVIEW #4
PACIFIC PARK PLAZA
13000 S. W. PACIFIC HIGHWAY
TIGARD, OREGON
I p1
•rissG
"4,
CO IS WOO
ItS o6
Job 03-500.07
June 27, 2006
Harris Hyman, PE/PLS
LKIN ENGINEERING, P. C.
7165 S. W. FIR LOOP #204
TIGARD, OR 97223
503-598-1866
RESPONSE TO STRUCTURAL PLAN REVIEW#4
June 27,2006
Item 1. Shear wall calculations attached (Tiland notes); strap deleted from design.
Item 5. Overturning calculations attached(Tiland notes)
Item 6. Shear walls recalculated, calculations attached(Tiland notes)
Item 7. Plans revised, sheets 17, 18.
Item 9. Roof pitch induced by styrofoam underlay, eliminates ponding; drawing 11/4
Item 10. Framing calculations for two-story section attached; detailed on plan sheets 19, 20
Item 11. Calculations attached;framing detailed on drawing 11/4; out-of-plane effect
insignificant.
Item 15. Calculations attached(Tiland notes)
Item 19. Calculations attached(Tiland notes); Details revised
Item 20. Calculations attached; details on drawing 13/3
Item 21. Construction of trash enclosure deferred.
Item 24. Floor framing by joist fabricator; deferred submittal
Item 25. Sheet 17 revised.
Item 26. All shear walls are two story; Sheets 17, 18
Item 27. Deferred submittal
Item 28. Deferred submittal
Item 29. Deferred submittal
JOB NAME: Pacific Park Plaza CITY OF TIGARD
JOB ADDRESS: 9975 SW Frewing, Tigard, OR BUILDING DEPARTMENT
DATE: May 26, 2006 13125 HALL BOULEVARD
MCE Project No.: 051333 TIGARD, OR 97223
SHEET 1 OF 4 Tigard Building Permit BUP-2004-00297
STRUCTURAL PLAN REVIEW#4
Engineering Dated 5/22/05 and 5123106
Corr. item Page No. Comments Code Section
Made No.
1 I, Calculations Submit calculation for loads to shear walls as Table 16-M #2
required for the seismic and wind controlled Section 1612,1 &
directions. The analysis still needs to comply with Section 1633.2.9
Section 1612.1 which requires compliance with
Sections 1633.2.5 and 1633.2.6. Therefore, submit
details for lateral load transfer and connections at the
reentrant comer.
Provide engineering to account for the bending In the
strap from the exterior wall to the line of action. In
addition, provide details in hpw the strap Is connected
to the walls and the other framing.
The submittal addressed a portion of the item. Submit
calculations and details to address each of the items.
Not 2 X Submit details for lateral load transfer and Section 2211
Req'd connections including Omega.
Not 3 Submit details for shear walls including fasteners, Section 2211
Req'd spacing and method of proper Installation.
Not 4 Submit details and calculations as required. Section 2211
Req'd
5 t Pages 3 thru The overturning calculations at the shear walls do not Section 1612.1
6 of revised properly account for the application of forces from the
calculations diaphragms. Submit calculations to properly account
Y for the application of forces from the diaphragms to
the shear walls.
Provide information concerning the development of
the spreadsheet used in the calculations, as the
output seems to not properly account for the loads as
previously stated.
The submittal is incomplete. Submit calculations and
details to address the item.
6 Pages 3 thru Submit calculations for the shear walls so as to Section 2315.1
6 of revised comply with Table 2306.4.1.
calculations Clarify the use of 505 pif for the capacity of the shear
walls as indicated in the plans.
Clarify the discrepancy between the plans and
engineering, as the engineering is based on
Structural 1 (from Table 23-11-1-1)whereas the
drawings specify OSB.
I
•
JOB NAME: Pacific Park Plaza CITY OF TIGARD
JOB ADDRESS: 9975 SW Frewing, Tigard, OR BUILDING DEPARTMENT
DATE: May 26, 2006 13125 HALL BOULEVARD
MCE Project No.: 051333 TIGARD, OR 97223
SHEET 2 OF 4 Tigard Building Permit BUP-2004-00297
STRUCTURAL PLAN REVIEW#4
Engineering Dated 5/22/05 and 5/23/06
Corr. Item Page No. Comments Code Section
Made No.
7 Plans Submit plans and details for the revised shear walls Section 106.3.3.1
K per the calculations dated 3/22/06 including
fasteners, spacing and method of proper installation.
Provide information for the complete lateral load path
to the foundation including bottom plate nailing and
anchor bolting.
The submittal Is incomplete. Submit calculations and
details to address the item.
5/26/06 8 Calculations Submit calculations and details to comply with the Section 1606.2
y partition loading requirement.
9 Calculations Submit calculations and details for the ponding on the Section 1612.3.3
roof or show that the beams are adequate to resist
ft the additional loading as a result of the ponding.
e The submittal is incomplete. Submit calculations and
details to address the item.
10 Calculations Submit calculations and details for the framing of the Section 1612.1
;f two-story walls including headers, sill framing and
" columns to resist out-of-plane loading requirements.
r' ,/ The submittal is Incomplete. Submit calculations and
details to address the item.
11 Calculations Submit calculations and details for the second floor Section 1612.1
exiting including floor framing, floor framing "
t l connections and the out-of-plane loading
requirements at the two-story ballooned framed wall.
The submittal is incomplete. Submit calculations and
details to address the item.
5/26/06 12 Calculations Submit calculations and details for the snow drifting at Section 1614
the parapet along the perimeter per the code
requirements.
5/26/06 13 Revised Clarify the wind loading requirements as the Section 106.3.3.1
Calculations calculations Indicate the 100 mph exposure 'B'
whereas the drawin•s indicate 80 m•h ex•osure 'A'.
5/26/06 14 Revised Clarify the elevations of the building as the Section 1621.3
Calculations calculations Indicate the overall building height as 29',
but the drawings indicate the height to be 31'tall.
15 Revised Submit calculations and details for the seismic Section 1612.1
Calculations calculations including partition loading and storage
loading per the code requirements. In addition, show
calculations comparing the wind load in comparison
to the seismic load of sections "A"and RB".
The submittal is incomplete. Submit calculations and - g
details to address the item.
_ _
• •
,
„ JOB NAME: Pacific Park Plaza CITY OF TIGARD
JOB ADDRESS: 9975 SW Frewing, Tigard, OR BUILDING DEPARTMENT
DATE: May 26, 2006 13125 HALL BOULEVARD
MCE Project No.: 051333 TIGARD, OR 97223
SHEET 3 OF 4 Tigard Building Permit BUP-2004-00297
STRUCTURAL PLAN REVIEW#4
Engineering Dated 5/22/05 and 5/23/06
Corr. Item Page No. Comments Code Section
Made No.
5/26/06 16 Revised Submit calculations and details for the floor to floor Section 1612.1
Calculations hoidowns In line with the capacities as listed by
is Simpson Manufacturing.
5/26/06 17 Calculations Submit calculations and details for the uplift capacity Section 1612.1
Detail 8/2 & 3 of typical anchor bolts used as hoidowns and the
r allowable tension on the top of the thickened footing.
5/26/06 18 Calculations Clarify the use of the hoidowns spaced at 4' o.c. and Section 106.3.3.1
Detail 8/2, 3 why they are used for negative tension.
& 10/3
19 Calculations Submit calculations and details for the in plane and Section 1612.1
Detail 9/2 & 3 out-of-plane load transfer at the roof and floor
11/3 & 4 diaphragms per the code tequirements.
The submittal is incomplete. Submit calculations and
j' details to address the item.
20 Calculations Submit calculations and details for the guardrails so Section 509
Detail 12/3 & as to comply with the code requirements.
4 The submittal is incomplete. Submit calculations and
details to address the item.
21 Plans Submit calculations and details for the trash Section 106.3.3.1
enclosure per the code requirements.
Clarify whether the trash enclosure is a deferred
submittal or not to be constructed.
5/28/06 22 Plans Section 11/2 indicates a floor throughout the section, Section 106.3.3.1
'whereas Sheet 9 indicates a clearstory volume.
Clavi and ensure the drawin.2s are consistent.
5/26/06 23 Sheet 9 Submit calculations and details for the in-plane and Section 106.3.3.1
out-of-plane load transfer at the joist transition
between TJW and TJI oists.
24 Sheet 10 and Submit calculations for the joist connections at the Section 106.3.3.1
Detail 12/1 beams to com. . + . e code :• reme
f e em s a deferred subm al, remove the call-
outs from the •lans to avoid conflicts.
25 Sheet 17 art 7.7":". - •• = • - . pare ' - _- Section 106.3.3.1
wall locations as indicated in the wall elevations. In
addition, wall elevations 18/3 and 19/8 do not exist.
Provide information for each wall as required.
The submittal Is incomplete. Submit calculations and
details to address the item.
26 Sheet 17 Submit calculations and details for the load transfer _ Section 1612.1
between the full height shear wall and the two story •
shear walls as Indicated in the plans.
The submittal is incomplete. Submit calculations and
I .
JOB NAME: Pacific Park Plaza CITY OF TIGARD
" JOB ADDRESS: 9975 SW Frewing, Tigard, OR BUILDING DEPARTMENT
DATE: May 26, 2006 13125 HALL BOULEVARD
MCE Project No,: 051333 TIGARD, OR 97223
SHEET 4 OF 4 Tigard Building Permit BUP-2004-00297
STRUCTURAL PLAN REVIEW#4
Engineering Dated 5/22/05 and 5/23/06
Corr. Item Page No. Comments Code Section
Made No.
details to address the Item.
27 General Submit one set of manufactured floor and roof joist Section 106.3.4.2
shop drawings, which have been reviewed and
initialed by the project engineer, to be filed with the
City of Tigard before placement.
28 General Submit one set of stairway shop drawings, which Section 106.3.4.2
have been reviewed and initialed by the project
engineer, to be filed with the City of Tigard before
placement.
29 General Submit one set of suspended ceiling shop drawings, Section 106.3.4.2
which have been reviewed and initialed by the project
engineer, to be filed with the City of Tigard before
placement.
, , ...t. weriosityri ,,,v;ipplo
I44:01
...4 ,
1 , aatv-4v,,om \ .
ewooz ze/q111 .040.,/i•
\\
iiiiV
L
''0401Me19' -s. ,
WA
106. •••••0011116._____iiiiki4s,
y'e.,97g 40/10/ "likpAP
azipez. 7.4,70 ____--------1---ev ,
j '''''', 1-1-----j-------00- f i ille
i grO7t A°"4441011.1ifq'rip 74(90.1 .. -..... -,,- pr*A0.10/1,014
56'1777 "t 00,104/144141.1to .4,/(21A eAdoemy,,iroti
4,-
•
. .
0/ .op ii41:;..1"...1
'
[ -
,� _-'____ _____-__'_ _
. - _ ' __ -__- - - ____�_-- __'___-__-- __
--
' ^��
_� � � - ' - i- -_ - -_---_ ' "
��'�» /
°-� � -
- --------' -- --- -------' ------ ---� ----r - -----------�--- -- ---- __._ --.-
-~
- - - -
- 1 --'
ilt/
74/44
S.
-_---' ._ _ ~-_-_~~.~ � N
� - - 0__,�-_ /fit ~_ ~ ' -- .-VA __ ^
-~)_-__-__-'_____---.�-
���
- _-' -
114/1�° �*
�
� Aev -;,0 f.,--/,,.,f., /,,.,,._ Z.
`'__ __-- /__'
�� ~� ~ / ^ �-
_ _ �� ____ ��� cc:.,?; ' _- _^��-
��~
__ - _'� -' --_. _-- _- --� -
�� .0,6. J.', # «����� ° /4.44' • :� �� (D-45-/-40.)
- -' - ' -- - - - - '- -- - -�-- ^+-^- ��� ' ����-� ���� - _
_ .
___--__
�� �� ~ ^ �
�-� -'- -- -' -�---' - - -�- ^-`- --~-'^=�- = �_cs *^� ���~��_ � �� ���
. .
'
-rhere- iifree /1/4" dki-4.;t &tit' "17" 44410744_&4-",#00-' "4/ y/44,....
-
A
ftrateide / Meriiiiiii 414.0, .7'. 0 . 7_*".te140,1;;;‘
_
___'~_- °-'.~.04
ptal,"--60',11°V—
__ - � . .
eheiOlvoig _ tv.4/4 4kyr- icomote, ;-iet _Ali& t4,20- - -
- - - me_411/_ 174,,1104,-;#r(Lk_ '-.... .114--, ot ,t,. 'II/44. _:-/-#10? es
onr.
Atiie ,
^,~,_a.)~_ ._ If
�
Atifr'ii - diem 4.40.-:
e4friftioie‘( •-i<
,/,‘7
~' '°_°°��-�__- - '- - '-- _� '' _- - _ _ -
174:5- di/14,e-s/ Mfg' 4-/ Mil /..; I'' 6-4 -';' ti4W-fikottefi‘' 77/
°
4jc„
,, 0,14 ,i, .5 gt/ 1, . . ..fiesviesee-- 7-... ., iiers,/,-;:.
-7-Aitile... 5 -ixtil'a. ilei.; I d-w&e. A 1.' 4, 114-- 11,0„.. /., 4°`
sit~iii.440-04ire:, iheed; 4 bier- ,j tlY7A44
C,,-' 4riteil/lakqrAS la,4'. ithdero• &OW' frl hi ti.ie,e4.5 W
i/ /
S /�� ��.��- � ~ �� ' - �� ~�f�� '� � �� ~^ yi
iu�' CO .�» ' ,� ^_/ �� ` V�
' . _ _
,
l
' ' _ - _- '______- __-_--__ � _ __-_
- �
^ ^
- 1.7:044 . ' -' 'lee-
~_- - _-_4�U�---�1���'_ �
��� -- ' � �'~- �----- ----~---^'^-~~-~-- �*m�~»°_�___ ___
_- -_ _ _-- -__ _-_-�- ~~ �,
_ _1:
� -
e���
ate,itimov, .,,,,,z.-17/1.74.#y oi...54‘, e,..,,, .„....,40:(//_ / Azo 41/epic 4,44,60, ,
>4,4^^� . '-
��
---'--'-- - -'- -- - -
_,
, � ----�
^ -� _-------____-_'______-_-_ --_-
_--___-__-__�____
-
'- -- - -- - - --� ---�� --'- /ohp -
i. �� ^ - e��-�, tc„zc�cu4 ----
I.
I --�`--'- -_
/no-�-
'- ,e `
--72
-~~ ~ _wfte..
_ ,04
' °,, _, , ;e'er 1�I, - 41
_°s - _- � --
^w�e -loop��,�- --
• /4�_A4...! an, --v
-
y-e �m�/__-� ��/ Apr' 7,4044.-
kt
- '
id_oam. 4,41tio& 44 pry /6 ' 441:174 maft*,".
' - - °^'-ei -~~~p
' °
' - - '^^^ ,..P.114 ~ 1,-,. ,?, 41,./4/,
/1.44up��'
~�"~*' 4~�~~ ~` - ;q'^�� f ~� ^" -a ^�� - 7w"�� ��
� r
,- e&--;
omili ./,,,:zf' �� /~ 01
�-- --' ' ,2~40 ^~ � - - P ~464
~
~...-,. .,°~/ /
M ,,,-)0;`,44,/,7��' � ��^
- �
,
^
/g 0,*.c...,..7 7/07y, ,c0-er )mbigit2Y- 4tf? e;iiiirk
9 _:_5,7 , . ,_..__._
)44"'91.' ; '°:"C 5/ 44e el" ""v41.- A° 07+* ffit#11f--/
---2467,4e;,467P0-746-;- .1---a;; - ,,,,airizowor .7i kee Pr - ---Imie;*
----71 00;iv-p-----0,- Pr-- --,,,dreigi -,. ../-- -----#.44A -' Agit#V1-41-
r
4 twit
--'' ' ',71713"----'41.1-44**V4';'frn -.r ------Ole '*' it-------4.- -ii-----
nrw- ----- ---
„stiesc„
- - -- - -,.-'-e7- - -,4,147(P-1 lemir.;,-- "azalir '-^/ Cf‘itir'
---.Aa?,1;11:9,21TIVVr-1- -Ird- :fffil--7/Orr --rP —WI ,. - elte'
_ .., ____ie4wv___/70.444c_w_v_____ ____ _ _ ___ __ _ _ 1
____:__
Welkin Engineering, PC HE 14:04 20-Jun-06
Project 03-500.07
Massih Building
BEAM ANALYSIS
27' streetside framing, 16" tributary
6/114 ft'
BEAM PARAMETERS
CONFIGURATION 2 spans
support 1: simple R = 20#
span 1-2 = 9.7'
support 2: simple R = 202#
span 2-3 = 17'
support 3: simple R = 84#
BEAM SECTION
material: Doug.Fir E=1,550,000 psi
section: 2x6
width=1.50" depth=5.50" area=8.25 sq.in.
S=7.56 inA3 I=20.80 inA4
LOADING
continuous load from 0' (10.8#/ft) to 15' (10.8#/ft)
continuous load from 15' (12.3#/ft) to 26.7' (12.3#/ft)
LOAD and DEFLECTION
D+(max)=0.04" @6. 7'
11#/ft lief 12#/ft
L=26.7'
R=20# R=202# R=84#
D-(max)=0.39" @19.0' -' ` "
/,y/IIS
0,Of,
SHEAR FORCE and BENDING MOMENT
V+(max)=116#@9. 6' M+(max)-3,485 in-#@19. 8' fb+(max)-461psi
V-(max)=85#09. 6' M-(max)=-3,835 in-#09. 6' fb-(max)=507psi
Welkin Engineering, PC HH 14:04 20-Jun-06
Project 03-500.07
Massih Building
BEAM ANALYSIS
27' streetside framing, 39" tributary
j' /
BEAM PARAMETERS
CONFIGURATION 2 spans
support 1: simple R 48#
span 1-2 - 9.7'
support 2: simple R = 493#
span 2-3 = 17'
support 3: simple R s 205#
BEAM SECTION
material: Doug.Fir E=1,550,000 psi
section: 2x6
width=1.50" depth=5.50" area=8.25 sq.in.
S=7.56 in^3 I=20.80 in"4
LOADING
continuous load from 0' (26.4#/ft) to 15' (26.4#/ft)
continuous load from 15' (29.9#/ft) to 26.7' (29.9#/ft)
LOAD and DEFLECTION
D+(max)=0.10" 06. 7'
26#/ft 1g /f 30#/ft
L=26.7'
R=48# R=493# R=205#
_2 D-(max)=0.96" @19.0' c z
SHEAR FORCE and BENDING MOMENT ' S. +mfr'';
V+(max)-283#@9. 6' M+(max)-8,473 in-#@19.8' fb+(max)=1,121psi
OOPV-(max)x=207#@9. 6' M-(max)=-9,341 in-#09. 6' fb-(max)=1,236psi
Welkin Engineering, PC HE 14:04 20-Jun-06
Project 03-500.07
Massih Building
BEAM ANALYSIS
27' streetside framing, 60" tributary
•v4 .
BEAM PARAMETERS
CONFIGURATION 2 spans
support 1: simple R = 74#
span 1-2 = 9.7'
support 2: simple R = 759#
span 2-3 = 17'
support 3: simple R = 315#
BEAM SECTION
material: Doug.Fir E=1,550,000 psi
section: 2@2x6
width=3.00" depth=5.50" area=16.50 sq.in.
S=15.12 in^3 I=41.60 in"4
LOADING
continuous load from 0' (40.7#/ft) to 15' (40.7#/ft)
continuous load from 15' (46#/ft) to 26.7' (46#/ft)
LOAD and DEFLECTION
D+(max)-0. 08" @6. 7'
41#/ft 19rf 46#/ft
Lim26.7'
R-74# R=759# R-315#
D-(max)=0. 74" @19. 0' 4„ / 7'/Z..Ir
-..-
7_2 ' ," 74
"
747/
SHEAR FORCE and BENDING MOMENT
V+(max)=436#@9. 6' M+(max)-13.0 in-K@19.8' fb+(max)-862psi
V-(max)-320#@9. 6' M-(max)=-14.4 in-K@9. 6' fb- (max)=951psi
•
Welkin Engineering, PC HH 15:50 22-Jun-06
Project 03-500.07
Massih Building
BEAM ANALYSIS
parking side stud, D/L = 1/240 iff, w 7714
BEAM PARAMETERS
CONFIGURATION 1 span
support 1: simple R = 410#
span 1-2 = 25.7'
support 2: simple R = 437#
BEAM SECTION
material: Doug.Fir E=2,000,000 psi
section: rectangle (calc)
width=1.75" depth=9.50" area=16.63 sq.in.
S=26.32 in^3 I=125.03 in^4
LOADING
continuous load from 0' (31.2#/ft) to 15' (31.2#/ft)
continuous load from 15' (35.5#/ft) to 25.7' (35.5#/ft)
LOAD and DEFLECTION
31#/ft 3f$f 36#/ft
L=25.7'
R=410# R=437# + .y
D-(max)-1.29" @12.9' L. ' - 6• / a /Z
rs
2 ' ,
SHEAR FORCE and BENDING MOMENT
V#(max)=409#@-O.1 ' M+(max)-32.4 in-K@13.1 ' fb+ (max)=1,231psi
V-(max)=436#@25. 6'
." 451
6 s�
/ 7 7/i1
117
4/1,fi e//11 ._ _. 3'fi /-it 77
._
iist
4.7 •
°Al I it 1/0
CI 7 4 *air" 54.2 "S:4,0/ /3i, t _ tese, iulfrojr
Crial
,"s,
,(44.54Z/ fol? .VApar, .4= 67
-0/v/2G1 " a-70W,,
' / Cy
i
a
Ile oti 74/ 0 1-5' ....z. ../ .,,0,44,40,
,...
,,..\ -01- -- .
, ,
,
._...__ ..._.._..._.._........ .._� ..,..W,.«�a,.�:;na.�,:K::mac,•..-,-. .
a , :1 . (Iva; ,- '/
Harris Hyman, PE/PLS HH 09:17 23-Jun-06
Project 03-500.07
Massih Building
BEAM ANALYSIS
walkway stringer
BEAM PARAMETERS
CONFIGURATION 1 span
support 1: simple R = 1,200#
span 1-2 = 20'
support 2: simple R = 1,200#
BEAM SECTION
material: Doug.Fir E=1, 900,000 psi
section: rectangle (calc)
width=1.75" depth=11.88" area=20.78 sq.in.
S=41.13 in^3 I=244.21 in^4
LOADING
continuous load from 0' (120#/ft) to 20' (120#/ft)
LOAD and DEFLECTION
120#/ft 120#/ft
L=20.0'
R-1,200# R=1,200#
D-(max)-0.93" @9.9'
2)
SHEAR FORCE and BENDING MOMENT
V+(max)-1,197#@-0.1 ' M+(max)=72.0 in-K@9.9' fb+(max)-1,751psi
V-(max)=1,197#@19.9'
........_ _. .._ _ R
rt
9
./... .4.4_ -4:' ]
'1 M ^- �..... r � •rte ........ ____.__..,_ ' 4
.bei I
1/
_ _ .
x
4011 fa, �, '
__ !IC9
r
i - iV
O
F L i
"z . '.4 " "
•
w "12t . a,.
•7 " t es s4 -M. Yti
•
YNN
ENT, S
PACIFIC PARK PLAZA @
13000 S.W. PACIFIC HWY.
TIGARD, OREGON
STRUCTURAL -171
,i 4v�z60
-71417-4)
CALCULATIONS
LATERAL ANALYSIS
ONLY
FOR
NOTE : These documents are provided solely for the project at the specific site noted on the "wet►stamped cover sheet and on the title block
at the bottom of each individual document sheet, below this SNete note. Any other use of these documents is unauthorized by the office of
RONALD L. TJLAJVD CONSULTING ENG1 .LKIN ENGINEERING
Ronald L.Tiland Consulting Engineer Project: Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O. Box 7066 Tigard, Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)-409-1810 Client : Welkin Engineering
email:RLTILAND@ix.netcom.com JobNum : 06081 Date : 6-26-06
rI
.r.I.•.,d.> yit.) {f 3.l••+:M'bWIW i.,Z1.1.,-..,,,,,,i4.,,,4,.,....Y N Y .. ..., t t
•
1IyF
- 40°
Norray - _-
, 'Nq� -.
� 2A �
Nig
� 51►.nP�iotJ �stto
....... Ga 7pa{., fL4T0. Aa,ovE
r,wa wM..If ��t��'��IIIA
ti
Qr►� I it-ti • I ��� �..�
Ark QCOF t 'D
1 ^T••• .f./ \ 0'
454 s.f, st• og hieSECOND FLOOR
1111111
2952 squore feet offices
2C )'�A 1308 squore feet storage/mechanical
ill i t.
`
ilk IM? 1.1 GMh TG Up
•
•r-i
Iu DOD 101 CONSTRUCT
r s01.0b 00Y-C,, Agit. OPENINGS IN THE WALLS
: WITHOUT
•:: .. � 0 w�L.G.
BETWEEN
OF THE SENG NEER
�- B S1Mr oW chmit-1tv r1
rt♦
�. �. i ,� v, _,
rQ • ��pen •l below WEI �i�/Zi.J/ -ti
! r 0 vKTG1G « I1
Ece4`btc.,
� 1 0
:.. 140tiL'gOm RIM., _
�,t t-v' FSI. ` 654 s f, • _
�.Q&, g G, ! ,ii r, mechoniao/ • 2' 2G
br III.Room J do storoge
2E
f .$ ; ..
o rPeg- Pt.c901Z 1''t„4tJ
NOTE These documents are provided solely for the project at the specific site noted on the "wet'stamped cover sheet ana on the title block
at the bottom of each individual document sheet, below this 'red'note. Any other use of these documents is unauthorized by the office of
RONALD L. T ILAND CONSULTING ENGINEER..
Ronald L.Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O.Box 7066 Tigard, Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853(971)-409-1810 Client: Welkin Engineering
email:RLTILAND@ia.netcom.com JobNum : 06081 Date : 6-26-06
Pi l
,.. .n•a..k.,........ A..a....... ,........ ...„...... . ....... wt ,i.i apt it . ..,.A.. .. ,w J' nf...:.._.. .....i . c ..., . .. .
i marmin
Vi
1...1 .......- a '"- - --- .
- _
'-1
IF, rosi_=--4. _________7illr,..____._____...,.. .,,..1A 1P ,i NOT Ilf�tun; O sr►.tY�au Coil co sTa,
Gam'v Ten�kre ggovg.
" I�. Ali
illirdanill
\\it
\D spm.: f/a• . I�_c. �o'
jillt0 rg! I i FIRST FLOOR
�,Mi �'" --------=''\ 6949 square feet
•
Ai 4111111.1r6r
li 'I I n 00 CONSTRUCT
OPENINGS IN THE WALLS
BETWEEN SUITESWITHOUT
ADVICE OF THE ENGINEER
vN , A
I
1 D L_._.... ._.... „ma 400!.....o =_.:_ ;, f; _■_ ,
0011 ,..**t.....) -
,L' ®� ..
•W MA
44>
L.JL :j.jI” 1
,I'.)'1.- Ww
• :— _
NYIliV
MA11J FL-cow ?c-
NOTE : These documents are provided solely for the project at the specific site noted on the "wet'stamped cover sheet and on the title block
at the bottom ofeach individual document sheet, below this 'red'note. Any other use of these documents is unauthorized by the office of
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L.Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O.Box 7066 Tigard, Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853(971)-409-1810 Client : Welkin Engineering
email:RLTILAND@Ix.netcom.com JobNum : 06081 Date : 6-26-06
• Fr Z.
c,4,+.i.,-,a.i..,.,1,n.L. .. :....L...6 M.e...,.,,.].-..,..' .......La..i,1..:n, ....a n. .an;i......i'r;...a ar..•it.N: .ia.Jiis.a,
L # - A-x)/44..N k,l 'q t..1.11,C..
• W 1 NT7 r` P7�h l - W I NI', G,re.f.. % 800.Wi'N
'F Pdhul ' '
I ',raR-TAC. , pAGTbit =w.. 10 O
l : ' 21,E(;7 Notz►•n-/fit - Fo1-r 5.TE-+ob
-? 0 w12 N1e1 � 147-4-.-- 260,Ga/ FT
s 13,007
— —
r w V q v Ge Qty 41.btJ
Lsew me.T7 w4tA ) c.,r✓
(coi--,..rtnn cr-nye-1 ) vitA..)= i,c)
6.63 : w 1 kr.r,wottcb L A, -T7
Is
O - IT •CoZ 0.-7 -P2
in' ;5:-tom A107-Z5 ,,-7 Z
,-7C
jr.;a litr:
-'30 o
w
w t -A'1Z'DL EP:A.) ,
D/c ii, , 1 f5it; Co,0
(5-eht71.1107V L .) i if-Z-0 8 , $
1 Zo-zS 9 , 4
zv.--u, 10, 0
c.c.-Ain V-1-1 tJ7U1t• I % „� 42.
t.l9� a [fo;D+ G#cJi4Z,Cfl4- 10,0441,41,x)Z,\-7 ,_
1i2.0
-- - y.4- *-8,8 4- 8,6 _►_.8 33
3 4- 8 . 1 1Xa--
T— 11, ?.....x.?.....x. )17
- (
= I$to r/4--
wL,� Io,o* 1 1�0 k `t,44.y ak.411'7 4. 8 ,$ 445 9 , 1-) -4-
8 t 1 [1,171734. 12i C 7 4. 600 10,, 27177Z
= 1410211Lf
NOTE : These documents are provided solely for the project at the specifu;site noted on the "wet'stamped cover sheet and on the title block
at the bottom of each individual document sheet, below this 'red'note. AM,'other use of these documents is unauthorized by the office of
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L.Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O. Box 7066 Tigard, Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)-409-1810 Client : Welkin Engineering
email:RLTILAND@ix.netcom.com JobNum : 06081 Date : 6-26-06
C„ I
... ...... r .. ....w. ... ., .... .. r...�.1..,. . ,. ... .r. ., ..I.I Jr..4L 1.e. r..•.:rs.��.o..u.a,E,G.�,N....•�t.r.L',I....4 .:{. 45 r....J.'... ...
comm 1T1 O u *2. <
w24 0'2 + lo,o41,(01 .29,q,3
2.0,to-7
8,611c94c17,5 f�t� -1-6,04Goiv
7.10 7600(41-1 Z(or( 1
4 Pc,F
WO '4 19 o * 13, 3 l 112 Pc.-F
e-tvt4 -r1`Ci
wt.:: 24*- ,o 4-10,S + (o,04 \I; 317 z 2847c..
4PW1-7 M 1C. e-JTATlc.- EM-ler ,7
(Co *clot, 17 e, s=,77
"Pr-ow-1 `rYNef- 417 )
\1-= Z,-*,3 4-1 4.W 1(4 1.,u
5
WIE.cor += ,o iS* [e..09 Ste✓] _ ► 4,� to
\.) viz
vj tos,y- + , 1 1 * [147 = 3Z,5 }L-
W kry,WikA_47'dC. ,D 6✓4-175 G,S l 1 , 41t..
( 48,Z le-
\k)u npAz- PL-rL- = ,o bS t513 - 11,0 K-
W 'y,K i W AKA- leo,'fJ + ,o Cj 442 Z6o3 77z
W wA 4i 11 ,4 2 = z z & le--
11-72.744.-
V► r\c-,4t. tett-rpt ( uT\trN
Ll�w c- w to UJ F V
12.00-P 14 7 L 210, 395Z 1°1Z,514"-. 1,Cvu-
utrt-rC tZjZf4' (01 1$ ) O 881I t —,4)4,
2,60(Co V-- 51 faZ Z d,lp1�-
NOTE : These documents are provided solely fbr the project at the specific site noted on the "wet'stamped cover sheet and on the title block
at the bottom of each individual document sheer, below this'red'note. Any other use of these documents is unauthorized by the office o1
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L.Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O. Box 7066 Tigard, Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853(971)-409-1810 Client : Welkin Engineering
email:RLTILAND®ix.netcom.com JobNum : 06081 Date : 6-26-06
,L
..i.<...4 f.....,q.. .«.... m...... :. .,:,. . ,a.,.,... ,.. ... . ..i>.•5,.:1ia. . ...i..,,.i:d..r.,...r.1vw..wu.+:i1.K<..:>;:..4,.", .w, .�.,1 a,. .
4-,ILo wc,18
62
47:.509 07_ t)ta
titk
N
2-016076 lA
V12 r- V¢ tr' \v5 1v4..
UI (w - 4 ,V7 114- 121,Z31<T tt'w 14-0
'N10.r" ( w> •14-04 1115,,k 1 =21 a-lt-F7' 62_09
t 8A (57 z: 4-4,22 w=-r (3z►v>
, 11/ )k 11,1 = q,0 w�T
Ft, syo~u--
`l2.Cw • 4,1774 2 ,Co"1= 1,04-1e- LwA4-L.= X3,1'1F-r L1-1,4„, , zlZ1Lt.,F
CSS=
911(a -I- l,54.= 10)1 k- c1'� .177-3
1.466 19i 4-7-4.l1; 4-Z.,5)(--F7" Z-27 I
Iv14–? , 13 )5 r 4z .=I S 9)r—rY
Fie.—
U�,�w� 2,t„`7+ 1 ,9Zr.: 4,59 ) L0,OP; 7-, )'731p
(5')=- 1 ,54-4- (.49z ,Z* (r4 , lob
)--"dT64. 4 >e.13= 59 ,1 tc-r--r' o-7 Go
3 C.? = 47.,o v -r O,o
N1.rL ? 015 JF u,5+ 30.o 19 8 wr 141 1..)')
F O -&
�- I t°t Z+ � °I'Z= �,a4-�- Lwr--r- u- = , 1 o 911-t.i�
01 l,Lo9+1,1o97ali, c�h= ,00t.(o
PAo-r64>_ x,8 4 4117=49 4,cl ter ct.9
4 C.47 ) 417 19. I C1.) 111
W1 it, Lb I5 D,5 -�,1�7 35D8��. 2So,11LT (1881.;)
Z
No T1 k m) 12ei,Z\r)
NOTE : These documents are provided solely for the project at the specific site noted on the "wet'stamped cover sheet and on the title block
at the bottom of each individual document sheet, below this'red'note. Any other use of these documents is unauthorized by the office of
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L. Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O. Box 7066 Tigard,Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)-409-1810 Client : Welkin Engineering
email:RLTILAND®ix.neteom.com JobNum : 06081 Date : 6-26-06
•
........,64.) :.-
.r .u............ .. .. ....v.•.......JJ/. ''... .. .v.+ A♦ :.'“:' ... 1 .I.,r 4. 'YM4 . .
.wu.w.xni. M...�..,5v .....n.../..{2•..r.. ,..r
vh `4.) 1r9Z+lr94,: .i ,8(ofG— LwA ,LIzr.. 15,0€ r U"w . 1 ► 01--t..r
. C‘71 r(o°l l 11 I h
1•nir ? C,o )S* 7.0,5+, 1U] .1.,5'j0,61 t5t71v-F"r C1$?;ati,
F4 D Nc.)�1Ow "�
N
---
V4,,,64.. 1 i`i Z 11- 1.w At,t,�. 3Co PT U'w%i U cJ1) )l-t-r
C47)� 1,-1 1 11.- V4=/01$
N'toTCw>.= ltaZ4K-1'27 2-tO IL*r C, °
6' 64>= 21-17 1 -r Clr7r�
►t0
,?tLo15 1.14. , 117 3(oZ
N� la) ) T (4149 vs,.)
FL p : I t.•a O
T 1 v-w1v 1?-V-6, ,
1 - 'I
& -`i I- c., : <5, vrrz-i c-At -Co r-741? `17 ‘
NOTE : These documents are provided solely,;or the project at the specific site noted on the "wet'stamped cover sheet and on the title block
at the bottom of each individual document sheet. below this 'red'note. Any other use of these documents is unauthorized by the office of
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L.Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O.Box 7066 Tigard, Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)-409-1810 Client : Welkin Engineering
email:RLTILAND®ix.netcom.com JobNum : 06081 Date : 6-26-06
1. t4'
.. ,....,....,,,a...i•.,. _..�.wi..w...,,........ ....... . ,,.... .l,nvat........... ..�...i r. .. ..:.:ri:;i..U�FSlibr.�c•.ia,.:R......:).....,.. ..,... ......._
��1Z ►v4 4/59
1, c8� I,ZZ
10,i ,z3 �,3B ,40
.41121 P 14),-.-...t1'' "FZ S'12 ;¢ 75 ?(o
' ', 1 to 4-7o r2.0 a
_� i- y v c
6.
'ie \
4 v 1 (�Co,C�� M vti t Crzol ur6 i (Zv ,uri e: (t',6 v
q� Xdr q5- V4,
V1(w :.- (4,1x6 4- 2,017:6,4)1(- 1..widec,t-= I,7-5r--r v = ,-z-wIN..f
C1.7 . 61 ,11.0 + 17,14=12. ,904- 1Y4= . 4-1-2
1-n OT 4 ) ', 1404'C1,i5*Zco,LD1 4- LO -, )4o]tec-1l,'75-4. l12r61 61°1 51)
1 , A = *#1121 7'
..47 > I I I A, 1 ►4r-r (11 \ )17
Kfrtr.. ,1 1.1li5. l, ,q1 r
war• zi0 4-(1,04> F9 ,0'"1t-- t.wAe.1..r; '0, , 1i F•T 1114,) 11' , Z11711.4.a=
• Cil 72 f14-4-CE o,.1= 14,4-4-g- (747 A 4175
t•-frAo-rCw> 111',7-It g-I 5 1 47...447.60,(014- 7.111-t"lIZ)405,4-1.*I1)►601 6111 1
2i l'5 = 1oO ti-FT
C' ty(o,4 COI-
M x-? ,z-1715 ,4z'1-7.- s 4-,1 K. --r
-7----
4- 41 \ 14 4- 4, 114
\)Sete =6i-1S' )4- \ ,9°l =Co,✓& 14- Li,Atc,;-"4,v$1-T ►t'w:. ,Z.lei 1N.F
CS>= C ,-z:
�+ 1, IS=4 ,�8)1.- 0-4.7 t l 4tP
N\o- w> 4,59 4zto,.14-1,99*)-17,(0.-7,- ► so1 r 6)04>
3
z
C��- tor- w>r�- C� a>
/1-'\1:.-: [,o)5X-Z-Z-aS-I- ,2-1 4- ,0154 14),25-1 �o,O_aZ 17 1117 tf -' *
O = l.16 TI>; pt9xt .Q'SZ) t" Cie(to w�
\1/Ittk) %- 1,99-1- B4') -1,ct`i-7iaz1L-- 1.-wAwy-�9,o& r L4-Ad r-- ,z,z..17u-c.
Cti>= 1,), .4-(_x,1 +)i15=9► ° l'- t1-S e 1 col.
X01'�w'`)=. 4444Zc,.r(.7+1),184117,Lelr l 51 i 7 &11,40 �
4r C'y,= Izti"l-r CS-7, I
P\1 -- L,015 i4-20,5+,2-1 4-,ot54c 7-015.14-.S 08-'.:5c)ctx-pr
NOTE : These documents are provided solely for the project at the specific site noted on the "weir stamped cover sheet and on the title block
at the bottom of each individual document sheet, below this 'red'note. Any other use of these documents is unauthorized by the office of
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L.Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O.Box 7066 Tigard,Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)409-1810 Client: Welkin Engineering
email:RLTILAND@ia.netcom.com 3obNum : 06081 Date : 6-26-06
L,S
.. .......... .�. .. ....r..w......l v... .. ..... ...,�.. ...... ... .........../....<..)v...i..lrli..t�.ry..w2w.t.Y.Ge1t.M1wi.rn.a.4bn..... .v. ... .. ...., ..., .
\ ( ) = 1►ac+ (3#$c04 2101:3 '?t$Cott- L idAeu.7; ►Dbri- mom <zz c
r ! ► t�-✓ 4--(7-,t4-04- l I eo z 51 I K- 0-2.7c-, !1 2?
N'\u-T'Cw =3,&(o '(off 410 ,1=13,601 := 1581 (.2 1)(0
e5> (8-7 t I
!✓1�? 015*Z-ot5 ,z-I ,6I54ZO,9J * 35-,O 5081
r G C� ► /1/4-)0 T► jO�UUiJ �S�. '� 6445 w;
)( wAt 2tD l -l- t,e'tZ> r:'Ai ,c 47v7(. *--7- U't,,z-# (Cl k4
C5� 1
11 dad
PkoTe.w> 1,417-*Z(0,(11+ z,o 1,X-13,(01 71 Sr? u.*-t Co 97
co Cy> co(,5 ter 043,9
Ct015 *t4, +t7.--77 151pa] *3tot:. "274'?-ytt 7"
F Nv TT Vv-6w"-J r-rc<0n-• "7"-- C77 l l w
u tPc.-lz-
�i `� c.-1�(a ' �Y Nth ciz-f�,�k- To F—� L4 )
1z-v.A7 p-4-9 44C( 61.YOLIL
>'-- 47-1-7
z - S
a?
K- \/ppm 440,0 X--
y� , t 0'2. PLAN r , o°t 5-
ee
Z zO „,5"(0 ---7 t r a t4-
, tot �. ) 4'
NOTE : These documents are provided solelyibr the project at the specific site noted on the "wet'stamped cover sheet and on the'titte bloci:
at the bottom of each individual document sheet, below this 'red`note. .4nv other use of these documents is unauthorized by the office of
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L.Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O.Box 7066 Tigard, Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)-409-1810 Client : Welkin Engineering
email:RLTILAND@ix.netcom.com JobNum : 06081 Date : 6-26-06
•
SHEAR WALL SCHEDULE
MARK WALL COVER EDGE NAIL FIELD NAIL BASE CONN. ANCHOR BOLTS SEE NOTE 12
• ® 15/32' PWD. SHTG.,
ONE SIDE 8d ! 6' 0.C, 8d t 12' MC. 16d ! 12' 0.C. 1/2' DIA A,B,'S It 48' O.C.
• ® 15/32' PWD. SHTG.,
ONE SIDE 8d ! 6' O.C. 8d ! 12' O.C. 16d ! 4' O.C., 5/8' DIA. A.B.'S t 32' O.C.
NOTES
L 'O' INDICATES WALL TYPES USED ON THIS PROJECT, 12 THE ANCHOR BOLTS SHOWN ARE FOR 2x P.T. PLATES U.N.O.
2. ALL STUDS, PLATES, AND BLOCKING TO BE W-L U.N.D. AND REQUIRE 3/I6' x 2 x 2' PLATE WASHERS 0 EACH
3. U.N.O. UNLESS NOTED OTHERWISE, SHEAR WALL ANCHOR BOLT, WASHERS NOT RECM. AT 3x OR 4x PLATES.
4, REFER TO DETAILS FOR ADDITIONAL INFORMATION. 13, ALL NAILING TO PRESSURE-PRESERVATIVE TREATED WOOD
5. WALL COVER INDICATED IN SCHEDULE TO EXTEND WOOD SHALL BE HOT-DIPPED ZINC COATED GALVANIZED,
FULL HEIGHT OF STUD WALL AT THE LEVEL
INDICATED - SEE PLANS.
6. FOR THE EXTENT OF THE NAILING INDICATED IN
THE SCHEDULE REFER TO THE PLANS, TYPICAL
7, FRAMING MEMBERS OR BLOCKING SHALL BE PROVIDED
AT THE EDGES OF ALL PWD. SHEETS AT SHEAR WALLS.
8, MINIMUM DISTANCE BETWEEN PVD, EDGES IN A SHEAR
WALL SEGMENT TO BE 2'-0' UNLESS ALL EDGES OF THE
UNDERSIZED SHEETS ARE SUPPORTED BY FRAMING MEMBERS
OR BLOCKING.
9. ALL NAILS TO BE 'COMMON' NAILS OR GALVANIZED BOX
8d COMMON ! .131 IN DIA,
10d COMMON t 448 IN DIA.
16d COMMON t 462 IN DIA.
10. SHEATHING ON SHEAR WALLS SHALL NOT BE INTERRUPTED
BY ANY WALL PERPENDICULAR TO THE SHEAR WALL
11. ALL SHEAR WALL PVD. SHTG. TO BE C-D GRADE
WITH EXTERIOR GLUE U.N.O.
NOTE these-documents are provided soiely,for tate project at the specific site noted on the "wet'stamped cover sheet and on the title blocs.:
at the bottom a,each individual document sheer, below this 'rednote. . n1%other use of these documents is unauthorized by the office o
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L. Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O. Box 7066 Tigard,Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)409-1810 Client : Welkin Engineering
email:RLTILAND@lx.netcom.com JobNum : 06081 Date : 6-26-06
L
•
TIEDDWN SCHEDULE
MARK TIEDOWN CONN, MBRS, STUD CONN, BASE ANCHOR
• NOT REQUIRED
SIMPSON CS16 2x STUD, U.N.O. b4F-8Sc# BRAP EA, END
SIMPSON LSTHD8/LSTHD8RJ 4x, U.N.O. 24-16d SINKERS SEE NOTE 13
• 2-SIMPSON CS16 2-2x OR 4x, U.N,O. Wicic F IAPENE
SIMPSON HTT16 2-2x OR 4x, U.N.O. 18-16d SIMPSON SSTB16
U.N.O.
SIMPSON STHD14/STHDI4RJ 4x NO.2, U.N.O. 38-16d SINKERS SEE NOTE 13
3-SIMPSON CS16 2-2x OR 4x, U.N.O. bt'EACi pEND
• I SIMPSON HTT22 2-2, OR x 32-16d SINKERS SIMPPSON SSTB24
NOTES
1. '•' INDICATES TIEDOWN TYPES NOTED ON THE PLANS FOR THIS PROJECT.
2. USE ALL CONNECTORS PER MANUF.
3. ALL 'CONN. MBRS,' TO BE DF-L
4. MINIMUM CONCRETE STRENGTH TO BE 2500 PSI,
5. TIEDOWNS LOCATED AT EACH END OF SHEAR WALL U.N.O, - SEE PLAN
6. U.N.O. = UNLESS NOTED OTHERWISE
7. 'EDGE NAIL' WALL COVER TO 'CONN. MBRS,', TYP„ SEE SHEAR WALL SCHEDULE
8. THICKEN FOOTING AS REQUIRED FOR TIEDOWN ANCHOR EMBEDMENT TO MAINTAIN
3' MINIMUM CLEARANCE TO BOTTOM OF FOOTING.
9, A HIGHER NUMBERED TIEDOWN CAN BE USED AS AN ALTERNATIVE
TO THE TIEDOWN INDICATED. FOR EXAMPLE, A TYPE '3' TIEDOWN
(2-SIMPSON CS16 STRAPS) MAY BE REPLACED WITH A TYPE '4' TIEDOWN
(SIMPSON HTT22), U.N.O.
10. 8' MINIMUM FOUNDATION WALL THICKNESS REQUIRED.
11. THIS TIEDOWN TYPE IS NOT TO BE INSTALLED CLOSER THAN 8' TO THE CORNER
OF A FOUNDATION WALL UNLESS SPECIFICALLY NOTED ON THE PLANS.
12. EMBED ANCHOR 8' MINIMUM INTO FOOTING PER SIMPSON REQUIREMENTS w/ MINIMUM
8' DISTANCE TO THE EDGE OF THE FOOTING,
13. SINGLE POUR INSTALLATION UNLESS SPECIFICALLY NOTED OTHERWISE.
NOTE : These documents are provided soleli',tbr the project at the specific site noted on the "vet'stamped cover sheet and on the title bioci
at the bottom of'each individual document sheet, below this 'rets'note, Any other use of these documents is unauthorized by the office
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L.Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O.Box 7066 Tigard, Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)-409-1810 Client : Welkin Engineering
email:RLTILAND@ia.netcom.com JobNum : 06081 Date : 6-26-06
Sr;►Z
'EDGE NAILING' U.N.O. — SEE PLAN
PWD. SHTG, w/ 10d @ 6' O.C. @ PANEL EDGES &
10d @ 10' D.C. IN FIELD U.N.O, - SEE PLAN
NO HO Z PWD, �! A ,—'EDGE NAILING' FOR SHEAR WALL ABOVE
NN ,� FLOOR JOIST, WHERE JOISTS RUN PARALLEL
HORIZ. PWD, JOINT , ' TO WALL BLOCK FIRST JOIST SPACE @ WALL
@ 48' O.C. & NAIL PWD, TO BLKG, w/
10d@4' O.C.
NO HORIZ, PWD.
JOINT 'EDGE NAILING' FOR SHEAR WALL BELOW
CONTINUOUS 'TIMBERSTRAND'
RIM JOIST OR BLOCKING
PWD. SHTG. w/ 8d @ 6' O.C. AT PANEL
EDGES & 8d @ 12' O.C. IN FIELD U.N.O.
SEE PLAN
D. 1 TYP, @ PERIM{ & SHEAR WALLS
NOTE : These documents are provided soiei1or the protect at the specific site noted on the "wet'stamped cover sheet and on the title floc;:
at the bottom of each individual document sheet, below this
'red'
note. 4tn
other use of these documents is unauthorized by then,1�:ce vf'
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L. Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O.Box 7066 Tigard,Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853(971)409-1810 Client : Welkin Engineering
email:RLTILANDBix.netcom.com JobNum : 06081 Date : 6-26-06
'EDGE NAILING' — SEE IF SHEAR WALL ABOVE
SHEAR WALL SCHEDULE
'BASE CONN.' AT SHEAR WALL
ABOVE
PWD. SHTG. w/ 10d @ 6' D.C. PAIPv'
FOR ADDITIONAL INF❑RMATI❑N
AT PANEL EDG. S & 10d @ SEE 1.1
10' D.C. IN FIE D U.N.O.
SEE PLAN -
4x BLKG. OR J❑IST OVER
SHEA" WALL BELOW
SHEAR WAL TYPE 'B'
SIMPS❑N L 0 @ 32' D.C. 8d ► NAIL @ 6' D.C.
'EDGE NAILING' — SEE
SHEAR WALL SCHEDULE STUD WALL
PWD. SHTG. FOR SHEAR
WALL — SEE SHEAR WALL
SCHEDULE
D. 2 INTERIOR SHEAR WALLS
PERPENDICULAR TO JOIST SPAN
NOTE : These documents are provided solely for the project at the specific site noted on the "wet'stamped cover sheet and on the title block
at the bottom of each individual document sheet, below this 'red'note. Any other use of these documents is unauthorized by the office of
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L.Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O. Box 7066 Tigard, Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)-409-1810 Client : Welkin Engineering
email:RLTILAND@ix.netcom.com JobNum : 06081 Date : 6-26-06
-9"2.
J.. .,..... .. . ,,.. ...,. ... , �.. :.kit.... : ...... . . ..
PWD. SHTG, w/ 8d @ 6' D.C,
AT PANEL EDGES & 8d @
12' 0,C, IN FIELD U,N.0, -
SEE PLAN
8d @ 4' D,C, EDGE NAILING STUD WALL
U.N.D. - SEE PLAN
CONC. SLAB-ON-GRADE
2x P,T. PLATE w/ 1/2' DIA, ABS
@ 48' D.C. TYP. U.N.O, - SEE 'BASE
CONN.' AT SHEAR WALL SCHED,
FIN, GRADE
CONC, WALL
D. 3 TYP, @ PERIM, & SHEAR WALLS
NOTE These documents are provided soler,for the project at the specific site noted on the "wet'stamped cover sheet and on the title block
at the bottom of each individual document sheet, below this 'red'note. ,env other use of these documents is unauthorized by the once of
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L. Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O.Boa 7066 Tigard, Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)409-1810 Client : Welkin Engineering
email:RLTILAND@iz.netcom.com JobNum : 06081 Date : 6-26-06
1
PWD, SHTG, w/ 8d @ 6' O,C,
AT PANEL EDGES & 8d @
12' O,C, IN FIELD U,N,O. -
SEE PLAN
STUD WALL
2x P,T, PLATE w/ 1/2' DIA, A,B,S
@ 48' O,C, TYP, U.N.O. - SEE 'BASE\
CONN,' AT SHEAR WALL SCHED, CONC, SLAB-ON-GRADE
8d @ sod. EDGE NAILING
UN,O, SEE PLAN
CONC. FOOTING
D. 4 TYP, @ INTERIOR SHEAR WALLS
NOTE : These documents are provided solely,1br the project at the specific site noted on the "wet'stamped cover sheet and on the title block
at the bottom of each individual document sheet, below this `red`note. Any other use of these documents is unauthorized by the office of
RONALD L. TILAND CONSULTING ENGINEER..
Ronald L. Tiland Consulting Engineer Project : Pacific Park Plaza @ 13000 S.W. Pacific Hwy.
P.O.Box 7066 Tigard,Oregon
Aloha,Oregon 97007 Lateral Analysis Only
(503)-591-5853 (971)-409-1810 Client : Welkin Engineering
email:RLTILAND@ix.netcom.com JobNum : 06081 Date : 6-26-06
Site Address: 9? 75- st,.) ritt, r�1
Building Division
TIGARD Transmittal Letter
TO:
r9)1 c DATE RECEIVED:
DEPT: BUILDING DIVISION
2006
FROM: I' U#' 11(1
JJ€kl 13 ekX. )ThT� �:r r `�
COMPANY: pay
PHONE #.: ��j " 5 7 b ' cote ( 19 .
RE: 1 -F-) 0 O 7 6
4 )
(Case number, site address, etc.)
r-t SS t �f orr
(Project name or subdivision name and lot numb r)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Co ies: Description: nn
Additional set(s) of plans. Revisions: `�jlek 1�LiJS oL�'��
Cross section(s) and details. Wall bracing and/or?ateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other (explain):
REMARKS:
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: Initials:
Fees Due: ❑ Yes n No Fee Description: Amount Due:
Special
Instructions:
Reprint Permit (per PE): ❑ Yes ❑ No ❑ Done
Applicant Notified: Date: Initials:
I:Building\Forms\LetterTransmittal.doc 03/06/06
: 4Y
*,,:
.1
r
Iii‘
:,.
II&
_.
54 114,• WELKIN ENGINEERING, PC
n
0 Engineers C7I Planners i surveyors
/,. -
'" E
TRANSMITTAL
DAThJOB NO.
TO: .
C,2 I
'
er.'...-" ''''''" '-'_,
(11- `1- CF I i 61 Nce-- ATTENTION ,
0 ' ....
i (1.-c ' AA,..\ t--\ Ao.....c...._ G L../i,..':N,
1.....
. i
1,
WE ARE TRANSMITTING THE FOLLOWING BY:
Mail Messenger
_ - — Other
•4,';•
elt.v Ativmotgattvp.i:i.. ..i4.L...i---' 414,ira:ii' w,A,,,;,,
111111111111111111 Z.- . ,
,
1 2
ar MIL 'e
ri ' • t .4410 ' •••'•do 11
.ii.....1111111111111111111.111.11111111111111.. 7 110111,
, V.X.0 ,-„ , \,„, V V.I,„„,,„t„•&V ,
AS INDICATED BELOW:
jFor approval For your useAs requested For review and comment
-
REMARKS:
CC: SIGNED BY:
0( d+
8000 SW P
. FAFFLE ST. 0 PORTLAND, OR 97223
9O3.59E1.1888 CI (F) 503.598.1868 0 WELKIN PC@ C 0 NI CAST.N ET