Loading...
Plans (7) M C2015 - 00679 EQUIPMENT SCHEDULE = ;Y rk , t sr RECEIVED Scope of Work .1 Equipment # Unit Weight Unit Voltage Cooling Btu's Heating Btu's Unit CFM OSA Model 1) Install three ton gas pack and complete OCT 7 2015 RTU - 1 490 LBS 208-230-3 36,000 1159000 1200 141 582JP04A1 15 duct system. W'YOFTIGAIRD 2) Install new black iron pipe gas line from BUILDING DIVISION EX- 1 5 LBS 115 -- 80 -- QTRN80 the meter. 3) Vent the restroom through the roof. M N CITY OP TIGARD REVIEWED FOR CODE COMPLIANC$ ■ c 0 SA TABLE Approvcd: OTC; x Default People Area Outdoor Pcrrnit#" L�,A�2C)l5 N o Outdoor Air Zone Air Address: Occupant Zone Air Rate per Rate per Distrtbuti Zone Outdoor Swite#• � w Ventilation occupancy Area Net Density Populatio unit area from Gross CFM OSA Room name • • n Note 3 Person from OMSC 2010 = on Airflow 8y; Dates 6 �� N classification Note 1 (Az) #/1000 OMSC 2010 Vbz RpPz+RoA Effectiven (Voz) M IFT2 (Pz) table 403.3 table 403.3 Ra ess (Ez) � N kn kn Note 2 (Rp) (Ra) OFFICE COPY M z • n 101 Open Office Off Ice 500.00 5:00 3.00 5.00 0.06 45.00 0.80 57.00 �� P M �, 102 Conference Conference 164.50 50.00 9 .00 5.0.0 0.06 54.87 0.80 69 .00 103 Office Office 114.00 5.00 1 .00 5.00 0.06 11 .84 0.80 15.00 Y; P O NOTES: (1 ) Occupancy Type or room classifies as Naturally Ventilated. (2) Estimated Maximum Occupant Load, Persons per 1000 SQFT from OMSC 403.3. (3) Calculated Occupancy Load using SQFT Areas and Occupancy Load Factors in OMSC Table 403.3. (4) Expected Average occupant load is much less than the Regulatory Requirements; calculated total for some rooms. Use 100% of Programmed Occupancy or 50% of Calcuated Occupancy (per OMSC 403.3), which ever is less. 1. Al( work, installations, material and equipment shall comply with the F--i provision of the following codes, standards and regulations, except Single Line Double Line Deseri tion where more stringent requirements are shown or specified, E'"•� p A. State of Oregon Mechanical Code, State of Oregon and Washington pp a Energy code, I--- Framing structure B. All work shall comply with the IBC and any amendments set forth O by the State of Oregon or, the State of Washington, C, All City, County and Federal applicable laws and regulations, 2• screw Into VOlume Damper D. Regulations and standards set forth by ASME, ASHRE. SMACNA, AGA framing structure ��--� p and ARI, • 24 ga. strap through 24 ga. strap -7+ 2. All electrical products shall bear the U.L. label, r� FD FDFIre Damper A. All wiring shall be installed in accordance with the National F� SD FSD Flre/Smoke Damper Electrical Code, B. State of Oregon Electrical Code, State of Washington Electrical 00 Duct asD Smoke Damper code. SD O MD Motorized Damper Ductwork Types; N Ma. strap attached MD e� to duct work. Starap For ductwork 28' and smaller. Mitered Elbow with Turning wraped around MiVanes 1. Galvanized Steel Sheet Meatal ductwork, A. Metal gauges, joints and reinforcement in accordance with Radlused Elbow mechanical code, ASHRAE and SMACNA tables and recommendations B, Supply air duct insulation to be 2 inch duct liner; commercial Rectangular Maln with Round grade, or 2 inch foil f aced duct wrap insulation with a R rating of Branch R-4 when located within the envelope of the building. All insulation shall be installed in accordance to manufacturer's, ASHRAE and Framing structure —' Rectangular Maln with SMACNA recommendations, Rectangular Branch C. Exposed ductwork shall not be externally insulated, REVISIONS Concentric Square to Round 2, Flexible Ductwork 3' lagg Into framing Eccentric Transltlon, A. Insulated low pressure f lexilole duct with an R value of 42 may be structure attached V Rectangular or Round used in areas where protected from damage, ( generally above a to al(-thread. V suspended ceiling,) all-thread �� Symmetrlcal Wye B. Flexible duct shall be a UL 181, Class 1 Air Duct or better. Rectangular Duct Riser Installation Description; ss Round Duct Riser A, Locate ducts with sufficient space around equipment to allow Duct P Rectangular Duct Drop normal operation and maintenance activities B. Provide manual volume dampers on all supply air ducts, and as Round Duct Drop necessary on exhaust or return air ducts. �— C. Provide back draft dampers on all exhaust -Pans. Rectangular Offset LessJOB NUMBER' p For ductwork over 30' wide and multi le than 15' D Install access doors for inspection and cleaning at all fire by all thread supported p g p dampers, coils, filters and fans or as required by governing code, 29716 duct runs on same trapeze hangers, Rectangular Offset More E, Support of ductwork shall be done with 1 inch wide 24 gauge than 15' cradle hangers not more than 8 feet c/c or as required by code. DATE: Straps will be supported be 16 gauge wire and or 3/8 inch threaded Round Wye rod. Support terminal units independent of adjacent ductwork. Attach 10/7/15 Framing structure to available building construction as per good practices for materials —EX Extractor involved. DRAWN BY: /3' eye Tagg IntoF, All Wiring and electrical devices required for controls will be framing structure Bellmouth installed to manufacturer's instructions and in accordance to the MJM Ma. wire —�. N,E C, and O E.C Seismic Support at Round Duct with Round the end of all duct Branch G, The support of gas lines installed inside of a building shall be SCALE: runs end ofu supported every 10 feet horizontally by 3/8 inch threaded rod and 16ga. wire at consistingit 5• —� Concentric Transition, loop hangers. Vertical runs will be supported by uristrut and pipe 1�4��=1-0 angle Rectangular or Round clamps every 10 feet. Where a gas line is installed across the roof Accoustically Llne Duct of a building it will be supported by pressure treated 4X6 and SHEET NO. Ma. wire tied to 24 Flexible Connection fastened down with two hole , pipe clamps at 8 foot intervals. All HVAC ga. starap wraped equipment will have a gas shut off valve with in 4 feet of that piece around ductwork. Round Insulated Duct of equipment. ,M i �Ii M N 3 �. cQv a w Q 'q U M 0., U �1 103 OFFICE ...: .;i; ;.. rr 4. •~ .,t I 325 215 CFM CF 10060 -00 102 CONFEREN E # I H NEW 1" BLACK IRON GAS UNE "'" AT APPROX. 160' TO THE METER. THE UNE IS I" POUND PRESSURE. p0 THE UNE CAN SUPPORT 134K AT e # 200'. THE LOAD IS 115K. I I 12, cd dLl JJA I C� 330 p > CFM 00 t 0 0 14„ ri I 101 OMEN OFFICE I I r I © I 330 REVISIONS CFM V \ I I I JOB NUMBER: 29716 DATE: 10/7/15 DRAWN BY: mim SCALE: 11411=11.011 SHEET NO. REFLECTED CEILING PLANM2 1 /411= 1 —0