Plans (9) I�
l
I
i
i
i
i
FLOW TEST DATA HYDRAULIC AREA
Static Pressure 60 psi Density .05 gpm/sgft
Flow 1230 gpm Area 2 heads
Residual Pressure 48 psi Required Flow 26.4 gpm
Test Date 15 Dec 2014 Required Pressure BOR 25.4 psi
Hose Flow Included 0 gpm
RE ' EP
JAN 6 2016
CIT V OFTIGARD
BUILDING DIVISION,
I l I
OTILE
O
2-1 Li SHOWER
3
co, WALK—IN
4-4 5-2 '2 3-4 6-0 g' CLG. 4-0
0
URN. MASTER SUITE
0
GARAGE 18/0x13 0
0 20/8 x 19/2
O N
00 �' W.
X rn
O
rL
cfl
D.
Y 3-0
V
z :OE
z 9�L�F 9C
m\ LINEN a- �F
F1
of 9' CLG.
GREAT ROOM
U, PORCH FOYER 18/4x15/8
z CONCRETE
_ o
-"J t2
o,o COVERED
U
- - - - - - - -° - - - - - - - - - - DECK
"-SOL-PJM 10/0x18/0
6x� POST
W 2x WRAP
D s h I CITY OF'TIGARD
5
K . h2
0 Z O EW REVIEW
FOR CODE OC3MI'LIANC9
7-0 1-2 7-6 ,-4 5-10 3-8 4-2 12-4 I ApP��
9' CLG. 9' CLG.
DEN BR . 3 BR . 2 I 9' CLG. I °T
� DINING
12/6x10/8 12/6x10/8 ,}, I Pcrinit#: [�~
15/0x10/0 ( �
® ` I Suite#3
Sys Dates
REF. DW
PANTRY - - - -_ _ _ _ _ _ - OFFICE COPY
El
MAIN FLOOR PLAN
1905 SQ. FT.
O FT 2 FT 4 FT 6 FT 8 FT 10 FT 12 FT
NOTES APPROVALS AND INSPECTIONS SPRINKLER SYMBOLS FP-1
All piping and fittings to be CPUC. DATE DESCRIPTION SOUTHVIEW HEIGHTS LOT 1 MM R-OM PLAN
All hangers to be CPVC Standoff type and located per NFPA 13D requirements. O Concealed Pendant, 4.9 K—factor, 160', Quick Response, Qty. 15 ,
Max. sprinkler spacing to be 16'x 16'w/8'-0"off walls. ° ' PERMIT NO.
All CPVC i in to be 1"w/Riser to be 1"black steel I Ing.
WYATT 15230 SW HARVEY'S VIEW AVE.
p p g p p ° ti
CONTRACT No. C15-755
Meets design requirements of NFPA 13D 2013 edition. - v
All piping to be installed before insulation and protected with a medium weight plastic barrier(to be provided by others). _ �8 FIRE PROTECTION, INC. TIGARD, OREGON 97224 APPROVAL
Riser to be connected to domestic water prior to hot water heater. M.COLLEY
Double check to be provided by Wyatt Fire but installed, permitted and tested by plumber(contact Stonebridge Homes for information oni 9095 S.W. Burnham DRAWN BY
1
plumber) y.
Tigard, OR 97223 SCALE 1/4"= 1'-0"
(503) 684-2928 DATE 4 JAN 2016
STONEBRIDGE HOMES, 4230 GALEWOOD ST,#100, LAKE OSWEGO, OR 97035 REVISED
PLOTTED FP 1 of 3
RECEIVED
JAN 6 2016
C111 Of HGARD
BUILDING DIVISION
5'-8" HIGH WALL
J
Q
8' CEILING J
M
I =
I
® 2-6 - 2 = 14-6
8' CLG.
BONUS
37/0x12/0
DECK
10/0x10/0
UPPER FLOOR PLAN
480 SQ. FT.
0 FT 2 FT 4 FT 6 FT 8 FT 10 FT 12 FT
NOTES APPROVALS AND INSPECTIONS SPRINKLER SYMBOLS FP-2
All piping and fittings to be CPUC. DATE DESCRIPTION
SOUTHVIEW HEIGHTS LOT 1
All hangers to be CPVC Standoff type and located per NFPA 13D requirements. O Concealed Pendant, 4.9 K—factor, 160', Quick Response, Qty. 4 UPPER FLOOR PLAN
Max. VC pips spacing to be is x 16'w/ " black
off walls. f W")rAT T PERMIT NO.
All CPVC piping to be 1"w/Riser to be 1" black steel piping. '' CONTRACT NO. C15-755
Meets design requirements of NFPA 13D 2013 edition.
x 15230 SW HARVEY'S VIEW AVE.
All piping to be installed before insulation and protected with a medium weight plastic barrier(to be provided by others). FIRE P R 0 T E C TION� INC. TIGARD OREGON 97224 APPROVAL
Riser to be connected to domestic water prior to hot water heater. ' DRAWN BY M.COLLEY
Double check to be provided by Wyatt Fire but installed, permitted and tested by plumber(contact Stonebridge Homes for information on 90955 S.W. Burnham
1/4"
plumber)
Tigard, OR 97223 SCALE
{503) 684-2928 DATE 4 JAN 2016
STONEBRIDGE HOMES, 4230 GALEWOOD ST, #100, LAKE OSWEGO, OR 97035 IREMED
PLOTTED FP 2 of 3
nECEIVEP
JAN 6 2016
CITY OF"TIGARD
BUILDING DIVISION
TO SYSTEM
n3
` --1"CPVC
PRESSURE GUAGE
n2
POTTER VSR-S
WATERFLOW
1"DCVAAMES ALARM SWITCH
SERIES 2000B
n1
1"EDDY-THREAD SCHED.30
TO METER AND SUPPLY
MAN. TRUSSES ® 24" O.C. W/
R-49 BLOWN—IN INSULATION
& R-21 BLOWN—IN INSULATION @ T.O.W.
2x4 STUDS @ 16" O.C.
O
P . BONUS
FLOOR
I
1/2" CHIPBOARD OVER
1-118" T&G ENG. PLYWOOD ON
11 7/8' L.P.I. 20 JOISTS @ 24" O.C. B — RISER DETAIL
I
1 3/4"x11 7/8" LVL 1 3/4"x11 7/8" LVL I
RIM
JOIST
' I 12"OF BATT OR
PORCH FOYER HALL GREAT ROOM BLOWN-IN INSULATION
BRANCHLINE
W/PIPE STRAP
MEDIUM WEIGHT PLASTIC
GRADED BACK BARRIER OVER LINE PIPING
TO MAIN
I 1/2" CHIPBOARD OVER
1-118" T&G ENG. PLYWOOD ON
11 7/8' L.P.I. 20 JOISTS ® 24" O.C. ; 1"x DROP
(SEE PLAN)
CONC. SLAB
AR-38 INS. R-38 INS.
2X RAMING
CRAWL
SPACE
o GYP. BOARD
o!
QQ
fr
CROSS SECTION B � �
W
Q
zQ
A — CROSS SECTION C — TYPICAL INSULATION COVER
0 FT 2 FT 4 FT 6 FT 8 FT 10 FT 12 FT
NOTES APPROVALS AND INSPECTIONS SPRINKLER SYMBOLS FP-3
All piping and fittings to be CPVC. DATE DESCRIPTION
SOUTHVIEW HEIGHTS LOT 1
All hangers to be CPVC Standoff type and located per NFPA 13D requirements. s CROSS SECTION AND DETAILS
Max. sprinkler spacing to be 16'x 16'w/8'-0"off walls. PERMIT NO.
Wl)rATT
All CPVC piping to be 1"w/Riser to be 1" black steel piping. 1 =� 15230 SW HARVEY'S VIEW AVE. CONTRACT NO. C15-755
lI
Meets design requirements of NFPA 13D 2013 edition. r
All piping to be installed before insulation and protected with a medium weight plastic barrier(to be provided by others). APPROVAL PROTECTION INC.
'
TIGARD OREGON 97224
Riser to be connected to domestic water prior to hot water heater. =` DRAWN BY M.COLLEY
Double check to be provided by Wyatt Fire but installed, permitted and tested by plumber(contact Stonebridge Homes for information on 9095 S.W. Burnham
plumber)
Tigard, OR 97223 SCALE _ -
(503) 684-2928 DATE 4 JAN 2016
STONEBRIDGE HOMES, 4230 GALEWOOD ST,#100, LAKE OSWEGO, OR 97035 REVISED
PLOTTED FP 3 of 3