Plans (14) FPS2015 - 001 83
FLOW TEST DATA HYDRAULIC AREA 1
Static Pressure so psi oer>sity .05 Wn/sgft
now 1230 Wn Area 2 heads
Residual Pressure 48 psi Required Flow 27.2 gpm
Test Date 15 Dec 2014 Required Pressure BCR 3230
Hose Flow Induded 0 gpm
-1�T 47 4
NOV 19 2015
1 Y ji
BI
Q O
A TIAL COVERED A
I 119/0X10/0 i
I I I
I I I
1 1 1
E
1 1 1
I — I
I � I
9' CLG.
U Q{�
1 - F r CLG.
I 10/0X10/6 $' CLG. I i�
.11 Jj X11 161 11 /6x10/10
! I 1
4-& 7-0I
1 _0 T�.
4. 0„ 4!-0. 8-0 " r-0r
Go
6-0 1-6
n C4
1 1
! 1
4'-10'
3-D I 1-6 $ 3-4 fl
a Li
I
9 8 X 16j{/2 9' CLG. - .j � I8' C G.
3-10 1-6
I
j4/0X1 2/0 _a• 12/1 C xi 2/0
! / 1 M
I I I O
O "
r
I18/8X33/4 ' o
I DN I DN
LIN N
, ! 1
1 1 p 1
' N N
1 1 I
°°OPEN 43
I OPEN ABOVE I "BELOW _ !
I I CITY 4F' 'IGAl2I�►
' - 9' CLG. N r-D• - REVIEWED FOR CODE COMPLIANCE
-~
I I =Y :� I�,,� Approved:
I t ; 4-0. 4-0' 6-6 4-0,5-4 1-8 4- OTC.
I I 1-0 18%6X 16/0 I _
- -- �, Percntt#: Edi J W(—T
CD
'S
; &' CLG. o Address: z:n -
I suite#.
j UP UP 8/6x�}3/2 Br; Date:
F-1-11 I ? � Al
FJI
I I I OFFICE COPY
16/0x8 10 O'HD. GARAGE DOOR 1 i
1 , 1
BALCONEI
I COVERED I
1
F
LOWER FLOOR PLAID MAIN FLOOR PLAN UPPER FLOOR PLAN
150 SQ. FT. 1,101 SQ. FT. 1,194 SQ. FT.
0 FT 2 FT 4 FT b FT 8 Ft 10 FT 12 FT O FT 2 FT 4 FT 6 FT 8 FT 10 FT 12 FT OFT 2 FT 4 FT 6 FT 8 FT 10 FT 12 FT
NOTES APPROVALS AND INSPECTIONS SPRINKLER SYMBOLS FP-1
All piping and fittings to be CPUC. DATE DESCRIPTION SOUTHVIEW HEIGHTS LOT 27
All hangers to be CPVC Standoff type and located per NFPA 13D requirements. L ♦ UPPER FLOOR
Max.sprinklers cin to be 16'x 16'w/8'-0"off walls. Concealed Pendant, 4.9 K–factor, 160', Quick Response, Qty. 20 'r
_ PERMIT NO.
spacing W�AT
All CPVC piping to be 1"w/Riser to be 1"black steel piping. 12055 ;x111/ TIJRNAGAIN DR
Meets design requirements of NFPA 13D 2013 edition. 1 r CONTRACT No. C15 686
All piping to be installed before insulation and protected with a medium weight plastic barrier(to be provided by others). = FIRE PROTECTION, INC. TIGARD, OREGON 97224 APPROVAL By A NISHIHARA
Riser to be connected to domestic water prior to hot water heater. __ _ 9O9rJ' S.W. Burnham _1,- ,
Double check to be provided by Wyatt Fire but installed, permitted and tested by plumber(contact Stonebridge Homes for information on OR 97223 SCALE 1!4" 0'
plumber)
Tigard,
(503) 684-2928 DATE i8 NOV 2015
STONEBRIDGE HOMES,4230 GALEWOOD ST,#100, LAKE OSWEGO, OR 97035 REVISED FP 1 of 2
PLOTTED
TO SYSTEM
n3
'-1.CPVC
G,
PRESSURE GUAGE
n 2 OTTER VSR-S
- WATERFLOW
1"DCVA AMES ALARM SWITCH
SERIES 2000E
T'EDDY-THREAD SCHED.30
- ///TO
METER AND SUPPLY
O
BR. 2 BATH
WATER M . BATH M . SUITE
j FLOOR
SE DETAIL
_ T
PATIO KITCHEN DINING GREAT RM .
12"OF BATT OR
-_ BRANCHLIKE BLOWN-IN INSULATION
W/PIPE STRAP MEDIUM WEIGHT PLASTIC
GRADED BACK BARRIER OVER LINE PIPING
TO MAIN
OP
GARAGE (SEEP AN)
2X RAMING
v
BOARD
w
OW
FrW
W
z Q
A - CROSS SECTION C - TYPICAL INSULATION COVER
0 FT 2 FT 4 FT 6 FT 8 FT 10 FT 12 FT
NOTES APPROVALS AND INSPECTIONS SPRINKLER SYMBOLS o
All piping and fittings to be CPVC. DATE DESCRIPTION �r
All hangers to be CPVC Standoff type and located per NFPA 13D requirements. SOUTHVIEW HEIGHTS LOT 27 CRm,%. c'n N AND DETAILS
Max.sprinkler spacing to be 16'x 16'w/8'-0"off walls. _-
PERMIT NO.
All CPVC piping to be 1"w/Riser to be 1"black steel piping. ` 12055 SW TURNAGAIN DR CONTRACT NO. C15-6$6
Meets design requirements of NFPA 13D 2013 edition. _ _,
All piping to be installed before insulation and protected with a medium weight plastic barrier(to be provided by others). _ FIRE PROTECTION, INC.
TIGARD, OREGON 97224 APPROVAL
Riser to be connected to domestic water prior to hot water heater. '_ � _- DRAWN sr A. NISHIHARA
Double check to be provided by Wyatt Fire but installed, permitted and tested by plumber(contact Stonebridge Homes for information on 9Q95 S.W. BLlrnham
plumber)