Loading...
Plans (8) Jn 7-i _I l / , o "o, 1 5 � 0 ,,_ II I oo FLOW TEST DATA HYDRAULIC DEMAND Static Pressure 60 psi Density .05 gpm/sgft Flow 1230 gpm Area 2 heads Residual Pressure 48 psi Required Flow 26.0 gpm Test Date 15 Dec 2014 Required Pressure BOR 33.8 psi Hose Flow Included 0 gpm R +C `d NOV 17 2015 CITY OF TIGARO BUILDING DIVISION A A A I � I I I COVERED I c, ( b Poo T I O i 9' CLNG. `° �° 1 ' tP I UP n1 -a s-z N lo-s 12/6x10/0 _ 9' CLNG. I C3 kLN U. 12/2x16/0 DEN /BR. 4 I BR. 2 RR - 11 8x12/4 3 ox5 10/8x12/0 11 /8x12/0 / 6-3 V-1' ' ' n3 �I K-7, I HOWER I uP I FURN. n n7 n6 DN ' n5 6-6 n4 3-11 -- ¢-4 2-0 __ __ 0 3 ONC. FILLED 0 Ll STEE PIPE ® FURN. 6/4x5/8 ` I 8' C G. -—-—-—-—-—-—- -- __ - I --- W ; —- -—-—_ — 8x8 POST I D. I CM 0 I Y 1 a 1 _ 8/2x /4 w M N i-8-2 L 72-0 N " HOLE IN BEAM TO I = ' BE DRILLED BY OTHERS IN LOCATION n8 u°° I P 1 I I APPROVED BY STRUCTURAL ENGINEER I I 1 ( I n9 a I 1 1 4'-3. 1 h1 N N 1 19/8x23/2 N p ISLAND N 14x4 ' 1 I <:' I N ----- - x 5/0x6 0 I POST 0 ® I N LOW WALL UP ® _ LJ B'-cr b I 9' CLNG. I z M 10. Z GREA. T RN W I d i 20/4x17/0 �' I 8' CLNG. M M A S TF.R I `� 2-0 8-212 I I� 8,_D. 14/8x14 0 O_ 3'-0' S 0' 4'_g• „, 8' CLNG. M (� 10— 0 `" 2-4 o I < N 16/4x12/2 ——— 1 GAS/ METAL o I o 0o D I FIREPLACE a A Bj 11 ENCH SEAT `\� ENCH SEAT - A - _Mj CITY of TIGARD REVIEWED FOR CODE COMPLIANCE Approved: [ v1 . 1/4"=1'-0" 1,312 SQ. FT. .,178 SQFT LOWER FLOOR PLAN , MAIN FLOOR PLAN [�� UPPER FLOOR PLAN OTC: t E Permit 1/4"=1'-0" 270 SQ. FT. . _('N 1/4..=1'-0' 1 - O FT 2 FT 4 FT 6 FT 8 FT 12 FT CONCRETE 10 FT OFT 2 FT '4FT 6 FT BFT 10 FT 12 FT GvZ OFT 2 FT 4 FT 6 FT 8 FT 10 FT 12 FT C� • • By: Date: 2 OFFICE COPY �� z � NOTES APPROVALS AND INSPECTIONS SPRINKLER SYMBOLS FP-1 All piping and fittings to be CPUC. DATE DESCRIPTION SOUTHVIEW HEIGHTS LOT 15 All hangers to be CPVC Standoff type and located per NFPA 130 requirements. O Concealed Pendant, 4.9 K-factor, 160', Quick Response, Qty. 25 R'OM PLAN Max.sprinkler spacing to be 16'x 16'w/8'-0"off walls. PERMIT NO. All CPVC piping to be 1"w/Riser to be 1"black steel piping. WYATT 12021 SW AUTUMNVIEW STREET CONTRACT NO. C15 684 Meets design requirements of NFPA 13D 2013 edition. TIGARD, OREGON 97223 All piping to be installed before insulation and protected with a medium weight plastic barrier(to be provided by others). FIRE PROTECTION, INC. DRAWN APPROVAL A NISHIHARA Riser to be connected to domestic water prior to hot water heater. Double check to be provided by Wyatt Fire but installed, permitted and tested by plumber(contact Stonebridge Homes for information on '" 9095 S.W. Burnham plumber) Tigard, OR 97223 SCALE 1/4"= 1'-0" DATE 17 NOV 2015 (503) 684-2928 STONEBRIDGE HOMES, 4230 GALEWOOD ST, #100, LAKE OSWEGO, OR 97035 REVISED 11 PLOTTED FP 1 of 2 TO SYSTEM 1"CPVC 1"EDDY-THREAD n3 TEST AND DRAIN PRESSURE GUAGE POTTER VSR-S / \ WATERFLOW / \ 1"DCVA AMES ALARM SWITCH / \ SERIES 20008 nt / R-49 BLOWN INSULATION \ ---------------------------------------------------------------------------'--------------------------------------------------- A X Z ----------------------------------------------- I 1"EDDY-THREAD i TO METER AND SUPPLY f , BR. 2 BATH MASTER , , I i O I FLOOR , BEAM 2 R-23 INSULATION B - RISER DETAIL NOT TO SCALE 1 �I i DINING KITCHEN 12"OF BATT OR BLOWN-IN INSULATION MEDIUM WEIGHT PLASTIC Zi x, BRANCHLINE R-38 INSULATION - ----- —, BARRIER OVER LINE PIPING GRADED BACK R-38 INSULATION I TO MAIN `// / BEAM 3 CRAWL SPACE HDR H4 1"x DROP GARAGE (SEE PLAN) 391 2X FRAMING GYP.BOARD CONCRETE SLAB AT GARAGE w 0 IIIU) wQ A - CROSS SECTION C - TYPICAL INSULATION COVER 1/4"=l'—O" NOT TO SCALE— TO BE PROVIDED BY OTHERS AFTER PIPING INSTALLATION NOTES APPROVALS AND INSPECTIONS SPRINKLER SYMBOLS FP-2 All piping and fittings to be CPVC. DATE DESCRIPTION SOUTHVIEW HEIGHTS LOT 15 Q9M SECTION+ DUA" All hangers to be CPVC Standoff type and located per NFPA 13D requirements. Max.sprinkler spacing to be 16'x 16'w/8'-0"Off walls. PERMIT NO. All CPUC piping to be 1"w/Riser to be 1"black steel piping. WYATT 12021 SW AUTUMN VIEW ST CONTRACT NO. C15 684 Meets design requirements of NFPA 13D 2013 edition. All piping to be installed before insulation and protected with a medium weight plastic barrier(to be provided by others). FIRE PROTECTION, INC. TIGARD, OREGON 97223 APPROVAL Riser to be connected to domestic water prior to hot water heater. DRAWN BY A NISHIHARA Double check to be provided by Wyatt Fire but installed, permitted and tested by plumber(contact Stonebridge Homes for information on 9095 S.W. Burnham SCALE 1/4" plumber) Tigard, OR 97223 DATE 17 NOV 2015 (503) 684-2928 STONEBRIDGE HOMES, 4230 GALEWOOD ST, #100, LAKE OSWEGO, OR 97035 REVISED PLOTTED FP 2 of 2