Loading...
Correspondence (573) yS 61Jo2-60& Site Address: II I Building Division IciA :D Defe tal Transmittal Letter SIS (-DaA ,Sviw5 TO: DATE RECEIVED: DEPT: BUILDING I)IVISION FROM: COMPANY: fiC �,P,✓s`�<D�✓ Mi�Y 3 07 j PHONE: �� ��S D/�� ," ��i —20 X1—,1 sl °y: RE: •�l�'S� G4) "7 7'/ (Permit/des-�� 9t� (Site Address} a um r)_ L (Project or subdivision name���bS OFFICE COPY Valuation of Deferred Submittal: S eta ATTACHED IS THE FOLLOWING DEFERRED SUBMITTAL ITEM: r Copies. Description: / �1 1/.4 ---/ ,4a.'t6_ .S .. 440".. 0 Remarks: NOTE: Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2 FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: n Yes No Fee Description: Amount Due: :.s', sr ' t� Q�x�aY L�:C Deferred Submittal Fee: $ _ t.� ba‘tts. ,fit;' Additional fee based on valuation: $ AZ! Other: $ Total Fees Due: $ Special Instructions: Reprint Permit(per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: The fee for processing and reviewing deferred plan submittal shall be an amount equal to 65%of the building based on the valuation of the particular portion or portions of the project with a minimum $200.00 fee. This fee is in addition to the project plan review fee based on the total project value. t:BuildingtForms\Transmittal Lencr-DcfrdSubrtl,doc 04/04/07 T., .r., �....... , ...I r (7,11-1,I'I