Loading...
Correspondence (7) Feb 08 06 11 : 44a Welkin Engineering P. C. 503-598- 1868XPP. 1 / i ✓ l/(/" �vot-1' V/�O2 7 r'I,75-. 54> Frew/Ks. s, - `'` WELKIN ENGINEERING . P . C . I-1- • PLANNERS • ENGINEERS • SURVEYORS February 8, 2006 RECEIVED Blalock RECEI`,ED City of Tigard FEB 13125 SW Hall Boulevard 0 2006 Tigard, OR 97223 CITY OF TIGARD >!'M -Mb° BUILDING DNISION FAX 503-53-941752 Dear Brian, In our phone conversation of Monday,02/06/06, I informed you that the proposed construction change to steel studs would not be made,that wall construction based on timber studs per the approved plans would be constructed, and that I was aware of Ray Miller's concerns regarding seismic effects of the building shape. I also requested that the foundation construction be permitted to continue,through the beginning of framing. You approved my proposal. I will have a revised analysis for you next week. Framing will probably begin the week of February 20th. Thanks, Harris Hyman,Y +'LS cc: Dr. Massih, FAX 503-644-8330 David Gleason, FAX 503-430-8060 • 8000 SW PFAFFLE ST. • PORTLAND, OR • 97223 (503) 599-1866 • F(503) 5913-18515 • WELKINPC@COMCAST.NET