Loading...
Correspondence (8) �"�a""'�'lllii'IIIJ�� May 1, 2006 CITY OF TIGARD OREGON Welkin Engineering, P.0 Harris Hyman 8000 SW Pfaffle St Portland, OR 97223 RE: MASSIH OFFICE BUILDING - REVIEW Project Information Permit: BUP2004- Construction Type: 5N Tenant Name: Massih Office Building Occupancy Type: B Address: 9975 SW Frewing St Occupant Load: TBD Area: I1,14ZSq Ft Stories: 2 To whom it may concern, An additional structural design concern has been raised by Miller Consulting Engineers. The City of Tigard has now requested that Miller Consulting review the structural design of the entire building above the foundation. There is still some discrepancy about whether there is any floor or offices in the central corner of the shell. Some cross sections show joist while the plan view indicates open to below. The owner thought there were supposed to be some offices in the central corner. Miller Consulting projects to have their review done by midweek of the first week of May and you should receive a complete plan review letter. Respectfully, .$ri. sial•ck P r s Examination Supervisor. 13125 SW Hall Blvd., Tigard, OR 97223 (503)639-4171 TDD (503)684-2772 L BEAVERTON VISION WORLD, INC 11020 SW Beaverl:on-Hill.sdlae Hwy Beaverton,OR 97005 Tel. 503-526-9697 Fax. 503-644-8130 www.bvwyes.com 4/13/2006 Ed Christensen Welkin Engineering MO SW Pfaffle St. Portland,OR 99233 Dear Ed, Thank you for attending the meeting with Brian Blailock and the consulting engineer front Miller's Engineering. I ani very disappointed that Harris did not give me a straight answer on when I could expect to have the proper calculations sent to the City of Tigard. Because of his inadequate submittals,my plans have been on hold by the City of Tigard. Your company has been paid k the plans that lack details and proper calculations. The City of Tigard officials are appalled and frustrated(as so am 1),and are prepared to close the doors on my permit. My financial loss to this point is dose to$500,040,which will grow if my plans are stopped by the City. T demand that you hire another engineer who will submit to the City of Tigard the City's required calculations,on or before April 21,2006. If you fad to do this by April 21 or the City again rejects your moons,I will hire a firm and backcbarge you for all fees to finish the calculations and,at my discretion,assert claims for my losses caused by you. Tbaak you far your cooperation. Sincerely, !Camelia Massih,Principle Massih,LLC