Loading...
Plans (4)BUP2016 00075 01 00 00 GENERAL DATA LAVATORIES GENERAL REQUIREMENTS FEMALE 1. ALL CONSTRUCTION WORK SHALL BE DONE IN COMPLIANCE WITH THE LATEST EDITION OF THE OREGON FEMALE STRUCTURAL SPECIALTY CODE AND ALL OTHER STATE OR LOCAL CODE REQUIREMENTS THAT APPLY. 1 PER 40 FOR THE FIRST 80 AND 1 PER 80 FOR THE REMAINDER EXCEEDING 80 2. VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS AND AT THE EXISTING BUILDING AND 20 GA 3 5/8" METAL STUD BRACING TO NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO STARTING THE WORK. ROOF STRUCTURE AT 10'-0" OC WHERE BLDG. #: PCC BLDG. 8 (pcc232) REQUIRED 3. CONTRACTOR AND ALL SUBCONTRACTORS SHALL PERFORM DUE DILIGENCE INSPECTION OF ALL EXISTING 5. PATCH WITH DURABLE, INVISIBLE SEAMS THAT ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CONDITIONS PRIOR TO SUBMITTAL OF A PROPOSAL. SUBMITTAL OF A PROPOSAL SHALL BE CONSIDERED R-11 BATT INSULATION 4' CENTERED OVER WALL CONFIRMATION THAT SUCH INSPECTION HAS BEEN MADE, AND NO FURTHER COMPENSATION SHALL BE DUE THE CONTRACTOR FOR CLAIMS ARISING AS A RESULT OF FAILURE TO PERFORM SUCH INSPECTION. I EXISTING SUSPENDED CEILING 4. BY SUBMITTING A PROPOSAL, CONTRACTOR AND ALL SUBCONTRACTORS CERTIFY THAT THEY HAVE FLOOR AREA: B 15,927 SF OFFICE / 100 SF = O F-1 4,464 SF PRODUCTION / 200 SF = 23 OCC. EXAMINED THE SITE AND INCLUDED IN THEIR PROPOSAL ALL WORK NECESSARY TO COMPLETE THE WORK MIN. 6" PENETRATION INTO EXISTING CONCRETE AND MIN. OF 6" EXPOSURE INTO POUR BACK. CENTER 23,511 SF TOTAL 189 OCC. RACO STYLE RECESSED DESCRIBED OR REASONABLY IMPLIED IN THESE DOCUMENTS. THIS INCLUDES BUT MAY NOT BE LIMITED TO CODE ANALYSIS FOR NON -SEPARATED USES (508.3) BASIC ALLOWABLE AREA FOR MOST RESTRICTIVE REVEAL HEADER. CONCEPT ALL MATERIALS AND INSTALLATION, DISPOSAL OF EXCESS MATERIALS (USEABLE FINISH MATERIALS SHALL BE 12,000 SF SPRINKLER INCREASE (506.3, ONE STORY = ADDITIONAL 300%) 36,000 SF WALLS #1-487RDT LEFT IN THE TENANT SPACE AS DIRECTED BY PACTRUST), CLEANING AND ALL PREPARATION OF SUBSTRATE YARD INCREASE (DERIVED FROM 506.2 = ADDITIONAL 50% BASE AREA) 6,000 SF 7. REMOVE PATCHES THAT ARE VISUALLY UNSATISFACTORY IN THE ARCHITECT'S OPINION AND REPLACE AT NO SURFACES PRIOR TO INSTALLATION, AS WELL AS FINAL CLEAN UP. Q� O0 TOTAL ALLOWABLE AREA 54,0000 SF 54,000 > 46,384 SF NON SEPARATED USES ALLOWED 5. IT IS THE INTENT OF THESE CONTRACT DOCUMENTS TO MATCH AND MAINTAIN EXISTING BUILDING ADDITIONAL COST. U)° I, c\j(d 3-1/2" BATT INSUL STANDARDS FOR ALL EXISTING PRODUCTS AND SYSTEMS. UPON DISCOVERY OF A DISCREPANCY TO THIS ^.-. CC Q O� Ln 09 00 00 FINISHES INTENSION, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY. Loo T_ D.- IX 0- LL 3-5/8" MTB. STUDS @ O.C. 6. FURNISH ALL NEW MATERIALS EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE. GENERAL 5/8" GYP. BRD. BOTH SIDES ES 7. COORDINATE THE WORK OF ALL TRADES. PROVIDE CARPET "WALK -OFF MATS" TO PROTECT EXISTING o CENTER LINE OF STUD CARPETS. o, 1. CLEAN, SEAL AND WAX ALL RESILIENT FLOORS PER MANUFACTURERS SPECIFICATIONS. 8. ALL ROOF PENETRATIONS FROM ABANDONED EQUIPMENT TO BE REMOVED. PATCH AND REPAIR ROOF 2. SUBMIT SAMPLES OR DRAW DOWNS FOR THE FOLLOWING: ■ U N `_ 6'-0" MAX MAIN RUNNERS AT 4' 0" O.C. SUPPORT WITH #12 WIRE AT 4'-0" O.C. MEMBRANE AS NEEDED. Na Q 9. ALL ROOF WORK TO BE PERFORMED BY PACTRUST APPROVED ROOFING COMPANIES. APPROVED b. PLASTIC LAMINATES COUNTERSLOPE HANGERS IF MORE COMPANIES INCLUDE: V/ THAN 1:6 OUT OF PLUMB d. PAINT a. ARROW ROOFING, ALFONSO PEREZ (503) 460-2767 e. TILE, MARBLE, GRANITE, STONE, AND GROUT O STRUCTURE OR A TRAPEZE FOR DUCT AND/OR PIPE WORK 3-1/2" BATT INSUL. IN SOUND ATTENUATION WALLS b. PACIFIC ROOFING, GUY BELT (503) 640-3163 NOTE: 4" RUBBER BASE-TYP. c. GRIFFITH ROOFING, GREG STONE (503) 643-1596 CIO CONNECTION DEVICES TO BE IBC APPROVED TYPE AND HAVE 100# CAPACITY 09 53 00 SUSPENDED ACOUSTICAL CEILING ATTACH BOTTOM TRACK TO FLOOR WITH 10. KEEP THE AREA OF WORK FREE OF GARBAGE AND DEBRIS ON A DAILY BASIS INCLUDING DOCK ACCESS 1. FOLLOW MANUFACTURERS PRINTED INSTRUCTIONS FOR THE DELIVERY AND INSTALLATION OF CEILING SYSTEM, INCLUDING GRID, PANELS, AND HANGARS AND ACCESSORIES. 5 CEILING BRACING DETAIL POWDER DRIVEN ANCHORS AT 12" O.C. AREAS AND COMMON AREA. FLOORS TO BE SWEPT OR VACUUMED DAILY. NOT TO SCALE 3. CO-ORDINATE CEILING WORK WITH INSTALLERS OF RELATED WORK INCLUDING BUT NOT LIMITED TO FINISH FLOOR 11.PROVIDE ADEQUATE PROTECTION TO ALL EXISTING IMPROVEMENTS INCLUDING BUT NOT LIMITED TO SPRINKLERS O COMMON CORRIDORS AND STAIRS, BUILDING ENTRANCES, SUITE ENTRANCES, ETC. THE CONTRACTOR WILL 4. PRODUCTS: 4 7/8" /EXISTING BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGES TO EXISTING IMPROVEMENTS DUE TO CONSTRUCTION O b. TILES -ARMSTRONG FISSURED ITEM # 705,24 x 24 x 5/8"W/ ANGLED TEGULAR EDGE ACTIVITIES. 3 WALL SECTION W/ SOUND INSUL. 12.PROVIDE TEMPORARY SANITARY FACILITIES. CONSTRUCTION WORKERS SHALL NOT USE BUILDING A-1 RESTROOM FACILITIES. SCALE 1" = l'-0" 13. STORAGE AND STAGING OF CONSTRUCTION MATERIALS SHALL BE LIMITED TO AREAS AS DESIGNATED AT z w?: PRE -CONSTRUCTION MEETING. UNDER NO CIRCUMSTANCES SHALL BUILDING UTILITY AREAS OR ANY OTHER 5. ALL TILE CUTS SHALL BE DONE WITH RAZOR SHARP KNIVES. CUT/TRIM TILE EDGE TO CREATE TEGULAR EDGE COMMON BUILDING AREA BE USED FOR STORAGE. 14. KEEP THE ROOF FREE OF DEBRIS (I.E. NAILS, SCREWS, BOTTLES, ETC.) AT ALL TIMES. I__ < N < - r ­ 15. ALL DIMENSIONS ARE TO FACE OF GYPSUM BOARD UNLESS OTHERWISE NOTED. U 16. CONFIRM SIZES OF ALL OPENINGS REQUIRED FOR THE INSTALLATION OF STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING WORK PRIOR TO FRAMING OR CUTTING FOR INSTALLATION. I 17. LEAVE THE PROJECT CLEAN AND READY FOR OCCUPANCY. 6. IN EXISTING SPACES REPLACE WATER STAINED OR DAMAGED TILES. O1 fr OH U� O 18. CLEAN ADJACENT EXTERIOR AREA, I.E. WALKS, EXTERIOR GLASS, ETC. 7. TUNE UP GRID SYSTEM TO WITHIN PLUS OR MINUS 0.5 INCHES OF LEVEL. 19. FILL ALL PAPER AND SOAP DISPENSERS IN RESTROOMS AND BREAK AREAS. 20 GA. 3 5/8" MTL. STUD BRACING AT 10' O.C. 8. BENT OR DAMAGED T -BARS TO BE REPLACED, 20.13ROVIDE "AS -BUILT" DRAWINGS OF THE WORK AT THE CONCLUSION OF CONSTRUCTION. "AS -BUILT" TYPICAL STUD DRAWINGS MAY BE IN THE FORM OF TWO COPIES OF CONSTRUCTION DOCUMENTS MARKED -UP WITH RED ^Q^LO^^O LL T LL REVISION ONE SIDE SCREW ATTACHED ACCEPTABLE. PEN. DELIVER RECORD DRAWINGS TO THE ARCHITECT. COMPLETE OPERATION AND MAINTENANCE MANUALS 3. 4. SHALL BE PROVIDED FOR ALL MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT. PACTRUST MAY HOLD 5. CONTRACTOR'S FINAL PAYMENT UNTIL "AS -BUILT" DRAWINGS AND 0 & M MANUALS HAVE BEEN RECEIVED (E) PARTITION TO 12' AFF INTERIOR: co AND APPROVED. 1. WALLS: DRAWN BY: 21.IT IS THE INTENT OF THE CONTRACT DOCUMENTS THAT THE CONTRACTOR PROVIDE A COMPLETE, - DATE: 02/25/16 (E) SUSPENDED CEILING a. PRIME NEW DRYWALL WITH MILLER'S HIGH -BUILD "SUPER SEAL" PRIMER. FUNCTIONING PROJECT INCLUDING ALL GENERAL, MECHANICAL AND ELECTRICAL CONSTRUCTION REQUIRED b. NEW AND EXISTING DRYWALL TO BE FINISHED TO ACHIEVE UNIFORM COVERAGE WITH MILLER'S TYPICAL TO FULFILL THAT INTENT. ALL ITEMS REQUIRED SHALL BE FURNISHED AND INSTALLED, REGARDLESS OF I I 5/8" GYPSUM BOARD HEADER I I I I LATEX ENAMEL. � II II 2. GENERAL NOTES: WHETHER OR NOT SHOWN ON THE DRAWINGS. INSTALL STUDS WITH SAME i i i i CENTER LINE OF STUD a. KEEP ALL HARDWARE, HINGES, AND DOOR KNOBS CLEAN OF ALL PAINT SPLATTERS, DRIPS, OR ROLLER cr _ 22.ITEMS OR WORK NOT TO BE FURNISHED OR ACCOMPLISHED BY CONTRACTOR ARE NOTED "N.I.C.". DIMENSION (10" MIN.) FOR SPRAY. O 23."ALIGN" AS USED IN THESE DOCUMENTS, MEANS TO ALIGN THE FINISHED FACES OF ELEMENTS IN THE SAME BRIDGING ALIGNMENT a ` I I I I REMOVE WALL BELOW 8'-8" AFF PLANE, EITHER IMMEDIATELY ADJACENT TO ONE ANOTHER OR ACROSS AN OPENING. O ° AFTER SUSPENSION OF EXISTING c. DURING PROGRESS OF WORK, KEEP JOB SITE CLEAN OF ALL PAINT MATERIALS, RUBBISH, CANS, AND 24.DO NOT DISASSEMBLE SETS OF CONSTRUCTION DRAWINGS. DRAWINGS ARE INTERRELATED. WALL FROM STRUCTURE ABOVE RAGS AT THE END OF EACH DAY. U) O 25.SUBMIT SAMPLES OR DRAW DOWNS FOR ALL FINISHES REQUESTED TO THE ARCHITECT OF RECORD WITHIN d. UPON COMPLETION OF WORK, CLEAN ANY PAINT SPLATTER BY USING PROPER METHODS OF WASHING w u-' TWO WEEKS OF PROJECT AWARD. PRODUCTS INSTALLED WITHOUT APPROVED SAMPLES ARE SUBJECT TO AND SCRAPING, USING CARE NOT TO SCRATCH OR DAMAGE FINISHED SURFACES. ? U REPLACEMENT AT CONTRACTOR COST. AN APPROVED SUBMITTAL DOES NOT CHANGE THE CONTRACTUAL `� I e. PROTECT WORK OF OTHER TRADES. REQUIREMENT TO PROVIDE THE SPECIFIED ITEMS UNLESS SPECIFICALLY NOTED AS A SUBSTITUTION BY THE I ii POWDER DRI CONTRACTOR AND SPECIFICALLY APPROVED BY THE ARCHITECT AS SUCH. REPLACE SUCH PRODUCTS AS f. PROVIDE "WET PAINT" SIGNS AS REQUIRED TO PROTECT NEWLY PAINTED FINISHES. k ANCHORSAT DIRECTED AT CONTRACTOR'S COST. FINISH FLOOR 26.SUBMIT COMPLETE SHOP DRAWINGS FOR MILLWORK, SPECIAL SYSTEMS, MECHANICAL, ELECTRICAL AND (E) PRODUCTION (E) OFFICE PLUMBING SYSTEMS (INCLUDING FIRE PROTECTION SYSTEMS). SUBMIT A MINIMUM OF TWO COPIES OF ALL (1) #10-16 SCR SHOP DRAWINGS FOR REVIEW AND APPROVAL TO THE ARCHITECT OF RECORD. ARCHITECT WILL RETAIN ONE 26 00 00 ELECTRICAL: DESIGN / BUILD- ONLY MODIFY SYSTEM(S) AS REQUIRED TO PER STUD FLA COPY AND ONE COPY WILL BE RETURNED TO THE CONTRACTOR. ACCOMMODATE TENANT IMPROVEMENT WORK. 27.THE DESIGN OF FIRE PROTECTION SYSTEMS IS THE RESPONSIBILITY OF THE FIRE PROTECTION SYSTEMS CONTRACTOR. ALL FIRE PROTECTION SYSTEMS SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER SCALE 1 " = V-0" LICENSED BY THE APPROPRIATE JURISDICTION FOR THE DESIGN OF THIS TYPE OF SYSTEM. COORDINATE INTERFACE WITH EXISTING BUILDING SYSTEMS AND WITH ARCHITECT. ALL SPRINKLER HEADS SHALL BE CENTERED IN CEILING TILE (OR 2 x 2 MODULE OF A SECOND LOOK II TYPE OF CEILING TILE WHERE WALL BASE DETAIL APPLICABLE). LOCATION OF THOSE IN GYPSUM BOARD CEILINGS SHALL BE PRE -APPROVED IN WRITING BY 4 REST ROOM INFORMATION SUITE #100- 189 OCCUPANTS (SEE CALCULATION UNDER TENANT INFORMATION) 190 OCCUPANTS / 2 = 95 OCCUPANTS EACH SEX TABLE 29 B OCCUPANCY - WATER CLOSETS LAVATORIES MALE FEMALE MALE FEMALE 1 PER 25 FOR THE FIRST 50 AND 1 PER 50 FOR THE REMAINDER EXCEEDING 50 1 PER 40 FOR THE FIRST 80 AND 1 PER 80 FOR THE REMAINDER EXCEEDING 80 WOMEN 3 WC REQUIRED 4 WC PROVIDED 2 LAVS. REQ'D. 3 LAYS. PROV'D MEN 3 WC REQUIRED 3 WC + 1 U PROVIDED 2 LAVS. REQ'D. 3 LAVS. PROV'D TRACK WORK TO ADDITIONAL REST ROOM CORE NOT IN CALCULATIONS ABOVE: PROPOSED ALTERATION CONVERTING ONE WOMEN'S REST ROOM TO UNI -SEX SHOWER FACILITY AND LEAVING ADDITIONAL MEN'S REST ROOM AS -IS VEN T 12" O.C. EW FLAN ) ---------- z - THE ARCHITECT PRIOR TO INSTALLATION. A_4 - �_ u 28.000RDINATE ALL CONSTRUCTION SEQUENCING WITH PACTRUST AND SCHEDULE ALL SERVICE SCALE 3 - 1 0 TO PORTLAND INTERRUPTIONS OUTSIDE NORMAL BUSINESS HOURS TO MINIMIZE INCONVENIENCE TO CURRENT TENANTS. GENERAL 1. REMOVE ALL EXISTING VCT, SHEET VINYL, ETC. IN AREAS WHERE NEW FLOOR COVERING IS SPECIFIED PRIOR FLOOR AND/OR ROOF STRUCTURE TO INSTALLATION OF NEW FLOORING. I ALTERNATE MEANS OF CONSTRUCTION ARMSTRONG BERC2 CLP AS 2. ALL ROOF PENETRATIONS FOR ELECTRICAL, LOW VOLTAGE, GAS PIPING, ETC. SHALL BE SLEEVED THROUGH FOR THIS PROJECT.) A R JACK, CLAMPED WITH A STAINLESS STEEL CLAMP AND SEALED WITH VULKEM 921 A LEAD ROOF J C, POLYURETHANE SEALANT. SILICONE SEALANT NOT PERMITTED. ADDITIONAL HANGERS AT ALL MAINS WITHIN 8" OF THE PERIMETER 01 73 29 CUTTING AND PATCHING APPROVED VERTICAL STRUT AT 12'-0" O.C. EA. WAY BEGINING WITHIN 1. PERFORM CUTTING AND PATCHING WITH SKILLED CRAFTSMEN EXPERIENCED WITH THE TYPE OF WORK 6'-0" OF THE PERIMETER OF EACH CEILING SECTION. SEE STRUT DETAIL BEING UNDERTAKEN. STRUTS AT FIXTED EDGES NOT ATTACHED TO THE BUILDING TO 2. PROTECT EXISTING CONSTRUCTION TO PREVENT DAMAGE. HAVE 4 WAY LATERAL BRACING FROM THE MAIN RUNNER TO THE E T T BE RET I EDI/F BUILDING STRUCTURE ABOVE. 3. PERFORM CUTTING USING METHODS LEAST LIKELY TO DAMAGE ELEM N S 0 A N BUILDING OWNER: PACIFIC REALTY ASSOCIATES, L.P. 9 2016 15350 SW SEQUOIA PKWY #300 A T EXISTING MATERIAL THAT VISUALLY MATCH EXISTING ADJACENT 4. PATCH, USING MATERIALS IDENTICAL 0 S G S PORTLAND, ORE 97224 I�MCIT�p-Y (503) 624-6300 (PHONE) SURFACES TO THE FULLEST EXTENT POSSIBLE BLDG. #: PCC BLDG. 8 (pcc232) BLDG. PERMIT #: N/A 5. PATCH WITH DURABLE, INVISIBLE SEAMS THAT ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CONST. TYPE.: III -B TENANT INFORMATION 6. AT CONCRETE SLAB REPAIRS (POUR BACKS), PROVIDE #3 x 12" LONG REBAR DOWELS AT 24" O.C. MIN. WITH I OCCUPANCY: B / F-1 / S-2 FLOOR AREA: B 15,927 SF OFFICE / 100 SF = O F-1 4,464 SF PRODUCTION / 200 SF = 23 OCC. S-2 3,120 SF WAREHOUSE / 500 SIF = MIN. 6" PENETRATION INTO EXISTING CONCRETE AND MIN. OF 6" EXPOSURE INTO POUR BACK. CENTER 23,511 SF TOTAL 189 OCC. CODE IBC W/ 2014 OSSC .. z CODE ANALYSIS FOR NON -SEPARATED USES (508.3) BASIC ALLOWABLE AREA FOR MOST RESTRICTIVE DOWEL IN SLAB. USE (GROUP F-1) FROM TABLE 503 -TYPE III -B CONSTRUCTION 12,000 SF SPRINKLER INCREASE (506.3, ONE STORY = ADDITIONAL 300%) 36,000 SF TOTAL TO 48 000 SF , YARD INCREASE (DERIVED FROM 506.2 = ADDITIONAL 50% BASE AREA) 6,000 SF 7. REMOVE PATCHES THAT ARE VISUALLY UNSATISFACTORY IN THE ARCHITECT'S OPINION AND REPLACE AT NO / Q� O0 TOTAL ALLOWABLE AREA 54,0000 SF 54,000 > 46,384 SF NON SEPARATED USES ALLOWED Ln 00 � ADDITIONAL COST. U)° I, c\j(d U) Q ^.-. CC Q O� Ln 09 00 00 FINISHES 75 Loo T_ D.- IX 0- LL GENERAL 8" CROSS MEMBERS BETWEEN MAIN W MAX RUNNERS 1. CLEAN, SEAL AND WAX ALL RESILIENT FLOORS PER MANUFACTURERS SPECIFICATIONS. ^ 0 2. SUBMIT SAMPLES OR DRAW DOWNS FOR THE FOLLOWING: ■ U N `_ 6'-0" MAX MAIN RUNNERS AT 4' 0" O.C. SUPPORT WITH #12 WIRE AT 4'-0" O.C. a. FLOOR COVERINGS AND BASE Na Q OR WITH #10 WIRE AT S-0" O.C. b. PLASTIC LAMINATES COUNTERSLOPE HANGERS IF MORE c. ALL NATURAL WOOD (INCLUDING DOORS AND CASEWORK) V/ THAN 1:6 OUT OF PLUMB d. PAINT SECURE ALL HANGERS TO BLDG. e. TILE, MARBLE, GRANITE, STONE, AND GROUT O STRUCTURE OR A TRAPEZE FOR DUCT AND/OR PIPE WORK f. TOILET PARTITIONS f. NOTE: CEILING SYSTEM TO BE USED SHALL BE CLASSIFIED AS "HEAVY DUTY". ALL h;OILET AA CIO CONNECTION DEVICES TO BE IBC APPROVED TYPE AND HAVE 100# CAPACITY 09 53 00 SUSPENDED ACOUSTICAL CEILING U a 1. FOLLOW MANUFACTURERS PRINTED INSTRUCTIONS FOR THE DELIVERY AND INSTALLATION OF CEILING SYSTEM, INCLUDING GRID, PANELS, AND HANGARS AND ACCESSORIES. 5 CEILING BRACING DETAIL 2. USE ALL PRODUCTS FROM ARMSTRONG WORLD INDUSTRIES, INC. A-4 NOT TO SCALE 3. CO-ORDINATE CEILING WORK WITH INSTALLERS OF RELATED WORK INCLUDING BUT NOT LIMITED TO INSULATION, GYPSUM BOARD, LIGHT FIXTURES, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS AND FIRE SPRINKLERS O ROOF SYSTEM ON 2 X PURLINS 4. PRODUCTS: U /EXISTING a. GRID - PRELUDE 24 XL 15/16" EXPOSED TEE (HEAVY DUTY) O b. TILES -ARMSTRONG FISSURED ITEM # 705,24 x 24 x 5/8"W/ ANGLED TEGULAR EDGE W � c. ACCESSORIES - MANUFACTURERS' STANDARD cz~ } _�_j z w?: 2 X 4 NAILER @ 24" O.C.- SECURE TO (E) PURLIN: 5. ALL TILE CUTS SHALL BE DONE WITH RAZOR SHARP KNIVES. CUT/TRIM TILE EDGE TO CREATE TEGULAR EDGE Yt WdN I__ < N < - r ­ U CONDITION SO THAT CEILING TILES LAY FLAT. I OC 6. IN EXISTING SPACES REPLACE WATER STAINED OR DAMAGED TILES. O1 fr OH U� O 3 5/8" MTL. STUDS 16" O.C.- SECURE TOP TO 2 X 4 NAILER 7. TUNE UP GRID SYSTEM TO WITHIN PLUS OR MINUS 0.5 INCHES OF LEVEL. ULL 20 GA. 3 5/8" MTL. STUD BRACING AT 10' O.C. 8. BENT OR DAMAGED T -BARS TO BE REPLACED, 5/8" TYPE GYPSUM BOARD 9. REPAIR HOLES IN GRID FROM REMOVED WALLS. USE OF ARMSTRONG "BP ES -4" EXPANSION SLEEVE ^Q^LO^^O LL T LL REVISION ONE SIDE SCREW ATTACHED ACCEPTABLE. 3. 4. 09 91 23 PAINTING 5. 6. (E) PARTITION TO 12' AFF INTERIOR: co 1. WALLS: DRAWN BY: - DATE: 02/25/16 (E) SUSPENDED CEILING a. PRIME NEW DRYWALL WITH MILLER'S HIGH -BUILD "SUPER SEAL" PRIMER. b. NEW AND EXISTING DRYWALL TO BE FINISHED TO ACHIEVE UNIFORM COVERAGE WITH MILLER'S ACROPURE 1450 WITH A TIGHT ROLLER STIPPLE FINISH. RESTROOM FINISHES TO BE MILLER'S S/G I I 5/8" GYPSUM BOARD HEADER I I I I LATEX ENAMEL. � II II 2. GENERAL NOTES: i i i i CENTER LINE OF STUD a. KEEP ALL HARDWARE, HINGES, AND DOOR KNOBS CLEAN OF ALL PAINT SPLATTERS, DRIPS, OR ROLLER cr _ I SPRAY. O b. ALL SURFACES TO BE SANDED BETWEEN COATS, PRIOR TO INSTALLATION OF NEXT COAT. z a ` I I I I REMOVE WALL BELOW 8'-8" AFF O ° AFTER SUSPENSION OF EXISTING c. DURING PROGRESS OF WORK, KEEP JOB SITE CLEAN OF ALL PAINT MATERIALS, RUBBISH, CANS, AND WALL FROM STRUCTURE ABOVE RAGS AT THE END OF EACH DAY. U) O d. UPON COMPLETION OF WORK, CLEAN ANY PAINT SPLATTER BY USING PROPER METHODS OF WASHING w u-' 14 AND SCRAPING, USING CARE NOT TO SCRATCH OR DAMAGE FINISHED SURFACES. ? U I `� I e. PROTECT WORK OF OTHER TRADES. I ii F � i, f. PROVIDE "WET PAINT" SIGNS AS REQUIRED TO PROTECT NEWLY PAINTED FINISHES. FINISH FLOOR 23 00 00 HVAC: DESIGN / BUILD- ONLY MODIFY SYSTEM(S) AS REQUIRED TO ACCOMMODATE (E) PRODUCTION (E) OFFICE TENANT IMPROVEMENT WORK. 26 00 00 ELECTRICAL: DESIGN / BUILD- ONLY MODIFY SYSTEM(S) AS REQUIRED TO 6 WALL DROP AT SUSPENDED CEILING ACCOMMODATE TENANT IMPROVEMENT WORK. A-6 SCALE 1 " = V-0" z O m co _ _ - __ CARMAN RD. EXIT #291 u LF r- - - - J Q�j n 16 TT [T_ 10 17 n ..... n01 =� - Ir rn �R O 7 -- _, _ _ - - 9 J I 7 �z 1 o of O�� cl �O Q A b ' / SW 72ND AVENUE VICINITY MAP BUILDING LOCATION Za NOT TO .SCALE area of work r- - - - - - - - - - - - - - - - - - - area of work 2 VICINITY MAP " A-7 NOT TO SCALE Phase 2 TENANT IMPROVEMENT for PA CIFIC STAR COMMUNICATIONS, INC. PROJECT NARRATIVE PROJECT CONSISTS OF MINOR TENANT IMPROVEMENT WORK TO 23,511 SF OF INTERIOR SPACE. WORK SHALL INCLUDE BUT NOT BE LIMITED TO SELECTIVE DEMOLITION, DRYWALL/METAL STUDS, FLOOR FINISHES, DOORS/FRAMES/HARDWARE AND PAINTING. ALL EXISTING CONSTRUCTION COMPLIES WITH AND ALTERATIONS WILL COMPLY WITH CURRENT ANSI/ICC A117.1 CODE. WORK INCLUDED BUT PERFORMED UNDER SEP. PERMIT PLUMBING WORK FIRE PROTECTION SPRINKLERING HEATING, VENTILATION & AIR CONDITIONING WORK ELECTRICAL WORK, BOTH LINE VOLTAGE AND LOW VOLTAGE BUILDING INFORMATION _ BUILDING OWNER: PACIFIC REALTY ASSOCIATES, L.P. 9 2016 15350 SW SEQUOIA PKWY #300 c);: PORTLAND, ORE 97224 I�MCIT�p-Y (503) 624-6300 (PHONE) (503) 624-7755 (FAX) BLDG. #: PCC BLDG. 8 (pcc232) BLDG. PERMIT #: N/A Li CONST. TYPE.: III -B TENANT INFORMATION TENANT: PACIFIC STAR COMMUNICATIONS INC. I OCCUPANCY: B / F-1 / S-2 FLOOR AREA: B 15,927 SF OFFICE / 100 SF = 160 OCC. F-1 4,464 SF PRODUCTION / 200 SF = 23 OCC. S-2 3,120 SF WAREHOUSE / 500 SIF = 6 OCC. 23,511 SF TOTAL 189 OCC. CODE IBC W/ 2014 OSSC .. z CODE ANALYSIS FOR NON -SEPARATED USES (508.3) BASIC ALLOWABLE AREA FOR MOST RESTRICTIVE } USE (GROUP F-1) FROM TABLE 503 -TYPE III -B CONSTRUCTION 12,000 SF SPRINKLER INCREASE (506.3, ONE STORY = ADDITIONAL 300%) 36,000 SF TOTAL TO 48 000 SF , YARD INCREASE (DERIVED FROM 506.2 = ADDITIONAL 50% BASE AREA) 6,000 SF [L / Q� O0 TOTAL ALLOWABLE AREA 54,0000 SF 54,000 > 46,384 SF NON SEPARATED USES ALLOWED Ln 00 � CODE SUMMARY ALL CONSTRUCTION WORK SHALL BE DONE IN COMPLIANCE WITH STATE AND LOCAL CODE REQUIREMENTS THAT APPLY, INCLUDING BUT NOT LIMITED TO: • 2014 OREGON STRUCTURAL SPECIALTY CODE • 2014 OREGON MECHANICAL SPECIALTY CODE (GMSC) • 2014 OREGON PLUMBING SPECIALTY CODE (OPSC) • 2014 OREGON ELECTRICAL SPECIALTY CODE (OESC) • 2014 OREGON FIRE CODE (OFC) • ASCE-7-10 ■ IGC/ANSI Al 17.1-2009 • 2014 OREGON ENERGY EFFICIENCY SPECIALTY CODE CT"I'Y OF TIGARD REVIEWED FOR CODE COUJUANC33 Approved: t L" OTC: r� Permit #1 A6."I0 -7 Addres6t ( ` Suite BY: I Dates dqhc=, V 3 1� OFFICE COPY BUILDING DEPARTMENT USE GEE- 41V E jr-11 MAR 9 2016 c);: -r;(,;. ni,-'ic I�MCIT�p-Y PROJECT #16110 U Li F I U Q .. z O o O } Cb Z Y 'It [L = Q� O0 0O C' O Ln 00 � Z U)° I, c\j(d U) Q ^.-. CC Q O� Ln OLO 75 Loo T_ D.- IX 0- LL W EL ^ 0 ■ U N `_ Na Q (- 00 4� M V/ z O m� CIO U a O U O O W � cz~ } _�_j z w?: cf)0 Yt WdN I__ < N < - r ­ U o m oDo � OC 4- -- O1 fr OH U� O o U ULL ULa Ln C13��</� VJ ^Q^LO^^O LL T LL REVISION 1. 2. 3. 4. 5. 6. 7. 8. DRAWN BY: mwh DATE: 02/25/16 PERMIT SET DEMOLITION NOTES: D1 REMOVE EXISTING PARTITION & DISPOSE OF; D2 REMOVE EXISTING FLOOR FINISH & BASE- PREP WALLS FOR NEW BASE D3 INSTALLATION; D4 REMOVE EXISTING DOOR/FRAME/RELITE AND SALVAGE FOR REUSE; a re a of w o r k D5 REMOVE EXISTING CABINETRY AND DISPOSE OF; _ _ _ D6 REMOVE EXISTING TOILET FIXTURES AND DISPOSE OF; -9 D7 REMOVE / RELOCATE EXISTING STOREFRONT DOOR; r ____ __ D7 ----------------------- REMOVAL- DIAMOND GRIND CONCRETE SLAB TO Ds IN ADDITION TO FLOOR/BASE I --------------------------. ----------------- ` II CLEAN CONDITION FOR APPLICATION OF ESD SEALER; /' II I 9 i II === II 11 PLAN NOTES: I D3 O D3 D2 OFFICE CIRC. 0 NEW CARPET & BASE TO AS CLOSELY MATCH EXISTING AS POSSIBLE; 136 2 NEW CEILING HEIGHT PARTITION(S)- REFER TO DETAIL 3/A-1; I ' 11 138 OFFICE CONF. INFILL EXISTING WALL W/ 5/8" GYPSUM BOARD EACH SIDE OF 3 5/8" METALI LL I - � ;,I D1 135 134 -\CD3 D1 II D1 D2 2 1 STUDS AT 24" O.C. PACK WALL CAVITY WITH SOUND ATTENUATION INSULATION _'----_--_--_-_ 1j O �12 14 PRIOR TO COVER- PATCH AND PAINT; I 0 _ __ __ D2 =__� D3 I I 11 I 1 O4 FIBERGLAS ADA SHOWER UNIT, PROVIDED BY PACTRUST, INSTALLED BY I I I pg g 2 `, i I I rrr_-- CONTRACTOR; i i 00� D2 i i OFFIr1 0 RELOCATED WC AND GRAB BARS; I -8111III A 3 i i D1 D3 9 i 13 ��U D4 i D4 6 NEW CT FLOORING- MATCH MODULE; 0 0 PROVIDE OPAQUE FILM TO STOREFRONT GLAZING BELOW 7' AFF TO MATCH I� � it D2 i iiii 10 EXISTING; PROD. WEST PROD. EAST --a'-1 3 s APPLY ESD SEALER TO CLEAN CONCRETE SLAB; INSTALL 4" COVED RUBBER BASE TO EXISTING WALLS PRODUCTION SIDE OF WALL --------_ 14o ii 139 CIRC) --------------------�-- 0 AFFECTED BY DEMO WORK; D1 D1 s D1 11 10 CLOSER/LOCK 129 10 CUT -IN SLOT RELITE THIS DOOR- MATCH EXISTING; O11 J ------ --�— � --U- NI-SHOWER RELOCATE EXISTING DOOR/FRAME/(RELITE ELITE);•Al �i, I 126 17 12 THIS WALL TO 12' AFF; D1 I I i i 4 i 6" 1 �FFICE I 13 RELOCATE ELECTRICAL PANEL; 16 Obi D3 D1 9 JD 1Fl-30-1 STOR. A14 PROVIDE NEW WOOD BASE TO MATCH EXISTIBG ALONG THIS WALL; I i/ i D2 i pg 2g f i - ' �_ I 131 15 MODIFY/ADD SLATE TILE TO MATCH EXISTING; I13 it D8OA SHAD VEST. I 1 1 16 INSTALL NEW OVERHEAD DOOR TO MATCH EXISTING; 17 1 17 PROVIDE OCCUPANCY INDICATOR THIS DOOR, REPLACE DOOR AS NECESSARY; I 107 O9 9 Ir ------------D4------------ SERVER NOTE- PATCH, CLEAN, PRIME AND PAINT ALL GYPSUM BOARD WALLS AFFECTED BY I 128 SELECTIVE DEMO �'���� �������������������������������� ��BF 7 125 _ 127 LARGE SCALE FLOOR PLAN - SHOWER 126 SCALE 1/4" = l'- 0" I■ I I II 'I STOR. ENG. SUPP. I I jj O 143 142 �i Fan -, I I �� LJ 0 0 DEV. LAB 141 OPEN OFFICE 149 CIRC. 147 LP CIRC. 144 TEL \Ij 119 =4q ❑ CIRC. CIRC. OFFICE WAREHOUSE r-11-81117 120 106 WOMEN znell116 1_1 W r 0 145 �r)I H N I rn M 146 I 0 1010c= [=(D =0 I I I II 0 0 I I I t MEN Fl f I------- Li II II II n H TRAINING/LUNCA CIRC. IT LAB ' I 104 105 iiii 103 � I I uu H I I IIII I I I I II II H II CONFERENCE 101 CRTC. 102 RECEPTION 100 WORK/COPY 114 0 L OFFICE 121 OPEN OFFICE 109 MARKETING JL//7 113 ------------------ — — — L - — — — — — — I I _ D3 \ T�, CONFE ' NCA/ D1 2 JFFICEOFFICE D71111F, 10 i II I II II EXEC. OFFICE II OFFICE 148 I i i 1O ENTRY 150 II 1 151 II - -------------------------------------------------- ----- area of work 1 PARTITION & POWER PLAN N A-2 SCALE 1/8" = l'- 0" OPEN OFFICE 10s D OFFICE 132 OFFICE 122 I I I I I I I I I I OFFICE 123 ----------- FM I I I I I I I I I I I I L I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Fol PROJECT #16110 W EL U`�N Cc N EL Q 00 M z O my U a 0 O U _0 W Z -F-� U cf) III a- N N Ua: 0 o:� •-0-o 0 L4__ o a) '— o o U U� ULA U LL LoCa ^ Ln ^— LO 0 a- T LL REVISION 1. Add. # 1 - 3-7-16 2. 3. 4. 5. 6. 7. 8. DRAWN BY: mwh DATE: 02/25/16 PERMIT SET A- 21 U W U Q z 0 O 4 } O 0 Lo . �j 0p (y) r-- Z W U)° C\l C\j Q 000 Lo LoO =X T_ a_ 0 -LL W EL U`�N Cc N EL Q 00 M z O my U a 0 O U _0 W Z -F-� U cf) III a- N N Ua: 0 o:� •-0-o 0 L4__ o a) '— o o U U� ULA U LL LoCa ^ Ln ^— LO 0 a- T LL REVISION 1. Add. # 1 - 3-7-16 2. 3. 4. 5. 6. 7. 8. DRAWN BY: mwh DATE: 02/25/16 PERMIT SET A- 21 _I 00 CEILING WORK SCOPE cl REMOVE EXISTING LIGHT & RELOCATE; C2 NEW LIGHT LOCATION- MATCH EXISTING; a re a of W o r k cs RELOCATE EXISTING HVAC; C4 NEW DRYWALL HEADER AT 8'-8" AFF- PAINT; r��������������������������������� C5 REMOVE EXISTING TRACK LIGHTS AND DISPOSE OF; ■ _ L-----� area of work 1 REFLECTED CEILING PLAN " A-3 SCALE 1/8" = l'- 0" PROJECT #16110 U w I- U rr Q z O o 0 Z Y Z QC 00)o Lo� >• O Z �o , �(.c) 0� 00 `/ LOO^=^ T LL IX LL UL H W EL . NO N EL Q *A M rn V! q z El 0 m� U a 0 Uo O W c� z . U) LLl 0_ N N Uoc0°� r) _ q - U 0(1)� 0U�0 LL U 0 M �_�� u- `n ro LO If� d- o a- REVISION 1. Add. # 1 - 3-7-16 2. 3. 4. 5. 6. 7. 8. DRAWN BY: mwh DATE: 02/25/16 PERMIT SET