Report 6a6v,t6--000szl
e) . C I 2_5 57-3
CARE
October 5, 2006 w,
City of Tigard Ntg � IN
13125 SW Hall Blvd. .
Tigard, OR 97223
Attention: Val Henzel, Senior Plans Examiner
Brian Blalock, Plans Examination Supervisor
RE: Response to City of Tigard Plan Check Comments—Review#5 Dated September 15, 2006
STRUCTURAL
Val, it is our understanding at this point,that we are still running into complications between Miller
Engineering, and our vendor, Rowell Engineering that they are working through. As soon as we have
information, we will complete this item on the list.
FIRE-LIFE-SAFETY
**New Remark A...
--Val, we are bringing to our meeting today two separate proposals as alternatives to this issue. We will
go over them at our meeting on Thursday, October 5th at 2 PM at your office. Hopefully they will suffice
and we can complete this issue.
3. Required Wall Rating Assemblies
Owner Response—Rated Assembly information is being submitted with this letter to address all rated
walls, floor/ceiling, and roof issues.
6. Copy of STC 50 System and TJI designed floor system
Owner Response—STC 50 System rated assembly information provided via both printed material and
the gypsum manufacturer book showing the UL rating system for an STC 50 system. From numerous
printed materials,the STC 50 rating shall consist of: One layer of 5/8" gypsum wallboard on each side of
single studs,plus an additional resilient typical sound channel on one side of the wall. Pictures and
diagrams to follow. In addition, copy of the TJI floor system designed by BMC West showing layouts
and details of both second and third floor framing are enclosed.
9. Shaft enclosure design details at elevator.
4444 SE Oatfield Hill Rd. Milwaukie, OR 97267
503-653-5656 www.elite-care.com
R
44,
CARE
Owner Response—STC 50 rating system previously addressed. Copies of ESR-1153 (17 Pages) and
PFC-4354 (27 Pages) are enclosed with this response.
11. Fire Reistive structural member locations
Owner Response—Same as item#9, STC 50, ESR-1153, and PFC-4354 rating systems have been
provided.
14. TVF&R Reports
Owner Response—Copy of previously submitted TVF&R report has been enclosed. In addition, during
the Thursday, October 5, 2006 meeting,the fire marshall is going to be present to address any other issues
that you feel are necessary as a result of this report.
16. Egress Pathway Issues for Porte Cochere
Owner Response—We will have a copy of the code book with us, and can discuss this issue in person to
determine the correct way to submit a response to this item.
23. Point of Safety—2' & 3rd Floors
Owner Response—Should be addressed with the re-drawing of plans submitted today due to issues
arising from Fire/Life Safety issue#A(New Remark from 8/9/06)
25. Roof Assembly information
Owner Repsonse—This item will also be addressed today,but roof is heavy timber construction which
should rate out to 1 hour construction without any problems. Again,the fire marshall will be in the
meeting today at 2 PM so we can discuss the use of heavy timbers versus standard construction and fire
burn times to ensure that we meet this requirement without any additional information since there are no
UL listings for straight heavy timber construction.
Val,thank you for your time today, we look forward to the reconciliation timely of all of these manners.
Thank you,
Mark Reed
NW Ventures Group, Inc. for Elite Care
4444 SE Oatfield Hill Rd. Milwaukie, OR 97267
503-653-5656 www.elite-care.com
CARE
E
October 6,2006
John K.Dalby
Deputy Fire Marshal 900 \.
TVF&R
14480 SW Jenkins Road
Beaverton, OR 97005-1152
Re: 12353 SW Grant Street Development
John,
•
Thank you for taking the time to sit down with the group yesterday to discuss our residential care facility at
12353 SW Grant Street in Tigard.
As you recall,there were two major items that were discussed in the meeting that needed some sort of letter
to Val Henzel at the City of Tigard,or just a note to her stating that you were agreeing to the following
•
items_
Ihose two items addressed were:
1.The Gate at the entrance to the property
—This gate will be allowed so long as there is a push buttonftutn-key entrance that releases the gate
automatically as the gate will be electrically controlled. In case of an electrical problem,the gate will be able
to be opened easily by a single person,as per code. In addition,we will attempt to put the gate far enough
back on the property to allow the fire truck to not sit in the street as per your request,although depending on
site engineering,we may not be able to get the truck 100%off the street
2. The Fire Hydrants to the property
--As this is a fully sprinklered building,you will allow Two fire hydrants to be placed on site,one on either
side of the driveway located directly behind the sidewalk in the public right of way.
In addition to these items,we discussed minor engineering issues that will be addressed and located on our
site plans. We will make all of those changes to the plans in order for the engineering to be signed off..
Should you have any questions,please feel free to contact me directly.. I will copy this letter to the parties
involved in our meeting yesterday.
Ihank you,
/
Mark Reed
NW Ventures Group,for Elite Care
971-506-0167
reed@stdairy..com
4444 SE Oatfield}Jill Rd.. Milwaukie,OR 97267
503-653-5656 www.elite-care.com
October 10, 2006
Elite Care
Bill Reed
2300 SW 103`d
Portland, OR 97225
RE: GRANT STREET ELI 1'E CARE-NEW BUILDING —REVIEW#6
Project Information
Building Permit: BUP2006-00053 Construction Type: V-A
Tenant Name: Grant Street Elite Care Occupancy Type: SR-1
Address: 12353 SW Grant St. Occupant Load: 394
Area: 31,279 sq ft Stories: 3
The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition;
and the State of Oregon Fire Code (OFC) 2004 edition. For better clarity I have removed issues that have
been resolved. Please provide the following information in order to complete the review.
Note (First request April 5,2006,2nd request 6/30/06,3'request 8/9/06,4th request 8/28/06,5th request 9/15/06)
STRUCTURAL
1. The structural review was completed by Miller Consulting.The plan review dated January 16, 2006,was
E-Mailed to Afghan Associates for response (review doc. attached).
RESPONSE RECEIVED 8/14/06 sent structural to Miller for review—**9/15/06- Ray Miller spoke
with Todd Rowell on 8/16/06,on the requirements to meet the irregular building requirements and
not being able to use the simplified analysis approach per 1616.61, 1617.5 has to be designed per sec
1620.2.3 requirements.Therefore, they stated they will be submitting new structural calcs and design
complying with chapter 16.
FIRE LIFE-SAFETY- Please provide the following,
**New remark *8/9/06- 10/5/06 awaiting information on this issue
A. Gates at 2nd floor exit stairway obstruct landing more than 1/2 distance per 1009.4 revise Stairway landings.
RESPONSE PARTIALLY ACCEPTED 10/5/06— Awaiting design information on stairway
alternate per meeting held 10/5/06 and conversation
held with Brian and Scott on 10/9/06—Scott
verifying code compliance of open stair between floors 2 and 3.
RESPONSE ACCEPTED Items #3,6,9,11,17 and 25 --- 10/5/06—Thank you for your submittal of a
copy of the approved listed rated assembly STC 50 system , the TJI designed floor system used,STC
50 system for one hour assemblies and ESR-1153 and PFC 4354 system information for the two hour
assemblies and roof assembly.
16. Egress path and occupant load 1004, 1013, 1014 (The construction documents shall show in sufficient detail
the location, construction, size and character of all portions of the means of egress in compliance with the provisions of
this code. The construction documents shall designate the number of occupants to be accommodated on every floor, and
in all moms and spaces. 106.1.2)
RESPONSE PARTIALLY ACCEPTED 6/28/06—Thank you for your response on the egress path
information and on 8/9/06 the occupant load issue with the corridor. Please provide information on
the exit discharge into the Porte Cochere(exit court) example, is it rated and sprinkled is there
glazing etc. this area needs to comply with section 1023 and section 1023.5.
A. Table 1004.1.2 shall be used for occupant load calculation for I-1 occ. Sleeping area 1/120 etc. B.
Hall/corridor serves more than 10, clam 72"requirement SR10108.2.1, 1005 C. Smoke partition and 1
hour wall design required for corridor confirm assembly complies SR104.2 (note stairs also included in
this enclosure) D. Provide egress path of travel lay out. E.Access discharge at exit court 1023
23.Point of safety 2"d& 3th floors SR104.3.1, 1021
RESPONSE ACCEPTED 10/5/06—Thank you for your response will be handled with new remark
#A above
NOT PART OF THIS REVIEW:
• Electrical, Fire Sprinklers, Fire Alarms, Mechanical System, Site, & Plumbing
SITE—Issues addressed on sit permit#SIT2006-00014 . RESPONSE ACCEPTED 10/5/06—
1. Gate to be push button/turn-key electrically controlled and automatic release when power shut
down. Final approval by Fire Marshal. 2.Fire Marshal approval of fire hydrant location provided
locations marked on site plan with hydrant located within 600 feet of building.
Please provide an item by item response.
When submitting revised drawings or additional information, please attach a copy of the enclosed City of
Tigard, Letter of Transmittal.The letter of transmittal assists the City of Tigard in tracking and processing
the documents.
Respectfully,
Val Henzel,
Senior Plans Examiner
October 12, 2006
City of Tigard, Oregon
13125 SW Hall Blvd.
Tigard, OR 97223
Attention: Val Henzel, Senior Plans Examiner
Brian Blalock,Plans Examination Supervisor
RE: Response to City of Tigard Plan Check Comments of October 10, 2006
for the Grant Street Elite Care Building.
RE: GRANT STREET ELITE CARE -NEW BUILDING—REVIEW #6
Project Information
Building Permit: BUP2006-00053 Construction Type: V-A
Tenant Name: Grant Street Elite Care Occupancy Type: SR-1
Address: 12353 SW Grant St. Occupant Load: 394
Area: 31.279 sq ft Stories: 3
The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition;
and the State of Oregon Fire Code (OFC) 2004 edition. For better clarity I have removed issues that have
been resolved. Please provide the following information in order to complete the review.
Note (First request April 5,2006,2nd request 6/30/06, 3rd request 8/9/06,4th request 8/28/06, 5th request 9/15/06)
STRUCTURAL
1. The structural review was completed by Miller Consulting. The plan review dated January 16, 2006,was
E-Mailed to Afghan Associates for response (review doc. attached).
RESPONSE RECEIVED 8/14/06 sent structural to Miller for review—**9/15/06 - Ray Miller spoke
with Todd Rowell on 8/16/06, on the requirements to meet the irregular building requirements and
not being able to use the simplified analysis approach per 1616.61, 1617.5 has to be designed per sec
1620.2.3 requirements. Therefore, they stated they will be submitting new structural calcs and design
complying with chapter 16.
Response from Ownership
- Now that the central stair issue hasbeen resolved, Rowell Engineering has
been directed to complete their work in response to this project. Submittal from
Rowell to Miller pending.
FIRE LIFE-SAFETY- Please provide the following;
**New remark*8/9/06 - 10/5/06 awaiting information on this issue
A. Gates at 2"d floor exit stairway obstruct landing more than 1/2 distance per 1009.4 revise Stairway landings.
RESPONSE PARTIALLY ACCEPTED 10/5/06— Awaiting design information on stairway
alternate per meeting held 10/5/06 and conversation held with Brian and Scott on 10/9/06—Scott
verifying code compliance of open stair between floors 2 and 3.
Response from Ownership
- Revised plans addressing this central stair have been submitted which
addresses concerns addressed by Tigard Plan Check in our meeting of 10/5/06 and
the conversation of Brian and Scott on 10/9/06. No open stair has been submitted.
See revised drawings A 2.1,A2.2,A2.3 Plans for floors 1, 2 and 3.
RESPONSE ACCEPTED Items #3,6,9,11,17 and 25 --- 10/5/06—Thank you for your submittal of a
copy of the approved listed rated assembly STC 50 system , the TJI designed floor system used, STC
50 system for one hour assemblies and ESR-1153 and PFC 4354 system information for the two hour
assemblies and roof assembly .
16. Egress path and occupant load 1004, 1013, 1014 (The construction documents shall show in sufficient detail
the location, construction, si<e and character of all portions of the means of egress in compliance with the provisions of
this code. The construction documents shall designate the number of occupants to be accommodated on everyfloor, and
in all rooms and spaces. 106.1.2)
RESPONSE PARTIALLY ACCEPTED 6/28/06—Thank you for your response on the egress path
information and on 8/9/06 the occupant load issue with the corridor. Please provide information on
the exit discharge into the Porte Cochere(exit court) example, is it rated and sprinkled is there
glazing etc. this area needs to comply with section 1023 and section 1023.5.
A. Table 1004.1.2 shall be used for occupant load calculation for I-1 occ. Sleeping area 1/120 etc. B.
Hall/corridor serves more than 10, clarify 72" requirement SR10108.2.1, 1005 C. Smoke partition and 1
hour wall design required for corridor confirm assembly complies SR104.2 (note stairs also included in
this enclosure) D. Provide egress path of travel lay out. E. Access discharge at exit court 1023
Response from Ownership
- Revised plans addressing this Porte Cochere area has been noted as a 1 hr
rating throughout and that fire suppression sprinklers will be installed throughout this
area and addresses sections 1023 and 1023.5 of the 2003 IBC.
23. Point of safety 2"d& 3`d floors SR104.3.1, 1021
RESPONSE ACCEPTED 10/5/06—Thank you for your response will be handled with new remark
#A above
NOT PART OF THIS REVIEW:
• Electrical, Fire Sprinklers, Fire Alarms, Mechanical System, Site, & Plumbing
SITE—Issues addressed on sit permit# SIT2006-00014 . RESPONSE ACCEPTED 10/5/06—
1. Gate to be push button/turn-key electrically controlled and automatic release when power shut
down. Final approval by Fire Marshal. 2. Fire Marshal approval of fire hydrant location provided
locations marked on site plan with hydrant located within 600 feet of building.
Please provide an item by item response.
Regards,
Scott Churchill
RECEIVED
November 1, 2006 NOV 1 2006
CITY OF TIGARD
BUILDING DIVISION
City of Tigard, Oregon
13125 SW Hall Blvd.
Tigard, OR 97223
Attention: Val Henzel, Senior Plans Examiner
Brian Blalock,Plans Examination Supervisor
RE: Response to City of Tigard Plan Check Comments of October 17, 2006
for the Grant Street Elite Care Building. —Structural Engineering Item
Project Information
Building Permit: BUP2006-00053 Construction Type: V-A
Tenant Name: Grant Street Elite Care Occupancy Type: SR-1
Address: 12353 SW Grant St. Occupant Load: 394
Area: 31.279 sq ft Stories: 3
STRUCTURAL
1. The structural review was completed by Miller Consulting. The plan review dated January 16, 2006,was
E-Mailed to Afghan Associates for response (review doc. attached).
RESPONSE RECEIVED 8/14/06 sent structural to Miller for review—**9/15/06 - Ray Miller spoke
with Todd Rowell on 8/16/06, on the requirements to meet the irregular building requirements and
not being able to use the simplified analysis approach per 1616.61, 1617.5 has to be designed per sec
1620.2.3 requirements. Therefore, they stated they will be submitting new structural calcs and design
complying with chapter 16.
Ownership Response - These changes have now been made by Rowell
Engineering with the agreement of Ray Miller. This response submission is being
given simultaneously to both City of Tigard and Miller Engineering per the request
of Val Henzel.
L
JOB NAME: Elite Care Extended Family Residence CITY OF TIGARD
JOB ADDRESS: 12345 SW Grant St., Tigard, Oregon 13125 SW HALL BLVD
DATE: December 1, 2006 TIGARD, OR 97223
SHEET 1 OF 2
Project No. 060376 STRUCTURAL PLAN REVIEW#3
Calculations Dated 12/1/06
Corr. Item Page No. Comments Code Section
Made No.
11/1/06 1 Insufficient information on construction 106.1.1
documents. (See items below)
11/1/06 2 Calculations Wind Design 1603.1.4
11/1/06 3 Calculations Earthquake Design 1603.1.5
11/1/06 4 Calculations and Clarify which shearwall schedule is noted on 106.1.1
Sheets A2.1, A2.2 and which plans.
A2.3
11/1/06 5 Beam Calculations Clarify location of beams. 106.1.1
R1 thru R6
Beams 1 thru 9
11/1/06 6 Sheets A2.0, A2.1, Clarify which detail apply at which location 106.1.1
A2.2, A2.3 and A2.4
12/1/06 7 Sheet A2.4 Submit calculations and load for snow. 1608
Including drifting.
11/1/06 8 Sheet A2.4 Submit calculations and details for wind at 1609
overhangs soffits and edges.
11/1/06 9 Sheets A2.0, A2.1, Submit calculations and details for plan 1620.4
A2.2, A2.3 and A2.4 irregularities and vertical irregularities.
11/1/06 10 Calculations Submit calculations for path of wind and 1609.1
seismic forces to shear walls. 1617
12/1/06 11 Special Inspection Submit special inspection program. 1704
1707
12/1/06 12 Quality Assurance Submit quality assurance program. 1705
1707
12/1/06 13 A5.2 Roof Framing Submit calculations for roof framing 106.1.1
members.
NOTE: Submitted calculations have errors.
14 General Submit one set of roof and floor joist and
(Deferred Submittal) beam shop drawings, which have been
reviewed and initialed by the Project
Engineer, to be filed with the City of Tigard
before placement.
JOB NAME: Elite Care Extended Family Residence CITY OF TIGARD
JOB ADDRESS: 12345 SW Grant St., Tigard, Oregon 13125 SW HALL BLVD
DATE: December 1, 2006 TIGARD, OR 97223
SHEET 2 OF 2
Project No. 060376 STRUCTURAL PLAN REVIEW# 3
Calculations Dated 12/1/06
Corr. Item Page No. Comments Code Section
Made No.
15 General Approved resolution of the above items shall
be incorporated into submittal plans before a
permit will be issued. Submit (4) sets of the
revised plans to the City of Tigard.
ragcivi i
Val Henzel - RE: Status on Plan Check for Elite Care -Grant Street Tigard
From: Val Henzel
To: Churchill, Scott
Date: 12/6/2006 9:44 AM
Subject: RE: Status on Plan Check for Elite Care-Grant Street Tigard
CC: Blalock, Brian; CPMARCH@aol.com; Reed', 'Mark
Scott,
I have received Ray millers review document response dated 12/1/06 and it shows all issued resolved with item
14 stating deferred submittal information and item 15 stating submittal of 4 complete sets of plans,we only need
2 complete sets of plans submitted incorporating resolutions of all issues as noted on my review and Rays.At
this time no plans have been submitted to this office addressing these completed plans.
Val Henzel
Senior Plans Examiner
13125 SW Hall Blvd.
Tigard, OR 97223
(503)718-2436
valva tigard-or.gov
>>> "Scott Churchill" <monroestreetassociates@earthlink.net> 12/05 11:33 AM >>>
Val,
My understanding is that now that Ray Miller is back from vacation....and he
and our Structural Engineers,Rowell Engineering have resolved all of the
remaining concerns about the building. Those revised plans have been sent to you
directly as well as Miller Engineering.
Can you please confirm that this is your understanding as well...?
We look forward to completion of this last piece of the Plan Check process.
Regards,
Scott Churchill
(503) 929 9138
file://C:\Documents and Settings\val.000\Local Settings\Temp\GW}00001.HTM 12/6/2006
•
rage iorz
Val Henzel -RE: Status on Plan Check for Elite Care- Grant Street Tigard
From: "Scott Churchill" <monroestreetassociates@earthlink.net>
To: "'Val Henzel'" <Val@tigard-or.gov>
Date: 12/6/2006 11:33 AM
Subject: RE: Status on Plan Check for Elite Care -Grant Street Tigard
CC: <CPMARCH@aol.com>, "'Mark Reed" <Reed@stdairy.com>, "'Bill Reed"
<breed@elitecare.com>, <brianb@tigard-or.gov>, "'Scott Churchill'
<monroestreetassociates@earthlink.net>
Val,
Thank you for the status update.
We will work on getting you sets which incorporate these
Changes.
Regards,
Scott Churchill
Original Message
From: Val Henzel [mailto:Val@tigard-or.gov]
Sent: Wednesday, December 06, 2006 9:44 AM
To: monroestreetassociates@earthlink.net
Cc: CPMARCH@aol.com; Reed@stdairy.com; Brian Blalock
Subject: RE: Status on Plan Check for Elite Care -Grant Street Tigard
Scott,
I have received Ray millers review document response dated 12/1/06 and it shows all issued
resolved with item 14 stating deferred submittal information and item 15 stating submittal of 4 complete
sets of plans,we only need 2 complete sets of plans submitted incorporating resolutions of all issues as
noted on my review and Rays.At this time no plans have been submitted to this office addressing these
completed plans.
Val Henzel
Senior Plans Examiner
13125 SW Hall Blvd.
Tigard, OR 97223
(503)718-2436
vai fttig ard-or.gov
>>> "Scott Churchill"<monroestreetassociates@earthlink.net> 12/05 11:33 AM >>>
Val,
My understanding is that now that Ray Miller is back from vacation....and he
and our Structural Engineers,Rowell Engineering have resolved all of the
remaining concerns about the building. Those revised plans have been sent to you
directly as well as Miller Engineering.
file://C:\Documents and Settings\val.000\Local Settings\Temp\GW}00002.HTM 12/7/2006
rage h UI
Can you please confirm that this is your understanding as well...?
We look forward to completion of this last piece of the Plan Check process.
Regards,
Scott Churchill
(503) 929 9138
file://C:\Documents and Settings\val.000\Local Settings\Temp\GW}00002.HTM 12/7/2006
rage i oz 1
Val Henzel -RE: Our counter meeting today
From: "Scott Churchill" <monroestreetassociates@earthlink.net>
To: "'Val Henzel'" <Val@tigard-or.gov>
Date: 12/14/2006 7:37 PM
Subject: RE: Our counter meeting today
CC: "'Bill Reed" <breed@elitecare.com>, "'Mark Reed" <Reed@stdairy.com>,
<CPMARCH@aol.com>, "'Scott Churchill" <monroestreetassociates@earthlink.net>
Val,
Per our counter meeting today,what you need to clear your part of the
Plan Check process for the Grant Street Elite Care Project is the following:
1) Two sets of complete Architectural and Engineering documents completely updated,
cross-referenced for consistent coordination,and wet signed by architect and engineer.
2) Engineering documents submitted by Rowell to Miller Engineering including all calculations
to be formatted on 24"x 36" sheets to match the remainder of the set of Permit Documents
and have those document included in the submission of the two updated sets.
You will then send the sets to Miller for their processing stamp and sign-off.
When that set is signed and returned to you from Miller,you will then be able to
issue your approval and sign-off.
That will clear your portion of the Plan Check Process.
You also mentioned that Emily Eng(Planner assigned to the project from Planning)
has not signed off on the Planning Portion of the Review. That needs to take
place before the permit is issued. I believe that Lilly from Bill Reed's office
is managing those issues at this point.
You also mentioned that Engineering has not issued their approval for issuance
of the Building Permit. Thank you for giving me the name of the Engineer now
assigned to the Project...Kim McMillan. I will contact them to see what it will
take to get their approval so as not to hold up the permit in that department.
Please let me know via email if this is your understanding as well.
Regards,
Scott Churchill
(503) 929 9138
file://C:\Documents and Settings\val.000\Local Settings\Temp\GW}00002.HTM 12/18/2006
Mark VanDomelen-TEXT.htm Page 1 �
Val Henzel
Senior Plans Examiner
13125 SW Hall Blvd.
Tigard,OR 97223
(503) 718-2436
val@tigard-or.gov
>>>Val Henzel 01/31 11:25 AM>>>
Scott,
It was good talking with you also. I would like to set up a meeting with you and Craig to go
through the plans so you can see what and why I am asking for clarity. Friday after 1 PM or any
time Monday will work for me please let me know what is best for you. Thank you in advance
for your assistance in this.
Val
Val Henzel
Senior Plans Examiner
13125 SW Hall Blvd.
Tigard,OR 97223
(503) 718-2436
val@tigard-or.gov
>>> "Scott Churchill"<monroestreetassociates@earthlink.net>01/31 9:23 AM>>>
Val,
It was good talking with you yesterday about the status of the Documents for
The Grant Street Project.
Per our discussion,you will be issuing a formal list of final items
To Craig and myself so that we can execute the necessary changes.
The list will come in the form that we have done in the past{i.
Mark•VanDomelen-TEXT.htm Page 2
A clear checklist so that there is no confusion on the remaining items.
Per our agreement,as soon as the list is issued I will review it with
Craig,pull the two sets of documents,make the necessary changes
Complete documentation for us of those changes and re-submit
Those modified documents.
Please feel free to contact me if you have any questions.
Regards,
Scott Churchill
(503) 929 9138
I SII
#2. Doors opening onto a landing shall not reduce the landing to less than one-half the required width.
When fully open, the door shall not project more than 7 inches into a landing.
Please address the handrail extension issue now created
1009.11.5 "handrails shall extend horizontally at least 12 inches (305 mm) beyond the top riser and
continue to slope for the depth of one tread beyond the bottom riser."
**New remark*8/9/06 -
A. Gates at 2nd floor exit stairway obstruct landing more than '/z distance per 1009.4 revise Stairway landings.
RESPONSE ACCEPTED 10/17/06—Thank you for your response in resolving this issue.
16. Egress path and occupant load 1004, 1013, 1014 (The construction documents shall show in sufficient detail
the location, construction, size and character of all portions of the means of egress in compliance with the provisions of
this code. The construction documents shall designate the number of occupants to be accommodated on everyfloor, and
in all rooms and spaces. 106.1.2)E.Access discharge at exit court 1023
RESPONSE ACCEPTED 10/17/06-Thank you for your response in resolving this issue.
NOT PART OF THIS REVIEW:
• Electrical, Fire Sprinklers, Fire Alarms, Mechanical System, Site, & Plumbing
When submitting revised drawings or additional information,please attach a copy of the enclosed City of
Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing
the documents.
Respectfully,
Val Henzel,
Senior Plans Examiner
October 17, 2006
Elite Care
Bill Reed
2300 SW 103rd
Portland, OR 97225
RE: GRANT STREET ELITE CARE -NEW BUILDING—REVIEW#7
Project Information
Building Permit: BUP2006-00053 Construction Type: V-A
Tenant Name: Grant Street Elite Care Occupancy Type: SR-1
Address: 12353 SW Grant St. Occupant Load: 394
Area: 31,279 sq ft Stories: 3
The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition;
and the State of Oregon Fire Code (OFC) 2004 edition. For better clarity I have removed issues that have
been resolved. Please provide the following information in order to complete the review.
Note(First request April 5,2006,2nd 6/30/06,3rd 8/9/06,4th 8/28/06,5th 9/15/06,6th 10/10/06,10/17/06)
STRUCTURAL
1. The structural review was completed by Miller Consulting. The plan review dated January 16,2006,was
E-Mailed to Afghan Associates for response (review doc. attached).
RESPONSE RECEIVED 8/14/06 sent structural to Miller for review—**9/15/06 - Ray Miller spoke
with Todd Rowell on 8/16/06, on the requirements to meet the irregular building requirements and
not being able to use the simplified analysis approach per 1616.61, 1617.5 has to be designed per sec
1620.2.3 requirements. Therefore, they stated they will be submitting new structural calcs and design
complying with chapter 16.
FIRE LIFE-SAFETY- Please provide the following;
Revise stairway landing to comply with code requirement as stated below.
B. On sheet A2.2 the interior stair has been reduced 7" as was submitted from prior plan and now
has the issue of the door swinging over the landing and reducing landing past what is allowed per
1009.4 exception 2.
Stairway landings. There shall be a floor or landing at the top and bottom of each stairway. The width of
landings shall not be less than the width of stairways they serve. Every landing shall have a minimum
dimension measured in the direction of travel equal to the width of the stairway. Such dimension need not
exceed 48 inches where the stairway has a straight run.
Exceptions:
Page 1 of 1
Val Henzel -Grant Street Elite Care review response#5- bup2OO6-00053
From: Val Henzel
To: breed@OATFIELDESTATES.Com; Churchill, Scott; Reed, Mark
Date: 9/15/2006 8:56 AM
Subject: Grant Street Elite Care review response#5-bup2006-00053
Val Henzel
Senior Plans Examiner
13125 SW Hall Blvd.
Tigard, OR 97223
(503)718-2436
val ac tigard-or.gov
file://C:\Documents and Settings\val.000\Local Settings\Temp\GW}00001.HTM 9/15/2006
Page 1 of 1
Val Henzel - SW Grant Street
From: "Mark Reed" <Reed@stdairy.com>
To: <val@tigard-or.gov>
Date: 10/6/2006 3:13 PM
Subject: SW Grant Street
CC: "'Scott Churchill'" <palmhill2@mindspring.com>, "'Bill Reed" <breed@elitecare.com>
Val,
Thank you for setting up the meeting yesterday with the fire marshal),yourself, Brian, and Mike.
I will be sending off a note to the fire marshal)this afternoon regarding the two items we discussed,which will
hopefully ensure that those items are signed off.
It appears that the two items that I need send a response are the following.
Item#6- Copy of STC 50 system.—our architect is getting us a copy of that, and I will be bringing a copy to your
office on Tuesday, October 10th.
Item#25—Roof assembly—we agreed that the one hour roof construction can be heavy timber construction
covered with 2x6 T&G 'Car Decking',then '/"Plywood then our foam insulation, and finally a metal roof.
I will be bringing a document to you on Tuesday, October 10th.
That leaves only one item, the stairwell exits which our architects are re-drawing and I will be submitting as soon
as possible.
Thank you again for your assistance,
Mark Reed
NW Ventures Group
file://C:\Documents and Settings\va1.000\Local Settings\Temp\GW}00002.HTM 10/9/2006
Page 1 of 1
Val Henzel-RE: SW Grant Street-Tigard
From: "Dalby, John K." <John.Dalby@tvfr.com>
To: "Mark Reed" <Reed@stdairy.com>
Date: 10/9/2006 7:52 AM
Subject: RE: SW Grant Street-Tigard
CC: <val@tigard-or.gov>, "Scott Churchill" <monroestreetassociates@earthlink.net>, "Bill Reed"
<breed@elitecare.com>, "Brian Blalock" <brianb@tigard-or.gov>
Mark,
When I got back to the office and checked our fire hydrant map it appears there is an existing hydrant on Grant
Street near your proposed development. If there is indeed a hydrant within 600 feet of the proposed building,you
can use it rather than installing a new one. If it works for you, please note it on any submitted site development
drawings and indicate the distance from the site.
John K. Dalby, Deputy Fire Marshal II
Tualatin Valley Fire & Rescue, North Division
14480 SW Jenkins Road
Beaverton, OR 97005-1152
503-356-4723
From: Mark Reed [mailto:Reed@stdairy.com]
Sent: Friday, October 06, 2006 3:39 PM
To: Dalby, John K.
Cc: val@tigard-or.gov; 'Scott Churchill'; 'Bill Reed'; 'Brian Blalock'
Subject: SW Grant Street-Tigard
John,
Thank you for your time yesterday regarding the SW Grant Street Project.
Please see the attached letter for your review.
Thank you,
Mark Reed
NW Ventures Group
For Elite Care
971-506-0167
file://C:\Documents and Settings\val.000\Local Settings\Temp\GW}00001.HTM 10/9/2006
Page 1 of 1
Val Henzel -RE: SW Grant Street Stair
From: "Scott Churchill" <monroestreetassociates@earthlink.net>
To: "'Val Henzel"' <Val@tigard-or.gov>, <Reed@stdairy.com>
Date: 10/9/2006 11:22 AM
Subject: RE: SW Grant Street Stair
CC: <breed@elitecare.com>, "'Bill Reed" <breed@oatfieldestates.com>, "'Brian Blalock"
<brianb@tigard-or.gov>, <CPMARCH@aol.com>,
<monroestreetassociates@earthlink.net>
Val,
Thank you for your email. We have been in touch with our Structural Engineers, Rowell Engineering
in regards to this potential change. We are looking at the structural impacts of both Scheme A and B for
this stair....as well as any code impacts. (both IBC and Oregon State)
It appears at this point that we will have the answers ready to submit later this week,but we need
to have our State meeting(scheduled later today) to confirm how quickly we can resolve this.
We also had a brief call Monday with Brian concerning the code impacts of an open stair
between floors 3 and 2...and we need to complete our code verification to make sure
we are fully in compliance with all applicable codes for the occupancy of this building.
Regards,
Scott Churchill
Original Message
From: Val Henzel [mailto:Val@tigard-or.gov]
Sent: Monday, October 09, 2006 7:17 AM
To: Reed@stdairy.com
Cc: breed@elitecare.com; palmhill2@mindspring.com
Subject: Re: SW Grant Street
Thank you for your quick response to this. I only have one further question ,with the changes to the
stairwell is there structural issues to be addressed and if so are they being reviewed with the other
structural issues by Miller?
Val Henzel
Senior Plans Examiner
13125 SW Hall Blvd.
Tigard, OR 97223
(503) 718-2436
vaI@tigard-or.gov
file://C:\Documents and Settings\val.000\Local Settings\Temp\GW}00001.HTM 10/9/2006
Page 1 of 1
Val Henzel -RE: SW Grant Street
From: "Mark Reed" <Reed@stdairy.com>
To: "'Val Henzel"' <Val@tigard-or.gov>
Date: 10/9/2006 8:44 AM
Subject: RE: SW Grant Street
CC: "'Bill Reed" <breed@elitecare.com>
Val,
Thank you also for setting up the meeting. Our architects are ensuring that the plans that we submit for the
change on the stairwell either have no structural changes, or that the changes that are made go through Miller
Engineering/Rowell engineering during the process that they are still working on for all structural issues.
Thank you,
Mark Reed
NW Ventures Group
Original Message
From: Val Henzel [mailto:Val@tigard-or.gov]
Sent: Monday, October 09, 2006 7:17 AM
To: Reed@stdairy.com
Cc: breed@elitecare.com; palmhill2@mindspring.com
Subject: Re: SW Grant Street
Thank you for your quick response to this. I only have one further question ,with the changes to the
stairwell is there structural issues to be addressed and if so are they being reviewed with the other
structural issues by Miller?
Val Henzel
Senior Plans Examiner
13125 SW Hall Blvd.
Tigard, OR 97223
(503) 718-2436
val@tigard-or.gov
file://C:\Documents and Settings\val.000\Local Settings\Temp\GW}00002.HTM 10/9/2006
Page 1 of 1
Val Henzel-RE: SW Grant Street Stair
From: "Scott Churchill" <monroestreetassociates@earthlink.net>
To: "'Val Henzel'" <Val@tigard-or.gov>, <Reed@stdairy.com>
Date: 10/9/2006 11:22 AM
Subject: RE: SW Grant Street Stair
CC: <breed@elitecare.com>, "'Bill Reed' <breed@oatfieldestates.com>, "'Brian Blalock"
<brianb@tigard-or.gov>, <CPMARCH@aol.com>,
<monroestreetassociates@earthlink.net>
Val,
Thank you for your email. We have been in touch with our Structural Engineers,Rowell Engineering
in regards to this potential change. We are looking at the structural impacts of both Scheme A and B for
this stair....as well as any code impacts. (both IBC and Oregon State)
It appears at this point that we will have the answers ready to submit later this week,but we need
to have our State meeting (scheduled later today) to confirm how quickly we can resolve this.
We also had a brief call Monday with Brian concerning the code impacts of an open stair
between floors 3 and 2...and we need to complete our code verification to make sure
we are fully in compliance with all applicable codes for the occupancy of this building.
Regards,
Scott Churchill
Original Message
From: Val Henzel [mailto:Val@tigard-or.gov]
Sent: Monday, October 09, 2006 7:17 AM
To: Reed@stdairy.com
Cc: breed@elitecare.com; palmhill2@mindspring.com
Subject: Re: SW Grant Street
Thank you for your quick response to this. I only have one further question , with the changes to the
stairwell is there structural issues to be addressed and if so are they being reviewed with the other
structural issues by Miller?
Val Henzel
Senior Plans Examiner
13125 SW Hall Blvd.
Tigard, OR 97223
(503) 718-2436
val@tigard-or.gov
file://C:\Documents and Settings\val.000\Local Settings\Temp\GW}00002.HTM 10/9/2006
Apr 14 06 02: 32p Welkin Engineering P. C. 503-596-1668 p. 2
•
April 14,2006
03.500.07
W E L K I N
Dr.Kamelia Massih
Beaverton Vision World
11020 SW Beaverton-Hillsdale Hwy. E N 6 1 N e e R I N e, P.c.
Beaverton,OR 97005
RE: PACIFIC PARK PLAZA
Dear Dr.Massih:
I received your letter and have noted your concerns. We thank you for allowing us to
provide you with the design services for you commercial building. As you know the building
and site plans were approved over a year ago. You then worked with a contractor and had us
change from wood engineering to a composite wood and steel framing. That was in December
of 2005. Then a few weeks ago you requested that we change back to all wood. Miller
Engineering was asked to reevaluate the structural calculation by the City of Tigard and this
reevaluation is requiring us to reengineer the building from the 1997 Uniform Building Code to
the 2003 International Building Code. This is not our fault. However,it does require us to
completely redesign the building to a much higher level of analysis than under the previously
approved 1997 USC,and redraw the structural components.
I have talked to Harris aholrt the changes and resubmittal to the city and his lack of
commitment to a date certain to finish the design. The changes are significant and he needed to
evaluate the method of making the changes. There is a need to redraw all the shear walls and
address reentrant loading paths and hold downs. I have committed him the resources to make
the changes. This will be turned in to Miller Engineering by Friday,April 21,2006. Hiring
another engineer and even finding one who has the timc to look at this issue would takeweeks
longer than that. I know because I have had clients attempt to find engineers to no avail and
even if one says they will get to it.it just will not happen that wa
J PPe _Y
We will perform this work on a time and material basis,with a not to exceed without
written authorization of 1;5000.
We are looking forward to working with you toward a succcssful compaction of your
project.
Sincerely,
WELKIN ENGINEERING,P.C. ACCEPTED:
Dr.Massih
Ed Christensen,F.E. DATE:
President
sum sw Pkaltie Street,Portland,Oregon 97223 Phone(503)5984866 Fax(503)598-1868