PFI2016-00119 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12016-00119
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/08/2016
Parcel: SEG1907
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Comcast
Project Description: Comcast proposes to overlash(1)-48ct fiber to existing strand,then push(1)-48ct fiber 350'through
existing conduit, and trench to place(1)-2"conduit a minimum of 36"below grade within the City of
Tigard ROW.
Owner: FEES
Description Date Amount
PFI Permit Fee 06/07/2016 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
IVAN CHANDLER
11308 SW 68TH PKWY
TIGARD, OR 97223
PHONE: 971-777-0908
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant Not Present
Signature:
01.
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12016-00119
Type: Condition Name: Status: Severi :
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services:503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection,and after completing work covered by the permit. Ken Fisher 503-816-6146 or Kenny@tigard-or.gov
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and,in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing,of any/all assignment changes.
PFI_Utilities 21 -OTHER Applied Notice
RECEIVED
JUN 0 6 2016
City Of Tigard CITY OF TIGARD
�" PUBLIC; WORKS— E:NGINFAMING PLANNINGIENGINEERING
a,� s
Public Facility Improvement (PFI) Permit
DESCRIPTION OF WORK(in the right-of--way) TYPE OF WORK
Check one: ❑ Utility Connection ❑ TYPE 1—Franchise Utility\Cork
❑ Sidewalk/driveway approach \Cork performed by N\\N,PGF
❑ Street improvements and/or utility agency.
Detailed description: Comcast proposes to overlash(1)-48ct fiber to exisiing strand, ❑ 'TYPE 2 --Sidewalk/Driveway/Sewer
then push(1)-48ct fiber 350'through existing conduit,and trench to place(1)-2"conduit Work performed for the purpose of:
a minimum of 36"below grade within the city of Tigard ROW - Sidewalk installation or repair.
• Driveway approacli installation
l O�
Ppropertyaddress/locatiot)(s): / and/or repair
• Sanitary sewer lateral installation
13249 SW Summit Ridge St,Tigard, OR 97224 and/or main line rap
Tigard,OR 97224
❑ TYPE 3—Dull scale Development
Applicant: COME'st Work performed with Land use
11308 SW 68th Parkwayapproval which includes any of
Address: the following:
City/state: Tigard, OR Zip: 97223 • Subdivisions or Partitions
Phone: (971)-777-0908 F:n)ail: Ivan_Chandler@cable.comcast.com - Street widening
Contact name: Ivan Chandler Phone: (971)-777-0908 • Mainline installation for Sanitary
sewer,Storm sewer,Tigard water
Contractor: Texstar Enterprises and/or Tigard Water Service:area
CCB#: 178798 Exp)radom 10/1012017_ SUBMIT COAIPLE'rEI)APPI.iCA't'ION 1'O:
Address: 14122 Arndt Rd City of Tigard
City/state: Aurora, OR zip: 97002 Planning/Engineering
503 776-5049 imminer texstarenter rises.com 13125 SW Nall Blvd.
Phone: ) )✓mail:1 @ p Tigard,OR 97223
Contact name: Jim Miner Phone: (503)776-5049 applications for"miner work in right-of-way"
only may be emailed to:
Engineer: K&B Technical Solutions rowhermitsatigard-or.gov
Address: PO BOX 2529
Cit)/stat,: Clackamas,OR Zip: 97015 ®'
Phone: (503)650-6041 Email: John_Forster@kbmail.com Case No.: PFICZ� Co g
Contact name: John Forster :application submittal fee: S Seo•CO
:Additional fees: —
Estit))ated value of work is required(if over$5,000):$_.. .application accepted:
(within the public right-of-way) By:— L � Datc: —"A2
,application reviewed:
Is work related to a LAND-USD:DECISION? El U- No 't / Date: _ ,f(�
If so, please specify (�4LP,SDR,SUIS,etc.)case #: By: t�
Applicant notified:
Is work related to a BUILDING 1'}�lu�•IIT? E3 Yes [3 No Byi Date:
—6�4��2
If so,please specify(BUILDING PERIMI'l)case#: r:ycvRrlf+yMasteiaytanduwAONK+tbns Re�()?X9/201s
City of Tigard • 13125 SSV I fall I3h-d. - Tigard,Orcgon 97223 - xvwwtigard-or.gov - 503-718-2421 • Page 1 of 4
_ 1
i
APPLICANT'S
NOTE: Person specified as Applicant"shall be designated"Permittee"and slialh provide financial assurance for work.
When the owner and the applicant are different people,the applicant roust be the purchaser of record or a lessee in possession with written
authorization front the owner or an agent of the owner. Tlic owncr(s)must sign this application in the space provided or submit a written
authorization with this application.
I
BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT:
• Thcabms, rcquest does not v iolate an decd restrictions that may be attached to or imposed upon 1 Subject propertT�
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and Luuitations of the approval.
• All of the above statements and the statements in the plot plan,attaclunents,and exhibits transinittcd lierewitli,arc true;and
the applicants so acknowledge that any permiit issued,based on thus application,may be revoked if it is found that any such
statements ace false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requireme tits for approving or denying the application.
SIGT RES:of each owner IJthe subject pro erty required.
Y plica t/f thorized Agent's signature Print name Date
i
I
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
-"-�_ -✓.- �.. � '.P:.an�&�Z:.-23:4Wuh}.'� iT"..T�+25 �Lw�n - ..fid' P.^il!,ta
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • ,vw-%mtigard-or.gov 503-718-2421 • Page 2 of 4
i
1
DEVELOPMENT ENGINEERING FEES ,
Public Facility Improvement(PFI)Permit: '
1 1 i
e �
APPLICATION FEE
Part 1: Required submittal fee$300.00
FRANCHISE UTILITY AND SIDEWALK/
PERMIT FEE DRIVEWAY AND UTILITY
CONNECTIONS,ETC.
Part 2: All non-water system improvements (work in the nigh[of way) '
Engineer's estirnate 15%(less$300.00 subnuttal fee)
Engineer's estimate X 2%Plan Review Sketch
(including information below)
WATER SYSTEM FEE ❑ Dimensions
Part 3: All public water system unprovemcnts ❑ Street Name
Engineer's estitnate 1 12% ❑ Site Address
PFI Permit Fee Exemptions:
There will be no permit fee charged,or assurance required FULL SCALE DEVELOPMENT
for the following types of work: (Subdivisions/Partitions and Street Improvements)
• Sidewalk repair(less than 20 lineal feet)
• Relocate or replace mailbox Design Plans
• Ditch cleaning that does not involve regrading. (6 sets,24-66 or 22x34)
• Weephole repair ❑ Cover—Site,Vicinity,Abbreviation,Legend
• Curb repair or replacement(less than 20 lineal feet) ❑ General Motes(Cit,Water,Sewer,etc.)
• Lawn sprinkler system'installation or repair ❑ Street(Plan,Profile)
• Street txee pruning or planting ❑ Water,Storm and Sanitary(Pian Profile)
• Planter strip landscape maintenance ❑ Water Quality Facilities
• Test wells ❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas,
Note: A cash assurance may be required per Storm,Sanitary,Water,Signage,Street Lights,etc)
TMC 15.04.140.(crtstomer deposit) ❑ Details
❑ Traffic Sight Distance �..
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(Project land use name,revision and j
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Patliway Design(if applicable)
❑ Water Department Approval
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard 13125 SW Hall Blvd. • 'Tigard,Oregon 97223 • xvwwtigard-or.gov • 503-718-2121 • Page 3 of 4
SAMPLE SKE,rctl:
Edge of Pavement
Ditch
Streetlight I .®.®.—.—.®._ c^®�'®.®
kk " �
� I
i i®'�•roj>os crSeWer`�rie®'
( i Existing House i
ExistingI
I >� Driveway
I '
a�
v�
o
0-en
t!
v' I i
I Existing Shop �
Powerpole I ( o
2
I rl Ia. .---_.---7iopTrrty'L t'na _._--.
iI Fire Hydrant(FH)
i
1 I Scale: 1"=30'
i I I
I I
i I I
I i
N4INIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable):
North arrow Property lines &dimension Slope of property
Street & street name(s) EXisting building,structiu:es Utility &street light poles
Proposed work l.?listing curb or edge Trees
LxisunP SAV or of pmement l Xi;ting utilit)' locations
D/W Apron (sewer,-Vater, Storni)
_s�<.�n,:. =�. ;.^::--r •:,.. �w_�s..,;;,.._. .,,...�...__.. .-,,.. .a�_;. .�,r..-._g._a>:.�u;re,�....�a,.n;��as�:u��:� -��,.;>>:V�-a�:xrr;:cr��.�:z,.�;xx,-,.>_.k.�r..;,z,-���,>,r•�„•.�.✓;;,,,,.,•.•rasa
PUBLIC FACILITY IMPROVEMENT PERMIT
Cit) of Tigard 13125 SU-Hall Blvd. • ".Figard,Oregon 97223 • \vkvw.tigard-or.gov 503-718-2421 Page 4 of 4
N N
N Nj
A
f � A
N N
s
N N
D n
y $m
25 z
�m o
tiO �2
20 O
N N I ppCN �
�oo€
�Y
N N
T
4 �
SII{tl� N N
i.I.
�1
y IZ– �T myy
Z-1 37T0 2°�r
y— CIn
Q �p�i cN� m0 U
�m mZm •- P.
omo y0A O
D N z C N N
�myir m
N N A r N
TZg m m0
O N O0 T m T
mm2 mm R]I
p
0 O
i ..�en:ausa�, 13249 SW SUMMIT RIDGE ST
Comcast, °�°°° TIGARD,OR 97224
N `•/ 1Evtarxa0unla� ,
yContact:IvanChandler ppgpXt526,C4tlkrirs,OR67015 48193
N Phone:(503)596-3754 omu-(503)6504041 EA 216 - - TG3A TO TGSO NODE SEGMENTATION
a' Ivan Chandler@cable.eomeastc E—t..rom Fo.wgmm.anr - - CITY OF TIGARD ROW PERMIT DRAWING
Page 84 2011 Edition
Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater,when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the"Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 December 2011
2011 Edition Page 85
Stationary Lane Closure with Flagging Diagram 320
<@> 0C
.6
w C
a,
0 go� a
o
O
0 O
X11o a LLw�
�F O
LU 3
Qo I H
a
• m m
i— --------- I �•• m am
I $ I >O a
• o oL
® -0
j t m i 2 U)
I I I EE CL
O
m
I
I 2 CO
o-E
I og I�' I •
I 0)CO q I •
-j I r I I o
i
Is o
I •� I wQ�
j T Y I mw0
a~
Sign Spacing and Buffer Lengths(feet) 1 1 � w
ERRATA. pasted S acin Between Si ns Buffer ug
Speed A B C Space qo¢a On
SupplernentT&le 25 100 100 100 75
30 100
Updated:renrwry 11, 35 350 350 350 125
tole 40 150 1
0 Q
Or:onarTralr A-A-V 45 180 cc3
sea w" 50 500 500 500 210
55 250
Si zn S acin g and Buffer Lengths feet Supplement
Posted Spacing Between Signs "Buffer"
December 2011 Seed A B C Space
Chapter 5
60 285
65 700 700 700 325
70 365
Page 78 2011 Edition
Work on Shoulder Diagram 210
Diagram 210 covers stationary work with work or parked equipment on the
shoulder. This diagram does not cover work on a freeway shoulder. See
Diagram 710 for Freeway Shoulder work.
1. Vehicles should be parked as far off the roadway as practical.
2. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
3. For added visibility, truck-mounted arrow boards or PCMS in caution
mode may be used.
4. Arrow panels in caution mode are recommended for work on roads
with posted speeds of 45 mph or greater and high traffic volumes,
greater than 2000 average daily traffic (ADT).
5. Requirements for signing and devices are shown in Table 5-2, below.
Table 5-2: Device and Signage Guidelines
Proximity to Edge of Traveled Way
More than 15 feet
or behind Barrier or Less than 15 feet
Guardrail
One advance warning sign is
Advance warning required and two signs are
Work in Place signs, devices, and recommended.
More than 1 Hour flashing warning Cone taper is required. Cones
lights are optional. along the edge of traveled way
are optional.
Work in Place Advance warning signs and devices are optional.
Less than 1 Hour
Sign Spacing and Buffer Lengths (feet)
Posted Spacing Between Signs Buffer
Speed A B C Space ERRATA:
20 50
25 100 100 100 75 Supplement Table
30 100
35 350 350 350 125 Updated:February 12,
40 1 1 150 2016
45 180 By:ODM Traffic Roadvsy
50 500 500 500 210 Sectio"
55 250
Chapter 5 Si Zn Spacing and Buffer Len the feet Supplement December 2011
Posted S acin Between Signs F28
Speed A B C
60
65 700 700 700 325
70 1 365
2011 Edition Page 79
Work on Shoulder Diagram 216
It
(Optional)
•
• ; Protection Vehicle
w/TMA(both Optional)
See Chapter 4
•
• —4—
Buffer
•
•
•
• U3*
•
•
A
ROAD SHOULDER
WORK OR WORK
AHEAD AHEAD
Initial Warning Sign
t *Use as appropriate-see Table 5-2
December 2011 Chapter 5