Report (20) gt(e;o/ I- tOt5
9 571 cw G&s 7 4S2 .
TIMOTHY G. PLEGER, ARCHITECT
Sept. 11, 2014
PROJECT: RECEIVED
Made in Oregon
Washington Square, Space B05 SEP 1 5 2G`
Tigard, OR 97230 CITY OF 11(3ML
Bijimitismonolk.
FIELD DIRECTIVE NO. 1
The following modifications/revisions shall be made to the Documents:
ITEM NO. 1 :
Remove existing building column W42 near storefront entry and replace with new column &
beam design as shown on structural drawings and calculations from NishkkeanDean Engineers.
(See drawings SO—S3, and Structural Calculations dated 9-10-14)All work shall be done in
strict accordance with the design and specifications.
Revised the storefront entry configuration to conform with the new column locations as shown
on revised architectural drawings Al &A3, dated Delta 4, 9-10-14.
ITEM NO. 2:
Revise miscellaneous wall dimensions around the Pendelton wall and along the sidewalls to
A accommodate the millwork wall displays. (See revised architectural drawing Al, dated Delta 4,
9-10-14)
ITEM NO. 3:
Add light fixtures near the storefront as shown on revised drawing A3, dated Delta 4, 9-10-14.
END OF FIELD DIRECTIVE NO. 1
Respectfully Submitted,
4110) ,
goal .116
Timoth G. Pleg:r, ' A dr
Cc: Michael apotocky, Gray
Eric Fong, Macerich
a
15640 N 7th Street,Suite B9 Phoenix,AZ 85022
P 602-293-3300 F 602-293-3506