Loading...
PFI2016-00104 n CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12016-00104 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 05/18/2016 Parcel: SEG1824 Jurisdiction: Site address: Subdivision: Lot: Project: City of Tigard Project Description: UTILITY POTHOLING FOR CITY CIP 94033 Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX: Applicant: CHRIS DUNHAM 43530 SE NORTH BEND WAY NORTH BEND,WA 98045 PHONE: 425-888-2590 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: Not Present Issued By: ^--ti— Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12016-00104 Type: Condition Name: Status: Severity: PFI—Sidewalk/1 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Sidewalk/[ 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI—Sidewalk/1 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI—Sidewalk/1 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI—Sidewalk/1 05-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting- PFI—Sidewalk/1 06-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI—Sidewalk/1 07-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI—Sidewalk/1 08-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI Sidewalk/[ 09-OTHER Applied Notice RECEIVE® City of Tigard MAY 18 2016 _ PUBLIC WORKS —ENGINEERING p CITY II I Y OF GIARD RING Public Facility Improvement (PFI Permit DESCRIPTION OF WORK(in the right-of-way) TYPE OF WORK Check one: ❑ Utility Connection ❑ TYPE 1—Franchise Utility Work ❑ Sidewalk/driveway approach Work performed by NWN,PGE ❑ Street improvements and/or utility agency. Detailed description: 1111 r i.4y pyi 6 l i lq To✓ 6'4Y 0 TYPE 2—Sidewalk/Driveway/Sewer 6W Q 9 4b 33 Work performed for the purpose of: • Sidewalk installation or repair. • Driveway approach installation Property address/location(s): SW kw"( and/or repair n • Sanitary sewer lateral installation l0(0 A JE• and/or main line tap ❑ TYPE 3—Full scale Development Applicant: /SPS, ZNc., l' p Work performed with Land use Address: 43530 SE Alo�f414 BeoA Woy approval which includes any of the following: City/state: ti6MA geoid WA _ Zip: q$o,c 5 • Subdivisions or Partitions Phone:4zC-Q8g-ZS90 Email: Jw✓;sc(P_apsioz-AtS.4�oM • Streetwidening Contact name: C 6f i S Mo6daw, Phone: 266-5 71 -1867 e Mainline installation for Sanitary sewer,Storm sewer,Tigard water Contractor: SawIC. AS QP f j',6CtA1 and/or Tigard Water Service Area CCB#: ISO 130 Expiration: SUBMIT COMPLETED APPLICATION TO: Address: City of Tigard City/state: Zip: Planning/Engineering 13125 SW Hall Blvd. Phone: Email: Tigard,OR 97223 Contact name: Phone: Applications for"minor work in right-of-way" 11 only may be emailed to: Engineer: GAti ok rampermitsgtigard-or.gov Address: 13l ZS So HAI MVA. City/state: TLgafA 0I Zip: CO2,- 3 Phone:S03-11i-1-41-1- Email: av►drewh Case No.: fl 12-0/U—00104 Contact name: Ay%Aee,J fyk_40ry .Application submittal fee: O7— Additional fees: Estimated value of work is required(if over$5,000):$ too 066 ApplicaWna epted: (within the public right-of-way) Date: G Appli do eviewed: Is work related to a LAND-USE DECISION? ❑ Yes No g f Date: If so,please specify (MLP,SDR,SUB,etc.) case #: Applicant notified: Is work related to a BUILDING PERMIT? ❑ Yes M No By: Date: I:\CURPLN\Masters\Land Use Applications Mv.07/09/2015 If so,please specify(BUILDING PERMIT)case#: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as "Applicant"shall be designated"Permittee"and shall provide financial assurance for work. *When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT: • The above request does not violate any deed restrictions that may be attached to or imposed upon the subject properrn. • If the application is granted, the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments, and exhibits transmitted herewith, are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requircmcnts for approving or denying the application. SIGNATURES of each owner of the subject property required. Apphcant/Authorized Agent's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT Cityof Tigard • 13125 SW Fall Blvd. • Tigard,Oregon 97223 • xv,,vwtigard-or.gov 503-718-2421 • Page 2 of 4