Permit (68) CITY OF TIGARD BUILDING PERMIT
. COMMUNITY DEVELOPMENT Permit#: BUP2016-00073
T t GAR L) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/25/2016
Parcel: 23113E3000600
Jurisdiction: Tigard
Site address: 16580 SW 85TH AVE
Project: Clean Water Services-Durham Treatment Plant Subdivision: None Lot: None
Project Description: Odor control system improvements-Installation of skylight, new Kalwal panels&replace membrane roof.
Contractor: MCCLURE& SONS INC Owner: CLEAN WATER SERVICES
15714 COUNTRY CLUB DR 2550 SW HILLSBORO HWY
MILL CREEK, WA 98012 HILLSBORO, OR 97123
PHONE: 425-316-6999 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: Permit Fee-Additions,Alterations, 05/25/2016 $7,897.55
Demolition
Occupancy Grp: Occupancy Load: 12%State Surcharge-Building 05/25/2016 $947.71
Dwelling Units: 0 Plan Review 03/10/2016 $5,133.41
Stories: 0 Height: 0 ft DC Provision Review,COM New-Bldg 05/25/2016 $175.50
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM New-Ping 05/25/2016 $175.50
Value: $1,540,000 Info Process/Archiving-Lg$2.00(over 05/25/2016 $154.00
11x17)
Info Process/Archiving-Sm$0.50(up to 05/25/2016 $125.00
Floor Areas: 11x17)
Metro Const. Excise Tax 05/25/2016 $1,848.00
Total Area: 15000 Tig-Tual School CET-Non Residential 05/25/2016 $9,000.00
Accessory Struct: 0 Plan Review-Fire Life Safety 05/25/2016 $3,159.02
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $28,615.69
Required Items and Reports(Conditions)
Required:
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.23 .198 or 1.800.3.' .23,
Issued By: (�j n Permittee Signature: A.Ale
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2016-00073
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/25/2016
T[`'' L 9 Parcel: 2S113B000600
Jurisdiction: Tigard
Site address: 16580 SW 85TH AVE
Project: Clean Water Services-Durham Treatment Plant Subdivision: None Lot: None
Project Description: Odor control system improvements-Installation of skylight,new Kalwal panels&replace membrane roof.
Contractor: MCCLURE& SONS INC Owner: CLEAN WATER SERVICES
15714 COUNTRY CLUB DR 2550 SW HILLSBORO HWY
MILL CREEK, WA 98012 HILLSBORO, OR 97123
PHONE: 425-316-6999 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: Permit Fee-Additions,Alterations, 05/25/2016 $7,897.55
Demolition
Occupancy Grp: Occupancy Load: 12%State Surcharge-Building 05/25/2016 $947.71
Dwelling Units: 0 Plan Review 03/10/2016 $5,133.41
Stories: 0 Height: 0 ft DC Provision Review,COM New-Bldg 05/25/2016 $175.50
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM New-Ping 05/25/2016 $175.50
Value: $1,540,000 Info Process/Archiving-Lg$2.00(over 05/25/2016 $154.00
11x17)
Info Process/Archiving-Sm$0.50(up to 05/25/2016 $125.00
Floor Areas: 11x17)
Metro Const. Excise Tax 05/25/2016 $1,848.00
Total Area: 15000 Tig-Tual School CET-Non Residential 05/25/2016 $9,000.00
Accessory Struct: 0 Plan Review-Fire Life Safety 05/25/2016 $3,159.02
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $28,615.69
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.23 .198 or 1.800.3 .23 .
Issued By: /, ���tX Permittee Signature:
` Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
1
Buildin Permit A licat' 3/3►.0
CCommercial IVSD I OR UI hI( F: 1 SI: ONI.1
Received I 2_-1�/� D„7a
City of Tigard (o i Permit No.:��(C/'
ee�� 3 ���� Date/By:
13125 SW Hall Blvd.,Tigard,OR MAR Plan Revi w 0
e Phone: 503-718-2439 Fax: 503-598-1960 Date/By: Related Permit
1 I t, \It 1) Inspection Line: 503-639-4175 f A Date Ready/By: ) Jures: la See Page 2 for
g g �� �� a 1� Notified/Method: �t /`�,��i` Supplemental Information
Internet: www.ti and-or ov 1t1�� /l” '4
BUILDING WV' itx ,t 1y1
Tom,' or REQUIRED DATA:1-AND 2 FAfi Y DWW EI JNiG
❑New construction 0 Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY Oil O 1V work indicated on this application.
❑ I-and 2-family dwelling ElCommercial/industrial Valuation: $
❑Accessory building 0 Multi-family Number of bedrooms:
L ❑Other:
❑Master builder Number of bathrooms:
i -
JOB I a : INFORMATION AND LOCATION Total number of floors:
Job site address: i • I tO 5j4 g5 t A J=Z,_- New dwelling area: square feet
City/State/ZIP: 1-‘6 44-6 p 2_.. ' 7 24 Garage/carport area: square feet
,ri (4-4
.,`. Suite/bldg./apt.#: Project name: bUQ1 }rn ,^ P -o Do Z. Covered porch area: square feet
' Cross street/directions to job site: CO nSe.71.fi L y9�� Pat,,kic.,,,4`tS Deck area: square feet
N.
;y� _
r 1 2- Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
-., .k.111 ubdivision: I Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: 026/ �36�Q Com Indicate the value(rounded to the nearest dollar)of all
I. equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Valuation: $ cirri
Rif u i.m •-f -r o F btu'DTI 4(2 014-Ar01 1.46 j'
f a.k.AV/VL1,r I. Df..c..TwLta 1L 4SS/cc.1 Ie{-cc.1� Existing building area: square feet
t CLSG.• (&L 17L0p5 . SK/CI 6fa--C N(4 building area: square feet
❑ PROPERTY OWNER I 0 TENANT 'P` Number of stories:
' Name: ��. Nuc CL-,y4 v44-Qui- . / Jt‘.4.5 Type of construction:
, Address: 1��( � jyS
e S g ��2, Occupancy groups:
$ City/State/ZIP:'j ,4.i'4 OA__ '7(Z 4- Existing:
Phone:(t15' )S4 7 (5,k$ ...0
Fax:( ) New:
' :, l 0 APPLICANT ,.— C)CONTACT PERSON " BUILDiNG PERMIT FEES*
Business name: FAiE �- /tc.� ( °sens(erroleesehelsj
il
/-L ( Structural plan review fee(or deposit):
Contact name: •, Q Address:
City/State/ZIP:
FLS plan review fee(if applicable):
— -
Total fees due upon application:
2 Phone:( ) Fax::( ) Amount received: f 1'/33.ill
R E-mail: PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
'lip Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted Photo Voltaic Solar Panel Syste.•.
C
Business name: ?-k C_L t€ cu /3 S Submit two(2 s- of roof plan with Gonne •.n details
•
�5 7/Li 61‘i/ (htA Oit, and fire department a ;-ss,along wi • e 2010 Oregon C _
Address: Solar Installation S.ecia .• ecklist.
Permit fee(incl •- p .• review
City/State/ZIP: /1;1/ C om`/I viii, an. .•ministrative -es): $180.00
Phone:yids, /3/�/ /Teti ,t Fax:/ ( ) u
l0 r! State sure ge(12%of permit fee• $21.60
CCB Lie.: 7//,/7 Total fee due upon application: $201.60
Authorized signal f : This permit application expires if a permit is not obtained
/ within 180 days after it has been accepted as complete.
Print name: k 4/ N.tzF Date: 313/.6 f 6 * Fee methodology set by Tri-County Building Industry
Service Board.
1:ABuilding\Pennits\BUP_COM_PennitApp.doc Rev.04/21/2014 440-46131(11/02/COM/WEB)
I
dr
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
■
Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
-I 1 G A IZ lD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains: and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
1:ABuilding\Permits\BUP_COiA1_PermitApp.doc Rev. 12/18/21114
City of Tigard
COMMUNITY DEVELOPMENT DEPARTMENT
il■
T 1 c n iz D Building Permit Review — Commercial - No Land Use
Building Permit #: Lam( c2-O 1(p— O'd 7 3
Site Address: I G 58 0 S'W 9 g-0, ow-e- Suite/Bldg#:
Project Name: CLeAn WGi+v Servs Ce_s - OUrkar-1 q WWTP
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review Gp at-w-o I Sys tvrvi imp roveAncuLA-,'z .
Proposal: g..ePI4&_v1 n+ o L- cxiStin of i r hUno(lin 9 ectivi((V1 l'1i-
dwC4-Work- 1. Ol f S 0 G--o, tt-ot.. -eAkc-tr c aJ-
Existing Business Activity: P fVQ eA4 C4 09 p
Proposed Business Activity: 1 - 1'
Verify site address/suite# exists and active in permit system.
River Terrace Neighborhood: ❑ Yes /Z No
0 Zoning: I — P
71Permitted Use: Yes ❑ No El Spec Space
7 Confirm no land use required.
Business License:
Exists: ❑ Yes ❑ No,applicant notified to obtain business license
Notes: w19Pli(ont to pv-c) . iCUL €mO1, l ve fi Gi V ) NOi1� StZ1nJCct'1ctf
w/ iVf[Uce-vrtc-vi- 0 Go✓).s M.QLtitny Sec. i g, 6S0. 070 . D.,
Approved by Planning: M i i - . 'al low E'er`- Date: 3/ 5/ 1 k
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 3/54?
Site Plans: # 5
Building Plans: #
Building Permit#: 12"-Enter building permit# above.
Workflow Routing: B'Planning rmit Coordinator .21 Building
Workflow Sign-off: Sign-off for Planning(include notes from planning review)
Route Application Documents: Building: original permit application, site plans,building plans, engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: �,0,.,IA L-44. ' Date: .8/6
I:ABuilding\Forms\BldgPennitRvw_COM_NoLandUse_07091 5.docx
1 . 1
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
)54pproved,NOT Released: Date: 3///hi.
Notes: Ptee, E�4,e ' - -
Revisionsions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes " $/ 1
Tigard Trans SDC:
El Yes g/A
Parks SDC: ❑ Yes /A
OK to Issue Permit
Approved by Permit Coordinator: / I Date: 5 / 5 4".
I:ABuilding`Forms\BldgPennitRvw_COM_NoLandUsc 0709I5.docx
Kennedy/Jenks Consultants
Engineers&Scientists
421 SW 6th Avenue,Suite 1000
Portland, Oregon 97204
503-423-4000
FAX:503-295-4901
11 March 2016
�.., a,)1,t 110
fc.0 Fr�QJ'e
�5 INET ,�
Randy Naef V e 9PE9
Dan Garberly
Clean Water Services
Durham Treatment Plant Services •; GON
16060 SW 85th Avenue , • . °° �P�
Tigard, Oregon 97224 Ni.
Subject: Solids Building HVAC Noise Issue 1EXPIRATION DATE:iiMh 117
CWS Solids Building Odor Control
Project: 6755
K/J 1376013.70
Dear Randy and Dan:
The majority of the existing noise associated with the Solids Building HVAC systems is the
sound of air exhausting out of the Odor Scrubber stack. The intensity of the noise is related to
the air velocity exiting the stack. Decreasing the odor scrubber flow rate from 35,000 cubic feet
per minute (cfm)to 20,500 cfm will drop the noise generated from the stack from approximately
60 decibels (dB)to 48 dB, measured near the stack. This is a perceived noise reduction of
approximately one-half the human ear.
The 14,500 cfm decrease in air flow to the Odor Scrubbers will now be exhausted out of new
exhaust fans located on the roof. According to our calculations, the combination of new noise
sources and noise from the exhaust stack will result in a slight net decrease in noise (1-5 dB)
when compared to existing conditions.
Let us know if you have any further questions
Very truly yours,
KENNED /JE S CONSULTANTS
Jeff Foray, PE
ctusersyertiNappdarauxaryncrosomwM dowsuenpmay Internet Nea¢ontentc boklc4IOx4mMMdurham solids oua6np noise i pactaa
T
Albert Shields
From: John Floyd
Sent: Tuesday, March 15, 2016 9:25 AM
To: Albert Shields
Subject: FW: CWS Duham Solids Building Project: (BUP2016-00073)
Attachments: Durham Solids Building Noise Impact.pdf
Albert,
Please release the Planning hold on BUP2016-00073 for the improvements to the wastewater plant. Please also add the
attached letter to the file.
Thanks,
John
From: Randy Naef[mailto:NaefR@CleanWaterServices.org]
Sent: Monday, March 14, 2016 8:19 AM
To:John Floyd; #CD PoD
Cc: Dan Garbely
Subject: CWS Duham Solids Building Project: (BUP2016-00073)
John, Monica, et al.
Attached is a letter from the designer regarding the noise impact of this project.Although it states the situation from a
pure engineering standpoint I'd like to elaborate because it, to me, doesn't tell the story very well. A significant
secondary benefit of this project is the large reduction of noise from the scrubber.This scrubber noise is by far the most
perceptible from this facility to the surrounding area and it's reduction was a priority of this project.The new exhaust
fans that the noise report discusses are located on the roof at interior locations and will not impact the surrounding area
in the manner the scrubber does.So although the stated calculated net noise reduction is small, the perceptible noise
reduction will be significant. I'd be happy to demonstrate this with a site visit to whoever might be interested. Please
give me a call with any questions and/or if I can demonstrate this point.
Regards, Randy
DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule."
1