Loading...
Plans (40) /L>,g�Z-O(- ('r a2 e c c€ic SGL/ (A/ 54-1 Ste. .r X00' INFORMATION HOOD MAX. EXHAUST PLENUM SJPPLY PLENUM HOOD CONFIG IN AREAS WERE THE GREASE DUCT IS WITHIN lB INCHES OF A COMBUSTIBLE MATERIAL NO. TAG MODEL LENGTH COOKING TOTAL RISER(S) TOTAL RISER(S) HOOD END TO (COMBUSTIBLE MATERIALS TO BE DICTATED BY THE HILI AND NEPA 96)AND IN AREAS TEMP. EXH GEM WIDTH LEND. DIA, CFM S.P. SUP.CFM WIDTH LENG. DIA. GEM S.P. CONSTRUCTION END ROW CAPTIVE-AIRF HOODS ARE BUILT WHERE THE AUTHORITY HANNC,1URISDICTION DEEMS NEVES Y,THE EXHAUST DUCT IS EIN COMPLIANCE WITH' TO BE WRAPPED WITH TWO DYERS OF 3M 20A FIRE RAINIER WRAP WHICH PROVIDES A 9424 8'la0a' 470 14' 24' 3613 -LIST• 430 SS Fig,04 CL cE BBBpppBRIER TO COMBUSTIB E5.INSTN..LATION DETAILS CAN BE OBTAINED 1 HOOD NI 3613 0 ALONE ALONE NFPA D96 NSF X3362 FROM N AG7URE.WHERE LOCAL CODE ALLOW ALTERNATIVE METHODS CAN BE UTILIZED ND[ Dom' Where Exposed /�T� ANO ONE OR HONE OF THE FOLLOWING 1AS LONG AS WROOOTTTEEENNN PERNIS90N IS OBT NEO FROM AUTHORm HAVING JURISOICTI[)rl, RECEIVED $000 INFORMA TIO {\•I E.T.LO . CLASSIFICATION X3054804-001 DUCT TO BE SUPPORTED PER ENGINEER'S SPECIFICATIONS.' ILTER(S) LIGHTS) UTILITY CABINET(S) TESTED TO UL 710 STANDARDS H000 FIRE SYSTEM ELECTRICAL SWITCHES FIRE HOOD N0. TYPE QTY.HEIGHT LENGTH QTY. TYPE WIRE LOCATION SYSTEM-ANGING PREFER TO MECHANICAL PLANS FOR DUCT SIZING.' GUARD TYPE SIZE MODEL N QUANTITY LOCATION PIPING WGHT HORIZONTAL DUCT RUNS ARE TO BE AVOIDED O POSSIBLE APR 2 5 2016 1 Stainless Steel Filter M12 16' 8 Incandescent Light ENT NO YES 723 AND USED ONLY WHEN NECESSARY. LDS THEY SHALL SLOPE NO LESS THAN 2'ON l2'C1610 WATER LEAK TESTING OF NEW GREASE EXHAUST VENT SYSTEMS EXHAUST OUTLET TO BE LOCATED A MINIMUM(IF CITY �.s�..., � GENERAL EXHAUST DUCT NOTES 10'FROM ANY AIR INTAKE.ADJACENT BUILDING.OR SUMMARY p HIGH PRESSURE Mll_T[�IOZZLE SPINJET IS TO BE PASSED THROUGH ALL NEV FOR QUESTIONS OR FURTHER INFORMATION, CONTACT PROPERTY LINE ALL DUCTS SHALL BE INSTALLED WITHOUT FORMING DIPS OR TRAPS THAT MIGHT COLLECT RESIDUES. GREASE EXHAUST VENT SYSTEMS TO CHECK FOR ANY LEAKAGE IN THE SYSTEM PLUS TO IN MANIFOLD(COMMON DUCT)SYSTEMS,THE LOWEST END OF THE MAIN DUCT SHALL BE CONNECTED CHECK FOR ADEQUATE ACCESS AND OTHER PROBLEMS THAT CAN BE REPAIRED DURING THE STEVE LUOOY AT (800) 825-3143BUILDING i� �/ �DIVISION FLUSH ON THE BOTTOM WITH THE BRANCH DUCT. CONSTRUCTION PHASE.ALL WATER USED IN THE TEST MUST BE COLLECTED IN SOME FASHION 1..J �f `,,! `V FOR DISCHARGE TO A SEWER. EXISTING EXHAUST FAN CLEANOUT OPENINGS SHALL BE PROVIDED AT THE SIDES IR AT THE TOP OF THE DUCT,WHICHEVER IS 1.ENVIROMATIC CORPORATION TO RECIEVE NOTIFICATION FROM SJ DESIGN/BUILD PROJECT 9.PLENTY OF HIGH PRESSURE HOSE ALONG WITH A 6'OR 12'SPINJET<OR ROTO-NOZZLE) 3613 CFM 0 1.500' STATIC PRESSURE MORE ACCESSIBLE,AND AT CHANGES OF DIRECTION. MANAGER OF UPCOMING PROJECT. REQUIRED. 00 NOT USE DUCTMATE'S ULTIMATE WELD ON PLATE OR DUCTMATES F2 SANDWICH PLATE FOR ACCESS 2.ENVIROMATIC TO NOTIFY THE TESTING CONTRACTOR TWO WEEKS AFTER CONSTRUCTION START 10.THE WORK IS TO START AT THE DISCHARGE PORTION OF THE SYSTEM COR AT THE N PANELS.INSTEAD USE THE STANDARD DUCTMATE ULITMATE PLATE. DATE FOR EACH REQUIRED LOCATION THAT TESTING WILL BE NEEDED AND GIVE THEM THE ELECTROSTATIC PRECIPITATOR WHERE APPLICABLE)AND WORK THE NOZZLE THROUGH THE CONTACT INFORMATION FOR THE JOB SUPERINTENDENT.THIS SCHEDULE AND CONTACT SYSTEM AT A RATE OF APPROXIMATELY ONE FOOT EVERY FIVE SECONDS UNTIL IT REACHES THE ACCESS DOOR SIZE SHALL BE A MINIMUM OF L2'Xl2' WHEN DUCT SIZE ALLOWS.WHEN DUCT IS TOO INFORMATION WILL BE OBTAINED BY ENVIROMATIC FROM SJ DESIGN/BUILD HOOD. SMALL TO ALLOW FOR A 12'Xl2'DOOR THEN THE LARGEST ALLOWABLE SIZE SHALL BE USED 3. THE WATER TESTING JOB IS TO BE SCHEDULED FOR AFTER THE WELDED GREASE EXHAUST II.WITH THE HOOD IN PLACE.THE TESTING COMPANY WILL HAVE TO COLLECT 100%OF THE -- a MAINTAIN MAXIMUM SLOPE AT ALL H000 WELDED EXHAUST DUCTWORK. SYSTEM WITH THE HOOD AND ALL ACCESS PLATES ARE INSTALLED.AT LEAST TWO-WEEKS PRIOR WATER SIMILAR TO A ROUTINE CLEANING WITH THE HOOD TAPED AND CLAMPED UP WITH AT NO HORIZONTAL RUNS UNLESS ABSOLUTELY NECESSARY, ARRANGEMENTS WILL BE GIVEN TO THE JOB SUPERINTENDENT FROM THE TESTING CONTRACTOR LEAST THREE MIL CLEAR POLY(PLASTIC)FUNNELING INTO A LARGE WATERTIGHT BRUTE (OR a SHALL SLOPE NO LESS THAN 2'ON 12'(16X) 4.ALL TESTING IS TO BE DONE BEFORE ANY FIRE-WRAP IS INSTALLED. SIMILAR)BUCKET. 4177 12.A WATER VACUUM WILL BE USED TO MAKE SURE ALL EXCESS WATER IS REMOVED FROM 1 ) ALL CHANGES IN DIRECTION ARE TO HAVE RADIUS ELBOWS. 5. TESTING CONTRALTO TO VERIFY WATER AVAILABILITY,BUILDING ACCES.ELECTRICAL HOOD AND DUCT WHEN DONE. - ALL SEAMS,JOINTS,PENETRATIONS,AND DUCT-TO-FOOD COLLAR CONNECTIONS SHALL HAVE A AVAILABILITY.AMOUNT OF HIGH PRESSURE HOSE NEEDED TO REACH ALL AREAS OF SYSTEM, ALL SEAMS, JOIS,CONTINUOUS EXTERNAL WELD. AND ANY NEEDED ROOF ACCESS WITH JOB SUPERINTENDENT WHEN SCHEDULING JOB AND 13.THE GENERAL CONTRACTOR'S WELDER WITH WELDING EDUIPMENT,A BRIGHT PORTABLE ti-r'1 ALSO DURING JOB REMINDER PHONE CALL THAT IS TO BE MADE BY TESTING CONTRACTOR TO LIGHT,AND A TORCH WILL BE ON-SITE WITH ACCESS TO ALL PARTS OF SYSTEM SO HE CAN DUCTS SHALL BE CONSTRUCTED OF CARBON STEEL NOT LESS THAN 1.6 GAUGE OR THE JOB SUPERINTENDENT THE WORKING DAY BEFORE THE JOB IS SCHEDULED. SPOT ANY LEAKS AND DO ANY REPAIRES WHERE NEEDED. STAINLESS STEEL NOT LESS THAN 1B GAUGE. 6.AN E-MAIL CONFIRMATION IS TO BE SENT TO THE SARKU JAPAN DESIGN/BUILD IA.THE WELDER WILL NEED THE TORCH TO DRY OFF ANY MOISTURE IN THE WELDS PRIOR TO PEASE DRAIN CONSTRUCTION MANAGER AFTER INITIAL SCHEDULING AS DEFINED IN 03 ABOVE. REWELDING ANY LEAKS. ACCEPTABLE DUCT-TO-DUCT CONNECTION SHALL BE AS FOLLOWS 15.IF THE DUCT LEAKS, THE LEAKS SHALL EE REPAIRED AND THE RE-TEST IS TO BE REDONE. M[N.40' (II TELESCOPING JOINT AS SHOWN IN FIGURE L 7.A WATER SOURCE WHERE A HOSE CAN BE CONNECTED WILL BE NEEDED. IF NOT 16.ADDITIONAL LEAKS ARE TO BE REPAIRED AND RE-TESTED UNTIL NO LEASKS EXIST.THIS WAY (2)BELL TYPE JOINT AS SHOWN IN FIGURE 2. AVAILABLE,A PORTABLE OR SEPARATE SELF CONTAINED WATER SOURCE WILL BE BROUGHT WITH.THE TESTING AND REPAIRS CAN BE COMPLETED IN ONE DAY. TOTAL AMOUNT OF WATER NEEDED DEPENDS ON LENGTH DF SYSTEM AND RETESTING / Ir BUTT WELD CONNECTIONS SHALL NOT BE PERMITTED. NEEDED.TO BE CALCULATED AND ALLOWED FOR BY THE TESTING CONTRACTOR. 17.THE TESTING COMPANY IS TO DRY OUT THE DUCT,REMOVE THE PLASTIC AND RETURN GREASE DUCT BRACING AND SUPPORTS SHALL BE MADE OF NON COMBUSTIBLE MATERIAL. 0.A GAS POWERED HIGH PRESSURE WASHER IS NEEDED WITH MINIMUM CAPABILITIES OF SYSTEM TO SAME CONDITION AS FOUND<WITH LEAKS REPAIRED). BOLTS,RIVETS,SCREWS OR OTHER MECHANICAL FASTENERS SHALL NOT PENETRATE DUCT WALLS. 1000 PSI Q 3GPM. 18. THE TESTING COMPANY WILL TAKE PICTURES OF THE SYSTEM AND PROCEDURE.ANO THEN E-MAIL THEM TO ENVIROMATIC TO VERIFY THE JOB IS DONE CORRECTLY. DUCTS EXPOSED TO THE OUTSIDE ATMOSPHERE OR SUBJECT TO A CORROSIVE ENVIROMENT SHALL BE 19.INVOICING SENT TO SARKU JAPAN DESIGN CONSTRUCTION COORDINATOR FROM MIN.18' PROTECTED AGAINST CORROSION IN AN APPROVED MANNER. ENVIROMATIC SHALL BE VERIFICATION THAT THE SYSTEM IS LICLID TIGHT AS SPECIFIED BY (I.� Iy��'� NFPA 96 GUIDELINES. 1a.'2476446 �'�N'AIIUsma i- 1e ' 1104'V I,'i,"1 9B4T.,,... '_" IIIIIIIIIIII IIIII 11111 II I I I I/II I/II I/II I [l II I 111 I I 1 I I I I I I I II •��tl"tea na�"4 a� 4.�a' _ RTD SENSOR INSTALLATION \/\/\ j\j �\ \/\/„./\/\.\\//,‘ � // \j \ - --=-W , MORS o.Rry�r T...t t t \\ �49'lt9n'Pi6,aAdY.' 147.13.310m..a a mmr0 ohm. RESPONSBILI TIES LIST _ M"'""'•°'• .�+.a...... OWNER CONTRACTOR / �A..� St St ^ri: 4 4 -' I.PROVIDE HOOD,FANS,i CURBS X y' _ _ 2.GREASE RATED DUCT X REFER TO FAN DETAIL FOR MORE INFURIATION J 4,. J --.-- = mre,.,, REGARDING FINAL BELL FITTING e.m w._ ._,..{}}��---®��® ....r M' 3 DUCT DEET TRANSITION PIECE FOR FANS X �.". -_._ -" I __ A u.I 4.ERJPNENT INSTALLATION FOR H00➢ N X OUT " 'a° va�r. 5.FIRE SUPWRESm6 SYSTEM -.P�,.===.-:-:--Z.--_. _L' .� "�'� � ..'s L WWI BE A IN ANDOOR INSTALLATION TO �` 6.ICK RUPI OF FIRE SLSPRESIION SYSTEM % A '�,. 7.ELECTRICAL CONTROL PANEL FOR % DETERMINED A AHJ -- - ...,« . � .d J.. _ "e f..p '�'° FOR.IMOD AND YAMS _ P--d B.ALL ELECTRICAL CONNECTIONS x ..._ .e.+.w,. ► 100W VAPORPR JH - -'----644 YAc_, R p -- 1 f J�' 4f1, 10.INSrALUTIOq IF GAS VALVE S VALVE x x E%HaJSY RISER INCANDESCENT L M _ __ _ _ __ IVra>6i"'• +��1 /. IL HOOD I DUCT PERMITS X HANGING ANGLE I 1 ',Jr,- • K"_ «[ ' - �, �N�Y- ,e,,,, I-' I2.FINE BIyREsslpM SYSTEM PERMITS x I 1\\ I ....�..«.." laarolo.sr. _ _ '.il' i'-F `d`0 �4s§45&4Fxin,m, IM \� ` • Moro.. _ __`__Jrah 's 4.. 12.= IPA �, \ iii AC=3 fie,. . l \ 1»uemaeamr.,.cun,4...Wwx A..a..r ' _ ' ' vow:cuc., R - """"'Bf""` aE„ D" SLOPED CREASE DRAIN PIPING - -- .N, w � _ AA--..�yy�� a WITH REMOVABLE CUP PIPE SYSTEM •NEVIRM.ISA 11 + =LR..'.;•:as K :: 16 21.10• _ ® T ®` CUSiOMFR SNF COOL.= ', 4 am 114. _-_ . ----- ..Gsn'+ 54 00' L E# I-24' p SET�R A p$ i,l OOP ® <TO BE FIELD WIRED tu.Listed L75 Series E26 Campy TO ELECTRICAL PACKAGE, ® EQUIPMENT $ L y ugh.n.e,r.-MSH T.,A.,.,ur 0 BY OTHERS i ) -`- _,.r,..r�, "'-fie,. I FtW 54.00' I 51.00 • 10:-&-.... PLAN VIEW - Hood (k1 (HOOD #1) SECTION VI HOOD MODEL 5424 ND! _ _ 8' 10.00" LONG 5424N01 # r'° _' .......-a JOB SARKU JAPAN x. _+_� �� _ LOCATION WASHINGTON SQUARE NCI. PACKAGE 4 -1G6YCATION S # 2456446 svlTacs FANS cONrnOLLEa , I =_ _ PATE 03-15-2016 JOB NQ TAD PACKAQE. LOCATION OPTION LOCATION OUNITRY TYPE 0 NP,VOLT RA II DIYC # SARKU DRAWN BY JSL ,1' SC-3111l0P Volt Noun*In SS Box SS WAU Mount Box I Ugh* Snort EontralX Thnaw.tatk Control ENaVf< 3 5000 EW 174 ��I Fan 50011 3 3.000 RMI lag REi! SCALE 3/4' = 1'-0' .x/2006 12:28 FAX 5032330451 JOHNSON AIR PRODUCTS -. ARROW MECHANICAL Rio 04 I • t+ [11 Greenheck 03/16/06 JOB: SORKU Fan MARK: GREASE FAN 4000 i 4275 CUBE • r moLiotwitil ] Belt Drive Upblast Centrifugal Roof Exhaust Fan � `_ 111 ING GREASE FAN 4000 II STANDARD CONSTRUCTION FEATURES ■ •Alu Up'.'..'_____ minum housi Backward inclined�J� n9 aluminum wheel•Curb cap with prepunched �► 25 5 mounting holes•Motor and drives isolated on shock mounts•Drain trough•Ball 1 11ri n bearing motors •Adjustable motor pulley•Adfustable motor plate•Fan shaft mounted II07 _„,, ip in ball bearing pillow blocks•Bearings meet or exceed temperature rating of fan• Static resistant belts••Corrosion resistant fasteners -II `� SELECTED OPTIONS&ACCESSORIES .� Switch-Nema-1,Toggle,Junction Bcoc Mounted and Wired Heat Baffle 1.75 Grease Trap with Drain Connection loy 34 ..1-1- Hinged Curb Cap IQ with Cables Bearings with Grease Fittings UUcUL-762 -"Power Vent.for Rest.EM.Appliances" NOTES:AI dimensions shown are in units of inches Fan weight is without accessories DIMENSIONS Approx.Fan Recommeded RoofANali Weight(Ib) Opening(in) 174 26.5 x 26.5 _PERFORMANCE (Elevation ft=0, Alrstreem Temperature°F=70) Volume SP h Motor Information Qty Model (CFM) w g) FRPM Power hp Size(hp) V/C/P End: Motor RPM: Windings FLA(A) 1 CUBE-22011P-20 4,000 1.5 1,013 1.71 2 208/60/3 ODP 1725 1 7.5 SOUND FIA-Based on tales 150 or 148 of Inlet Sound Power by Octave Band National Electrical Code 2002. 62.5 125 250 • 500 1000 2000 4000 8000 Lwa dBA Sones LwA-A weighted sound power level,based on ANSI S1.4. NA-A weighted sound pressure level,based on 11.5 dB .7 81 85 78 71 70 66 63 80 69 17.6 attenuation per octave band at 5.0 ft.Sones calculated using AMA 301 at 5.0 R 2.5 _ I 2.5 CM= ! — 0111Ttrlip alT11141 !A _ r_ — La , 'fit �,r"• �w nnn comno, • tJ r r — rnwcmnuu I' = r ` t3 irn,nnnrionni.mc. a — — ; i • — — — I 1.a • j g / ,a�Pp 1A i �t — ��� QT -y E —• _ aw d _ fi• as % • — 40w — atiev• — . o L... �' ° r 11 101 4 If , I 1111 aA • 0 1 2 3 4 5 5 7 Volume(Cwl X 1,000 CAPS 2.8.1.0 o il i ii I 111 I\ E \ I s 1 / ��)\\ / �,. (4) PLACES __i UNISTRUT 3/8" HEX NUT 4 UTASHER (2) PLACES (8) PLACES 3/8" THREADED ROD (4) PLACES HOOD • SAR KU JAPAN