Plans (3) BUP2014 00153
-
- #8 screw$
to roof deck
Granite top
taut 2.x* 4 �.� 1"steel conduit dia
- die wall - � suet nap track. .
braces @ 4W'at ting
f 0 0� O�
--
Plam face '^y
04A (E)Ceiling grid
T
_ . Wood base-
. , .
as„-a,° � Q � 0P O ON g Wood studs
or
22 GA steel
® steel studs 0916”o/c
w/5/$"bbd
ea side
0� 0� 0� 0ra 0� 0 p�
T.P.
•Accessible Counter
-y
I _ 1/2"x2-3/4"
�= 0 ( Q� . " stuanchors
d o/
�'►.
C� �� steel bottom track Conc slab
- G
6
mirror Mirror O }�. 0,� 0 0
Insulate hot
water and
Existin ceilin tiles `- _•-._ .. Gyp bd
x drain lines. Tows!dispenser g g Wall Detail
E 0 24" No sharp Top of lavatory -
v c, min< objects.
o Bottom of mk is A.
Grab bars �, Q reftecting'sur:ace Code Summary_
to 1-114"to f-112" m-m (local). A hcable Code: osSC 2010 Arellano s Market
6" In diameter C m o�
Pp
' maximum,between s � M Llgj ng Fixture Sc edule:
Building type VB Expansion
tali and waN / Ceiling
occupancy type:A2
A Recessed can w/12 watt LED Lighting Plan 12085 SW Hall Blvd
• Area: 1,440 sf
Maximum toe 1� Clearance beneath lava B Pendant mounted can w/12 watt LED Tigard, Or
� lavatory � i Occupant load: g '
clearance ' Maximum tae dearance within C Track lighting max 120 watts
Elevations total lavatory dearamce depth Assembly areas: 1,008/15=67 occupants
E Emergency egress lighting w/battery back-up
� X Exit sign Video Poker: 90 15=6 occupants
Service area: 152/100—2 occupants
Total: 75 occupants
i
REST ROOM MOUNTING HEIGHTS �
(E) Grocery Store
,. (E) Dining
4-0
_ - (E) Kitchen
'� Y'C ;' ® Pass shelf
Hand si
(E) RR Case Design Group
Hotel &Restaurant Design f
r` door sink 232 SE Oak 1
Suite 101
62 A Ys D Portland,Or 97214
?Drink well 503 863 4235
plot ,►.
Bar
RR
2
- Dining
1 Video Poker
o ° .9
Napa Auto Parts Trash area
4,500 sf , w ,� X:, Add 6'-0" high Stage ..
W solid wood
o Arellano's Market fence&gate DATE
v 0 2,990 sf
DEFERRED
- - €�
- l Fire Sprinkler ._.,, P�.t�P�'
Fire Alarm
Mechanical ,
y �. Y Plumbing t �J door Plan
Electrical �
4 J
1. 'frays Engineering
.,,... Cry()F TIGARD
Shop Drawings ..,...,
Pther R : EWED FOR(;ODE COMPI.�LANCX 1
- Appy
OTC.
t�
DOOR SCHEDULE: Pcrnlit
Address �1ft 11 `��i��
Suite#t
Site Plan A (N)3'x 6'-8"wood door in metal frame w/lever handles&"occupied"latch B
H B (E)3`x 6'-8"wood door in metal frame w/lever handles&"occupied"latch r. MA ...,, ,, Dates -7-/�r
C (E)3'x 6'-8"wood door in metal frame w/lever handles LEGEND
D (N)3x 6'-8"wood door in metal frame w/ e - hwid -- le _ --y�N1�.. -�{�
E (E)Pair 3'x T Aluminum storefront w/sign`' �`" Existing wails: "
New walls: Wood studs @ 16 o/c w/ 5/8 Gyp bd
"THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS"
Ck
CL '