Plans (3)BUP2014-00130 GENERAL NOTES & SPECIFICATIONS Design Criteria Applicable Building Code: 2010 Oregon Structural Specialty Code 1 Design live loads A. Floor loads 1.1. Retail 1.1.a. First floor =100 psf B. Roof loads 1.1. Minimum roof snow or live load Minimum Maximum dictated by Building Official = 25 psf 1.2. Minimum roof live load by code = 25 psf 1.3. Ground snow load = 20 psf slump range 1.3.a. Snow exposure factor (ce) = 1.0 BLDG. 1.3.b. Snow importance factor (Is) = 1.0 compressive 1.3.c. Thermal Factor (Ct) = 1.0 1.4. Flat roof snow load (Pf) = 25 psf 1.5. Total design snow load = 35 psf + drifting 1.6. Roof design is governed by the minimum roof live load or total design snow load BRG. + drifting whichever is more stringent. (psi) 2. Design wind loads A. Basic wind speed (3 second gust) (Ultimate) = 95 mph 2.1. Exposure =B 2.2. Importance factor (Iw) = 1.0 3, Seismic Ss = 0.944 S, = 0.340 Scs = 0.706 So, = 0.390 Seismic importance factor (le) 1.0 Risk Category II Seismic site class D (presumed) Seismic design category D 4. Frost depth = 12" General 1 The structure or its modifications are designed to be self-supporting and stable after the building or its modifications are fully completed. It is solely the contractors responsibility to determine erection procedure and sequence and insure the safety of the construction personnel, public, building and its component parts, and adjacent buildings and properties. This includes the addition of whatever temporary or permanent shoring, bracing, or sheet piling, etc. that may be necessary to brace new construction, adjacent buildings, existing walls, and framing to remain so that the structure is braced for wind, seismic, gravity, construction loads, etc. and that no horizontal or vertical settlement or any damage occurs to the adjacent existing structures. Temporary supports shall be maintained in place until permanent supports and/or shoring and bracing are installed. Design of these supports shall be by a registered engineer registered in the state where the project is located in the employ of the contractor. 2. Fall protection support shall be provided in accordance with OSHA requirements as required. Such material shall remain the contractor's property after completion of the project. 3. It is the contractors responsibility to enforce all applicable safety codes and regulations during all phases of construction. 4. The contractor shall perform all construction for the project in a manner and sequence that are based on accepted industry standards that recognize the interaction of the components that comprise the structure, without causing distress, unanticipated movements or irregular load paths as a result of the construction means and methods employed 5. Construction loads shall not exceed design live loads. The contractor shall be responsible for all design required to support construction equipment used in constructing this project. Shoring and re -shoring is the responsibility of the contractor. 6. Principal openings through the framing are shown on these drawings. The general contractor shall examine the structural and mechanical drawings for the required openings and shall verify size and location of all openings with the mechanical contractor. Providing all openings required by the mechanical, electrical, plumbing, or other trades shall be a part of the general contract, whether or not shown in the structural drawings. Any deviation from the openings shown on the structural drawings shall be brought to the engineer's attention for review. 7. The existing conditions shown on these documents were based upon existing drawings prepared by John Graham AIA dated 11/19/1973. The contractor is responsible for field verifying all existing conditions, any discrepancies are to be immediately reported to the engineer and architect prior to proceeding with any of the work in question. 8. All mechanical and electrical duct work, plumbing, piping, wiring, lighting and all architectural items that need to be removed during the modification of, or reinforcing of, existing structure shall be replaced in kind. The contractor shall keep all existing systems in operation during the construction phase of the project. 9. All contractors are required to examine the drawings and specifications carefully, visit the site and fully inform themselves as to all existing conditions and limitations, prior to agreeing to perform the work. Failure to visit the site and familiarize themselves with the existing conditions and limitations will in no way relieve the contractor from furnishing any materials or performing any work in accordance with drawings and specifications without additional cost to the owner. 10. Details labeled "Typical Details" on drawings apply to situations occurring on the project that are the same or similar to those specifically detailed. Such details apply whether or not details are referenced at each location. Notify engineer of clarifications regarding applicability of "Typical Details". 11. Work these drawings with architectural, mechanical, and electrical drawings. 12. Do not scale drawings. 13. Any discrepancies between structural and architectural drawings shall be brought to the attention of the architect and structural engineer. 14. Should any of the general notes conflict with any details or instructions on plans, or in the specifications, the strictest provision shall govern. 15. Shop drawings and submittals: A. These drawings shall be checked and coordinated with other materials and contracts by the general contractor and shop drawings and submittals shall bear the contractor's review stamp with the checker's initials before being submitted to the architect for approval. B. When the fabricator has been authorized to use the architect and engineer's drawings as erection drawings, the fabricator must remove all title blocks, professional seals and any other references to the architect and engineer from that erection drawing. The fabricator's name and title shall be placed on the erection drawings. C. Where dimensions and elevations of existing construction could affect the new construction, it is the contractor's responsibility to make field measurements in time for their incorporation in the shop drawings. Demolition 1. The structural drawings are intended to show only the general existing building construction within the area of demolition. the drawings do not show all framing members, incidental framing, walls, quantities, sizes, obstructions, etc., and are not intended to be used by the contractor to define the complete scope of demolition. The contractor must field verify the actual building conditions to define all elements within the scope of demolition. 2. The extent of work shown shall include removal and disposal, off site, of the building structure and slabs on grade. 3. Conform to all applicable codes for demolition of structures .,.vfety of adjacent structures. dust-untrol. run-off control, disposal and all items necessary to complete work. 4. A steel framing member shall be disassembled only after the load supported by that member has been redistributed or removed. 5. Steel framing shall be disassembled in a manner which does not deform or apply loads to the existing framing to remain. 6. The existing structure to remain is to be shored as required until the supporting elements are installed as shown on the drawing. 7. Existing slabs shall be saw cut in a manner that does not cause the steel framing supporting the slab to be cut. 8. Existing slabs shall be core drilled at reentrant corners of new floor openings to prevent over cuttirrt. 9. The demolished structure shall be reduced to pieces of a weight, and transported across the remaining structure in a manner, such that the remaining structure is not overstressed. 10. Existing mechanical and electrical equipment shall be protected from damage resulting from demolition 11. Contractor shall submit a proposed deconstruction sequence to the owner and structural engineer for review prior to commencement of work 12. Contractor shall field verify slab on grade floor construction type prior to cutting. Under no circumstances shall the contractor cut a structural floor slab thicker than four (4") inches without prior written approval from Engineer of Record. Notify Engineer of Record of any slab thickness greater than four (4") inches prior to proceeding with any saw cutting. 6/2/14 4:12 PM \\Tbs-projects02\2014\2014-0222\Cad\Structural\2014-0222_S-001.dwg Micropiles 1. Foundation design is based on Micropiles with the following allowable capacity: Types Size Gravity Design Load Per pile Per pile 50 tons Mfr. Mfr. 2. Pile lengths shown on the drawings are estimates for bidding purposes only. Final length to be determined by geotechnical engineer and micropile design engineer. 3. Pile shall be installed to depth required to obtain the capacity defined above including minimum socket depth into rock (if applicable). 4. Piles shall be furnished with top bearing plates, tension reinforcing and components (if applicable) and all other components as requested by the pile design engineer. 5 Material for pipe pile shall be ASTM A252 (Fy = 80ksi). 6. Material for bearing plates shall be ASTM A572 or A992 grade 50 ksi. 7. Pipe piles shall be filled/encased with 4000 psi grout. 8. Pile requirements shall comply with specifications. 9. Contractor shall locate existing utilities prior to beginning work. Protect utilities from damage when they occur in close proximity to piling operations. Drill pilot holes as required. 10. Upon completion of the work, a certified pile report shall be submitted by the contractor recording the following: A. Actusl elevation at bottom and top, elevation of rock (If any) B. Final centerline location at top C. Variation of pile from plumb D. Depth of socket (if applicable) E. Volume of grout placed. F. Any unusual conditions G. Date and time of start and completion of pile installation. H. Inspection, testing and placement of pile and pile cap concrete (include any delays in concreting) 11, A minimum of (1) -Pile load tests shall be performed complying with ASTM D1143, per the building code and the geotechnical engineer's requirements as defined in the geotechnical report, whichever is more stringent. The load tests shall be performed and the results approved by the structural engineer before production piles are installed. 12. Contractor shall submit micropile construction documents and calculations stamped by an engineer registered in the state where the protect is located. Foundation 1. The contractor shall familiarize themselves with the survey and the geotechnical investigation report before starting construction. All foundation work shall be in accordance with the recommendations of the geotechnical report by Geotechnical Resources, Inc., dated May 15, 2014 except where noted otherwise on drawings or specifications. 2. A soils testing laboratory shall be retained by the owner to provide construction review to insure conformance with the construction documents during the excavation, back fill, and foundation phases of the project. 3. The soils testing laboratory shall: • Discuss with the engineer the design intent of the construction documents and the testing procedures used to ensure conformance with the construction documents before construction begins. • Inform the engineer of any variance in these procedures. 4. It shall be the responsibility of the soils testing laboratory to: • Approve fill materials, perform density tests of fills to insure placement per specification requirements, Inspect foundation bearing surfaces 5. All fill materials shall be free of organic contaminations and other deleterious matter. 6. Notifystructural engineer of an unusual soil conditions that are in variance with the geotechnical report. 9 Y 9 P Concrete 1 All concrete construction shall conform to ACI 301, "Specifications for Structural Concrete" and ACI 302, 305 and 306 unless noted otherwise for the year referenced in the applicable building code. 2. All detailing, fabrication and placing of reinforcing bars, unless otherwise noted, shall conform to ACI 318, "Building Code Requirements for Structural Concrete" ACI 117, as referenced in the applicable building code, and the latest ACI detailing manual. 3. Concrete production: General as per ACI 301, Section 4, Article 4.3, except as noted. 4. Ready -mixed Concrete: use for all work, except that when small quantities (not over 1/2 cubic yard) are needed for isolated or relatively unimportant items. 5 Concrete Types Schedule Type of Concrete Minimum Maximum Specified Specified Specified air Maximum cementious water 28 -day slump range content range size BLDG. content cement compressive for placement (% by volume) aggregate BEAM (Ib/cu. yd) ratio strength with W . BRDG. (inches) BRG. BEARING (psi) (inches) BOLTED TIE JOIST • Interior concrete CANTILEVER C.I.P. CAST -IN-PLACE C.J. CONTROL JOINT CL CENTERLINE 0-3 CLEAR • Grade beams 564 0.48 4000 3-5 COLUMN 1 CONC. CONCRETE CONSTR. CONSTRUCTION Entrapped CONT. • Pile caps C.Y. CUBIC YARD DBA DEFORMED BAR ANCHOR Notes. A. All cement shall be Type I or Type III Portland Cement per ASTM C150. Types IA and IP are not acceptable. Use one brand of cement throughout project. B Minimum cementitious content shall consist of 100% cement or a combination of cement and fly ash per Note C. C. Fly Ash is permitted and shall conform to ASTM C618 Type C or F, but shall not exceed 20% of cementitious content by weight indicated above on a substitution basis and shall be included in the water -to -cement ratio. If fly ash is used, the mix design submittals shall have tests using the same amount of fly ash. The contractor's schedule shall account for the use of fly ash. D. Ground granulated blast furnace slag (GGBFS) is not permitted. E. All admixtures other than superplasticizers shall be added at the batch plant. Superplasticizers, designed for addition to the mix at the plant, may be added at the batch plant with verifications from the structural engineer and verifications that the water -to -cement ratio has not been exceeded. Superplasticizers added at the site shall be sent in pre -measured containers from the batch plant. F All concrete used for cast -in-place concrete slabs shall contain the specified water reducing or water reducing/retarding admixture. All concrete slabs, placed at air temperature below 50°F shall contain the specified non -corrosive, non -chloride accelerator. All concrete placed at air temperature above 80" shall contain specified water-reducing/retarder admixture. All concrete redriired to be air -entrained shall contain an approved air -entraining admixture. All pumped corcrete shall contain the specified high -range water -reducing admixture. Concrete with a water -cement ratio above 0.40 to 0.60 shall contain the specified water reducer. G. All concrete requiring a high slump for placement (i.e. pumping, drilled piers, etc.) shall contain mid-range and high -range superplasticizer. Increased slump may not be achieved by exceeding the specified maximum water cement ratio. Maximum slump is 8 inches with use of water reducing admixture (ASTM C494). H. Calcium chloride shall not be permitted nor shall any admixture containing calcium chloride be permitted. 6. Normal 1. right aggregate: ASTM C33, from a single source. 7. SMater-reducing admixture: ASTM C494, Type A, containing not more than 0.1% chloride ions. 8. High-r-:rge water -reducing admixture (superplasticizer): AbTM C494. Type F or G, containing not more than 0.1°< chloride ions. 9. 'Wpt, - - -., non -chloride accelerating admixture. ASTM C494, Type E, containing not more than 0. , % ch: -ide Ions. 10. Water-ru .ucing, retarding aunuxture: ASTM C494, Type D, containing not more than 0.1% chloride ions 11. Certific2i. )n upon engineer's request, provide admixture manufacturer's written certification that chloride .:n content complies with specified requirements. 12 Curing Compound: liquid membrane -forming type (sodium silicate type not approved) meeting all requirem •nfs of ASTM C309. Type 1-D clear or translucent, having a fugitive dye to facilitate visual check c' •,verage. Use of Type 2 white pigmented type is recommended during hot weather. 13 Molstur, retaining sheet materialsany of the types listed in and meeting requirements of ASTM C171: waterproof paper. 4 mil. (.004") polyethylene film. white burlap/polyethylene sheet 14 Sealing in ,tarials: for laps in sheet cover, provide pressure sensitive tape, non -staining mastic, or other effertivr a, :resive recommended by covering manufacturer 15. Premoto rt ioint filler: for use in expansion or isolation joints, size 112" thick x full depth of slab, either AST' ' 751 or D1752, and compatible with type of joint sealant used. 16. Moisturr %�arrier: polyethylene sheet not less than 10 mils thick, which complies with ASTM E 1745, Class t 17. Bond B, ,�r-ker Felt: 15# felt. 18. No elec,:!t at conduit shall be placed above the welded wire fabric or top reinforcing of slabs. 19. Concrete shall be discharged at the site within 1 1/2 hours after water has been added to the cement and aggro- dates. Addition of water to the mix at the project site will not be permitted. All water must be added at the batch plant. Concrete (cont.) 20. Slump may be adjusted only through the use of additional water reducing admixture or high range water reducing admixture. 21. All concrete shall be placed without horizontal construction joints, except where specifically noted. Horizontal reinforcement shall be continuous through vertical construction joints. 22. See architectural drawings for concrete finishes, masonry anchors, and for miscellaneous embedded plates, bolts, anchors, angles, etc. 23. The placement of sleeves, outlet boxes, box -outs, anchors, etc., for the mechanical, electrical and plumbing trades is the responsibility of the trade involved, however, any box -outs not covered by typical details in the structural drawings shall be submitted for approval. 24. Reinforcing steel shop drawings shall indicate the sequence in which layers of crossing reinforcing should be placed in order to produce the correct outermost layers as indicated on the drawings. 25 Reinforcing bars shall conform to ASTM A615, Grade 60. No tack welding of reinforcing in the field will be permitted. 26. Welded wire fabric reinforcing shall conform to ASTM A185 and be furnished in flat sheets and installed on chairs or precast blocks for slab on grade. 27. Reinforcing bar sizes #3 through #5 may be bent cold the first time, provided reinforcing bar temperature is above 32°. For other bar sizes, preheat reinforcing bars before bending. See procedures as outlined in ACI 301 referenced in applicable building code. 28. Wire bar supports shall be furnished for all reinforcing within slabs, inclusive of wire welded fabric. bottom bars in slabs on grade may be supported by other suitable supports. Reinforcing shall be properly positioned prior to concrete placement and may not be repositioned once concrete operations have begun. Wire bar and other types of supports shall be in accordance with the Concrete Reinforcing Steel Institute Manual of Standard Practice. 29. All hooks shown on drawings shall be standard hooks unless otherwise noted. 30. Where continuous bars are called for, they shall run continuously around corners and be lapped at necessary splices, or hooked at discontinuous ends. Lap lengths shall be as given in the splice and development table. Lap beam top bars at mid -span and beam bottom bars at supports, unless otherwise noted. Minimum Lap Splice and Anchorage Dimension Table 1 4000 psi normal weight concrete, Fy=grade 60, non -coated bars Top Bars Other Bars Bar Size Lap Anchorage Bar Size Lap Anchorage #3 24" 19" #3 19" 15" #4 33" 25" #4 25" 19" #5 41" 31" #5 31" 24" #6 49" 37" #6 37" 29" #7 71" 54" #7 54" 42" #8 81" 62" #8 62" 48" 2. When lapping two different size bars, use the lap dimension of the smaller bar or the anchorage dimension of the larger bar. Use whichever dimension is larger Minimum Concrete Cover for Reinforcing 1. Concrete reinforcing shall be placed per the tolerances of ACI 117 and ACI 318 as referenced in applicable building code regarding minimum cover. 2. Location Minimum Cover • Pile caps cast against 3" and permanently exposed to earth • Slabs on grade (W.W.F.) 1/3 slab thickness from top of slab Grade beam ties 1 1/2 3. Maximum deviation from the above requirements shall be ±1/4 inch for sections 10 inches thick or less; and ±1/2 inch for sections over 10 inches thick. See ACI 318 listed in the applicable building code reference standards, Section 7.7.1 for conditions not listed. 4. Filling-in: fill-in holes and openings left in concrete structures for passage of work by other trades, unless otherwise shown or directed, after work of other trades is in place. Mix, place and cure concrete as herein specified, to blend with in-place construction. Provide other miscellaneous concrete filling shown or required to complete work. 5. Grout base plates and foundations as indicated, using specified non-metallic non -shrink grout. 6. Form work for structural elements shall not be removed until concrete has reached 75% of its design. 7. Cold weather placing: comply with ACI 306. 8. Hot weather placing: comply with ACI 305. Floor Finish 1. Interior floor slabs: machine trowel unless noted otherwise. 2. Provide ACI 'Class A' tolerance, 1/8" variation in 10 feet, measured with a straight edge laid in any direction. Curing 1. Curing compound shall be provided as prescribed on architectural drawings based on floor use. Coordinate for compatibility of finish material. 2. Moisture curing method of curing concrete shall not be used inside existing buildings or where a potential for water damage exists. 3. Maintain initial curing for 12 hours after finishing, 24 hours for air temperature of 75 degrees F and above. Submittals 1. Product data: submit data for proprietary materials and items including admixtures, patching compounds, waterstops, joint systems, curing compounds, finish materials, and others as requested by architect/engineer. 2. Shop drawings/Reinforcement: see ACI 301, Section 3.1 Detailing shall conform to ACI 315, as referenced in applicable building code, "Details and Detailing of Concrete Reinforcement". 3. Shop drawing submittals shall consist of 3 prints of each drawing for the Structural Engineer, 1 print for the Architect and a minimum of 1 print for the General Contractor. 4. Mix design: submit mix designs for each concrete mix for the project per Chapter 5 of ACI 318. Mix designs shall include all back up material with compressive strength breaks based on field experience or breaks from a trial mix per Chapter 5 Quality Assurance 1 Mold and cure three specimens (cylinders) in accordance with ASTM C31. Three specimens constitute a strength test. Test one cylinder at 7 days and 2 at 28 days Acceptance of structure will be based on results of 28 -day tests. 2. Obtain at least one set of cylinders for each 50 cubic yards or fraction thereof, of each concrete mixture placed in any one day. 3 Air Content A. Determine air content of concrete for each strength test by either the pressure method (ASTM C231) or the volumetric method (ASTM C173). The "Chase" air indicator shall not be usea. B. A minimum of one air content test shall be made in the morning and one in the afternoon. Air content tests shall be made on all concrete whether the concrete is designated as air -entrained or not. C. Additional air content tests, for concrete specified as air-entr,oned, shall be made when any of the following conditions occur: • A change in appearance or consistency of concrete. • Possible reduction of air content due to time delays of truck and/or hot weather • When air temperature is over 80°F, check each truck load. 4. Slump test: perform slump test on each truck load of concrete. 5. Inform engineer immediately of any slump and/or air content tests that do not meet these specifications. If strength, durability or aesthetics of the structure would be impaired, that concrete shall not be used. 6. Concrete test reports shall contain the following information. concrete supplier, quantity of concrete represented, location of samples taken, design strength requirement at 28 days, list of all materials and admixtures used with quantity and brand or source, actual slump, actual air content, air temperature, concrete temperature, weather, cylinder weight as received, date molded. number of days on job site, date tested, test results for 7 and 28 days, and any other information necessary to evaluate test results. 7. Send one copy of reports on all required laboratory testing directly to t' -e structural engineer, two copies to the architect, one copy to the contractor and one copy to the concrete supplier. A copy of all test reports shall be in the engineers office within a maximum of five (5) working days from date of test or inspection. 8. Acceptance of structure: if 28 -day test results do not meet requirements, the engineer shall have the right to order a change in mix proportions for remaining portions of structure. He may require core tests to be made at contractors expense. Any such testing shall be done by an independent testing agency acceptable to the engineer. Structural Steel 1. Detailing, fabrication, and erection shall conform to the latest AISC specification as referenced in the applicable building code. Structural Steel: (W shapes) ASTM A992 (Fy=50ksi) (Plate, Angles) ASTM A36 uno HSS: (tubular shapes) ASTM A500 grade B (Fy=46ksi) All anchor rods shall be ASTM F1554 grade 36, uno. All structural steel shall be primed white or light gray, asphaltic paints are not acceptable. All column base plates shall have a minimum of four anchor rods. 3. Connections shown on these drawings are generally schematic. They are intended to define the spatial relationship of the framed members and show a feasible method of making the connection. Any connection that is not shown or is not completely detailed on the structural drawings shall be designed by a registered professional engineer, retained by the fabricator. Details and connections may be designed to conform to AISC Steel Construction Manual, as referenced per applicable building code. Completely detailed means the following information is shown on the shop detail drawings: A. All plate dimensions and grade. B. All weld sizes, lengths, pitches and returns. C. All hole sizes and spacings. D. Number and type of bolts: where bolts are shown but no number is given, the connection has not been completely detailed. E. Where partial information is given, it shall be the minimum requirement for connection. F. Method of design. 4. Details and connections completely detailed in the contract drawings may not be altered without written approval by the engineer. Where approved, altered connections shall be completely detailed by the fabricator's engineer clearly on the shop drawings. 5. Alterations of schematic connection details may impact architectural concept and shall not be made without prior written approval of the engineer. 6. Minimum connection plate thickness shall be 3/8", unless otherwise indicated in the contract drawings. 7. For W shapes, unless otherwise noted, beam to beam connections and beam to column connections shall be one of the following double angle (t min=5/16") framed beam connections: A. Shop welded per Table 10-3, AISC manual, as referenced in the applicable building code for using weld A, and using 3/4" diameter ASTM 325-n bolts in standard or horizontally slotted holes for the field connection. B. All bolted connections per Table 10-1, AISC manual as referenced in the applicable building code. Controlling strength of connection shall be least of bolt / angle strength or beam web strength taking into account coped flanges. The minimum length of connection angles shall be equal to one-half the depth of the member to be supported. 8. Unless otherwise noted, all connections at HSS sections shall be designed and detailed in accordance with the AISC "Hollow Structural Sections Connection Manual," first edition. 9. Where the reactions of uniformly loaded beams and girders are not shown on the drawings, the connections shall be designed to support the maximum allowable uniform load as indicated in the load tables of AISC Manual of Steel Construction for the given beam size and span. For beams and girders not uniformly loaded see plan for reactions, if no reaction is shown, contact Engineer of Record for reactions. 10. Twist -off type tension control bolts are not permitted to be used as bearing bolts 11. All bolts shall be considered bearing bolts. Do not over tighten bearing bolts, especially for beams to support concrete slabs. Tighten bearing bolts to a snug condition only, per AISC specifications. 12. All welding shall be done using E-70xx electrodes in accordance with the latest AWS specifications. 13. Work these drawings with architectural drawings for nailer holes and architectural clearances. 14. General contractor shall verify all structural beam locations, mechanical unit weights and opening sizes and locations with mechanical contractor and vendor's drawings for actual mechanical unit purchased. 15. Splicing of structural members where not detailed on the drawings is prohibited without prior approval of the structural engineer. 16. Cuts, holes, coping, etc. required for work of other trades shall be shown on the shop drawings and made in the shop. Cuts or burning of holes in structural steel members in the field will not be permitted, unless specifically approved in each case by the structural engineer 17. All HSS shapes (round, square, rectangular, etc.) are to have a 1/4" cap plate at all exposed ends. Cap plates to be seal welded all around, uno. Provide 3/8"O weep holes in the center of the plate. 18. All weld sizes not shown in details herein shall be the minimum required size based on thickness of thicker part as per AISC thirteenth edition, tables J2.3 & J2.4. exception: at member splices welds or bolts shall develop full strength of the member or components being connected. 19. All around welds indicated herein shall be discontinuous at the flange tips of open sections. 20. All structural steel, including base plates and tops of anchor bolts, to be exposed to soil are to be coated with an approved coal tar epoxy, 16 mils minimum thickness. 21. Any alteration made by the detailer on the structural steel shop drawings to schematic or completely detailed connections shown on the contract drawings must be clearly identified by clouding or by direct note on the shop drawing by the detailer prior to submission to the engineer. 22 Any member sizes shown on the plans, and currently listed in the AISC Steel Construction Manual latest edition, which are not currently available must be brought to the architect and structural engineers attention prior to award of steel contract. No claim for additional cost will be accepted after the award, for member/built up member substitutions for these sizes. 23. Level and plumb individual members of structure within specified AISC tolerances. For beams which support steel joists, maintain such tolerances as will assure specified minimum joist bearing. Tolerances shall not be accumulative. Temperature correction shall be applied so that the structure will be plumb and will have clearances specified at 70'F. Submittals 1 . Submit shop drawings prepared under supervision of a registered structural engineer, including complete details and schedules for fabrication and assembly of structural steel members, procedures and diagrams. Include details of cuts, connections, camber, holes, and other pertinent data. 2. Indicate welds by standard AWS symbols and show size, length, and type of each weld. Provide setting drawings, templates and directions for installation of anchor bolts and other anchorages to be installed by others. Provide calculations used for designing connections. 3. Shop drawings shall indicate the date of the structural drawings that were used to prepare the shop drawings. 4. Shop drawing submittals shall consist of 3 prints of each drawing for the Structural Engineer, 1 print for the Architect and a minimum of 1 print for the General Contractor. Quality Assurance 1. Test reports: submit copies of reports of tests conducted on shop and field bolted and welded connections. Include data on types of tests conducted and test results. 2. An independent testing and inspection agency shall be engaged to inspect high-strength bolted connections and welded connections and to perform tests and prepare test reports. Testing agency shall conduct and interpret tests and state in each report whether test specimens comply with requirements, noting any deviations therefrom. 3. Correct deficiencies in structural steel work which inspection and laboratory test reports have indicated to be not in compliance with requirements. Perform additional tests, at contractor's expense, as may be necessary to reconfirm any noncompliance of original work, and as may be necessary to show compliance of corrected work. 4 Field bolted connections: inspect in accordance with AISC specifications. Check at least one bolt on every connection Non -slip critical bolts tightened to a snug ft condition only require a visual inspection. Stip critical bolts require a turn of the nut or calibrated wrench method inspection. 5 Shop and field welding: inspect and test during fabrication and/or erection of structural steel. Certify welders and conduct inspections and tests as required. Record types and locations of defects found in work. Record work required and performed to correct deficiencies. Perform visual inspection of all welds. and perform ultrasonic tests of full penetration welds in accordance with ASTM E 164. ABBREVIATIONS RECHVED ,iln - 3 2014 CITY OF WARD BUILDING II)WISION A. B. ANCHOR BOLTS ADDT. ADDITIONAL AFF ABOVE FINISH FLOOR ARCH. ARCHITECTURAL B.PL BASE PLATE BLDG. BUILDING BILK. BLOCK BM. BEAM BOT. BOTTOM BRDG. BRIDGING BRG. BEARING BTJ BOLTED TIE JOIST CANT'L. CANTILEVER C.I.P. CAST -IN-PLACE C.J. CONTROL JOINT CL CENTERLINE CLR. CLEAR CMU CONCRETE MASONRY UNIT COL. COLUMN CONC. CONCRETE CONSTR. CONSTRUCTION CONT. CONTINUOUS C.Y. CUBIC YARD DBA DEFORMED BAR ANCHOR DET. DETAIL DIAG. DIAGONAL 0 or DIA. DIAMETER DJ DOUBLE JOIST DK, DECK D. L. DEAD LOAD DWG, DRAWING DWLS DOWELS EA. EACH E.F. EACH FACE E.J. EXPANSION JOINT EL. ELEVATION ELEV. ELEVATOR E.S. EACH SIDE EQ. EQUAL EQUIP. EQUIPMENT E.W. EACH WAY EXP. EXPANSION (E) or EXIST._ EXISTING EXT. EXTERIOR F/BLDG. FACE OF BUILDING F/CONC. FACE OF CONCRETE F. D. FLOOR DRAIN FIN. FINISH SPECIAL INSPECTION REQUIRED FLG. FLANGE State of Oregon Structural Specialty Code FLR. FLOOR F.S. FAR SIDE OR FOOTING STEP FT. FEET eal6oncrete and Reinforcing Steel FTG. FOOTING ❑ Bolts Installed in Concrete GA. GAUGE G. B. GRADE BEAM ❑ Special Moment -Resisting Concrete Frame G. C. GENERAL CONTRACTOR GALV. GALVANIZED ❑ Rein rng Steel & Prestressing Steel Tendons HD'D. HEADED tructurel Welding HORIZ. HORIZONTAL I,F. INSIDE FACE ❑ High-Strenght Bolting INT. INTERIOR J/B JOIST BEARING ❑ structural Masonry JST. JOIST ❑ Reinforced Gypsum Concrete JT. JOINT k KIP ❑ insulating Concrete Fill LG. LONG ❑ Spre lied Fire -Resistive Materials L. L. LIVE LOAD LLH LONG LEG HORIZONTAL O i6r1 Dolled Piers and Caissons L.11Yr 9s (LLV) LONG LEG VERTICAL LW LONG WAY ❑ Shotcrete MAS. MASONRY ❑ Special Grading, Excavation and Filling MC MOMENT CONNECTION MECH MECHANICAL ❑ Smoke -Control Systems MFR. MANUFACTURER ❑ Other Inspections MTL METAL (N) NEW (N.I.C.) NOT IN CONTRACT N. S. NEAR SIDE NTS NOT TO SCALE 0. C. ON CENTER 0. F. OUTSIDE FACE 0/0 OUT TO OUT OPP. OPPOSITE PC PRECAST CONCRETE PL PLATE PLCS. PLACES P.S.F. POUNDS/SQUARE FOOT P.S.I. POUNDS/SQUARE INCH RAD, RADIUS R. D. ROOF DRAIN REINF. REINFORCING REQ'D. REQUIRED RET. RETAINING SECT, SECTION SIM. SIMILAR TO S.O.G. SLAB ON GRADE SP. SPACES so. SQUARE STIFF. STIFFENER STL. STEEL STRUCT. STRUCTURAL SW SHORT WAY SYM. SYMMETRICAL T/ TOP OF TYP, TYPICAL UNO UNLESS NOTED OTHERWISE VERT. VERTICAL V.I.F. VERIFY IN FIELD W. P. WORK POINT W.W.F. WELDED WIRE FABRIC W/ WITH CITY OF TIGARD REVIEWED FOR CE COODS COMPLIANC Approved: I N' OTC: I Permit #: -43?p 1n 14-cooC) Address: ,q5}T C? -,! O L) < Suite #• LS B Dam OFFICE COPY PO l/ 6.�`c_ 103 Thorson Baker Associates C O N S U L T I N G E N G I N E E R S 3030 West Streetsboro Road (330) 659-6688 Ph Richfield, Ohio 44286 (330) 659-6675 Fax 1 Infinite Loop MS 52 -RD Cupertino, CA 95014 Tel: 408.974.3822 Fax: 408.974.3793 Architect: Woods Bagot www.woodsbagot.com Structural Consultant Thorson Baker & Associate www.thorsonbaker.com �� EOG INEcf Ia3a8i36 r ;V,�C3,�,� Yk -ZgtfOp v9jG,J� NCEEE tz/-sulk Washington Square Mall 9585 S.W. Washington Square Igard, OR 97223 Issued / Revised Date BID / PERMIT 06/02/14 Apple Approval Date GENERAI. NOTES S-001 iciate III ware ate 5/02/14 ate F; 6/2/14 4:11 PM \\Tbs-projects02\2014\2014-0222\Cad\Structural\2014-0222_5-001.dwg S A 68" o rz O ^ 20'-0"± T U 20'-0"± 0++' p 6th' `O (E) GRADE BEAM 6/2/14 4:11 PM \\Tbs-projects02\2014\2014-0222\Cad\Structural\2014-0222_5-101.dwg AFTER SHORING ABOVE, COLUMN TO BE REMOVED AND FOUNDATION ABANDONED IN PLACE. (E) GRADE BEAM SFJ Q ',. 0 C'P' C th' �\ +ryO '616 90 W CUT (E) GRADE BEAM EA. SIDE OF AFTER COLUMN IS REMOVED, FOUNDATION FOR INSTALLATION OF \40 SEE TYPICAL SLAB INFILL ••DETAIL " ON SH. S-201. . ' O, J W C0 W W _.. .. -. OPP. 1 HAND 5-201 6/2/14 4:11 PM \\Tbs-projects02\2014\2014-0222\Cad\Structural\2014-0222_5-101.dwg AFTER SHORING ABOVE, COLUMN TO BE REMOVED AND FOUNDATION ABANDONED IN PLACE. (E) GRADE BEAM 20'-0"± AFTER SHORING ABOVE, COLUMN TO BE REMOVED AND FOUNDATION ABANDONED IN PLACE. -- --- `•oC,s, , Q W co o GRADE BEAM TO BE POURED INTEGRAL WITH PILE CAP IT/ GR. BM. = T/ PILE CAP) 0 TYP. w d GB-1—T—TT71 ° —° — e — — 4 AC' DRILL & EPDXY (2) #5x2'-0" LG. (8" MIN. EMBED) DOWELS AT (E) GRADE BEAM AND (N) FOUNDATION USING HILTI HIT HY200 (OR EQUAL) TYP. TOP & BOT. (4 - TOTAL) EA. SIDE OF FOUNDATION. TYP. (4) -PLACES. (E) GRADE BEAM QN, EXISTING FOUNDATION PLAN 1/4"=1'-0" NOTES: - EXISTING FLOOR CONSTRUCTION: 4" CONCRETE SLAB ON GRADE (PRESUMED). - DENOTES FLOOR INFILL CONSTRUCTION: 4" CONCRETE SLAN ON GRADE WITH ONE LAYER OF 6x6-W2.1xW2.1 W.W.F. PROVIDE 10 MIL VAPOR BARRIER AND 4" LAYER OF GRANULAR FILL BELOW SLAB (UNO.) SEE TYPICAL DETAIL ON SHEET S-201. - TOP OF SLAB ELEVATION = 0'-0" - ELEVATIONS NOTED THUS (+X' -X") ARE TO TOP OF FOOTING REFERENCED FROM SLAB ON GRADE ELEVATION (UNO). - TOP OF (N) INTERIOR PILE CAP ELEVATION = (4-10') (UNO). - TOP OF (N) GRADE BEAM ELEVATION = (4-10") (UNO). - PROVIDE (2) #4x3'-0" LONG AT ALL REENTRANT CORNERS. V y MARK Q ',. W co C th' �\ +ryO '616 90 W CUT (E) GRADE BEAM EA. SIDE OF 1 (2)#5 FOUNDATION FOR INSTALLATION OF NEW FOUNDATION AT NEW COLUMNS. TYP. (4) -PLACES. w 20'-0"± AFTER SHORING ABOVE, COLUMN TO BE REMOVED AND FOUNDATION ABANDONED IN PLACE. -- --- `•oC,s, , Q W co o GRADE BEAM TO BE POURED INTEGRAL WITH PILE CAP IT/ GR. BM. = T/ PILE CAP) 0 TYP. w d GB-1—T—TT71 ° —° — e — — 4 AC' DRILL & EPDXY (2) #5x2'-0" LG. (8" MIN. EMBED) DOWELS AT (E) GRADE BEAM AND (N) FOUNDATION USING HILTI HIT HY200 (OR EQUAL) TYP. TOP & BOT. (4 - TOTAL) EA. SIDE OF FOUNDATION. TYP. (4) -PLACES. (E) GRADE BEAM QN, EXISTING FOUNDATION PLAN 1/4"=1'-0" NOTES: - EXISTING FLOOR CONSTRUCTION: 4" CONCRETE SLAB ON GRADE (PRESUMED). - DENOTES FLOOR INFILL CONSTRUCTION: 4" CONCRETE SLAN ON GRADE WITH ONE LAYER OF 6x6-W2.1xW2.1 W.W.F. PROVIDE 10 MIL VAPOR BARRIER AND 4" LAYER OF GRANULAR FILL BELOW SLAB (UNO.) SEE TYPICAL DETAIL ON SHEET S-201. - TOP OF SLAB ELEVATION = 0'-0" - ELEVATIONS NOTED THUS (+X' -X") ARE TO TOP OF FOOTING REFERENCED FROM SLAB ON GRADE ELEVATION (UNO). - TOP OF (N) INTERIOR PILE CAP ELEVATION = (4-10') (UNO). - TOP OF (N) GRADE BEAM ELEVATION = (4-10") (UNO). - PROVIDE (2) #4x3'-0" LONG AT ALL REENTRANT CORNERS. V y MARK SIZE REINFORCING ',. r C th' �\ +ryO '616 90 1 OPP. 1 5-201 HAND S-201 ° W 20'-0"± I A �+ 6+�' O (E) GRADE BEAM - - - ---------- +1 -- AFTER SHORING ABOVE, COLUMN TO BE REMOVED AND FOUNDATION ABANDONED IN PLACE. (E) GRADE BEAM A C2• Til, W. /'0 O 7O, O, W C0 W 0 w N ° ° a e d GB -1 d. e e u -e °- a AC's J L SEE TYPICAL SLAB INFILL DETAIL ON SHEET S-201 (TYP.) (E) GRADE BEAM - SEE ARCHITECTURAL DRAWINGS FOR EXTENT AND FINISH OF SLAB ON GRADE AND ANY FLOOR DEPRESSIONS, UNDERFLOOR CONDUITS, DRAINS, ETC. - SEE SHEET S-001 FOR GENERAL NOTES. - SEE SHEET S-401 FOR TYPICAL DETAILS. - PC -X DENOTES PILE CAP. SEE SHEET S-201 FOR PILE CAP DETAILS. - GB -X DENOTES GRADE BEAM. SEE THIS SHEET FOR GRADE BEAM SCHEDULE. - FOUNDATIONS ADJACENT TO EXISTING STRUCTURES SHALL BEAR ON UNDISTURBED SOIL AT THE SAME ELEVATION OF THE EXISTING FOOTINGS. - (E) DENOTES EXISTING CONSTRUCTION. - DENOTES EXISTING 10"0 STEEL PIPE PILE FILLED WITH CONCRETE. - 0 P50 DENOTES NEW 50 TON MICRO PILE. REFER TO MICROPILE SUPPLIER FOR PILE DETAILS AND FIELD INSTALLATION DRAWINGS. AFTER SHORING ABOVE, TO BE REMOVED AND FC ABANDONED IN PLACE. w I m W 0 0 0 0 N 0 36 37 38 GRADE BEAM SCHEDULE_ MARK SIZE REINFORCING STIRRUPS OT WIDTH x DEPTH BTOM TOP GB -1 12"x12" (2)#5 1 (2)#5 #3 @ 12" O.C. GRADE BEAM NOTES: 1. BOTTOM REINFORCEMENT TO LAP AT CENTERLINE OF SUPPORTS AND TOP REINFORCEMENT TO LAP AT MIDDLE THIRD OF GRADE BEAM SPAN. 2. LAP SPLICES SEE GENERAL NOTES. 3. TOP REINFORCEMENT TO EXTEND TO ENDS OF PILE CAP AND HOOK V-0" MINIMUM. 1*3 Thorson Baker Associates C O N S U L T I N G E N G I N E E R S 3030 West Streetsboro Road (330) 659-6688 Ph, Richfield, Ohio 44286 (330) 6596675 Fax 1 Infinite Loop MS 52 -RD Cupertino, CA 95014 Tel: 408.974.3822 Fax: 408.974.3793 Architect: Woods Bagot www.woodsbagot.com Structural Consultant: Thorson Baker & Associate www.thorsonbaker.com ��PEp PROfFSS 1NEF9 C� 81 364P 9r 0 4 �CEE1A fjagLL�3t �Mf Washington Square Mall 9585 S.W. Washington Square Tigard, OR 97223 Issued / Revised BID / PERMIT Apple Approval EXISTING FOUNDATION PLAN S-101 Date 06/02/14 Date Y z O 2 z BASE PL zo IY z O Q M SAWCUT & REMOVE EXIST. SLAB AS REQUIRED PILE CAP ADEQUATE 2'_6^ LO'R AP ADEQUATE F: Ow 2" MAXIMUM 8" FOR 12" MAXIMUM 1/8" WIDE x T/4 DEEP EMBED. d ° EQ. EQ. OPILE DIAMETER / PILIECAP PILE AND SAWCUT x BONDING AGENT MICROPILEDIAMETER U rn ° o a SEE TABLE w NEW SLAB EXISTING P a CL OF COL. GENERAL NOTES INFILL j SLAB & PILE CAP a c ° ° F – J a ° a oyEQEQ (4) #5 E.W. ° a n ° ;Fl �HOOKED BOTTOM W o 000,7 O O ° ° ° ° ° 7BARRILER7, 7 ° ° S eVAPOR ° r EXISTING VAPORFOUNDATION, PIER, NBARRIER n PILE CAP, ETC. #4x18". DRILL w INTO EXAND 6" LAP VAPOR 50 TON MICROPILECL PILE SEE PLAN NOTES GROUTSING HILTI BARRIER HEAVY HEX NUT WITH 50 TO MICROPILE (4) #5 E.W. BY MICROPILE MFR HIT HY150 ANCHORAGE OVERSIZED WASHER. HOOKED BOTTOM SYSTEM (OR EQUAL) TACK WELD TO RODBY MICROPILE MFR CONTROL JOINT TYPICAL SLAB INFILL DETAIL TYPICAL ANCHOR ROD DETAIL (ASTMF1554GR.36) PILE CAP PC -1 PILE CAP PC -1A (SEE PLAN FOR LOCATIONS) DEPTH = 2'-10" DEPTH = 2'-10" UNO • CONTRACTOR MAY USE LEVELING NUTS OR LEVELING PLATES AT CONTRACTORS OPTION. • AN INCREASE IN GROUT THICKNESS FOR LARGE BASE PLATES IS PERMISSIBLE IF APPROVED BY THE ENGINEER. COORDINATION DUE TO INCREASE IN GROUT THICKNESS FOR OTHER TRADES IS THE RESPONSIBILITY OF THE CONTRACTOR. SEE TYPICAL SLAB INFILL DETAIL ------ i4 0 x w d 0 w O o a w D a a < 0 X z O 0 a m O o u - i H w J W (L m }Ww H m W Y O W - z O z Lu z �z� w0tn 0wo O < in Q 6/2/14 4:11 PM \\Tbs-projects02\2014\2014-0222\Cad\StructuraN2014-0222-S-201.dwg r.we��� i•;•K•�•�•�• SEE PILE CAP DETAILS FOR SIZE & REINF. BEARING PLATE TO BE DESIGNED, PROVIDED, & INSTALLED BY MICROPILE MFR. STEEL PIPE CONCRETE — FILLED/ ENCASED MICROPILE BY MICROPILE MFR. REINFORCING BAR BY MICROPILE MFR. ° SECTION , 3/4" = 1,_0„ TUBE COLUMN SEE PLAN BOND BREAKER MATERIAL TYP. (4) -SIDES NEW FLOOR SLAB INFILL AS REQUIRED °a ---- w z Lu g EL O rn J F 0 EL w N �y J a w 6" MIN. MICROPILE EMBED 0 AS DETERMINED BY GRADE BEAM (SEE PLAN) RUN GRADE BEAM REINF. TO END OF PILE CAP AND PROVIDE V-0" HOOKED END TOP OF ROCK BEARING STRATA (SEE GEOTECHNICAL REPORT) TO BE DETERMINED BY ON SITE GEOTECH (4) - #6 HOOKED DOWELS TOP & BOTTOM EPDXY ANCHORED 10" INTO (E) PILECAP USING HILTI HIT HY200 (OR EQUAL) wlg w U a 0 N (E) PILE (E) PILE L (N) PILE 3'-0" 1'-3"t 1'-9"t 1 V-3" SEE TYPICAL SLAB — — — — — � INFILL DETAIL &VO 7 NO SECTION 2 3/4"= 1'-0" - ° / b - PILE CAP REINFORCING AS DETERMINED BY MICROPILE DESIGNER NEW MICROPILE SEE DETAIL 1 THIS SHEET FOR ADD 'L. INFO. SEE TYPICAL SLAB INFILL DETAIL /------------- a I LT i w a-------------� w • • GRADE BEAM b 8 FREINFORCING GRADE BEAM a SEE SCHEDULE SEE PLAN SECTION 3 3/4" = 1'-0" 103 Thorson Baker Associates C O N S U L T I N G E N G I N E E R S 3030 West Streetsbom Road (330) 6596688 Ph. Richfield, Ohio 44286 (330) 6596675 Fax 1 Infinite Loop MS 52 -RD Cupertino, CA 95014 Tel: 408.974.3822 Fax: 408.974.3793 Architect: Woods Bagot www.woodsbagot.com Structural Consultant: Thorson Baker & Associate www.thorsonbaker.com �PEp PROFFS c����G1NfF'95��2 81364P 9 ORE 9L�O E E N�� `I 14 fa✓r� '1+ Washington Square Mall 9585 S.W. Washington Square Tigard, OR 97223 Issued / Revised Date BID / PERMIT 06/02/14 Apple Approval Date FOUNDATION SECTIONS & DETAILS S-201 date 4all )quare Date 06/02/14 R Date 6/2/14 4:42 PM \\Tbs-projects02\2014\2014-0222\Cad\StructuraN2014-0222_5-301.dwg EQ. I EQ. T&B 1/44 IF POST IS WIDER THAN BEAM > 1/4 POST & BEAM OF EQUAL WIDTH O 1/4 V \ \ SHOP INSTALLED ERECTION SEAT0 J I w \ (ANGLE REMOVED TO COMPLETE I FIELD WELDING) TYP`— (4) YP. (4) 1 1/16"0 HOLES FOR 3/4"0 ANCHOR ` ALL TUBE TO TUBE CONNECTIONS RODS TO BE WELDED ALL AROUND, UNO TYPE I TYPICAL COLUMN BASE PLATE DETAIL DBL. L 5x3x3/8 W/ 2 1/2" LG. SLOTTEDHOLES1\3'1, I I I W33, SEE PLAN T/ STEEL EL. = SEE PLAN (3) SIDE SECTION , 3/4"=1'-0" - A (N) HSS8x6 COLUMN SEE PLAN 3/4"0 A325 BOLTS. TIGHTEN AFTER ANGLES ARE WELDED TO COLUMN. HSS8x4 W/ SLOTTED ENDS HSS 4x4x1/4 TYP 1/4 SEE SECTION 3/5-401 FOR ADD'L. INFO. SECTION 4 3/4" = 1'-0" 6/2/14 4:56 PM \\Tbs-projects02\2014\2014-0222\Cad\Structural\2014-0222_5401.dwg TYPICAL BRIDGING DETAIL (E) HSS7x7 COLUMN 3/4"0 A325 BOLTS. TIGHTEN AFTER ANGLES ARE WELDED TO COLUMN. SHORE (E) HSS 7x7 COLUMN PRIOR TO CUTTING (E) HSS 7x7 COLUMN BASE PL 3/4"x8"x8" W33 BEAM SEE PLAN DBL. L 5x3x3/8 W/ 2 1/2" LG. SLOTTED HOLES W33, SEE PLAN SECTION 2 3/4"=1'-0" - U Lu m O T/ STEEL EL. =SEE PLAN (3) SIDES SHOP INSTALLED ERECTION SEAT (ALTERNATE LOCATION) TYPICAL TUBE TO TUBE CONNECTION (E) JOIST (TYP.) 3/16 V 2" L7x4x3/8 (LLV) TYP.EA. BRACE>3/16 6" (E) METAL DECK 1 DBL L 4x4 BRACE , NEW JOIST BRIDGING @ DOUBLE ANGLE BRACE. SEE TYPICAL DETAIL THIS SHEET. TYP. AS SHOWN TYpI T/ STEEL EL. = SEE PLAN I I I I I s ao1 I W33 BEAM SEE PLAN l 1 SECTION SHORE (E) HSS 7x7 COLUMN PRIOR TO CUTTING DBL L 4x4 TYP. SEE F SEE SECTION 3/S 401 FOR ADD'L. INFO. SECTION 5 3/4" = 1'-0" SEE PLAN 1/2"= 1'-0" 3/16 TYP.EA.BRACE TYP. 3 SID ti DBL L 4x4 SEE PLAN (TYP.) ti \\T 15' Y�La FULL DEPTH STIFF. PL3/8" x6" EA. SIDE OF BEAM DETAIL A 3/4"=,'-0" - NEW JOIST BRIDGING @ TOP OF (E) METAL DECK COLUMN BRACE. SEE TYPICAL BRIDGING DETAIL (E)JOIST ----- — ------ — ---- --- (TYP.) — - -- - (V I (2)5/8-0 THRU-BOLTS L 8(4x7/16 & FS I W/ (2) 2" LG.. VERT. 8" SLOTTED HOLES (N) HSS 8x6 COLUMN SEE PLAN SECTION 6 3/4"=1'-0" 13 Thorson Baker Associates C O N S U L T I N G E N G IN EE R S 3030 West Streetsbom Road (330) 659-6688 Ph. Richfield, Ohio 44286 (330) 659-6675 Fax 1 Infinite Loop MS 52 -RD Cupertino, CA 95014 Tel: 408.974.3822 Fax: 408.974.3793 Architect: Woods Bagot www.woodsbagot.com Structural Consultant: Thorson Baker & Associate www.thorsonbaker.com 90 PRO NEEss�o 813 PE OR O LEE NE tA, I� I 6rP.R+� Washington Square Mall 9585 S.W. Washington Square Tigard, OR 97223 Issued / Revised Date BID / PERMIT 06/02/14 Apple Approval Date FRAMING SECTIONS & DETAILS S-401 V W 20'_0"± — T-2"± --------------------------------\ �o o (E) WF BEAM (HI) (E WF ` �_ BEAM (E) WF BEAM - I r I I 'I I N I I (E) 24" STEEL JOISTS @ 6'-8"± O.C. I I i I I — I I I rI I I I I I D., 0" I I I I N SEE SHEET S-301 I I x FOR COLUMN I I 00 REMOVAL FRAMING I I IN I 1= I IZ (E) WF BEAM ❑ (d) WF BEAM El (N) L4x4x5/16 BRACE TYP. I I I — I I I I I I I I -- I I I I I r I I I I I — I I I I I (E) 26" STEEL JOISTS @ 6'-8"± O.C. I � I I I -^` 0 I '+ I �051+J���P� GOA Q� G Q� I (E) WF BEAM (El) WF BEAM I I I I I I I I I I I I --------------------- --- ----------� Q� STOREFRONT FRAMING PLAN NU 1/4"=V-0" NOTES: - (E) ROOF CONSTRUCTION: 1 1/2" METAL ROOF DECK OVER STEEL JOISTS. - SEE SHEET S-001 & S-002 FOR GENERAL NOTES. - SEE THIS SHEET FOR TYPICAL DETAILS. - C -X DENOTES COLUMNS SEE THIS SHEET FOR SCHEDULE. - (E) DENOTES EXISTING CONSTRUCTION. +i QALL (N) STEEL TO BE ROVIDED BY TENANT COLUMN SCHEDULE (N) HSS6x6x1/4 COLUMN SIZE OUTRIGGER TYPE (TYP� 1 5-501 C-1 HSS8x8x5/16 O I (4)-5/8"0x3 1/2" EMBED. HILTI KWIK BOLT T-2 Z (p +I X rn U) (E) WF BEAM ❑ (d) WF BEAM El (N) L4x4x5/16 BRACE TYP. I I I — I I I I I I I I -- I I I I I r I I I I I — I I I I I (E) 26" STEEL JOISTS @ 6'-8"± O.C. I � I I I -^` 0 I '+ I �051+J���P� GOA Q� G Q� I (E) WF BEAM (El) WF BEAM I I I I I I I I I I I I --------------------- --- ----------� Q� STOREFRONT FRAMING PLAN NU 1/4"=V-0" NOTES: - (E) ROOF CONSTRUCTION: 1 1/2" METAL ROOF DECK OVER STEEL JOISTS. - SEE SHEET S-001 & S-002 FOR GENERAL NOTES. - SEE THIS SHEET FOR TYPICAL DETAILS. - C -X DENOTES COLUMNS SEE THIS SHEET FOR SCHEDULE. - (E) DENOTES EXISTING CONSTRUCTION. +i QALL (N) STEEL TO BE ROVIDED BY TENANT COLUMN SCHEDULE MARK COLUMN SIZE BASE PLATE TYPE ANCHOR RODS C-1 HSS8x8x5/16 PL.3/4"x14"x1'-2" I (4)-5/8"0x3 1/2" EMBED. HILTI KWIK BOLT T-2 • SEE THIS SHEET FOR TYPICAL COLUMN BASE PLATES. • SEE SHEET S -X FOR TYPICAL ANCHOR ROD DETAIL. 6/2/14 5:02 PM \\Tbs-projects02\2014\2014-0222\Cad\Structural\2014-0222_5-501.dwg 36 37 T/(E) JOIST EL. (+30'_0"±) (E) BULKHEAD FRAMING TO REMAIN (E) ANGLE SUPPORTING METAL STUD FRAMING TO REMAIN (N) HSS: (N) CO...... 1.2 1 W SEE PLAN SECTION , 11/2"=V-0" T/(E) JOIST EL. _ (+30'-0"±) TYP. 1/4 TYP. SEE SECTION 1 FOR ADDITIONAL INFO. (E) BULKHEAD J FRAMING TO REMAIN (E) ANGLE SUPPORTING METAL STUD FRAMING TO REMAIN (N) HSS20x8 (N) CONT. HSS6x6 —1 (N) HSS8x8 COL. 1.2 W SEE PLAN \ (N) L2x2x3/16 /tx (E) ROOF JOIST (N) L7x4x5/16 NS & FS OF COL. (LLV) W/VERT. SLOTTED HOLES FOR (2) 5/8"0 THRU BOLTS HAND TIGHTEN NUTS ONLY & BURR THREADS (N) HSS8x8 COLUMN ALL (N) STEEL TO BE PROVIDE BY TENANT I 1 [ti SEE TYPICAL TUBE TO TUBE CONN. DETAIL ` (E) BULKHEAD FRAMING TO BE REMOVED (N) HSS6x6 OUTRIGGER BEYOND SEE PLAN SECTION 2 1/2"=V-0" (E) ROOF JOIST (N) L7x4x5/16 (LLV) 103 Thorson Baker Associates C O N S U L T I N G E N G I N E E R S 3030 West Streetsboro Road (330) 659-6688 Ph. Richfield, Ohio 44286 (330) 659-6675 Fax 1 Infinite Loop MS 52 -RD Cupertino, CA 95014 Tel: 408.974.3822 Fax: 408.974.3793 Architect: Woods Bagot www.woodsbagot.com Structural Consultant: Thorson Baker & Associate www.thorsonbaker.com PROFFS 813 PE 9r O G OL L� 8 �A� C NES 14 Washington Square Mall 9585 S.W. Washington Square Tigard, OR 97223 Issued / Revised Date BID / PERMIT 06/02/14 Apple Approval Date STOREFRONT FRAMING PLAN & DETAILS S-501