Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (6)
MEC2013 00415 GENERAL NOTES: RECEIVED JUL 2 2 2013 TRANE NATIONAL ACCOUNTS EQUIPMENT PACKAGE (OWNER FURNISHED EQUIPMENT) A MECHANICAL CONTRACTOR SHALL VERIFY THAT ALL EQUIPMENT, AS SHOWN ON THESE N MECHANICAL EQUIPMENT SCHEDULE DRAWINGS, WILL NOT CONFLICT WITH ANY DRAINS, SCUTTLES, JOINTS, VENTS, PIPING OR c�oFTIGARD EQUIPMENT. BUILDING DIVISIO HEATING COOLING B. ALL ROOFTOP EQUIPMENT SHALL HAVE MANUFACTURER SUPPLIED ROOF CURBS. DARDEN RESTAURANTS HAS A NATIONAL ACCOUNT AGREEMENT WITH THE TRANE COMPANY FOR BUNDLED SOLUTIONS, THE ROOFTOP UNITS ARE AN OWNER MARK CFM O.A. S.P. VOLTS/ FAN MCA/ EER/ INPUT OUTPUT NOM. TOTAL SENS. ENT. ENT, MANUFACTURER/ WEIGHT NOTES FURNISHED ITEM, ASSIGNED TO THE INSTALLING CONTRACTOR. THE INSTALLING CONTRACTOR IS RESPONSIBLE FOR PROPER INSTALLATION AND ONE YEAR LABOR CFM PHASE HP MOCP IEER MBH MBH TONS MBH MBH D.B. W.B. MODEL C. THE MECHANICAL CONTRACTOR SHALL PROVIDE COMPLETE INFORMATION AND COOPERATION TO THE OTHER CONTRACTORS AND TRADES AS REQUIRED FOR COMPLETION AND WARRANTY. RTU-1 5,000 1,000 1,0" 12.0 250.0 203.0 12.5 160.0 121.8 82.8'F 68.3'F 2600 LBS. 1 2 3 5 6 7 8 9 10 14 15 COORDINATION OF THE COMPLETE PROJECT. FOR COMPLETE INFORMATION ON THE FOLLOWING PACKAGE OF EQUIPMENT CONTACT TRANE NATIONAL ACCOUNTS: 1-407-660-1111 CHRIS ST. JOHN 12.6 YFD151E3H x1116, STACEY ABBOTT x 1158, ANDREW LIVELY x1142 or KEVIN SCHILF x 1120) 12.0 D. THE MECHANICAL CONTRACTOR SHALL BE RESPONSI8LE FOR ADMINISTERING ALL RTU-2 5,000 1,000 1.0" 12 6 250.0 203.0 12.5 160.0 121.8 82.8'F 68.3'F YFD151E3H 2600 LBS. 1 2 3 5 6 7 8 9 10 14 15 WARRANTIES ON EQUIPMENT WHICH HE INSTALLS. THIS INCLUDES ALL CONDENSERS, ANY CHANGES OR VARIATIONS TO THE ORIGINAL EQUIPMENT PACKAGE DESCRIBED BELOW THAT WOULD AFFECT THE HVAC EQUIPMENT PACKAGE SHOULD BE REFRIGERANT LINES, AND OTHER ITEMS FURNISHED BY OTHERS AS WELL AS THOSE BROUGHT TO THE ATTENTION OF THE ACCOUNT COORDINATOR AT TRANE NATIONAL ACCOUNTS AT TIME OF QUOTATION. RTU-3 5,000 500 1.0" SEE ELECTRICAL DRAWINGS 12'012 6 250.0 203.0 12.5 160.0 121.8 82.8'F 68.3'F YF01R51 E3H 2600 LBS. 1 2 3 5 6 7 8 9 10 14 15 FURNISHED BY HIMSELF. FOR VOLTAGE CHARACTERISTICS RRU-1 2,500 2,500 p 6' 12.5Z326 0 326.0 10.0 140.3 56.6 90.0'F $O.Q'F TRANS 2800 LBS. 1 2 4 6 8 9 1 1 12 13 14 15 E. ALL OUTSIDE AIR INTAKES SHALL BE A MINIMUM OF 10'-0" FROM ANY EXHAUST FAN, RTU HEATING AND COOLING EQUIPMENT PACKAGE: 14. RRU120E30QA GAS EXHAUST OR PLUMBING VENT. INCLUDES ALL ROOFTOP AIR CONDITIONERS (INCLUDING CURBS) OR SPLIT SYSTEM AIR CONDITIONING EQUIPMENT WITH ALL ACCESSORIES AS SPECIFIED ON THE PLANS RRU-2 4,500 4,500 1.0" "111 651.0 651.0 25.0 312.0 126.7 90.0'F 80.0'F RRU3T0 3DFA 3600 LBS. 1 2 4 6 8 9 11 12 13 14 15 F. CONDENSATE DRAINAGE FROM ROOFTOP HVAC UNITS SHALL BE COPPER, TRAPPED AND PIPED. NOTE: ORDERING PROCEDURES NOTES: Ol PROVIDE WITH FACTORY MANUFACTURED UNINSULATED CURB. �6 PROVIDE UNIT WITH HAIL GUARD, HINGED ACCESS PANELS, CRANK CASE 13 MECHANICAL CONTRACTOR SHALL INTERLOCK RRU-1/RRU-2 WITH THE HOOD TRANE NATIONAL ACCOUNTS DEPARTMENT W111 ORDER EQUIPMENT AND COORDINATE SHIPMENT WITH THE SUCCESSFUL HVAC CONTRACTOR. THE HVAC CONTRACTOR ONTRACOVIDE TORR TO SOLA ENT REQUIRED. DAND MICROPROCESSOR HEATER' AND FROSTAT. CONTROL SYSTEM SUCH THAT THE RRU-1/RRU-2 FANS WILL OPERATE WHEN THE G MACHINERY. SPECIFICATIONS. ISOLATION DEVICES AND FLEXIBLE CONNECTIONS TO ALL MOVING CONTRACTOR WILL BE RESPONSIBLE FOR EQUIPMENT WARRANTY, DELIVERY COORDINATION, RECEIVING AND INSTALLATION AS DESCRIBED IN THE O 7 PROVIDE WITH UNPOWERED RECEPTACLE. HOOD SYSTEM IS ACTIVATED. WIRE THE DRY CONTACT PROVIDED BY CAPTIVE AIRF CONTROLS. SPECIFICATIONS. � 8 PROVIDE WITH INTEGRAL DISCONNECT, AS PART OF THE HOOD CONTROL SYSTEM TO THE TERMINALS PROVIDED WITH 3 REMOTE SENSOR AND CPI CONTROL PANEL PROVIDED RRU-1. REFER TO E3.1 FOR WIRING INFORMATION. H. ALL FLEXIBLE DUCTS SHALL BE SUPPORTED EVERY S-0" WITH 2" WIDE GALV. STEEL JVX BY CPI. SENSORS INSTALLED AND WIRED BY MC. 9 PROVIDE WITH THROUGH BASE ELECTRIC. BANDS WITH A MINIMUM OF ONE PER EACH SECTION OF FLEXIBLE DUCT. THE MAXIMUM ATE: EQUIPMENT START-UP INSTRUCTION 14 R-410.0 REFRIGERANT. ALLOWABLE LENGTH OF THE FLEX DUCT SHALL BE 5'-0". D E V I T A & INSTALLING CONTRACTOR IS RESPONSIBLE FOR INITIAL STARTUP, RUNNING THE UNITS & MAINTAINING THE AIR FILTERS DURING THE CONSTRUCTION PHASE. 4 PROVIDE WITH SPACE TEMPERATURE AND HUMIDITY SENSORS. 10 PROVIDE COMPARATIVE ENTHALPY ECONOMIZER AND BAROMETRIC RELIEF. 15 PROVIDE ROOF CURB DESIGNED BY THYCURB TO WITHSTAND SEISMIC AND WIND TWO WEEKS PRIOR TO THE BUILDING TRAINING, THE CONTRACTOR WILL COORDINATE THE EQUIPMENT STARTUP VERIFICATION WITH TRANE. THE CONTRACTOR 5 FACTORY FURNISHED SMOKE DETECTOR. CONTRACTOR SHALL INSTALL 11 PROVIDE WITH DIRECT FIRED HEATING MODULE. CONDITIONS SEISMIC DESING CATEGORY "D". REFER TO DETAILS ON AC1.3. 1. ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. ASSOCIATES MUST PROVIDE ONE TECHNICIAN TO WORK WITH TRANE. TRANE WILL PROVIDE A SERVICE TECHNICIAN FOR ONE DAY TO CHECKOUT THE ROOFTOP UNITS. SMOKE DETECTOR IN THE RETURN DUCT. ELECTRICAL CONTRACTOR 12 INCLUDES 15T STAGE REFRIGERANT CONTROLS. N C UPON COMPLETION, TRANE WILL PROVIDE A WRITTEN REPORT TO DARDEN RESTAURANTS. SHALL INTERLOCK EACH SMOKE DETECTOR TO SHUT DOWN THEIR J. THE MECHANICAL CONTRACTOR SHALL COORDINATE ALL DUCT AND DIFFUSER LOCATIONS RESPECTIVE UNIT AND ADT SHALL INTERLOCK EACH SMOKE DETECTOR WITH SPRINKLER PIPING, SPRINKLER HEADS AND LIGHTING LAYOUTS AS REQUIRED. DA I PROJECT: 11005-09 TO THE FIRE ALARM SYSTEM TO PROVIDE REMOTE MONITORING. K. THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND PO BOX 1596 GREENVILLE, SC OTHER TRADES, ALL REQUIRED OPENINGS AND EXCAVATIONS. ALL REQUIRED OPENINGS IN FOUNDATIONS, FLOORS, WALLS AND ROOF SHALL BE CONSTRUCTED INTO THE STRUCTURE WITH THE USE OF SLEEVES, CURBS, ETC. CUTTING AND PATCHING SHALL BE DESIGNED BY: EKB HELD TO A MINIMUM. CHECKED BY: TPM IMC 403.3 VENTILATION REQUIREMENT SCHEDULE L. ALL ITEMS PROJECTING THROUGH ROOFS SHALL BE FLASHED THROUGH CURBS OR PIPE FAN SCHEDULE SEALS A MINIMUM OF 12" ABOVE THE ROOF. THE PIPE CURBS AND SEALS SHALL BE INSTALLED BY THE ROOFING CONTRACTOR. INSURE THAT AMPLE BOOT OPENINGS ARE PROVIDED TO ACCOMMODATE ANY ELECTRICAL CONDUIT PENETRATIONS REQUIRED. N0. OF PEOPLE ESTIMATED AIRFLOW PER AIRFLOW PER PER 1000 SQ. TOTAL MAXIMUM PERSON SQ. FT. (TABLE RE HU RED AUST OREQUIREDUTSIDE R PROVIDED EXHAUST OPROIVID DDE IR PROVIDED MARK CFM S.P. VOLTS FAN AREA SERVED MANUFACTURER WEIGHT NOTES M. ALL SUPPLY AND RETURN DIFFUSERS SHALL BE PAINTED AS REQUIRED BY THE OWNER. 080427PE UNIT AREA AREA FT. (TABLE OCCUPANCY (TABLE 403.3) 403.3) (CFM} (CFM) (CFM) (CFM} (CFM) PHASE HP MODEL / EREFER TO ARCHITECTURAL DRAWINGS. F'0'! _\ NUMBER SERVED 403.3) N. THERMOSTATS AND REMOTE SENSORS SHALL BE LOCATED GENERALLY AS SHOWN. EXACT EF-1 900 -1.00" 0.5 HOOD # 1 NCA8FA 105# 1 4 6 LOCATIONS SHALL BE FIELD COORDINATED TO AVOID INTERFERENCE WITH WALL MOUNTEDOREGON KITCHEN 1984 -' -- -- -- 1350 -- WORK. - EF-2 2,217 -1.00" 1.0 HOOD # 2 140# C-1 4 66 "\ vIN NCAI4FA v 0. ALL HORIZONTAL EXHAUST DUCT RUNS SHALL BE "PITCHED" BACK TO SOURCE. X3,2 - OFFICE 60 5 1 5 o.os -- � ��,,��� MOAP� � RTU-3 -7000 +5000 -2000 EF-3 1,583 -1.00" 0.75 HOOD # 3 NCAI4FA 140# i 4 6 o RRU 2 COOLER 165 -- -- -- -- -- -- P. MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL 4" HIGH BLACK NAMEPLATES FOR xPiR�s: 121131/201-2 F- ,1 d0 -1.00" 0.75 HOOD 4 # 1 4 6 ROOFTOP UNITS AND EXHAUST FANS. E 4 # NCAi 4rA M/E ROOM l05 -- -- __ __ -- -- EF-5 300 -0.50" 0.18 HOOD #5 DUI2HFA 4d# 1 2 4 6 RESTROOMS 392 -- -- -- -- 600 -- RTU-1 EF-6 300 -0.50" 0.18 HOOD #6 DUI2HFA 40# 1 2 4 6 RTL!-2 -600 +4500 +3900 SEISMIC DESIGN REQUIREMENT: RRU-1 DINING/WAIT. 6205 70 422 7.5 0.18 -- 4283 EF-7 600 -0.50" 0.33 DISHWASHER DU33HFA 50# 1 2 4 6 Q 3 EF-8 600 -0.50" 0.25 RESTROOMS DR30HFA 45# ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE 000(D 4 6 RESTRAINED IN ACCORDANCE WITH SECTION SECTION 1613 OF 2010 o NOTE: TOTAL 1950 4292 -7600 +9500 +1900 OREGON STRUCTURAL SPECIALTY CODE FOR SEISMIC DESIGN V) ESTIMATED MAXIMUM OCCUPANCY AND REQUIRED OUTSIDE AIR BASED AC-1 1700 - 1/2 AIR CURTAIN 42C 55# 03 CATEGORY 'D'. r ON THE INTERNATIONAL MECHANICAL CODE. ANY COMPONENT SUPPORT DETAILS, NOTES, SPECIFICATIONS, OR (8� �- OTHER STEMS SHOWN IN THESE DRAWINGS INDICATE STANDARD W1 NOTES: SUPPORT REQUIREMENTS, AND REQUIRED SEISMIC RESTRAINTS � 3 1 EXHAUST FANS AND MANUFACTURED CURBS ARE PROVIDED BY THE OWNER AND INSTALLED BY THE MECHANICAL CONTRACTOR. SHALL BE PROVIDED IN ADDITION TO THESE STANDARD SUPPORTS. oo A I R BALANCE SCHEDULE 2 PROVIDE WITH BACKDRAFT DAMPER. WHERE REQUIRED BY CODE, SPECIAL INSPECTIONS SHALL BE PERFORMED BY A QUALIFIED SPECIAL INSPECTOR RETAINED BY THE 3 PROVIDE DOOR MICRO-SWITCH. OWNER. S 4 MECHANICAL CONTRACTOR SHALL PROVIDE PADLOCKS FOR ALL FAN CURBS. PROVIDE KEYS AND LOCKS TO OWNER. �J MARK OUTSIDE RETURN SUPPLY EXHAUST PRESSURE PERCENT 5 REFER TO ELECTRICAL DRAWINGS FOR VOLTAGE CHARACTERISTICS. ( y AIR AIR AIR AIR OUTSIDE AIR 6 PROVIDE GREENHECK MODEL GRSR-16 ROOF CAP WITH GPF ROOF CURB. VERIFY QUANTITY AND SIZE OF ANCHORS WITH MANUFACTURER. L s RTU-1 1,000 4200 5,000 ---- +1,000 20% o ('� � RTU-2 1,000 4240 5,000 ---- +1,000 20% SCHEDULE �AIR DEVICE V V H E D U L E = � o RTU-3 500 4300 5,000 ---- +500 10% Lrlt ---- M � RRU-1 2,500 ---- 2,500 +2,500 0 MARK RECT. ROUND FACE THROW MOUNTING MANUFACTURER/ NOTES �' E + NECK SIZE NECK SIZE SIZE PATTERN MODEL RRU-2 4,500 -- - 4,500 ---- +4,500 100% oA ---- 12" 24"x24" SEE PLAN LAY-IN FRAME �� fi 7 EF-i ---- ---- ---- 900 -900 ---- -� B ---- 14" 24"x24" SEE PLAN LAY-IN FRAME TITUS 3 6 7 EF-2 ---- ---- ---- 2217 -2,217 ---- PAS-AA aC ---- ---- ---- ---- ---- ---- - -- U EF-3 ---- -- ----- 1583 -1,583 ---- < cY) EF-4 ---- 1100 -1,100 ---- E ---- ---- 4'-0' (4 SLOTS) TRANSFER SURFACE MLR-39 9 4- EF-5 ----- ---- ---- 300 -300 ---- Issue Date. 3-23-2012 ---- " L> F 14"x14' 16x6EXHAUST SURFACE 355F 1 Q ---EF-6 ---- ---- ---- 300 - REVISION INFORMATION FO R MATI O N . G ---- ---- ---- ---- ---- Q. EF-7 ---- ---- ---- 600 -600 ---- r H 22"x22" ---- 24"x24" RETURN LAY-iN FRAME IT7 EF-8 ---- ---- ---- 600 -600 ---- 2 ---- 10" 24"x24" SEE PLAN LAY-IN FRAME T TITUS T S4 4 6 K ---- 8" 24"x24" SEE PLAN LAY-IN FRAME TITUS 6 TMS-AA CU NOTES: © TOTAL +1,900 L 30"x6" __-- 32"x8" ---- SURFACE TITUS 2 5 O OUTSIDE AIR PROVIDED BY RRU-1. TITUS M 12% 6" ---- 14% 8" ---- SURFACE O1 FL 1 2 6 N 12"x10" ---- 14% 12" SEE PLAN SURFACE TITUS 1 6 4-0 (4 SLOTS) ML-39 P ---- 8" SEE PIAN SURFACE TITUS 8 L UNIT HEATER SCHEDULE Q 12"x12' ---- ---- R 24"x16" ----- 26"x18" RETURN SURFACE 350RL 4 7 ' MARK MANUFACTURE MODEL CFM AMPS KW V/PH/HZ NOTES S $"x$„ ___- TITUS UH-1 MARKEL F1F5103N 400 (AAD 3 24"x24" SEE PLAN LAY-IN FRAME TMS-AA 6 7 UH-2 MARKEL HF3326TD-RP 17570 T -- 8" 24"x24" 3-WAY LAY-IN FRAME TMS AA TITUS 4 6 CITY OF TIGARD 5 6 - _..�_....._..._.__ Approved...lti�. = `i�. l :-:[t•-]�' TITUS U --�- $" 24"x24" 2-WAY LAY-IN FRAME TMS-AA 4 6 Conditionally Approved..............[ ] See Letter to:Follow.................. [ ] Restaurant#: 0457 NOTES: Attached... ..... . ] 1 MOUNT HIGH AS POSSIBLE ABOVE FLOOR WITHOUT OBSTRUCTING AIRFLOW. 5 PROVIDE UNIT WITH BUILT-IN TAMPER PROOF THERMOSTAT SET AT 65' F. NOTES: Permit Number: - � 2 PROVIDE WITH UNIT MOUNTED THERMOSTAT SET AT 65' F BEFORE MOUNTING. 6 PROVIDE FACTORY INSTALLED DISCONNECT, AUTOMATIC RESET LIMIT SWITCH. 1 PROVIDE WITH OPPOSED BLADE DAMPER. INSTALL WITH BLADES FACING UP TRANSITION DUCT AS NECESSARY TO FIT Addr DIFFUSER NECK SIZE. By: -Date-$' RED LOBSTER 457 3 PROVIDE NECESSARY MOUNTING BRACKET AND ACCESSORIES FOR MOUNTING. 7 REFER TO ELECTRICAL DRAWINGS FOR VOLTAGE CHARACTERISTICS. 2 TYPE A FASTENING. ®ALL DIFFUSERS SHALL BE INSULATED FROM THE (8 PROVIDE MPI-39 INSULATED PLENUMS, END 4 MOUNT UNIT FLUSH, PROVIDE RECESSED BOX. 3 REMOVE PATTERN DEFLECTORS. FACTORY WITH INSULATION SIMILIAR TO TITUS CAPS, TYPE 1B FLANGED FRAME. RENOVATION �Q 4 PROVIDE PLASTER FRAMES. OPTION "18". O PROVIDE END CAPS, TYPE IB FLANGED FRAME. shallHppved pians On yob SftE?. 10330 KITCHEN HOOD SCHEDULE OFFICE COPY SOUTHWEST GREENBURG ROAD EXHAUST AIR/ MAKE-UP AIR/ MANUFACTURER/ MARK HOOD SIZE COLLAR SIZE COLLAR SIZE MODEL WEIGHT H-1 6'-0' L x 4'-6' W x 24" H 900CFM --_ 5APTI ND 2 400# 0_ \� TIGARD, OR O H-2 6'-4' L x 4'-0" W x 24" H 2217 CFM ---- CAPTIVE-AIRE / v 12" x 16" ---- 4824 ND-2 274# �J H-3 6'-4" L x 4'-0' W x 24" H 12"x 12" ____ C 8TNN D RE 267# �� MECHANICAL 2 H-4 5'-6" L x 4'-0' W x 24" H 1100 CFM ---- CAPTIVE-AIRE NOTES & 10 x 10 ---- 4824 ND-2 247# SCHEDULES 300 CFM CAPTIVE-AIRE H-5 3'-0" L x 3'-6" W x 24" H 8" x 8" ---- 4224 VHB-G 132# H-6 3'-0" L x 3'-6" W x 24" H 300 CFM -'-- CAPTIVE-AIRE 8" x 8" ---- 4224 VHB-G 132# Aci ■ INSULATED ROUND DUCT SHEET. METAL. ELBOW REQUIRED THE EQUIPMENT SUPPLIER SHALL PROVIDE ALL CONTROL WIRING DIAGRAMS FOR THE HVAC EQUIPMENT. 24 VOLT WIRING AND CONDUIT L L NOTE: SMALL = UNDER 24"x24" SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. PROVIDE ADDMONAL 24 VOLT TRANSFORMER(S) AS REQUIRED. ALL UNE VOLTAGE LARGE = 24"x24" AND ABOVE WIRING AND CONDUfT SHALL BE BY THE ELECTRICAL CONTRACTOR. TO SA MAIN USE GALVANIZED VANES FOR LOCKABLE QUADRANT DAMPER LOCATION GALVANIZED DUCTS. ROOFTOP AIR CONDITIONING UNITS: WHERE DAMPER WOULD BE INACCESSIBLE AT n I 1" WIDE, 18 GA TAKE-- OFF, PROVIDE W/ 3" EXTENDER JOIST THE HEATING AND COOLING FOR THE RTU's (RTU-1, RTU-2 AND RTU-3) AND THE STAND-ALONE RRU (RRU-2), SHALL BE ry cn SUPPORT STRAP w/ CONTROLLED BY THE CPI CONTROL PANEL LOCATED IN THE MAIN CPI PANEL SYSTEM AS SHOWN ON THE PIAN. ONE (1) SHAFT, HANDLE AND COLLAR 5 -0 MAXIMUM SPACING ROUND RIGID DUCT REMOTE SENSOR FOR EACH UNIT SHALL BE INSTALLED TO WORK WITH THE CPI CONTROL PANEL THE HEATING AND COOLING NOTE: DAMPER HANDLE TOFOR THE PRECONDITIONING RRU (RRU-1), SHALL BE CONTROLLED BY A UNIT MOUNTED THERMOSTAT SET AS INSTRUCTED BY BE INSTALLED MAXIMUM OF l� THE SUPPLER. HUMIDITY CONTROL FOR EACH RRU (RRU-1 AND RRU-2) SHALL BE CONTROLLED BY HUMIDITY CONTROL 5'-0" ABOVE CEILING. SECURELY TAPE VINYL FLEX DUCT TO SHEET. �� 4s AIR �pyy SENSORS AS SHOWN ON THE PLAN. ONE (1) REMOTE HUMIDITY SENSOR SHALL BE INSTALLED FOR EACH UNIT. METAL W/ MIN. OF (2) CONTINUOUS WRAPS OF AIR FLOW A5 4�• DUCT TAPE. STRAP CLAMP OVER FLEX DUCT ! THE ROOFTOP UNITS SHALL BE FITTED WITH A MIXED AIR SENSOR THAT WILL INITIALIZE FIRST STAGE HEAT WHEN THE UNIT IS 18" LONG ORANGE MARKER INSUL.A11ON & VINYL TO SHEET. METAL TAPE RUNNING IN EITHER COOLING OR HEATING CYCLE AND THE MIXED AIR TEMPERATURE IS BELOW 54' F. UNIT SHALT. RETURN TAPE ATTACHED TO DAMPER INSULATION TO DUCT TO FORM A GOOD SEAL I TO STANDARD OPERATION MODE WHEN THE SENSORS CALL FOR HEATING OR COOLNG. TO IDENTIFY LOCATION RUNNER RUNNER DOUBLE VANE SINGLE VANE EXHAUST & SUPPLY FANS: BUTT DUCT INSULATION FIRMLY AGAINST INSULATED FLEXIBLE DIFFUSER BODY. PULL VAPOR BARRIER JOIST EF-1 THRU EF-6 SHALL BE CONTROLLED BY THE CONTROL PANEL ON THE HOOD. RRU-1 AND RRU-2 SHALL BE CONNECTION (MAX. 5 FT.) DOWN & CLAMP w/ DRAWBAND. INTERLOCKED WITH THE HOOD CONTROL PANEL SUCH THAT, WHEN THE EXHAUST FANS ARE IN OPERATION, THE FAN 2" WIDE SUPPORT STRAP w/ FLEXIBLE DUCT, 5'-0" MOTORS FOR RRU-1 AND RRU-2 SHALL ALSO BE IN OPERATION. RRU-2 SHALL ALSO BE WIRED TO SHUT DOWN WHEN DOUBLE VANE SCHEDULE SINGLE VANE SCHEDULE S-0" MAXIMUM SPACING MAXIMUM LENGTH THE HOOD SUPPRESSION SYSTEM IS ACTIVATED. THE HEATING AND COOLING CYCLES OF RRU-1 AND RRU-2 SHALL ALSO SHEET METAL BAND AND (3) J8 BE ABLE TO OPERATE INDEPENDENTLY OF THE HOOD SYSTEM. SHEET METAL SCREWS 1" THICK BLANKET INSULATION. LAY R1 R2 L SP GA R 5P GA OVER ENTIRE BACK OF DIFFUSER BODY. SMALL 2" 1" 1/8' 2 1/2 26 SMALL 2" 1 1/2' 24 SMOKE DETECTORS: LARGE 4 1/2"2 1/4-2 1/4"3 1/4' 24 LARGE 1/2" 3 1/4" 22 THE EQUIPMENT SUPPLIER SHALL HAVE FACTORY INSTALLED SMOKE DETECTORS IN EACH ROOFTOP UNIT (RTU-1(SUPPLY), D E V I T A & CEILING RTU-2{SUPPLY), RTU-3(SUPPLY}, RRU-1(SUPPLY) AND RRU-2{SUPPLY)), CAPABLE OF SHUTTING DOWN THE RESPECTIVE FAN/AIR ASSOCIATES �l CONDITIONING UNIT UPON ACTIVATION. THE SMOKE DETECTORS SHALL BE 24 VOLT. ANY LINE VOLTAGE WIRING AND CONDUIT SHALL BE BY THE ELECTRICAL CONTRACTOR. N C DAI PROJECT= 11005-09 1 DIFFUSER CONNECTION DETAIL 2 TURNING VANE DETAIL 3 ROUND DUCT SUPPORT DETAIL 4 CONTROL NOTES PO Box 1596 GREENVLLE, SC �12NOT TO SCALE �12NOT TO SCALE �12NOT TO SCALE �12NOT TO SCALE _.._.._----_.... , _—__ __.._._.__._...__—__..__ __ -_...----_---_. _........-_-- -.__ _._._......_._.. _ --..__-._ --...__..__-___-- —. ------__- - _-- -.._.___....... _ _._ _ .._�__.._ ___.-.__ -_ __ _..__.._.._.__.......__..-- -- ---.._...._ __ DESIGNED BY: EKB NOTES CHECKED BY: TPM A. WRAP GREASE DUCT CONTINUOUS AS SHOWN FROM CONNECTION AT FAN THROUGH CURB AND EXTEND TO *TERMINATE VENT HOOD. ' ABOVE THE HEIGHT SELECT CURB TYPE I OF THE PARAPET IN DEPENDING ON NUMBER B. FOR HORIZONTAL RUNS OF EXHAUST DUCTS PROVIDE TYPICAL TRAPEZE SUPPORT SYSTEM WITH 1/2" COMB. AIR INTAK COMPLIANCE WTIH OF PIPE PENETRATIONS PED HANGER RODS A MAXIMUM OF 6" FROM INSULATION EDGE. TRAPEZE SUPPORTS SHALL BE SPACED A & VENT CAP LOCAL CODE. MAXIMUM OF 60" ON CENTER FROM CENTERLINE OF VERTICAL EXHAUST DUCT. PIPE I 60" UNLESS FOOT OF 9 � C. SLOPE HORIZONTAL EXHAUST DUCT RUNS A MINIMUM OF 1/4- PER FOOT (2% SLOPE) TOWARDS EXHAUST HANGER STRAPS MAX STRAP IS PLACED n MANUFACTURE'S POLYVINYL CHLORIDE I 80427PE HOOD. FIREMASTER F2-HT-XL3 DOOR SYSTEM UNDER A BOTTOM �.. CONCENTRIC VENT PIPE BOOT I STAINLESS STEEL CLAMPS REINFORCEMENT REFER TO ARCHITECTUAL DRAWINGS FOR I;( ROOF STRUCTURE CONFIGURATION TERMINATION KIT �� OREGON D. PROVIDE INSULATED ACCESS DOOR OR PANEL AT ALL CHANGES IN DIRECTION OF EXHAUST DUCT RUN FOR ROOF JACK AND-/ (PROVIDED BY M.C.) CURB COVER �y v��� 3 20�� \\ NOTE: AVAILABLE FROM THERMAL i CLEANING AND INSPECTION OF DUCT. PROVIDE AN APPROVED SIGN ON ACCESS DOOR OR PANEL WHICH CERAMICS FIREMASTER DISTRIBUTORS. FLASHING oMq M�P��` READS " ACCESS PANEL DO NOT OBSTRUCT" SEAL WATERTIGHT r i i FINISHED ROOF---,,,.,. N EXPERES: 12/3 1%2 1 o I —_ _ ROOF INSULATION — -- 2 AIR VENTILATION DUCT ENCLOSURE SYSTEM CONTINUOUS HANGER j E ; 5 2 HOUR SHAFT ALTERNATIVE / ZERO CLEARANCE TO COMBUSTIBLES STRAP AROUND aucT -- EXPANSION EXPANSION ; ROOF DECK 1 j� STRAP HANGERS TANK TANK 2 I I` I ; I " j 15° PATE SERIES PCC � 4 PIPE CURB {� NOTE: FLUE PIPE COMBUSTION ALR j LABEL REQUIRED I i Q INTAKE PIPE 7 PIPE CURB DETAIL "ACCESS DOOR" 4 NOT TO SCALE DO NOT OBSTRUCT I STRAP OR ANGLE f �12 4. - •� ROD 0 WATER HEATER WATER HEATER FIREMASTER FIELD FABRICATED DOOR SYSTEM f ICE MACHINE CONDENSER I ON ROOF (FURNISHED w/ THE KITCHEN EQUIPMENT) 3 ro MOUNT CONDENSER ON p U SIZE BOLT(S) + Y Q 3" FOR LOAD TRAPEZE HANGERS a_ L ; BUILT-IN-PLACE RAIL SYSTEM BY Q �] a a OTHERS. SEE ARCHITECTURAL DETAIL o 1 1/2" 1 1/2" J PROVIDE VIBRATION ISOLATION 2 z 4 ° 4 I 5 RECTANGULAR DUCT SUPPORT DETAIL I SEE PIPE CURB DETAIL a 6 CONCENTRIC VENT DETAIL r �12NOT TO SCALE NOT TO SCALE o f �12 ! REFRIGERANT PIPING ICE MACHINE IN �1 i MAX. LENGTH 50' KITCHEN (FURNISHED r 1 O 1/2" • (TRIM EXCESS PIPE) a w/ KITCHEN 24" 1 r EQUIPMENT) .0 i cv BUTT-JOINT/3.OVERLAP 6tjrT-JX�INTfcoLt AR NOTE: 3 __.-- --._.__ ____-- --- ----- -------- f -- .----.--- © LABEL REQUIRED ~ I REFER TO ARCHITECTURAL DRAWING FOR PROVIDE 36" ' 4 6" 4 "ACCESS DOOR" 6 ADDITIONAL INFORMATION & SERVICE LOOP AT U 3" 3" 1 1/2" 2 3" DO NOT OBSTRUCT AND MOUNTINDETAILS ON G CURB INSTALLATION CONNECTION REFRIGERANTING SYSTEM EACH 1 1/2 1 1 1/2* - / 7 }- -1 1/2" �• v r, ; ALL DUCTWORK ASSOCIATED WITH DISHWASHER SHALL BE STAINLESS STEEL, BE LIQUID TIGHT I c� 21" TVP. 21° TYP. EXHAUST FAN AND ALL HORIZONTAL DUCT RUNS SHALL BE CL KEYED NOTES ! REFER TO STRUCTURAL DRAWINGS "PITCHED" BACK TO SOURCE. TELESCOPE WRAP OPTION BUTT JOINT OPTION CHECKERBOARD WRAP OPTION ROOF TOP AC UNIT FOR BRACING REQUIREMENTS Issue Date: 3-23-2012 a 1. DUCTMATE F2-HT ACCESS DOOR OR 16 GAGE FIELD FABRICATED ACCESS DOOR. SEE CAPTIVE AIRF � 1 , SINGLE LAYER OR OUTSIDE LAYER INSTALLATION OPTIONS PROVIDE SEISMIC STRAPS DRAWINGS. E 11 ICE MACHINE PIPING DETAIL REVISION INFORMATION p 2. ALL THREAD RODS. FILL VOID WITH Q' KEYED NOTES NAILER STRIP FAN CURB -- FIBERGLASS INSULATION �12NOT TO SCALE 3. INSTALLATION PINS WITH SPEED CLIPS. RIGID INSULATION : /— REFER TO STRUCTURAL DRAWINGS GASKET C r FOR BRACING REQUIREMENTS 1. TWO LAYERS OF FIREMASTER FASTWRAP XL BLANKET FOR GREASE DUCT ENCLOSURES 4. THREE LAYERS OF FIREMASTER FASTWRAP XL BLANKET - �� __._..._ .._....__ .. .. ..._...-.................. ._ ____..______._.____.._.______..______..._...._.. __._._.__._.._.__---.__.___._ WITH MINIMUM 1" OVERLAPS AND ALL EDGES SEALED FLASHING 2. STEEL BANDING MINIMUM 1/2° WIDE BY 0.015" THICK. WITH ALUMINUM TAPE. ORE-FAB CURB —� 3. TIGHT BUTT JOINTS ON INNER LAYER 5. SPOOL PIECES FOR THREADED RODS BY AC-UNIT ROOFING i MANUFACTURER d 4. MIN. 3" OVERLAP ON PERIMETER AND BETWEEN ADJACENT BLANKET ON OUTSIDE LAYER 6. WING NUTS AND WASHERS CANT STRIP REFER TO ARCH€TECTUAL DRAWINGS FOR REFER TO ARCHITECTUAL DRAWINGS FOR LEVELING STRIP ROOF STRUCTURE CONFIGURATION ROOF STRUCTURE CONFIGURATION SEE CAPTIVE AIRE 5. MIN. 3/8° DIAMETER HANGER ROD 7. OUTER COVER PLATE LABLED "ACCESS DOOR - DO NOT DRAWINGS. OBSTRUCT" f y; 6. MIN. 2" x 2" x 1/8" ANGLE FOR GREASE DUCT ENCLOSURES -- MIN. 1-1/2" x 1-1/2" x 1/8" ANGLE OR SMACNA EQUIVALENT FOR AIR VENTILATION DUCT ENCLOSURES * THE INTEGRITY OF THE DUCT WRAP INSULATION PRODUCT stogy EF� EXHAUST FAN WITH IS LIMITED TO THE QUALITY OF THE INSTALLATION 4 x16 \X/ 4 x16 BIRDSCREEN 7. OPTIONAL 6" FIREMASTER FASTWRAP XL COLLAR U THE INTEGRITY OF FIREMASTER DUCT SYSTEMS IS LIMITED TO THE QUALITY OF THE INSTALLATION CEILING EXTEND DUCTWORK ROOF OVERTOP OF CURB. FMXLOOI-2 SECURE DUCTWORK TO CURB NAILER ( 8N� KITCHEN � - SECURE EXHAUST FAN GREASE DUCT 9 ACCESS DDDR SYSTEMS 10 ROOF TOP UNIT CURB DETAIL _ �12NOT TO SCALE �12NOT TO SCALE �12NOT TO SCALE 24"X24" 18 GA S.S. COLLAR `-- 24"X24" 18 GA. S.S. COLLAR TO ROOF CURB (BY MECHANICAL CONTRACTOR) (BY MECHANICAL CONTRACTOR) DISHWASN 1 PREFABRICATED INSULATED WITH TREATED WOOD 18 GA S/S ALL SCREWS, PINS, OR BOLTS f .SECURE CURB TO ROOF WfTH CURB W Restaurant#: 0457 ' REMOTE WELDED CONSTRUCTION SCULLERY/ / ALL WELDED CONSTRUCTION i;f NATTER CONDENSING UNfT ROOF INSULATION INSTALL FIRE WRAP FROM FAN OUTLET TO TOP EXHAUST FAN \ R ,h, OF HOOD. INSTALLATION SHALL BE IN A [ V V AS H ACCORDANCE WITH ALL MANUFACTURERS - ' RED LOBSTER 457 fl SPECIFICATIONS AND ASTM E 2336 `r -�-�� SEE PIPE CURB � MECH CONTRACTOR TO MOUNT HINGE . ' ASSEMBLY ON FRONT SIDE OF CURB (TOWARD DETAIL THIS SHEET BALANCE AIRFLOW TO 400 CFM —� BALANCE AIRFLOW TO 200 CFM -- -- s RENOVATION FRONT OF BLDG). ELECT CONTRACTOR TO ROOF �� -- " a _-_ _`' INSTALL DISCONNECT & JUNCTION BOX NEAR �a t n GALV. BOX HINGE SIDE W/ LIQUID TIGHT FLEX CONDUIT SUCTION LINE WALK-IN COOLER/ FOR GREASE TO ALLOW FOR COMPLETE 90' OPENING LIQUID LINE FREEZER — MECHANICAL CONTRACTOR u 030 j REFER TO STRUCTURAL DRAWINGS NEMA--3 JUNCTION BOX, SHALL BE ON BUILT-IN-PLACE RAIL VENT HOOD PROVIDED BY —''y SHALL MAKE FASTEN ANGLE IRON SECURELY TO SOUTHWEST FOR BRACING REQUIREMENTS ATTACHED TO CURB OVER MEMBRANE SYSTEM BY OTHERS. SEE E KITCHEN EQUIPMENT SUPPLER CONNECTION To VENT HOOD DUCT AND ROOF STRUCTURE AND SEALED ON ALL SIDES s. ARCHITECTURAL DETAIL � 0 EVAPORATOR UNIT I DIRECTION OF AND SEAL WATER TIGHT. I COUNTER BALANCED BACKaRAFT 1 PROVfDE VIBRATION ? DISHWASHER 1 DAMPER, SECURE TO DUCT FROM G RE E N B U RG ROAD GALV. CURB REFER TO ARCH. FLOW ISOLATION 4 I REQUIREMENTSFOR REFEBRACINR TO GDRAWINGS ABOVE TO ALLOW SERVICE OR F IrlDRAWINGS FOR FLASHING. 1 O.D. COPPfZ LI { REMOVAL OF DAMPER FROM ROOF DRAJN LINE A.0 SUCTION LINE AND CONDENSATE O , ; DISHWASHER EXHAUST DUCT UP THROUGH ROOF. DRAIN LINE TO INCLUDE 3/4" SEE PLANS FOR SIZE AND LOCATION TIGARD OR c 15 GA. WELDED ROOF ARMAFLEX INSULATION BY THE ': � (BY KITCHEN s DUCT-LIQUID TIGHT MECHANICAL CONTRACTOR 120V HEAT TAPE ON EQUIPMENT SUPPLIER) y CONDENSATE DRAIN ' g GREASE DUCT. FLARE TOP TO FIT B. VERIFY ALL LINE SIZES WITH PIPING IN FREEZER i K 14 BATHROOM EXHAUST FAN 3 CURB OPENING THE COOLER MANUFACTURER FOR ONLY INSULATEUUB THE MAKE AND MODEL TO BE USED OVER HEAT TAPE �12NOT TO SCALE MECHANICAL 3 3M FIRE BARRIER DUCT WRAP IN {2} 1-i/2' AT THE STORE TO FLOOR SINK. �\ _ , DETAILS SEE FS3.1 FOR y LAYERS FOR ZERO CLEARANCE TO COMBUSTIBLES ; DETAIL ' KITCHEN HOOD. REFER TO AND SEALED ON ALL SIDES. 'NO CHASE GREASE i n HOOD DRAWINGS FOR MORE DUCT" MAY ALSO BE USED BY METAL-FAB. I 1 INFORMATION TRAP -q i y � ' i 1 13 DISHWASHER EXHAUST DETAIL I , 3 rlNN� GREASE FAN DETAIL AND REDUCTION OF CLEARANCE I �12WALK-IN COOLER FREEZER REFRIGERATION PIPING DETAIL �12NOT TO SCALE 1 = �12NOT TO SCALE �1.2NOT TO SCALE AC1 m2 n u z NOTE: NOTE: THIS DETAIL INDICATES TYPICAL ROOF CURB INSTALLATION THIS DETAIL INDICATES TYPICAL ROOF EQUIPMENT INSTALLATION FOR SEISMIC/WIND LOAD RATED CONDITIONS. ACTUAL SIGNED FOR SEISMIC/WIND LOAD RATED CONDITIONS. ACTUAL SIGNED AND SEALED DETAIL DRAWINGS, ALONG WITH CALCULATIONS AND SEALED DETAIL DRAWINGS, ALONG WITH CALCULATIONS WILL WILL BE PROVIDED DURING SHOP DRAWINGS SUBMITTAL BE PROVIDED DURING SHOP DRAWINGS SUBMITTAL PROCESS. PROCESS. TYPICAL UT ThyCurb Wind Speeds up to 150 MPH; V I B R 0 -� C 0 U S T I C S" SREi Vf5EMA ❑ by the fabricating division of $+ up t0 3.61!9 Noise Control!Vibration Isolation I Restraint Systems ThybarCorporaton i ROOF CURB TYPICAL INSTALLATION DETAILS tee w 416-291-7371 1-RM565.s1 web: wwwmbr0-aCoustiCs.c0m FileDSSRB-001 DatF. 20Jan 2011 ❑ FOR SEISMIC / WIND LOAD fax= 416-291-SD49 1.ME-8.11-2264 eml- infoomwo-acoustics.com Suedes New Date:New RATED INSTALLATIONS j T -- -----_-_-_--- 0?i4'(6mm) T 01MEN810N8 X Motel. L *: °8 04` X I SIZED BY OTHERS TO MEET grommet � �e:;lfufa to in � � MMROOFTOP UNIT awn PROJECT REQUIREMENTS ROOFTOP UNIT i SOCIATES A 0 SR&222A 2 51 2 51 2 51 1/2 13 1 25 O BASE i 3/4-(19mm) SRS2228 2 51 2 51 2 51 3/g ,D 1 25 D E V I T A & GASKETING i SRB-2220 2 51 2 51 2 51 1/2 13 1 25 SR13422A 4102 2 51 2 51 112 13 1 25 Q V\�' FIELD CAULK SRB4228 4 102 2 51 2 51 3/8 10 1 25 1 I I I SRS-422C 1 4 102 2 51 2 51 1l2 13 1 25 ! SR84238 1 4 102 2 51 3 76 3/8 10 1 25 DAI PROJECT= 11005-09 L SRS423C 4 1A2 2 51 3 76 1/z 13 1 25 PO BOX 1596 GREENVILLE, SC RESTRAINT 8RACKET I I n V SRS-434C 4 102 3 76 1 4 102 1 1/2 13 1 11/2 38 QUANTITY AND LOCATION *4010 diameter for A models is through metal bracket since no grommet washer washer is AS REQUIRED I 0 SRB•4xx included. 0 DESIGNED BY: EKB ROOFCUR13 WALL ASTHICKNESS PERFORMANCE CHECKED BY: TPM THYBAR ROOFCURB REQUIRED SRB-222A SRB-422A CONSTRUCTED TO do not include a grommet IYhdait St6 :ws:k3ewws+ A tacf vwft{yeAdinE WITHSTAND DESIGN SRB-2xx washer, WIND/SEISMIC Wgwntble,t< Rioe�rDtatt AST AWau3atafr4, FORCES. TYPICAL SECTION UNIT RESTRA.NED TO UN-INSULATED CURS SR&222A 282 125 263 1-18 282 125 S2912-35 RED PR E Rigid W/NSN Pad SRB-222B 970 4-31 500 2.22 990 4.40 248* 1107 t SRB-222 NotSR8222A SRB-2220 970 4.31 500 2.22 990 4-40 2488 11.07 y SRB-422 or*432AtSRSRBSRB-WB564 181 529 2-35 564 1-81 1431 628 �/ - BOLT WRH WASHER SRS-422B 1540 8.63 1000 4.45 1980 8.81 2871 12.77 804 7P ROOFCUR8 3'0 BOLT IN EACH HOLE) SR&422C 1940 8.63 1000 4.45 1980 8.81 2871 1277 WALL THICKNESS i SRt3-1238 1940 8-63 1000 4.45 2912 12.95 2$71 1277 ORE AS REQUIRED OPTIONAL WELT CENTERED SRS-423C 1940 8-63 1000 4.45 2912 12.955 2871 12.77 ON EACH BOLT HOLE. I FILLET LENGTH AND SFR8434C 1940 8.63 1000 4.45 2045 9.10 1856 8.26 HEIGHT AS DETERMINED I •.•4 MqS p MOPP ,.. 8Y PROJECT REQUIREMENTS. < *AIIOM'aWeIoadSaremazunumsbasedOn 1/4'(6mm)Him selfdnlling screws installed ROOFCURB on ntmknum 16 ga base material for SRS-222A and SRS-422A and 10 ga for all Other C WALLTHICKNESS REQUIRED ANCHOR WITH NUT -�• I '" I & I LOCK NUT WrTH WASHER, _ (}' DIAMETER MINIMUM, ^CATEANU NED TO IFd I EXPIRES: t?./3T/2012 O WASHER CTUZER'S SPE.. EMBEDMENT DEPTH AND SR8-423 NOTES V � • - EDGE DISTANCE AS STRUCTURAL SRB434 •Allowable loads dDnot account for anchor bon capacity.Contactmbro-Acoustics c ` REQUIRED BY FIELD STEEL I forsetecbon- 70 ; CONDITIONS AND SraCJ*ts must be installed in acoordanCe waits insta Mason tmstrucuons to Provide `� � .. _ � HARDWARE SELECTION.) STRUCTURALATTACHMENT SRB423 for above peirtmwoft- (1) j toe-out If nK WAed On a housekeeping pad,the pad must be seismiCaliy doweled to C CONCRETE 4 i i channel tine the structuralnd slab athere must Ire sufficient edge distance and Concrete DECK • j frames using - thickness to •� ! install C6 or smaller •SRS-222A and 422A bracl(e�are gallvanUadall Other bracket sizes are I N Channel.CONCRETE ATTACHMENT POwder-cOated enamel for COrromn protectom i SR8-434 for •^ bolts,sett-dritiuLg screws,and NSN viflrati0n isolation pads available separatery from 45bro-ACoustics. larger sizes. . a .4 Mniff-diameter of round equitxTrent support is 12'(305 mm)for using Q I m • - Qr • SR&2ot brackets, C SEISMIC & WINDLOAD BRACKETS ARE DESIGNED & CALCULATED FOR USE W SEISUIC/WINDLOAD APPLICATIONS WHEN PROVIDED O AS PART OF A SEISMIC/WINDLOAD RATED CURB. ` N ATTACHMENT OF CALCULATED BRACKETS TO ANY OTHER CURB DOES NOT CONSTITUTE A SEISMIC /WINDLOAD RATED ASSEMBLY. ptenvieMaf bracw licropnu L- E 5: Project: IN_�4ATION INSTRUCTIONS: 2 6: E ROOF CURB SEISMIC/WIND LOAD RATING REQUIRES SOLID ATTACHMENT FROM UNIT TO CURB AND CURB TO BUILDING STRUCTURE. (Xistomer ❑ ❑ ❑ ❑ ❑ ❑ ❑ 3 r. Q RESTRAINT BRACKETS ARE REQUIRED TO ATTACH UNIT TO CURB. SEE THYBAR CORPORATION SALES REPRESENTATIVE FOR BRACKET Donsuttant wRASRe.4zt OR "0 RA C QUANTITIES REQUIRED. or SRS-2nc (� SRO-2a ❑ 4. tl Lr Dwg No- Rev Drawn by a,3{y n� ATTACH CURB TO BUILDING STRUCTURE ACCORDING TO CODE REQUIREMENTS FOR BUILDING TYPE. pqw T�PNW WLC-3m ❑ a ❑ ❑ QTY V-A Project Manager ❑ ❑ ❑ Attachment Method: 7 TAG; EQUIPMENT. O .r- 2' C COMMEMS: O oATe �f t � p o • CL , SEISIMIC AND WIND RESTRAINT CURB DETAIL2 SEISIMIC AND WIND RESTRAINT EQUIPMENT DETAIL = AC1.3 N.T.S. AC1.3 N.T.S. O (� ca O N C :r U .0 U L Q M n. t� o Issue Date: 3-23-2012 Q. REVISION INFORMATION O CL a� W V) CD C c�a D a� a� s H v� a a O U Restaurant #: 0457 RED LOBSTER 457 RENOVATION 10330 SOUTHWEST GREENBURG ROAD TIGARD, OR MECHANICAL DETAILS I DEV I TA & ASSOCIATES 5 REMOTE CONDENSERS 2 I NC _ __..__. _... .........._..._.._.._----___......_. 1100 9 (ICE—MACHINE)—' DAI PROJ>=CT= 5-0 EF 7 I PO BOX 1596 GREENVILLE, SC I °/A ............. _ .._......__..._......._ _____._.._._.__W____..-__... __—_.__..----___._...__._.__ DESIGNED BY. EKB 2 I I I RT CHECKED BY: TPM 3 0 ------------ r------------------i V, I I 5� �o Ofitss r--------------i ��j N F� %� ` 80427PE i I I ----------- ORE iCD i EF-4 ra I0 01 IIFXPtR S: 12131 r2p(�{ O I - ___ OSA i SEE PIPE CURB N ' DETAIL" ON SHEET AC1.2 i ------------- Z — F-2 (— _ I Ln E OSA I EF-3 I 0 0 a RA v I I --------,,� /110\ i '---- -`� 1 3 no I I I RR I s L 2 i I I cn I I I EF-1 j co °'A I cn _ SEE "PIPE CURB DETAIL RT ON SHEET AC1.2 U Q 4' dOLCL COOTO REMLTE ( WATER HEATERS.IC SEE AC3 wVENT DONFOR I O O o CONDENSER — CO$TINUATION AND AC1.2 FOR -_ ---- CONCENTRIC VENT DETAIL" _ Issue Date: 3-23-2012 ;` --- I I REVISION INFORMATION CL o L Q I ` REMOTE 4 o I i FREEZER 2 06-17-2013 NI I CONDENSER EF-8 OWNER'S CHANGES 2 I I 3 OSA I t SEE PIPE CURB DETAIL" _ _ ___.. ON S EET AC1.2 I5 v� _. ..__ — __,.._.............._ _.__._ _... _... _. _.___._ ..____._ _............ .._._ ...... _..._ ____. .........__.. . .._ .. __......_ _.._...._.w_,._...____,....._.__._-_ CL T 7 T g 7 h H 1 __._._..............._ _.___...__....________._.__........__.._......._ _ _ Restaurant#: 0457 ..............._....._.......__ .....___ .._..._____.__._....._.._.._ .,. __._..._ .__._...____._. -- --..__... ._...___._...._...... ..__ . _.._._.. ......_._ __...... .._.___ Q ti RED LOBSTER 457 RENOVATION V a OT 10330 SOUTHWEST D GREENBURG ROAD T n TIGARD, OR L 01 n L MECHANICAL ROOF PLANx r 0 0 c 0 �1MECHANICAL ROOF PLAN �21SCALE: 1�4" = 1'-0" E 0 4' 8' 12' a N AC2ml i W n O c� a c.7 KEYED NOTES: ROUTE DUCT UP IN TRUSS SPACING AS HIGH AS POSSIBLE. ROUTE DUCT THROUGH OPEN WEB OF TRUSS. ROUTE DUCTWORK TIGHT TO BOTTOM OF TRUSS OR BEAM. ROUTE 3"0 CPVC SEALED COMBUSTION AIR/FLUE UP THROUGH ROOF AND INSTALL CSA APPROVED CONCENTRIC VENT KIT. (AD SMITH PART#: 9003910105) INSTALLATION SHALL COMPLY WITH ALL STATE AND LOCAL CODE REQUIREMENTS. SEE "CONCENTRIC VENT DETAIL" ON SHEET AC1.2 ......---- ........... REMOTE MOUNTED SPACE SENSOR. FIELD VERIFY WITH THE OWNER'S REPRESENTATIVE THE EXACT LOCATION 7............ PRIOR TO INSTALLATION. 2 TRANSITION DUCTWORK TO CONNECT FULL SIZE TO THE RTU SUPPLY/RETURN OR RRU SUPPLY OPENINGS. -Aw At J ......... N A CONNECT BRANCH DUCT TO THE BOTTOM OF THE DUCT WITH DAMPER IN THE DIFFUSER. Jl WAC CONTROL PANEL (BY CPI) IN THE CPI PANEL SYSTEM. REFER TO WIRING CONTROL DIAGRAM ON 1 10 T SHEET AC4.1. lyp. /-8"x, 30"x20" .20"! k/I i 0"o P"ANDN 1 �A ;A 10*0 21 20 x8" BREAK -AREA DO NOT ROUTE ANY DUCTWORK ABOVE THE ICE MACHINE AREA SOFFIT. 6- ALL EXHAUST DUCTWORK ASSOCIATED WITH DISHWASHER EXHAUST FAN SHALL BE STAINLESS STEEL, BE 14 30"x2a" z±, 26"xl 4 3 N14 D15HWASHER 28"x 130"x 18 i j —7 ............. 1'�. 1711 i K 16) 22"X6 16 U7 LIQUID TIGHT AND ALL HORIZONTAL DUCT RUNS SHALL BE "PITCHED" BACK TO SOURCE. A.. ROUTE 12"0 EXHAUST DUCT DOWN TO DISHWASHER. PROVIDE PANT—LEG TRANSITION TO DISHWASHER UNIT TH IT EN CONNECTION SIZE AS REQUIRED. COORDINATE EXACT SIZE AND LOCATION WI K CHEN EQUIPM T D E V I T A & SUPPLIER. ADJUST VOLUME DAMPERS IN PAW LEG CONNECTION DUCTS AS REQUIRED BY KITCHEN ut, X f X ASSOCIATES EQUIPMENT SUPPLIER. SEE "DISHWASHER EXHAUST DETAIL" ON SHEET AC1.2 N12 I N C. LINE RETURN AIR DUCTWORK AND AT LEAST THE FIRST TEN (10) FEET OF SUPPLY AIR DUCTWORK WITH Q .......... It 1/2- ACOUSTIC LINER. DAIPROJECT: 11005-09 T1 A. I I PO Box 1596 GREEN\ALLE, SC ------ INTERLOCK SMOKE DETECTOR WITH UNIT SUPPLY FAN CONTROL CIRCUIT. UPON ACTIVA ON, THE SMOKE DETECTOR SHALL SHUT DOWN THE AIR DISTRIBUTION SYSTEM. UNIT SMOKE DETECTOR SHALL BE FACTORY FOR INSTALLED IN RTU'S AND RRU'S. DESIGNED BY: EKB RRU-1 17 CHECKED BY: TPM .......... COORDINATE DUCTS OVER THE HOOD WITH THE INSTALLATION OF THE HOOD. 41 1 C'41 f 1;72 S /rRTU -7 TRANSITION EXHAUST DUCTWORK TO CONNECT FUH SIZE TO HOOD COLLAR. OFFSET DUCTWORK AS �RU-7. PROVIDE TURNING VANES IN SUPPLY AIR AT CONNECTION TO DUCT RUNOUT. 7 REQUIRED TO ENTER JOIST SPACING AS SHOWN. E /K I U\j OFFIC 16 4 /K\ 3 MECHANICAL CONTRACTOR SHALL VERIFY CPI PANEL AND RTU-3 EXACT LOCATIONS. MECHANICAL CONTRACTOR SHALL COORDINATE RTU-3 SUPPLY AND RETURN DUCTWORK CONNEC11ONS TO AVOID LL INTERFERENCE WITH THE CPI PANEL. 8"0 .......... —----- I10- A2O0 .......... N ---------- :4A 00 12 p D6 16 0 ins t47 .... ...... ....... .... ROOF ACC .................. ... ......... ........................................ .... ..... ...... .................................. ....... ........... ............ .......... Uj (D 14 c T ? a- K 8"0 I 4nO ----------- .............. -0Xl 80 GENERAL NOTES: 321 0 m 12 L A4W A4M �A A. ALL DUCTWORK SHALL BE ROUTED UP IN TRUSS SPACING AS HIGH AS POSSIBLE OR THROUGH 4 -0 14 THERWISE. 114 1! B. REFER TO DRAWING AC1.1 FOR SCHEDULES AND DRAWING AC1.2 FOR DETAILS. 0 RA ............ RRD\ T114 r E C. REFER TO DRAWINGS AC5.1, AC5.2, AC5.3, AC5.4 FOR KITCHEN HOODS AND EXHAUST FANS. 7, LL V 'Z14 x1b i JR R lw D. REFER TO DRAWING AC4.1 FOR ADDITIONAL INFORMATION REGARDING THE WIRING OF THE 0 K ITxl 6' C I j 4 RTU'S TO THE CPI CONTROL SYSTEM. K 2 -7 LI N E. REFER TO STRUCTURAL DRAWINGS FOR ADD11IONAL INFORMATION TO PROPERLY COORDINATE z TURE. P, Li n 7 F. MECHANICAL CONTRACTOR SHALL VERIFY ALL ROOFTOP UNIT'S CURB SIZES WITH 0 ................ MANUFACTURER'S DATA. F-1 0 G ALL INSTALLATION OF THE MECHANICAL EQUIPMENT SHALL COMPLY WITH THE MANUFACTURERS 0 oft,@ K SPECIFICATION AND CLEARANCE REQUIREMENTS. P, MECHANICAL H. GREASE DUCTS SHALL BE 16 GA. CARBON STEEL OR 18 GA. STAINLESS STEEL WITH PROVIDE CLEANOUT AT EACH 260 46"06" CONTINUOUS WELDED SEAMS OF LIQUID TIGHT CONSTRUCTION. r YN 1 C41 K A9 0 full 1. ALL SUPPLY REGISTERS ARE TO BE PROVIDED WITH OPPOSED BLADE DAMPERS. TYP- 100 .......... \114 J. COORDINATE EXACT LOCATION OF CEILING DIFFUSERS AND REGISTERS WITH ARCHITECTURAL cc .......... ........... CEILING PLAN AND ELECTRICAL LIGHTING. FOR A R.Tjj_l(� ......... ............. /A\ K. ALL HORIZONTAL EXHAUST DUCT RUNS SHALL BE "PITCHED" BACK TO SOURCE. 4 L. PROVIDE ALL NECESSARY DUCT TRANSITIONS TO AND FROM ALL ROOF TOP UNITS INTO CURB ............. X AND JOIST SPACING. t < ------ M. SUBCONTRACTOR SHALL PROVIDE FULL WARRANTY SERVICE FOR A MINIMUM ONE (1) YEAR ino PERIOD. /KX R11 -0 10 14"0 N. ALL DUCTWORK BEHIND RETURN AIR GRILLES SHALL BE PAINTED FLAT BLACK. 44� —4 2" V X4V Issue Date: 3-23-2012 t: 10"0 77 REVISION INFORMA'7110N 1 0"o �il ---;7 3 WOMEN'S EF-8 RESTROOM 2- .......... CL ......----------- .......... HVAC LEGEND rx 30"X20" (0 a 1� 28*xl 30 2 06-17-2013 2 ................. (D co t;....... ........... ............. .................. ...... j....... .......... .......... ..................... RECTANGULAR OWNER'S CHANGES ........... ............. MOTORIZED DAMPER DUCT RISER 14 .... .... ..... ---------- 8"0 ............... 3 07-12-2013 MD ................................. ................... ROUND FS CHANGES 90' .............. RECTANGULAR 0 3 Uli\ll MS A2W ER ELBOW WITH 4 C14 RECTANGULAR TURNING VANES 8"o K DINING TYP. i! A, 5 ............. ROUND .......... ........... ..................... ........... .......................................... ........ R=W DUCT DROP A2O0 RADIUS ELBOW MEN'S 6 0 co ............ ............ ....... ........... .......... RESTROO IN ........... ........... ......... ............. A m ....... ..................................... ............ ........... ................. ..................... ..................... ............. c RECTANGULAR ...........2W L 7 OFFSET LESS ----------- THAN 15� RECTANGULAR ............ ................... RECTANGULAR MAIN DUCT WITH ROUND BRANCH RECTANGULAR 8 OFFSET MORE yl THAN 15' ROUND HIGH EFFICIENCY TAKE OFF BRANCH FITTING WITH DAMPER & STAND—OFF QUAD VESTIBUL UH-2 Restaurant#: 0457 T ROUND MAIN ECTANGULAR MAIN R DUCT WITH WITH RECTANGULAR ROUND BRANCH CONICAL BRANCH RED LOBSTER 457 TEE 45*DEG. L ................ 6 RENOVATION 15' MAX 15' MAX CONCENTRIC ITI TO ROUND 10330 ECENTRIC VOLUME DAMPER (RECTANGULAR OR ROUND) GREENBURG ROAD FIRE DAMPER S.D. SYMMETRICAL WYE DOUBLE FORMED TIGARD, OR SUPPLY AIR RETURN AIR EXHAUST AIR TURNING VANES ............ ........................................... UNIT MOUNTED SMOKE DETECTOR MECHANICAL DIFFUSERS FLOOR PLAN SUPPLY RETURN DOWN ...... ....... SWITCH FOR HOODS DIFFUSER DIFFUSER GRILLE /RT MECHANICAL FLOOR PLAN 2 EQUIPMENT TAGS 0 0 0 SCALE: 1/4" V-0" 0 4$ 8t 12' THERMOSTAT SENSOR HUMIDISTAT U.C. U q �2_ DIFFUSER WITH AJRFLOW NOTED CFM TYPE 2 DIFFUSER AC3ml DESIGNATION F.O.B FLAT ON BOTTOM CFM 2 DEVITA & 14"0 12"0 ASSOCIATES 77 DA1 PROJECT: 11005-09 - � .. ._ 200 ,�, � �s; PO BOX 1596 GREENVILLE, SC DESIGNED BY: EKS CHECKED BY: TPM O I 13 PRO" 11/0 i . 804 rT a �� _ fzi ALO .3 - do .,7s. i oco t �. Ni.44 }. Z. E GENERAL NOTES: A. ALL DUCTWORK SHALL BE ROUTED UP IN TRUSS SPACING AS HIGH AS POSSIBLE OR THROUGH Q THE OPEN WEB OF TRUSSES UNLESS NOTED OTHERWISE. O - B. REFER TO DRAWING ACII A FOR SCHEDULES AND DRAWING AC1.2 FOR DETAILS. C. REFER TO DRAWINGS AC5.1, AC5.2, AC5.3, AC5.4 FOR KITCHEN HOODS AND EXHAUST FANS. a, QM� D. REFER TO DRAWING AC4.1 FOR ADDITIONAL INFORMATION REGARDING THE WIRING OF THE RTU'S TO THE CPI CONTROL SYSTEM 00 E. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION TO PROPERLY COORDINATE 0 DUCTWORK WITH STRUCTURE. � 0 co F. MECHANICAL CONTRACTOR SHALL VERIFY ALL ROOFTOP UNIT'S CURB SIZES WITH MANUFACTURER'S DATA. 3 MECHANICAL MEZZANINE FLOOR PLAN U G. ALL INSTALLATION OF THE MECHANICAL EQUIPMENT SHALL COMPLY WITH THE MANUFACTURER'S o CL AC3.2 SCALE: 1/4" 1 ,-D" SPECIFICATION AND CLEARANCE REQUIREMENTS. 0 4 8 12 I 0D H. GREASE DUCTS SHALL BE 16 GA. CARBON STEEL OR 18 GA. STAINLESS STEEL WITH M o CONTINUOUS WELDED SEAMS OF LIQUID TIGHT CONSTRUCTION. PROVIDE CLEANOUT AT EACH i RAI TURN OF DUCT. :� _ co Q I. ALL SUPPLY REGISTERS ARE TO BE PROVIDED WITH OPPOSED BLADE DAMPERS. � J. COORDINATE EXACT LOCATION OF CEILING DIFFUSERS AND REGISTERS WITH ARCHITECTURAL N 2 CEILING PLAN AND ELECTRICAL LIGHTING. K. ALL HORIZONTAL EXHAUST DUCT RUNS SHALL BE "PITCHED" BACK TO SOURCE. c� L. PROVIDE ALL NECESSARY DUCT TRANSITIONS TO AND FROM ALL ROOF TOP UNITS INTO CURB AND J v M. SUBCONTRACTOR SHALL PROVIDE FULL WARRANTY SERVICE FOR A MINIMUM ONE (1) YEAR to PERIOD. s L N. ALL DUCTWORK BEHIND RETURN AIR GRILLES SHALL BE PAINTED FLAT BLACK. Q M a 0 Issue Date: 3-23-2012 0 REVISION INFORMATION 0. 0 L CL HVAC LEGEND SECTION NOT USED 2 06-17-2013 c o� DUCT RISER RECTANGULAR I MOTORIZED DAMPER OWNERS CHANGES c 3 y MD cu p DROUND UCT RISER v 77 90' RECTANGULAR ELBOW WITH 4 m T RECTAD OP R JJ� TURNING VANES DUCT5 ROUND DUCT DROP R_W RADIUS ELBOW 6 a CL 0 W U RECTANGULAR OFFSET LESS 7 THAN 15' RECTANGULAR RECTANGULAR MAIN r RECTANGULAR DUCT WITH ROUND BRANCH OFFSET MORE 8 t THAN 15' ROUND HIGH EFFICIENCY TAKE OFF BRANCH FITTING WITH DAMPER & r STAND-OFF QUAD 1 Restaurant#: 0457 ROUND DUCT ROUND MAIN RECTANGULAR MAIN 'v �� �� �� �� DUCT WITH WITH RECTANGULAR ° 2 SECTION A -' A ROUND ROUND BRANCH BRANCH T �32SCALE: 1/4" = t'-0" TOEIC� BRANCH 45'DEG. �6" RED LOBSTER 457 D 4' s' 12' RENOVATION 15' MAX 15' MAX CONCENTRIC CONCENTRIC SQUARE 3 ROUND TRANSITION TO ROUND n 10330 VOLUME DAMPER ECENTRIC (RECTANGULAR OR SOUTHWEST 15' MAX ROUND) 0 GREENBURG ROAD o FIRE DAMPER FD S.D. ,, SYMMETRICAL WE ® 0 71 0 ® 0 DOUBLE FORMED T!CARD OR n SUPPLY AIR RETURN AIR EXHAUST AIR TURNING VANES 0 DIFFUSERS �$ UNIT MOUNTED SMOKE DETECTOR MECHANICAL MEZZANINE SUPPLY RETURN DIFFUSER DIFFUSER GRILLE T F REMOTE MANUAL SHUT DOWN Q FLOOR PLAN SWITCH FOR HOODS 0 LA @� 0 O Q SENSORS RZ EQUIPMENT TAGS v THERMOSTAT SENSOR HUMIDISTAT U.C. DIFFUSER a DOOR UNDERCUT TYPE DIFFUSER WITH AIRFLOW NOTED CFM r CFM AC302 DESIGNATION u.t 0 a RRU-1 (DINING NC6ROOM) HAS NO CKT. BRD. INSIDE 0E3N cs RTU CNTRL. BOX .-� INTERCONNECTION ' C�5 WITH THE CPI ,M __ __ J7 BLOCK RRU-1 DINING RRU-2 KITCHEN SYSTEM R Y1 W1/0 G W2 Y2 X2 T COM 0 0 I� 7 1 s G NC3 I �+ RRUTS RRUTS 0 0 G C3I FIELD WIRING FIELD WIRING ` H1 Al FOR RTU-2 FOR RTU-3 WHITE WALLMOUNT WHITE WALLMOUNT WHITE WALLMOUNT TEMP. SENSOR TEMP. SENSOR TEMP. SENSOR �N O 3 4 4 SENSOR. LABELED: RTU1 SENSOR. LABELED: RTU2 SENSOR. LABELED: RTU3 PARTj.TFDCR00 PART#:TFDCRO0 PART#:TFDCRO0 HOODCONTROL RTD ANALOG SIGNAL RTD ANALOG SIGNAL ! RTD ANALOG SIGNAL PICTURE SHOWN BELOW PICTURE SHOWN BELOW PICTURE SHOWN BELOW V s -� I PANEL i !-' INC la 4 0 e FIELD WIRING RTU #1 RTU #2 RTU #3 j SU Y DUCT SU Ll Y DUCT I i .-� M SU Y DUCT FOR RTU-1 I ! SPACE SENSOR SPACE SENSOR I SPACE SENSOR SENSOR SENSOR SENSOR 0 0e0e010 0e0e00 000ee0 f RTU #I RTU J12 ! RTU 3 �+ Rru RTI RTi RT1 RTt RT1 tzru RT2 RT2 Iil2 RT2 RT2 t1711 RT3 R13 RT3 RT3 RT3 TERMINALS LOCATED TERMINALS LOCATED TERMINALS LOCATED SENSOR PREWIRED WITH SENSOR PR IRED WITH SENSOR PR IRED WITH - Yi Y7 w1 w2 c Y, Y2 w•1 w2 c Y1 M w1 w2 c INSIDE SENSOR CASE INSIDE SENSOR CASE INSIDE SENSOR CASE 12 LEADS FROM 12' LEADS FROM 12' LEADS FROM II MANUFACTURE MANUFACTURE MANUFACTURE ee0eee e000a0 e0eee0 00 ee 00 { e0 0e ; e I I e e ! U C O I R w f ` e e 1 j 00 BB 100 �DSI" 6 BB BG IRT RM Rn ea ee ee ee ee ee U w 00 SS DS1 e e e 0 ; ,. 0-1 owc ANALOG 0 � � 0 0 P PJ PJ 01 ,.....,. SIGNAL 6 U1 3 " 6 U2 3 6 U3 3 3 `cO L) f l l 2 f eMWAIR R w ( B w 0041 °�°u l 0 0 e e 0 0 e e I RES OUTPM FAU10" POT ; 5 I� RESISTANCE OUTDOOR TRANSDUCER AIR SENSOR ! i p U) PART RES-1#-1 000 SENSOR PREWfRED 12` � 1 f Z COLOR CODED LEADS �� i ,� Q2 Q7 - 0 C) PwY OZ ICN rrvt `SCJ PNII POWER I-V Q f I I � -}- — .}. ca+ SIG � i �a Y I u, t-v 1z ,sv sv � m E TEMPERATURE HUMIDITY TEMPERATURE HUMIDITY t THIS DRAWING IS THE PROPERTY A OF SENSOR SENSOR SENSOR SENSOR WAY NOT BE USED CAROLINA PRODUCTS, INC. AND I WITHOUT THE WRITTEN RPERMISIONCOF Q I CAROLINA PRODUCTS, INC. C 4) "SUPPLIED BY "SUPPLIED BY SET ALL JUMPER AND °G m o � TRANS TRANS DIP SWITCHES AS SHOWN FACTORY-WIRED REVIsioN 000 REVISION �✓ TO PANEL IN DRAWING. B 0 0 LP NEUTRAL REVISION QQ 0 ODA ODA OOA REVISI RED lex eea 9 a ORG U 4) e e I /0 d M � ( vU 00Rill t — CONTACTS FOR CONTACTS FOR INTRUSION ALARM ALARM ACTIVATION . . ooeel RARA p Au ALC ALC ALA oll 8 0 8 0 c TO TERMINAL BLOCK L+ p ` RR1 RR1 RR2RR2 I_ iDS1 IM DSt Dw 0 2 e e (� /� 00 c)c)oc)oo OooO OOO o o O O00000 .._ .A) .. •J nt e! u - K n4 U u J u to M r u • • b • 66666 • 6 U 0trAW EM CPU 00000❑00 EM 241 000000000 0000000❑ EL 223 ❑❑ a0aa0 as ❑0000 L 0� 0000�00nn@Qtpn p❑ Q 0 w A.1 J J A J J J A.1 AC�pGILY MODEM A.1 2-3.4.5.6.7 A .1 1 3.4 5.6.7 x Y +24 SF AL4 x RTD +24 S AM x RTD < ! VI)C 1 V� cy) 4- EL 1 y w- amg/ M> ■D a Issue Date: 3-23-201 o , 0 0 o 0 00 FIELD WIRING DETAIL 0.113.3000 U ,13.4:1130 I REVISION INFORMATION Q m@nannocmnoo❑@nta 214-20=41M D 00000000 Z4t-tMnnun lonnnonnn or3n0on0n Ti31R2a-= ❑❑❑o❑oao 2o-�� ❑❑o❑❑ao❑ Z31-�� SENSOR PREWIRED WITH SENSOR PREWIRED WITH Q tr U nt U of GA a U v a to 1.1 1J 12 to I Y L W + • 1 • • • Y >✓ 12` LEADS FROM 12 LEADS FROM TEMPERATURE SENSORS PROVIDED BY TRANS p p 0000 000000000 (� 0 0 0000000000 000000000000 000 o SUOMT MST SU `'MbT a� ZONE TEMP SENSOR O O O ' O O RRUS#R RR SEN#1 — L RRUTS W/SETPOINT KNOB 1 2 1 TERMINAL #1 IS "ZONE" U U TERMINAL #2 IS COMMON LLJ TEMP. SENSOR TEMP. SENSOR PART#:TFDCR00 PART#:TFDCR00 = --- t_ 3 4 TERMINAL #3 IS SETPOINT I PICTURE SHOWN ABOVE PICTURE SHOWN ABOVE U ON SENSOR AND RRUTS W5U ' ~ 7 g ZONE HUMIDITY (RH) SENSOR a TERMINAL 5 1S < }' �j TERMINAL 6 IS "-" I - - OBSERVE POLARITY! RRUTS AND LTB ARE SET DIP SWITCHES SUPPLY DUCT SENSORS MUSTBE w :D o LOCATED ON THE RIGHT (1} RRUTS AND LTB ARE LOCATED ON THE RIGHT INSTALLED AT LEAST 1 .5 X (� -- SIDE OF THE CONTROL AUTO/STOP INPUT SIDE OF THE CONTROL ENCLOSURE ABOVE THE 1 ,2,3&6 TO DOWN ENCLOSURE ABOVE THE FROM EF-1 AUXILLIARY COMPRESSORS PHOTOCELL SHOULD BE POSITION . SET DUCT-WIDTH DOWNSTREAM FROM M z o COMPRESSORS CONTACT. (2) ALL CUSTOMER WIRING MUST BE IN WIRED TO TERMINALS IN 4,5,7&8 TO UP 0 U y OPEN CONTACT = STOP ACCORDANCE WITH NATIONAL ELECTRICAL LAST HTG. OR COOLING COIL IN 0 U Restaurant #: 0457 CLOSED CONTACT = RUN CODES AN LOCAL CODES. THE CPI CABINETS AS POS ITI 0 N71 ORDER TO ACCURATELY o t- - (REMOVE JUMPER) SHOWN BELOW TEST �� (3) ANALOG INPUT WIRING MUST BE 18 GA. MEASURE THE TEMPERATURE OF SHIELDED TWISTED PAIR TRANS BASD WIREPHOTO L1J Z RED LOBSTER 457 1 � 2 ' #400-20-28, Q-4166 OR EQUIVALENT). E"N°s o AIR BEING DELIVERED TO THE Q m RENOVATION 24VA CPR1 rI 1 2 I (4) USE COPPER CONDUCTORS ONLY! � 24V CPR2 i BUILDING'S INTERIOR CPI PROJECT XXXXXA ,�, 3 4 (5) LOW VOLTAGE CONTROL WIRING MUST NOT 24V STOP EMERGENCY STOP INPUT BE RUN IN CONDUIT WITH POWER WIRING. CPI DRAWING # '� 033 r 5 6 WIRED TO FIRE SUPPRESSION (6) AUTO/STOP ON RRUTS AND EMERGENCY WIRE LEGEND: F 0 P\ L GHT NG CONTROL W R NG SEE SHEET: 2A SOUTHWEST SYSTEM STOP INPUTS ON LTB ARE DRY CONTACT ONLY e e e e DASHED FIELD GREENBURG ROAD OPEN CONTACT = STOP INPUTS. APPLYING POWER TO THESE M L+ A+ ASOLID 14AWG - Lm CLOSED CONTACT = RUN TERMINALS WILL CAUSE DAMAGE TO THE e e e e DASHED-DOT 18AWG DATE: 4/7/09 (REMOVE JUMPER) CONTROLLER AND WILL VOID WARRANTY. SHEET 2 DRAWN BY: AJ B TI CARD, OR T n L n n CPI HVAC 0 WIRING DIAGRAM n REFERENCE ONLY NOT APPROVED WITH THIS PERMIT 0 I v E E 8 r4 AC481 N r� U W n O ce a Fm HOOD INFORMA TION MAX, EXHAUST PLENUM SUPPLY PLENUM HOOD HOOD CONFIG, CAPTIVE — A I R E HOODS ARE ^ HOOD MODEL LENGTH COOKING TOTAL RISER(S) CFM S.P. SUTOTAL CM WIDTH LENGRI DIA. CFMS.P. CONSTRUCTION END ENDO ROW BUILT IN COMPLIANCE WITH / r aaai = -NO. TEMP, EXH, CFM WIDTH LENG. DI 5424 6' 0.00' 450 900 9' 9' 900 -0.265 0 430 SS ALONE N/A EXHAUST RISER 5424ND-2 Deg Where Exposed BUILT 1 10OW VAPORPROOF IN 4824 6' 4.00' 700 2217 12' 16' 2217 -0,705 0 430 SS a 1 ACCORDANCE 0 INCANDESCENT LIGHT 2WITH 4824ND-2 Deg. Where Exposed ALONE BACK I NEPA HANGING ANGLE 3 4824 6' 4.00' 450 1583 12' 12' 1583 -0.458 0 430 SS ALONE FRONT 4I No. 96 • 4824ND-2 Deg Where Exposed Intertek 4 4824 5' 6.00' 450 1100 10' 10' 1100 -0.366 0 430 SS ALONE N/A 3' STANDOFF 4824ND-2 Deg, Where Exposed NEPA # 96 4224 2' 6.00' 700 8' 8' 250 -0.018' 304 SS ALONE N/A 5 4224VHB-G Deg, 250 0 100'!. UL 710 & ULC 710 STANDARDS IT IS THE RESPONSIBILITY 24' NOM 6 4224 2' 6.00' 700 250 8' 8' 250 -0.018' 0 304 SS OF THE ARCHITECT/OWNER TO e16" . CLASSIFIED 4224VHB-G Deg 100''/. ALONE N/A E , T , L , LISTED 3 0 5 4 8 0 4 — 0 01 ENS FRROM LIMITED-COMBUST BAREANCE LE-TYPE �©AND COMBUSTIBLE MATERIALSE FILTERS FOR QUESTIONS OR FURTHER INFORMATION, CONTACT IS IN COMPLIANCE WITH STEVE LUDDY AT (800) 825-3143 LOCAL CODE REQUIREMENTS 3' SOF GREASE DRAIN ¢\� HOOD INFORMATION WITH REMOVABLE CUP �Q FILTER(S) LIGHTS) UTILITY CABINETS) FIRE HOOD FIRE SYSTEM ELECTRICAL SWITCHES SYSTEM WEIGHT WE - •8• NO. TYPE QTY HEIGHT LENIGTH QTY TYPE WIRE LOCATION PIPING IGH GUARD TYPE SIZE MODEL # QUANTITY LOCATION 1 SS Baffle with Handles 2 16' 16' 2 Incandescent Light Fix NO Right Ansul R102 3.0/3,0/3.0 E4020128 1 Light Outside YES 404 CAPTIVE A I R E HOODS ARE E T L LISTED ( # 3054804 - 001 ) 33' MIN 2 16' 20' i Fan LBS. 2 Spark Arrestor Filters 3 16' 16' YES 2 Incandescent Light Fix NO YES 268 TO UL710 STANDARDS AND ARE BUILT IN ACCORDANCE 48' MAX LBS, WITH NEPA96 AND COMPLY WITH STATE AND LOCAL 3 SS Baffle with Handles 1 16� 16� 2 Incandescent Light Fix N❑ 3 16 20 YES X88, CODE REQUIREMENTS OF COMMERCIAL HOODS A N D Q YES 247 80' TYP. 3 4 SS Baffle with Handles 4 16' 16' VENTILATION . r_ 0 5 1 Incandescent Light Fix NO NO 125 N LBS. E C3 N 6 1 Incandescent Light Fix N❑ NO 125 EQUIPMENT RA � tz LBS, BY OTHERS o0 3 o 00 CHARBROILER HOOD 3 t .o PLAN VIEW - Hood #2 - 6' 4.00' LONG 4824ND-2 0 CLL 6' 4.00' HOOD MINI FLUORESCENT BULB SPECIFICATION. � o ° PHILLIPS SLS 20 Alto 20W, 120V, E26, 2700K SECTION VIEW - MODEL 4824-ND—z a 0YR 38.00' 38.00' CONVEOOVEN HOOD RA e� HOOD-4 cj v� °) EXHAUST RISER EXHAUST RISER 10OW VAPORPROOF 10OW VAPORPROOF Q INCANDESCENT LIGHT HANGING ANGLE INCANDESCENT LIGHT U.L. Listed Incandescent Light Fix N U N w v Hood #2 48.00' L Q tf a 24' NOM 24' NOM 16.00' p 16" U.L. CLASSIFIE V16" . CLASSIFIEDv BAFFLE-TYPE LE-TYPEIssue Date: 3-23-2012 GREASE FILTERS E FILTERS 12,00 3.00 0 9,00' o REVISION INFORMATION o10.00, O L_ 10.00' o- GREASE DRAIN GREASE DRAIN 0 WITH REMOVABLE CUP WITH REMOVABLE CUP O 10,100' 10,00- L 8,. •8• 1 cc 1 12.0©' 4 48.00' Hood #4 33' MIN 33' MIN } 48' MAX 48' MAX [AM L12.00' 48.00' Hood #3 U.L. Listed Incandescent Light Fix L *' 80' TYP, F 80' YP. i U.L. Listed Incandescent Light Fix i 9, CL 0 U i EQUIPMENT EQUIPMENT Q 33.00' 33.00' BY OTHERS BY OTHERS 38.00' 38.00' 5' 6,00' PLAN VIEW - Hood #4 - 5' 6,00° LONG 4824ND-2 r Restaurant#: 0457 j FF 6' 4.00' CONVEYOR OVEN HOOD PLAN VIEW - Hood #3 - 6' 4.00' LONG 4824ND-2 RED LOBSTER 457 FRYER HOOD RENOVATION , SECTION VIEW - MODEL 4824-ND-2 SECTION VIEW - MODEL 4824-ND-2 JOB RED LOBSTER s Z0C4TRON TIGARD, OR FRYER HOOD CHARBR❑ICER HOOD ♦� �- i _ _ _ �,4TF 3/2/12 JOB # 10330 �_ _ _..� DX0 # RLTIGARDOR OR.4WN BYSJL-60 R�'fl SC�4L�' 3/4 SOUTHWEST GREENBURG ROAD 0 T i L TIGARD, OR 0 , KITCHEN r n HOOD DETAILS LA 2 E E s AC5m 1V J 1J 1 ELECTRICAL PREWIRE PACKAGEJOB NAME RED LOBSTER 2.0 REVISED DATE 9/2/2010 111111 AVAr -- DRAWING NUMBER E4020128 JOB NUMBER 1210417 DRAWN BY CONTROL INPUT 120VAC H1=LINE, N1=NEUTRAL 15A BKR - .,J ;:!RF 5='.: ,,.F 3Phase - 120V/1Phase Pre-wire with 4 3Phose Exhaust Fans, 2 1 - - 120V/1Phase Exhaust Fans, H1 N Exhaust on in Fire Condition, FS-01 Ir z R k H Relay w/ 2 -DPDT On/Off w/ - (Fon Swatch Shown Installed) Supply Fan. 2 1 ST- OL-1 ORA 96 95 WH 3.00 (� QO Q ST-2 OL-2 Ami O 8.50' O COMPONENT PARTS 3 ORA 96 5 WH -x Coe�tacta Hood #5 Hood ##6 ST-3 OL-3 -x d 9.00' Z1.Q0' 21.QQ' 4 ORA 96 S WH ea Fan Switch (Ughted)Stitch ST-4 OL-4 Hood Ught(s) ORA 96.,A5. WH FIRE � Re1ar agar - 34.,,o.a„8.a + sodoM --� 9100 �-- SYSTEM 5 -s �— T ORA WN O 42.00' 8.00' 42.00' 8.00' 6 R1-1 54.00' Hood #1 0 8W"IL 4TL NC c NO 0 L, Listed Incandescent Light Fix L. Listed Incan escent Light FixG01?_ 8 ` U.L. Listed Incandescent Light Fix Q Q CONTROL PANEL _ _ 0 9 SPARE FIRE DRY CONTACT'S_ O SHUT 03 • • 10 DOWN SHUNT TMP.USED wDISCHMG M TOtE SYS,Fl1 0 Q 18,00 18.00 18.00 18.00 - OR PRaMX R2-2 C 11 YW R3 WH __0R2 C =_ N 36.00' 36.00' 3' Q.00' 3' 0.00' 12 MS-1 G K R1 ,>� Tripped, , Ae,nw. c conx„on c aR1 Q 3 G1 0- TRT BK R2 _ �NO nae oe PLAN VIEW - Hood #5 - 3' 0.00” LONG 4224VHB-G PLAN VIEW - Hood #6 - 3' 0.00" LONG 4224VHB-G N0 13 - iee-w— O Nc 3 c . 3-2 0 6' 0.00' 12.00' TURBO CHEF OVEN HOOD TURBO CHEF OVEN HOOD 14 - 05 N0 Ilk FOM sreu: C� aPLAN VIEW - Hood #1 - 6' 0.00" LONG 5424ND-2 LIGHT INPUT 120VAC H2-HS=LINE, N2-NS=NEUTRAL 15A BKR (MAX 140OW PER CIRCUIT) C Ho se tae RA 15 NC-PR axgT NNo-SL NC C0-8K4) - H2 LS-O' N2cm NC-BR CONVECTION OVEN HOODI � H ��m� _ Ono L O 3 16 Yator a PH Volt HP Blit BREAKER Exh-1 Exh 3 208 0.5 1.8 15 Am e� O Exh-2 Exh $208 1 q16Am 3 17 Exh-3 Exh 0.75 3 PHASE 208V 1 PHASEE 115V Exh-4 Exh 0.75 ST-1 OL-1 C-6 Exh-5 Ezh 0.18 INPUT - IA I--�1----- 2 WIRE'3 �� FNPUTL1 T1 L1 T1 GR 183 PHASE_ L7 FCH-5 Esh-8 Ezh 0.18 c� L2 T2 T2 GR L2 T2 I— �---- EXH-1 1 PHASE- FN7 F---- O i C1 19 L3 L3 TE 3- �T3--- INPUT - L8 L3 F----- 2 WIRE- NB L4 3 PHASE O2DOV 1 PHASE , ! L Ll TF 1 l�1l O L2 T2 T2___ GR DENOTES FIELD WIRING 20 L3 TTT3 __- EXFI_2 DENOTES INTERNAL WIRING +� C R: W{ ST-3 OL-3 BL - BLUE GY - GRAY 21 3 PHASE 208V SK - BLACK YW - YELLOW EXHAUST RISER EXHAUST RISER L1 r1 T1 ___ BR - BROWN PR - PURPLE INPUT - 15 +----JC�- N 3 '1�2E - y5 L2 T2 T2 �_3 GR OR - ORANGE OR/BL -ORANGE/Bi.UE (STRIPE) 10OW VAPORPROOF 28 per_ L3 T��,r3---- - _ Ro LN _BLUE/RM (STRIPE) INCANDESCENT LIGHTOWW wlimn HANGING ANGLE Ll PHASE 208V HANGING ANGLE 23 � ` __ TERMINALS SHOWING NOTE: IF WALL FACTORY WIRING MPREWIRE, OR UST � ' ST-4 OL-4 INSTALLED FIRE SYSTEM MICROSWTfCH, THE Q 4• 24 3 TFT3 STI --- -4 GR BE FIELD WIRED. 1 3' STANDOFF 18 x 18 x 6 Box U N U 24' NOM 24' NOM Q 16" U.L. CLASSIFIED c BAFFLE-TYPE o /1 < GREASE FILTERS CAPTIVE -AIRE HOODS ARE issue Date: 3-23-2012 O 3' Q GREASE DRAIN DRAIN BUST IN COMPLIANCE WITH ] o WITH REMOVABLE CUP FULL PERIMETER GUTTER REVISION INFORMATION BUILT IN N 4' WITH Q- 2 ACCORDANCE NFPA N q�\I No. 96 CIS 48' MAX Intertek rn NF- PA # 96 L 80• TYP, 80' TY P. UL 710 & ULC710 STANDARDS E , T .L , LISTED 3054804 -001 J 3 �- EQUIPMENT FOR QUESTINS VE O UDDY TAT R(80)0825-3143 CONTACT o EQUIPMENT v BY OTHERS BY OTHERS i CAPTIVE AIRE HOODS ARE ETL LISTED ( # 3054804 -001 ) y __FT TO UL710 STANDARDS AND ARE BUILT IN ACCORDANCE 3 Restaurant #: 0457 WITH NF-PA96 AND COMPLY WITH STATE AND LOCAL 7, CODE REQUIREMENTS OF COMMERCIAL HOODS AND RED LOBSTER 457 �I SECTION VIEW - MODEL 5424-ND-2 SECTION VIEW - MODEL 4224-VHB-G VENTILATION. RENOVATION y 31 CONVECTION OVEN HOOD TURBO CHEF OVEN HOOD HOOD-1 HOOD-5 AND HOOD-6 10330 5 SOUTHWEST D GREENBURG ROAD to Lm r TIGARD, OR n L n 0 KITCHEN n HOOD DETAIL N 1: 0 y 2t I f0 iAC5v2 rl =j O fV W n O aC a i� TYPICAL OF EE - 5 ,6 , 7 FAN INFORMATION FAN EXHAUST FAN SUPPLY FAN DUHFA SERIES UPBLAST EXHAUST FANS (UL705) UNIT FAN UNIT MODEL # D �' NO, MODEL TAG CFM SIP, RPM H.P, 0 VOLT FLA BLOWER HOUSING TAG CFM SIP. RPM H.P, 0 VOLT FLA W FEATURES' D 1 NCA8FA NCA8F"A 900 - 1,000' 1596 0.500 3 208 1.8 j - ROOF MOUNTED FANS EF-1 - UL705 2 NCAI4FA NCAI4FA 2217 - 1,000' 1276 1.000 3 208 3.3 - VARIABLE SPEED CONTROL EF-2 - INTERNAL WIRING CURB NCAI4FA 3 NCAI4FA 1583 - 1,000' 1149 0,750 3 208 2.7 - WEATHERPROOF DISCONNECT EF-3 THERMAL OVERLOAD PROTECTION (SINGLE PHASE) E 4 NCAI4FA NCAI4FA 1100 - 1.000' 1110 0.750 3 208 2.7 EF-4 HT ° 5 DUI2 DUI2HFA 300 - 0.500 1395 0.180 1 115 2,0 F OPTIONS: 20 GAUGE EF-55 BACKDRAFT DAMPER STEEL 6 DUI2HFA DUI2HFA 300 - 0,500 1395 0,180 1 115 2,0 HINGED FAN CONSTRUCTION y EF-6 PITCHED CURB 3' FLANGE INSULATED CURB 7 D U33 HFA DU33HFA 600 - 0.500 1210 0,333 1 115 4.1 GREASE DRAIN BIRD SCREEN 8 DR30HFA DR30HFA 600 - 0.500 1093 0,250 1 115 4.0 + ` EF-8 B BACKDRAFT DAMPER INSTALLATION F0 AIR FLOW /RD ROOF OPENING OQ' c U o R E� BACKDRAFT DAMPER RD DIMENSIONS NOTE; � GREASE I DRAIN NOT REQ'D I- f� 1� R❑ PITCHED CURBS ARE AVAILABLE 7 a> FOR PITCHED ROOFS. a� C 30° :. SPECIFY PITCH: 12 RD — EXAMPLE: 7J12 PITCH = 30° SLOPE L CURB ASSEMBLIESDUHFA DIRECT DRIVE (ROOF OPENING) [a CENTRIFUGAL UP-BLAST EXHAUST FANS DIMENSIONAL DATA CURB DIMENSIONAL DATA o NO FAN ITEM SIZE WEIGHT FAN MODEL HT W B C F R R❑ LB FAN MODEL D E 1 # 1 Curb 19.500 W x 19,500 L x 22,000 H Vented Hinged o EF-5, EF-6 DUI2HFA 18 22 2 19 14 1/2 10 5/8 13 40 EF-5, EF-6 DUI2HFA 17 1/2 20 ° o. 2 # 2 Curb 23.000'W x 23,000'L x 20.000'H Vented Hinged EF-7 DU33HFA 25 1/4 25 1/2 2 21 18 1/2 12 1/8 16 50 EF-7 DU33HFA 19 1/2 20 3 # 3 Curb 23.000'W x 23,000'L x 20,000'H Vented Hinged 0 o QO 4 # 4 Curb 23,000'W x 23,000'L x 20.000'H Vented Hinged U O 5 # 5 Curb 17.500'W x 17,500'L x 20,000'H O p 6 # 6 Curb 17.500'W x 17500'L x 20,000'H Coil? o t 94� 7 # 7 Curb 19,500'W x 19,500'L x 20.000'H cu r_ 8 # 8 Curb 19,500'W x 19.500'L x 12,000'H � A Q- m va (� N L TYPICAL. OF EE - 8 o TYPICAL OF EF - 1 ) 2,,3,,4 Q DRHFA SERIES RADIAL EXHAUST FANS FEATURES: D v - ROOF MOUNTED FANS NCAFA SERIES UPBLAST EXHAUST FANS (UL762) W - UL705 D 2- FEATURES: Q W - SAFETY DISCONNECT - ROOF MOUNTED FANS D - STANDARD BIRD SCREEN RESTA- UL762URANT MODEL D Issue Date: 3-23-2012 SPEED G❑NTR❑L CURB o - AMCA SOUND AND AIR CERTIFIED E - WIRING FROM MOTOR TO DISCONNECT SWITCH VENTED REVISION INFORMATION o _ WEATHERPROOF DISCONNECT CURB o o OPTIONS: C HIGH HEAT OPERATION 300°F (149°C) b� _ a. - GREASE CLASSIFICATION TESTING E BACKDRAFT DAMPER 20 GAUGE n HINGED FAN STEEL . HT PITCHED CURB CONSTRUCTION HT NORMAL TEMPERATURE TEST 20 GAUGE INSULATED CURB CU EXHAUST FAN MUST OPERATE CONTINUOUSLY STEEL cn F WHILE EXHAUSTING AIR AT 300°F (149°C) CONSTRUCTION _ 3' FLANGE UNTIL ALL FAN PARTS HAVE REACHED THERMAL EQUILIBRIUM, AND WITHOUT ANY o o co DETERIORATING EFFECTS TO THE FAN WHICH f REASE DRAIN WOULD CAUSE UNSAFE OPERATION, 3' FLANGE `'/� /RDABNORMAL FLARE-UP TEST OPENING B D❑QE ❑ONS . oc B EXHAUST FAN MUST OPERATE CONTINUOUSLY RD t— WHILE EXHAUSTING BURNING GREASE VAPORS RD ROOF OPENING R i t AT 600°F (316°C) FOR A PERIOD OF DIMENSIONS 15 MINUTES WITHOUT THE FAN BECOMING R❑ RQ PITCHED CURBS ARE AVAILABLE 7 R DAMAGED TO ANY EXTENT THAT COULD CAUSE CL G_R+3� AN UNSAFE C❑NDITI❑N. C FOR PITCHED ROOFS. 30° y U SPECIFY PITCH: 12 OPTIONS: PITCHED CURBS ARE AVAILABLE 7 BACKDRAFT DAMPER INSTALLATION EXAMPLE: 7/12 PITCH - 30° SLOPE o RD- FOR PITCHED ROOFS, - C GREASE BOX 30° AIR FLOW i HINGED FAN 12 DRHFA DIRECT DRIVE BACKDRAFT DAMPER h PITCHED CURB SPECIFY PITCH; CENTRIFUGAL RADIAL EXHAUST FANS DIMENSI❑NAL DATA CURB DIMENSI❑NAL DATA n INSULATED CURB EXAMPLE: 7/12 PITCH = 30° SLOPE v DUCTWORK BETWEEN FAN MODEL HT W B C R RD WEIGHT FAN MODEL D E NCAFA BELT DRIVE EXHAUST RISER ON HOOD LB V CENTRIFUGAL UP-BLAST EXHAUST FANS DIMENSIONAL DATA AND FAN (BY OTHERS) CURB DIMENSIONAL DATA EF-8 DR30HFA 19 1/8 26 1/4 2 21 12 1/8 16 45 EF-8 DR30HFA 19 1/2 12 Restaurant#: 0457 FAN MODEL HT W B C F R RQ WELBHT FAN MODEL D E _ 19 1/2 22 ------ RD RED LOBSTER 457 �a EF-1 NCA08FA 25 1/4 27 1/4 2 21 18 1/2 12 1/8 16 105 EF-1 NCA08FA (ROOFOPENING) RENOVATION EF-2,3,4 NCAI4FA 30 1/2 33 3/4 2 24 3/4 23 14 7/8 20 140 EF-2,3,4 NCAI4FA 23 20 J 5 v� 10330 r� SOUTHWEST 0 GREENBURG ROAD i; 0 TIGARD, OR a Ln Ln m L KITCHEN HOOD DETAILS n 8 AC5m3N O Q' a i� .RZv ,SC4LS 3/4" �0(o oSo C) AN Q _ 5 Q ��A _ 0 Ln xxLn R) 3 Ut 90 ;:. <+ o n ` S a s 0 �o N� N� NOTES- FIELD SHOWN p�\y S EEV NG,E EDLBOWS,ATEES, AND NOZZLES SUPPLIED BY CAS 'C\d\`1 - RELOCATE NOZZLES IF FLOW PATTERN IS BLOCKED BY SHELVING, +� " I - MAX MUM D9 RELBOWS IN SUPPLY LINE, 24,00 ( I Q 20.00 24,00 32.00 - MINIMUM 72 INCHES OF AGENT LINE FROM TANK TO FIRST NOZZLE. �0� A �--� TO FRYER HOOD - IF APPLICABLE, PRE-PIPED CHARBROILER DROPS ARE SHIPPED LOOSE. o a — CN - FACTORY PIPING EXTENDS A MAXIMUM OF 6" ABOVE THE TOP OF THE HOOD, I — — +/ - APPLIANCE DIMENSIONS LISTED REPRESENT THE COOKING SURFACE T❑ CHARBR❑ICER HOOD �—� SIZE, NOT THE OVERALL APPLIANCE SIZE. L — — — — J - THIS FIRE SYSTEM COMPLIES WITH U.L. 300 REQUIREMENTS N O Hood # 4 Mz Job #: 1210417 Q Job Name: RED LOBSTER 2.0 REVISED Hood # 1 Drawn By: o System Size: ANSUL-3,0/3,0/3.0 Total FP required: 26 '0 — — — — — — — — — — — � Hood # 1 6' 0.00" Long x 54" Wide x 24" High 0 Riser # 1 Size: 9" x 9" CM RA a 1W � � I L 2 # POOH Hood # 2 6' 4.00" Long x 48" Wide x 24" High lw Riser # 1 Size: 12" x 16" — --- — —, Hood # 3 6' 4,00" Long x 48" Wide x 24" High L Riser # 1 Size: 12" x12' 3 Hood # 4 5' 6,00" Long x 48" Wide x 24" High o �� ( — — — — — Riser # 1 Size: 10" x 10" R1 3 28 r2� 1B 1B 1B I LEGEND - FIRE CABINET ANSUL SYSTEM + 1N 8 0� S o • o 0 1N @)@C0 ( a lA 1.5 GALLON TANK Q3 11 34 a� 14.00 3s.00 14.00 24.00 1B 3 GALLON TANK 2 OEM AUTOMAN RELEASE °, ( 3 DEM REGULATED RELEASE 4 OEM REGULATED ACTUATOR RA I 5 ANSULEX LIQUID AGENT (3 GAL.) rcl� v I 6 ANSULEX LIQUID AGENT (1.5 GAL.) 7 CARTRIDGE (101-20) 8 CARTRIDGE (101-10) 24.00 ( 2 I 24.00 1 9 CARTRIDGE (101-30) 1N 1N 1 9A CARTRIDGE (LT-A-101-30) Q 9B DOUBLE TANK CARTRIDGE 10 TEST LINK 1N ,. 1N �— — � 11 DOUBLE MICRDSWITCH a ( 12 HOSE ASSEMBLY � °' � A C, I 1100 DUCT NOZZLE <430913) o 2W DUCT NOZZLE (419337) o I 1W NOZZLE ASSEMBLY (419336) Issue Date: 3-23-2012 oiF NOZZLE ASSEMBLY (419333) X Hood # 3 Mo 1N NOZZLE ASSEMBLY (419335) REVISION INFORMATION n, CL,0 1/2N NOZZLE ASSEMBLY (419334) os oo A 3N NOZZLE ASSEMBLY (419338) fl. UZM AO � 245 NOZZLE ASSEMBLY (419340) £ M I 230 NOZZLE ASSEMBLY (419339) o " lw 2120 NOZZLE ASSEMBLY (419343) N LJ CL , 290 NOZZLE ASSEMBLY (419342) v s o — _ _ 260 NOZZLE ASSEMBLY (419341) o z00 — 28 DETECTOR BRACKET 0 3a 0 29 LOW TEMP FUSIBLE LINK 30 HIGH TEMP FUSIBLE LINK 8 MGV MECHANICAL GAS VALVE EGV ELECTRICAL GAS VALVE 34 REMOTE MANUAL PULL STATION a 24.00 16.00 16.00 20.00 S SWIVEL ADAPTOR v U 0 i v ri v 3N O3N 3N Restaurant#: 0457 V V N o a o RED LOBSTER A A A A A A RENOVATION c:la a . A N Ln � A +' � A4F-'� g �cu 3 EN 3 �N c it: LJ LJ OL J 1033 3 Ld LQ- La - 0 aso iso �- L � • L � L �,� SOUTHWE ST GREENBURG ROA a TIGARD, OR 0 Ln v KITCHEN HOOD DETAILS s 0 Mn E E 81 AC5 . 40 N_ WMA &I liJ f7L f1. SECTION 1501 Q SECTION 15010 SECTION 15020 SECTION 15060 SECTION 15070 MECHANICAL SPECIAL CONDITIONS MECHANICAL SPECIAL CONDITIONS MECHANICAL MATERIALS AND METHODS AIR CONDITIONING EQUIPMENT SHEETMETAL DUCTWORK AND ACCESSORIES Part 1 General 1. For installation of roof top units and duct systems where units furnished differ in physical size and Part 1 General Part 1 General Part 1 General arrangement from those scheduled and shown. 1.01 SPECIAL NOTICE 1.01 SPECIAL NOTICE 1.01 SPECIAL NOTICE 1.01 SPECIAL NOTICE 2. In other locations, as directed by the Owner's Representative. A The contractor shall read all relevant documents, become familiar with the job, scope of work, type of A. Each contractor shall read all relevant documents, become familiar with the job, scope of work, type A. Each contractor shall read all relevant documents, become familiar with the job, scope of work, type A. Each contractor shall read all relevant documents, become familiar with the job, scope of work, type general construction, and the architectural, structural, mechanical and electrical drawings and specifications. D. Shopdrawings shall be complete working drawings prepared in a neat reproducible form and shall of general construction, and the architectural, structural, mechanical and electrical drawings and of general construction, and the architectural, structural, mechanical and electrical drawings and of general construction, and the architectural structural, mechanical and electrical drawings and contractor shall also familiarize himself with the purpose for which these documents have been g I? 9 g p P P g g g Each c P p indicate the work of all trades in the meas involved. Unless otherwise directed, they shall be prepared by specifications. The contractor shall also familiarize himself with the purpose for which these documents specifications. Each contractor shah also familiarize himself with the purpose for which these documents specifications. Each contractor shall also familiarize himself with the purpose for which these documents prepared and shall become cognizant of all the details involved. Each contractor shall coordinate his work the Heating, Ventilating and Air Conditioning Contractor who shall be responsible for the coordination with have been prepared and shall become cognizant of all the details involved. Each contractor shall have been prepared and shall become cognizant of all the details involved. Each contractor shall have been prepared and shall become cognizant of all the details involved. Each contractor shall with that of others. other trades. coordinate his work with that of others. coordinate his work with that of others. coordinate his work with that of others. B. The term "contractor" used in this section of the specification shall mean the contractor whose work is 2.05 EQUIPMENT IDENTIFICATION B. The term "contractor" used in this section of the specification shall mean the contractor whose work is B. The term "contractor" used in this section of the specification shall mean the contractor whose work is B. The term "contractor" used in this section of the specification shall mean the contractor whose work is covered by this section. covered by this section. covered by this section. covered by this section. A. All major equipment such as air handling units and exhaust fans shall be identified by the attachment C. When the term "En ineer" is used in this section of the specification, it shall mean the consulting of nameplates constructed from laminated phenolic engraved plastic, 3 ply, with black surface and white C. When the term "Engineer" is used in this section of the specification, it shall mean the consulting C. When the term "Engineer" is used in this section of the specification, it shall mean the consulting C. When the term "Engineer" is used in this section of the specification, it shall mean the consulting 9 P 9 P P 9 P PY g P 9 g P 9 9 P 9 mechanical engineer. interior core, at least 1/16 inch thick. Engraved lettering shall be condensed gothic, at least 1/4 inch mechenicat engineer. mechanical engineer. mechanical engineer. high and properly spaced for easy and legible reading. Plates shall be attached to equipment by the use 1.02 SCOPE OF WORK of a permanent type adhesive or chromium plated screws. Embossed plastic tape is not acceptable. Part 2 Products (NO SUBSTITUTIONS ALLOWED) Part 2 Products Port 2 Products A. This section of the work shall comprise the furnishing of all materials, equipment, tools, labor and 2.06 RECORDS FOR OWNER 2.01 PIPE HANGERS AND SUPPORTS 2.01 AIR CONDITIONING UNITS 2.01 GRILLES, REGISTERS AND DIFFUSERS transportation necessary for the complete installation of the mechanical systems shown and hereinafter specified. Work is to be complete in every respect whether specifically mentioned in contract documents or A. Each contractor shall accumulate, during the job progress, the following data in duplicate, prepared in A. All horizontal runs of piping shall be suspended from the structural members above by means of A. Air conditioning units shall be fully packaged, factory assembled and tested roof top air conditioning A. All grilles, registers and ceiling diffusers shall be furnished and installed where indicated on the not. This work and materials includes, but is not limited to, the following items: a neat brochure or pocket folder, and turn over to the Owner's Representative: approved Mangers spaced as specified. Supports and hangers shall be installed to permit free expansion units, consisting of compressor, evaporator, condenser, gas fired heating unit, filters, and air handling fan, drawings. Supply units shall be designed to provide the throw and spread required with no apparent drafts and contraction, the piping shall be self-supporting and shall not be supported from the equipment refrigerant piping, manual outside air, damper, wiring and controls, all as hereinafter specified and or excessive air movements within the ventilation of air-conditioned spaces. Any air distribution accessories 1. Heating, ventilating and central air conditioning systems including, but not limited to, heating and 1. All warranties, guarantees and manufacturer's directions on equipment and materials covered by the connections or the suspension system furnished for suspended ceilings. scheduled. Units shall be ARi certified. All parts of the unit shall be contained in a single casing which required to effect these conditions shall be furnished and installed as part of the supply unit by this cooling units, complete duct system including grilles, registers and diffusers, insulation, accessories, Contract including operating instructions and recommended mainennce and seasonal changeovershall be weather proof, constructed of galvanized steel or equivalent corrosion proof material. Casing shall contractor. temperature control systems and the installation of exhaust and ventilation units furnished by the owner. procedures. B. All hangers shall be property sized to fit the pipe or the insulation around the pipe which they ore be complete with adequate removable panels for access to all internal parts. Access panels to filter rack _WJ1V supporting. All hangers shall bear the name of the manufacturer by whom they are made. Pipe hangers shall be properly Basketed and shall be removable without the use of tools. B. The noise spectrum of the supply units shall not exceed N.C. - 35 as defined in the latest issue of 1.03 FEES AND PERMITS 2. Copies of approved shop drawings. shall be formed steel clevis type hanger with adjustable attachment to hanger rod. Hangers shall be ASHRAE Guide. Units causing excessive air movement, drafts or objectionable noise shall be replaced as D E V i T A properly sized to support weight of piping under operating conditions as recommended in the B. The equipment shall be shipped completely assembled, pre-charged, piped and wired internally, ready part of the Contract. All devices shall be furnished with prime coat finish for final painting under another & A. The contractor shall obtain all permits, inspections and approvals applicable to his trade and required 3. An and all other data and/or drawings required during constructions. manufacturer's published literature. For un-insulated copper or brasspiping, use has hangers as specified for field connections. Unit shall be furnished with roof mounting frame and shall properly mate to the section of the work unless noted otherwise). ASSOCIATES C I A T E b regulatory authorities. All fees and costs of an nature whatsoever incidental to these permits, y / g q g P PP 9 P ( S S Y g ry Y P above except that they shall be copper plated or plastic sheathed wherever they will be in contact with bottom perimeter of the equipment. When flashed into the roof, it shall make a level unit mounting curb inspections and approvals shall be paid by the contractor as part of his Base Contract. Part 3 Execution the copper pipe. and provide weather-proof duct connection into the conditioned area. Unit shall be arranged for bottom I N C pp p p 9 C. DARDEN has classified Titus products as "Building Standard". This classification implies that Titus discharge. products will be used where feasible. Any substitutions must be approved by DARDEN prior to use. For 1.04 RESPONSIBILITY OF THE CONTRACTOR 3.01 EXAMINATION OF PREMISES C. Hangers shall be fastened to the construction by the use of malleable iron adjustable clamps, properly information on pricing and delivery of specified Titus products, call the local Titus representative in your DA I PROJECT 11005-09 designed and sized for steel encountered and be installed with lock nuts or bolts securely tightened. C. The unit shall contain hermetic compressors with crank case heaters and internal spring vibration area. Contractors must identify this project by Restaurant name and model number in order to receive PQ Box 1596 GREENVILLE, SC A The contractor shall be responsible for all work of every description in connection with his contract. He A. Before submittingproposals for his work each bidder shall be held to have examined the remises and Hangers, rollers, inserts, and beam clams shall be standard products of the some recognized isolators and automatically reversible oil pump. The coil shall be of non-ferrous construction with shall specifically and distinct) assume, and does so assume, all ask for damage or injury from whatever P P P g P P g DARDEN s National Account discount pricing. If the local representative is unknown, call Dirk Erfle at Titus P Y Y g } ry satisfied himself as to the existingconditions under which he will be obliged to operate, or that will in manufacturer. aluminum fins mechanicalty bonded to copper tubes. The condenser coil shall be protected from damage cause to property or person used or employed on or in connection with this work and of all damage or g P b metal grille. The evaporator (214-699- 1030). injury to an persons or roe wherever located, resulting from an action or operation under the any moaner affect the work under this Contract. No allowance shall be made subsequently in this y q p ator fart shall be of separate motor from the condenser fan motor, and shall 1 ry Y P property 9 Y P connection in behalf of the contractor for an error or negligence on his art. D. Miscellaneous steel necessary for supporting the pipe work. Necessary trapeze, rods, bolts and have adjustable motor pulley. Fan shall have been statically and dynamically balanced at the factory. DESIGNED BY: EKB contract or in connection with the work, and undertake the promise to defend the General Contractor YP ry PP g P P ry P D. Supply Grilles: Where supplies are noted or required, they shat! be grilles of the proper type as contract nst all claims resulting from any such damage or injury. accessories, clamps, weld clips, angle iron brackets or other approved means shall be used for attaching Compressor shall be furnished with a five year manufacturers extended parts warranty. hereinafter scheduled with the addition of factory installed key operated opposed blade dampers. CHECKED BY: TPM 3.02 SPACE AND EQUIPMENT ARRANGEMENT supporting steel to the building construction. Where additional steel members are required for hanging the lines in areas with special conditions, the steelwork shall be provided as part of the general contract. D. The heat exchanger shall be of sectionalized design and construction of steel, with a fused ceramic E. Gaskets: Flanges of all diffusers, registers and grilles shall be asketed with foam rubber gaskets to B. The contractor will be held responsible for the execution of a satisfactory and complete piece of work, A. The contractor shall be responsible to see that equipment proposed by him will fit the spaces available. metal coating, or aluminized steel construction. Burner shall be of the slotted port type and readily a g g g in accordance with the true intent of the drawings and specifications and all bulletins and addenda which prevent leaking and smudging. In certain instances he will nate that the equipment is mentioned by name in the equipment schedules. In E. On steel, plastic and copper piping, there shall be a hanger within two feet of each elbow or tee. accessible. The pilot burner shall be constructed of stainless steel. The heating control shall consist of a may be issued during the time of bidding. He shall provide, without extra charge, all incidental items these cases it is the equipment whose dimensions and connection arrangements have been used for the Additional supports shall be provided for valves, strainers, and other equipment in the pipeline. hand gas valve in addition to low voltage transformer limit switch, automatic gas valve, gas pressure O PR required r art of his work, even though not articular) specified d indicated, and if he has good of the layouts shown on the working drawings. Should the use of equipment b other approved g pilot igniter which is Part 3 Execution ��� F q P 9 P Y P 9 preparation y g 9 • y PP switch and line voltage fan switch. The unit shall have an automatic electric r g ' reason for objecting to the use of any material, appliance or method of construction as shown orphysical P g proposed, g g p y g p system shall be U.L and 3.01 SHEETMETAL DUCTWORK manufacturers or of other h sical sha a than those shown on the drawings be ro ased, it shall be the 2.02 SLEEVES protected during low as pressure b a as pressure switch. The entire control specified, he shall make report of such objections to the Owners Representative, and obtain proper responsibility of the contractor making theproposal to submit for nova! shop drawings showing the AGA approved. a`` 9 -v adjustment before the Contract is made, and shall proceed with the work, only with the understanding P ty g pp P g g r arrangement of the proposed equipment in the s ace available. Approval of substitution offered without A. Each and eve pipe, regardless of material, which posses through a mason wall, roof or other 80427PE that a satisfactoryjob is required. g P PP APP every P P e9 P 9 masonry A. Supply, return and exhaust duct systems shall be constructed and installed as shown and hereinafter 1 q these shop drawings does not relieve the contractor of the responsibility of arranging the equipment in a portion of the building structure shall be free from the structure and shall pass through a sleeve. E. Unit shall also be provided with 2 sets of two inch thick disposable air filters as required to filter all specified. Systems shall be complete including materials, fabrication, installation and connection to grilles, OREGON satisfactory workable installation in the space shown on the drawings. 0ir• diffusers, fans and other equipment. All ductwork and associated appurtenances shall be fabricated of 1.05 DRAWINGS AND SPECIFICATIONS B. All sleeves shall be constructed from 20 gauge galvanized steel or approved substitute and shall be standard galvanized steel sheets or aluminum base allo sheets having not more than 0.40% copper of � v9ti �0N� �, 3.03 MANUFACTURER'S DIRECTIONS flush on both sides of the surface penetrated. The sleeves shall be sized to allow free passage of the F. The controls of the system shall be contained within the unit and shall be factory wired. The cooling g y g PP SO -?3. ` � A The interrelation of the specifications, drawings and schedules shall be as hereinbefore described in the the minimum gauges recommended by SMACNA Where local codes require heavier gauges than specified, M P P 9 pipe to be inserted and when this pipe is to be insulated, the sleeve shall be large enough to pass the , system shall be protected by a high and low pressure control, compressor motor overload device and S P �0P� �' Z 1k, Architectural sections of the specifications. they shall be furnished. All construction details shall be in accordance with the applicable sections of the P A. The manufacturer's published directions shall be followed in the delivery, storage, protection, installation insulation. After the pipes have been installed in the sleeves, the void space around the pipe shall be timing device which will not permit the compressor to be subjected to starting current more often than " e s p ec ry, g , p standard practice manuals as published by the Sheet Metal and Air Conditioning Contractors National caulked with suitable non-hardening caulking compound or fireproof fiber. once every five minutes. Multi-compressor and multi-condenser fan units shall have multi-stage low " EXPIRES 32.31;2012 0 B. Should the drawings disagree in themselves, or with the specifications, the better quality or greater piping and wiring of all equipment and material. The contractor shall promptly notify the Owners ambient control to 32'F. Association, Inc.". 0 quantity of work or materials shall be estimated upon, and unless otherwise ordered by the Architect in Representative in writing of any conflict between the requirements of the Contract Documents and the 2.03 FLOOR AND CEILING PLATES M writing, shall be performed or furnished. In case the specifications should not fully agree with the manufacturer's directions, and shall obtain instructions before proceeding with the work. Should the G. The frame shall be welded construction and the casingshall be of galvanized panels with baked on B. Installation shall be made in a neat and workmanlike manner, with all joints and seams adequately is schedules, the latter shall govern. Figures given on drawings govern scale measurements and large-scale contractor perform any work before receiving such instructions, he shall bear all costs arising in g fastened and sealed to make a tight air duct system and in general with the bottom of the duct system rn A. In each finished space, install a chromium plated sectional escutcheon on each pipe or hanger rod outdoor acrylic finish. The entire cabinet shall be insulated with not less than 1 inch thick fiberglass m details govern small-scale drawings. connection with the deficiencies. penetrating a wall, floor or ceiling. Escutcheons shall be sized to fit snugly to all lines and where the 'insulation or equivalent thick polystyrene. kept level and held as high as possible against the building construction. C: lines are insulated, the escutcheons shall be fit snugly over the insulation. Where required, these plates C. The 'Scope of Work* as hereinbefore stated, is intended to designate the general description of the 3,04 CUTTING AND PATCHING C. Rectangular ductwork shall be constructed using Pittsburgh lock or snap lock seam on all longitudinal ±:: P 9 9 P shall be provided with setscrews so that they shall fit snugly against the finished surface. H. CPI shall furnish the HVAC control panel as part of the overall CPI package. CPI shall also furnish joints. Traverse joints shall be made as scheduled in the SMACNA Guide in accordance with duct :3 work which shall be performed by each of the major contractors. It is not intended to include all items remote temperature sensors to be installed and field wired by the contractor. U) of work, either generally or specifically, nor is it intended to limit the scope of work where Tans, A. The contractor shall notify the General Contractor sufficiently ahead of the construction of any floors, dimension. Elbows, tees, and splits shall be constructed with square turns and/or radius turns which shalt 9 IYP P 2.04 VALVES AND COCKS have a radius 1-1 2 times the width of the duct as an absolute minimum. If square turns are used the _ schedules, notes or standard practice requires the inclusion of other specific items. walls, ceilings, roofs, etc, of the openings that will be required for his work. He shall also see that any E. Provide manufactures extended 5 year compressor warranty. / q and all sleeves that are required for his work are set at proper times so as not to hold up the progress contractor shall fabricate and install turnip vanes in each turn. Where reduction in sizes of ducts are 0 3 A. Valves and cocks shall be furnished and installed in all branches serving more than one piece of 9 C D. When the drawings do not give exact details as to the elevations or pipe, conduit and ducts, the of the job. Any cutting and patching required to be done because of lack of proper coordination sholl be equipment such as pumps, tanks, coils, etc., for shut-off of branch mains, eliminating the necessity of J. Approved Manufacturer: Trone constructed, the reduction shall be gradual with a slope of approximately 15'. Where ducts swallow pipes 0 contractors shall physically arrange the systems to fit in the space available at the elevations intended done by the General Contractor at the expense of the contractors involved. P P g ty or conduit, construct a streamline fitting in the form of a teardrop around the conduit or pipe. P Y Y g Y P interrupting service to an entire system for maintenance purposes and where indicated. Valves shall be 9 P P P N with the proper grades for the functioning of the systems involved. Piping, exposed conduit and the duct installed with the best of workmanship and appearance and grouping so that all parts are easily K. Contact for pricing information: E systems shall be coordinated with the building construction, and located as high as possible against the B. Do not request the General Contractor to cut any structural members without first having received Trane Com an D. Acoustical linin of low-pressure ductwork shall be of the flexible type and shall have a combustibility L accessible. Manufacturers figure numbers are specified to indicate type and quality and construction and P Y 9 P YP ty a) structure in a neat and workmanlike manner. Work shall be concealed in all finished areas unless written permission from the Owners Representative. Cutting of round openings which can be done by the products of approved manufacturers may be substituted for those specified numbers shown. Valves for 1151 North Keller Rd. rating as hereinbefore specified. It shall be fibrous glass base material, (antimildew), one-inch thickness, C'? 0. otherwise noted. use of a rotary drill may be done by the contractor requiring some. similar service shall be of the same manufacturer. Pressure rating specified for valves are steam working Orlando, Florida 32810 and shall have a sound absorption coefficient of .58 in the third octave band. It shall be secured to the RA C pressure regardless of the services for which used except where noted as WWP. (No gate valves are to Attn: Chris St. John interior surface of the ducts by gluing into place with a fire retardant adhesive as recommended by the � A 1.06 FINAL INSPECTIONS 3.05 ELECTRICAL ENERGY, WATER AND SANITARY FACILITIES be installed.} 407-660-1111 manufacturer and subsequently secured with approved mechanical fasteners approximately 12 inches on 9) 3 centers in both directions, with all joints sealed and made vapor tight. All dimensions shown on drawings oo 4. A. The purpose of the final inspection is to determine whether the contractor has completed the work in A. Electrical energy, water and sanitary facilities required for the construction of this project shall be Part 3 Execution are those clear dimensions inside the lined duct. All return air ductwork and the supply air ductwork Op � B. Sizes: rovide a herein f r e ified un h Architectural cions of h work exce t as f Mows. All 0 a proper and workmanlike manner, that he has apparently installed the work in accordance with the intent p d s be o e specified c der t e set t e p o through the first elbow shall be lined as herein specified, at contractors option, all supply and return _JJ of the drawings and specifications and that, in the Owner's Representative's opinion, the work is electrical energy required for welding shall be provided by the contractor doing the welding in the form of * 3.01 INSTALLATION OF EQUIPMENT ductwork may be lined in lieu of insulation hereinafter specified. M00 =3 satisfactory for acceptance. portable gasoline power generators as allowed by local codes and regulations. 2-1 2 and Smaller Ball NE$CO #S-585 for sweat solder or A All air conditioning and heating equipment shall be set in lace, leveled and connected as indicated on E. A flexible connection shall be installed between sheet metal ducts and the supply side and return ''' 9 9P PP Y (, B. It shall be the duty of each contractor to personally make the special inspection trip as a whole, 3.06 ELECTRIC WIRING OF MOTORS AND EQUIPMENT Valve NEBCO #T-585 for threaded the drawings. All equipment shall be properly protected from damage during storage and construction and connection of each piece of air handling equipment. Flexible connections shall be fabricated of a heavy � o assuring himself that the work on the project is ready for final inspection. shall be thoroughly cleaned and factory applied paint touched up where scratched or otherwise damaged, glass fabric double coated with neoprene. The fabric shall be absolutely waterproof, air tight, C) o a A. The Electrical Contractor shall furnish and install all wiring for the installation of equipment furnished Globe 300# Crone Co. 17 prior to final acceptance. noncombustible, fire retardant and shall be resistant to acids, alkaline, gasoline, and grease. A minimum W C. Before making the final inspection, the Owner's Representative must have received the following under other sections of the work. The Electrical Contractor shall furnish all disconnect switches as required Valves BB, Union Bonnet of 4 inches in the direction of airflow shall be used at each point of connection, shall be carried around &_t a documents or evidence that they will be available at the time of inspection: for the proper operation of the equipment unless such equipment is specified to be factory mounted. B. Installation procedures shall be in strict accordance with manufacturer's published instructions and the the perimeter of the duct and fan unit, and shall have a sheet metal band on the exterior with clinching p, Check 125# Crane Co. #34 contract documents as hereinbefore specified. Contractor shall furnish all required valves, unions, supports bolts. Flexible connections exposed to the exterior shall be protected from the sun by installing a 24 9:1C 1. Certificates of acceptance from local inspecting authorities. B. The contractor shall note that the electrical design and drawings are based on the equipment Valves BB, Screwed and other required miscellaneous devices. gauge galvanized steel cover all around. The cover shall overlap the flexible connection by 1', it shall be •. cls scheduled and shown on the drawings, should any contractor submit for approval equipment requiring secured to the AHU/RTU side only and not short circuit the AHU/RTU vibration to the ductwork. changes to the electrical design for which the Electrical Contractor will request and extra, this extra shall Bafl Nibco C. Roofto 0 2. The letter of compliance from the Mechanical and Electrical Contractors. p curbs for rooftop equipment are to be set on top of a double 2x nailer. The rooftop curbs A " " be paid by the contractor providing the equipment requiring the change. Valves 585-70 are not to be set directly upon the roof deck. F. Flexible ducts may be used to make connections between duct systems and ceiling diffusers, in lay-in � 0 = 3. All dote called for in the Records for Owner article of this section of the specifications. 3,07 QUIET OPERATION acoustical ceilings. Duct shall be constructed of a fire retardant, non-combustible fabric with smooth inn, C. Gas Cocks: 3.02 AIR CONDITIONING UNiT DRAIN PIPING interior surfaces wound around a spiral wire form and insulated with 1 inch fiberglass vapor sealed. Flexible duct shall be secured to the sheet metal duct and to the device which they are serving by 1.07 GUARANTEE A. This work shall be installed in such a manner that under all conditions of load it shall operate without 1/4 inch to 1 inch inclusive, Crane Co. #289 A. Air conditioning unit drain piping and other miscellaneous small drain piping shall be fabricated from applying MMM-£M-800 compound to the mate end of each pipe, slipping the flexible duct on and �n A. All materials, equipment and workmanship shall be guaranteed for period of one year from the date sound or vibration which is objectionable in the occupied spaces in the opinion of the Owners 1-1 4 inch to 2 inches inclusive, Crane Co. #272 either Schedule 40 galvanized steel pipe or type "M" hard tempered copper. All piping shall be connected securing in place with an external metal band. Tap into duct shall be made with factory fabricated metal 9 P Y / P P PP PP9 Representative. In the cas f m vin machin sa sound or vibration annoyinglyn noticeable inside its own de o moving cry, u of � of acceptance of this project, except that where specific equipment is noted to have extended guarantees, 2-1/2 inches to 4 inches inclusive, Crane Co. #324 using drainage pattern fittings providing cleanouts at each change in direction. thimble with damper and locking quadrant. Flexible duct connections shall not be more than four feet in O J the contractor shall be responsible for the proper registration of these guarantees so that the Owner can room can be considered as objectionable. length, nor have an accumulated turn of more than 90'. W make all proper claims should future needs develop. All work found to be defective shall be repaired or D. Hose Bibbs: (with vacuum breaker) 3.03 VIBRATION ISOLATION t replaced b the contractor without an charge to the Owner. END OF SECTION G. All ductwork, both horizontal and vertical shall be property and secure) supported from the building P Y Y 9 Hose Bibbs -See Plumbing Plans for type and specification. P P Y Y PP 9 A. All equipment under this section of the work shall be installed in such a manner that under all structural system. Attachment to building structure shall be as specified. Rectangular ductwork depending Part 2 Products I E. Tempering valves shall be Leonard Model 110-AF Series. conditions of load it shall operate without sound of operation which is objectionable in the occupied on width shall either be supported on galvanized steel band iron secured to construction with a single 2spaces in the opinion of the Architect. Fans, compressors, and other similar equipment shall be properly hanger strap and fastened to the vertical sides of rectangular ducts with three or more sheet metal < 2.01 MATERIALS F. Approved Manufacturers: Crane Co., Hammond, Jenkins, Keystone, Lawler, Lukenheimer, Nibco, Norris, vibration isolated within the manufacturer unit system and all units shall be mounted on isolation pads so screws or supported on angle iron trapeze supported from the structure with two hanger rods depending CL Speakman, Stockham, Symmons, Walworth, and Watts, as to prevent metol to metal contact between equipment and building structure. on width as outlined in SMACNA manual. 0 A. Materials utilized in the construction of this building shall be new, and of the quality indicated and, p unless otherwise noted, be manufactured in the United States of America. Manufacturers' names are Part 3 Execution 3,04 KiTCHEN HOOD EQUIPMENT AND EXHAUST FANS H. Fire and smoke dampers shall be installed where indicated and where required by applicable codes. All Issue Date: 3-23-2012 >. mentioned herein. Products by the named manufacturers have proved to be satisfactory under similar fire and smoke dampers shall be constructed in strict accordance with the requirements of the National conditions of service. 3.01 SCAFFOLDING, RIGGING AND HOISTING A. Kitchen hoods, the hood fire suppression systems, kitchen supply, exhaust, make-up air heaters and Fire Protection Association, Bulletin No. 9, and furnished complete with a suitable Underwriters' approved REVISION INFORMATION atoilet exhaust fans all complete with roof mounting curbs, back draft dampers and starters where required thermal element and/or smoke sensing element and control with required electric service. All factory CL B. Where a manufacturer's name appears in the specifications, it is not to be construed to mean that A. Each contractor shall furnish all scaffolding as required for the installation of his work. He shall either shall be provided by the owner (GMRI, Inc.) and installed by this contractor. The contractor shall set all fabricated dampers shall bear applicable U.L labels. The Heating, Ventilating and Air Conditioning 0 equipment by the named manufacturer does not have to fully meet the requirements detailed in the arrange with the contractor for servicing in connection with any rigging and hoisting required or provide fans, hang the hoods, and install all interconnecting ductwork and accessories for proper operation as Contractor shall furnish and install a proper access door in the ductwork for access to and resetting of specifications. All similar equipment provided for the project by any one contractor shall be of the some his own equipment to hoist apparatus to be installed by him into place. Each contractor shall see that required by code and recommended by the hood manufacturer for proper operation of the systems. The the dampers. This contractor shall also famish an access door as specified in the Supplementary 2 manufacturer whether furnished under the original contractor or under a change order, unless specifically any equipment too large to permit passable through normal doorways and access ways is brought to the fire suppression system (supplied with the hoods) shall be installed complete with mechanical and Mechanical and Electrical General Conditions for installation by the General Contractor where necessary for CU specified to the contrary. job not delivered in this manner shall be disassembled and reassembled in the proper location. Equipment electrical gas valves for each riser and remote manual pull release stations. access to the fire and smoke damper through furring or ceiling spaces. 0 specified to be factory assembled and tested prior to shipment shall not be disassembled for installation C C. No substitutions shall be allowed without written approval from the Darden Restaurants Project Manager. into the building. B. The kitchen hood equipment shall be manufactured by Captive-Aire Systems, inc. Contact Steve Luddy I. Grille and outlet connections to the duct system shall be constructed in box form which shall be '3 at (407)682-3100 or FAX (407)682-2820 for information. secured to the duct with a clinch joint and shall extend through the ceiling and/or wall. Do not cut a 2- 2.02 CODES AND STANDARDS 3.03 JOINING OF PIPING SYSTEMS seam or joint in duct for grille boxes. Sidewall grille boxes shall have a flanged face flush with the 0 3.05 FOOD SERVICE EQUIPMENT REFRIGERATION finished wall, not less than 3/4-inch border. For ceiling outlets, extend tap through the ceiling for (D A. All materials and workmanship shall comply with all applicable focal, county, state and national codes, A. Plastic piping systems, PVC, polyethylene, ABS, or polypropylene shall be jointed by the use of socket connection to the outlet. The maximum dimension of the grille and/or outlet box shall determine the 0 specifications, ordinances, utility company regulations and specified industry standards. type plastic fittings of the same material with either solvent cement and/or heat of fusion type joints. All A. The contractor is to set all refrigeration compressors for the food service equipment. He is to run the gauge of the metal in the schedule for duct sizes. In each side wall grille box, furnish and install a fixed H piping shall be cut smooth and square, all burrs removed, and all surfaces property cleaned. Solvent refrigerant piping and supply the proper refrigerant charges. louver capable of equalizing the air distribution across the face of the grille. B. In case of a difference between building codes, specifications, state lows, local ordinances, industry cement shall be of the type recommended by the pipe manufacturer and all procedures shall be in = standards, utility company regulations and the Contract Documents, the most stringent shall govern. The accordance with manufacturer's published directions. 3.06 REFRIGERANT PIPING AND ACCESSORIES J. Range hood exhaust ductwork shall be fabricated and installed in full accordance with the requirements i contractor shall promptly notify the Owner's Representative in writing of any such differences. Should the of NFPA Bulletin 96. Ductwork shall be fabricated of 16 gauge minimum thickness, black steel with all a contractor perform any work that does not comply with the requirements of the applicable building codes, 3.04 VIBRATION ISOLATION A. Refrerant piping and connections shall be made with Type "K" hard drawn copper tubing, specially joints welded. Duct shall be properly attached to exhaust hoods and fans. Required clean-out access > 0 state lows, local ordinances, industry standards, utility company regulations, he shall bear all costs arising cleaned and sealed for refrigerant service, recessed solder joint fittings of wrought copper, assembled with doors shall be installed in the vertical face of the ductwork. Only opposed blade dampers may be used in 4 U in correcting these deficiencies. A. Transmission of vibration or structural bom noise to occupied areas of equipment installed under this siffos in an atmosphere of dry nitrogen using no flux. kitchen make-up air ductwork requiring balancing. ? contractor will not be permitted. Contractor shall furnish for approval, data showing disturbing frequency, C. In addition to the local, county, and state ordinances, the utility company regulations, the following supported weight, static deflection, efficiency and calculations supporting some for each isolator he B. Stop valves shall be of back seating key operated seal cap type except hose which must be closed or K. Ductwork for dishwasher exhaust shall be fabricated as hereinbefore specified for rectangular low industry standards and codes shall apply as applicable, except that where the requirements of this proposes to use. Equipment shall be manufactured by Amber Booth, Korfund, Mason Industries, Vibration opened during normal operation of the system, which shall have hand wheels and shall be of the pack pressure work, except that ducts shall be fabricated from equivalent thickness stainless steel sheets 3 specification are more stringent then the following standards, they shall take precedence: Eliminator, Vibration Mountings, or Consolidated Kinetics Corporation. less type. fabricated as hereinbefore specified for range hood exhaust ducts. All ductwork shall be properly pitched to drain to the hood connection and all joints shall be sealed to prevent leaking. Duct shall comply with AGA - American Gas Association B. All isolators shall be selected and certified, using published data, to limit vibration transmission to 10% C. Refrigerant strainers shall be of the angle type, cleanable without disturbing piping connections, requirements of NFPA Bulletin #96. r AIEE - Ame6con Institute of Electrical Engineers for equipment located on floors in direct contact with grade and 5% for equipment located other than the constructed of brass with solder joint connections. Screen shall be constructed of monel with perforations AMCA - Air Moving and Conditioning Association above. Should any noise or vibrations be objectionable as determined by the Owner's Representative, filed not to exceed 0.41 inch and free area not less than 5 times the area of inlet pipe. END OF SECTION , ASA - American Standard Association instrumentation tests and measurements shall be made by the isolator manufacturer or his representative Restaurant#: 0457 14 ASHRAE - American Society of Heating, Refrigeration and Air Conditioning Engineers to determine the source and cause of such disturbance. Any noncompliance with these specifications shall D. Refrigerant filter-dryer shall be of the straight type with permanent cartridges. Dryers shall have brass 3 ASME American Society of Mechanical Engineers be corrected by the contractor in a manner satisfactory to the Owners Representative at no additional bodies and solder joint connections. Cartridges shall be capable of removing moisture and acids and filter Z ASTM - American Society of Testing Materials cost. foreign matter. 4 AWWA - American Water Works Association RED LOBSTER 457 '' IES - Illuminating Engineering Society END OF SECTION E. Expansion valves shall be of the thermal, gas charged type with external equalizer connections, external 9 NEC - National Electrical Code super heat adjustments with seal caps, solder joint or flanged connections, capable to move from fully RENOVATION NEMA -National Electrical Manufacturers Association closed to fully opened, with 4o super heat change. Super heat setting shall be 10' at full load. 3 NFPA - National Fire Protection Association 5. SMACNA - Sheet Metal and Air Conditioning Contractor National Association F. Solenoid valves shall be selected for a pressure drop not to exceed #2 per square inch pressure drop. 21 UL - Underwriters' Laboratories Valves with port area 5/32 inch and smaller shall be directed acting type. Above 5/32 inch port area, c .I valves shall be pilot operated and floating piston type. Connections shall be solder joint or flanged with 1 0330 2.03 SUBMITTAL DATA manual lift stem. 11 SOUTHWEST D A The submittal data shall be handled as hereinbefore specified in the "General Conditions' section of G. Combination moisture and liquid indications shall be installed between the expansion valve and solenoid 6 these specifications as specified for "Shop Drawings'. valve and shall be provided with seal caps with solder joints connections. Liquid indicators only shall be G RE E N B U RG ROAD a installed as indicated on drawings. B. Before submittal of all data, the contractor shall check each piece of apparatus, equipment and 9, accessory to insure compliance with requirements of the plans and specifications and shall clearly mark H. Approved Manufacturers: Alco, Henry, Metrex, Mueller Brass, and Spartan. i each submittal with his signature to indicate that they are in full compliance. Any submittals received 3 without thr. e contractor's signature may be returned without being checked. It shall be the contractor's 3.07 REFRIGERANT AND OIL T GAR D OR responsibility to point out all deviations between the plans and specifications and the materials submitted. n A The Contractor shall furnish for each of the new machines and each of the relocated refrigeration , a`� C. Each set of data from any one manufacturer shall be bound in an individual folder properly indexed machines an adequate supply of refrigerant and oil, shall guarantee to maintain refrigerant and oil in the I and marked to indicate job, contractor, supplier and purpose for which data enclosed is being offered. system in proper quantities for one year from the date of acceptance by the Engineer for the Owner. 3j Data submitted shall show proposed equipment only and shall not be catalogues showing a manufacturer's MECHANICAL � complete fine. Each sheet shall indicate the name of manufacturer of the equipment being submitted. B. At the end of one years operation, an inspection of the system shall be made. At that time the ASufficient data shall be included to prove compliance with the specifications as far as use, capacity, refrigerant charge shall be brought up to the full charge, ail shall be brought to full charge, labor and SPECIFICATIONS 3 efficiencies, physical size, quality of materials and all other pertinent specified particulars. material costs involved shall be home by the Contractor. Any refrigerant and oil used during the one year period from the date of acceptance to the dote of inspection, shall be furnished free of charge by the 0 2.04 SHOP DRAWINGS Contractor for both labor and material, provided the loss of refrigerant has not been due to the misuse T of equipment. A. The contractor shall submit shop drawings whenever equipment proposed varies in physical size and I requires rearrangement of equipment space; where tight spaces require extreme coordination between END OF SECTION 0 ductwork, piping, and other equipment; where called for elsewhere in these specifications; and where E specifically requested by the Owner's Representative. Shop drawings shall be made at no additional charge. E B. All required shop drawings, except as hereinafter specified, shall be prepared at a scale of not less rl than 1/4 inch equals on one foot by the contractor. He shall submit prints as hereinbefore described under "Submittal Data'. ACS1 w r, a SECTION 15080 SECTION 15090 SECTION 15782 SECTION 15782 TESTING, ADJUSTING AND BALANCING COVERING AND INSULATION PACKAGED ROOFTOP AIR CONDITIONING UMTS PACKAGED ROOFTOP AIR CONDITIONING UNITS Part 1 General Part 1 General Part 1 General 2.09 ELECTRICAL 1.01 SPECIAL NOTICE 1.01 SPECIAL NOTICE 1.01 RELATED DOCUMENTS A. Furnish each unit with factory mounted fusible NEMA 3R weatherproof disconnect switch, short circuit protection of all electrical components and all necessary motor starter, contactor and overcurrent A. The contractor shall read all relevant documents, become familiar with the job, scope of work, type of A. The contractor shall read all relevant documents, become familiar with the job, scope of work, type of A. Drawings and general provisions of Contract, including General and Supplementary Conditions and protection. general construction, and the architectural, structural, mechanical and electrical drawings and specifications. general construction, and the architectural, structural, mechanical and electrical drawings and specifications. Division 1 Specification sections, apply to work specified in this section. Each contractor shall also familiarize himself with the purpose for which these documents have been Each contractor shall also familiarize himself with the purpose for which these documents have been B. Furnish each unit with factory mounted non-fused disconnect switch, short circuit protection of all prepared and shall become cognizant of all the details involved. Each contractor shall coordinate his work prepared and shall become cognizant of all the details involved. Each contractor shall coordinate his work 1,02 RELATED WORK electrical components and all necessary motor starters, contactors and overcurrent protection. with that of others. with that of others. A. Motor Requirements: Refer to Section 15010. C. Each unit to include low voltage control transformer and convenience outlet. B. The term 'contractor' used in this section of the specification shall mean the contractor whose work is B. The term "contractor" used in this section of the specification shall mean the contractor whose work is covered by this section. covered by this section. 1.03 QUALITY ASSURANCE D. Units shall have single point electrical connection. C. When the term 'Engineer' is used in this section of the specification, it shall mean the consulting C. When the term 'Engineer' is used in this section of the specification, it shall mean the consulting A. Substitution of materials: Refer to Section 00700 -General Conditions. E. Voltages shall be as scheduled. Motor horsepower shall accommodate CFM/SP requirements. mechanical engineer. mechanical engineer. 1.04 SUBMITTALS (NO SUBSTITUTIONS ACCEPTED) F. Factory installed duct mounted smoke detectors (by Division 15000) located in the return and supply 1.02 START-UP, TEST AND ADJUSTMENT Part 2 Products ducts shall be wired by Division 16. These units shall be System Sensor Model #DH100ACDCP. The Fire A. Submit shop drawings for all equipment as herein specified. Alarm Contractor shall connect the power, alarm and trouble outputs of these devices to the fire alarm A. The purpose of starting, testing and adjusting this equipment is to put it into final operating condition 2.01 AiR DISTRIBUTION DUCTWORK system via conduit extending from the unit to the FACP. The conduit shall be provided by Division 16000. for the Owner's use and benefit. All tests of equipment and systems required to prove compliance with B. Shop drawings to be complete and shall include data concerning dimensions, weights, capacities, the drawings and specifications shall be performed in the presence of the Owner's Representative. Owner's A. All air-conditioning supply ductwork (except that portion specified or indicated to be acoustically lined) materials of construction, ratings, fan curves, vibration isolation, complete power and control wiring 1. Prior to submitting shop drawings, verify exact locations of duct detectors with the local inspector. If Representative shall be made completely familiar with the complete working of all the mechanical systems. shall be insulated as hereinafter specified with 2-inch thick insulation material. diagrams and appropriate identification. the authority (inspector) determines that the duct detectors are to be installed in the ductwork rather 1.05 DESIGN CRITERIA than the A/C unit, notify the A/C unit manufacturer to provide but do not install the detectors in the B. The General Contractor will be responsible for the HVAC Test and Balance, which must be performed by B. All duct systems hereinbefore specified to be insulated shall be insulated with 3/4 Ib density fibrous unit. Field install the smoke detectors in the ductwork at the locations determined by the local inspector. Melink Corporation National Accounts, Cincinnati, OH. Contact Melink directly at (513) 271-1615 for pricing glass blanket insulation, factory faced with flame resistant fiberglass reinforced aluminum foil faced Kraft and scheduling (Substitutions are not accepted). paper. Install Duct Wrap Insulation with facing outside so that tape flop overlaps insulation and facing at A Design units specifically far outside rooftop application. 2. Upon a general alarm signal from the fire alarm control panel, all air handling units (as scheduled) other end of piece of Duct Wrap. Insulation shall be tightly butted. if ducts are rectangular or square, B. shall be shut down via fan shutdown relays provided by the fire alarm contractor. Connect between these C. The General Contractor shall schedule a tentative T & 8 date with Melink a minimum of 4 weeks in install so insulation is not excessive) compressed at duct comers. Seams shall be stapled approximately re Units to be completely factory assembled and run tested, piped, internally wired, fully charged with Y P P PP Y refrigerant and compressor oil when specified and shipped in one piece. relays and air handling equipment. D E V I T A & advance, and call in a confirmed date a minimum of 2 weeks in advance. This will be necessary to 6 on center with outward clinching staples, then sealed with pressure-sensitive tape matching the facing. A a C I A T E S guarantee the T & B work on the requested data. 3. The fire alarm contractor shall supply and install compatible test reset stations, Model RTS451. C. Where rectangular ducts are 24' in width or greater, Duct Wrap Insulation shall be additionally secured C. All V-belt drives shall be designed for 150 of motor rating. PP y P / # D. This work shall be erformed after the HVAC em start-up is completed. Also as and electric I N C P P P 9 to the bottom of the duct with mechanical fasteners such as pins and speed clip washers, spaced on 18' D. All insulation and liners to meet NFPA 90A requirements. G. Upon completion of the HVAC system and the fire alarm system, thoroughly clean all smoke detectors power must be turned on, cooking equipment operational, all doors and windows installed, and ceiling tiles centers (maximum) to prevent sagging of insulation. Adjacent sections of Duct Wrap Insulation shall be and associated hardware to assure false alarm free operation of smoke detectors. DAI PROJECT: 11005-09 in place - prior to the Test and Air Balance. tightly butted with the 2' tae fly overlapping. Seal all tears, unctures, and other penetrations of the E. All electrical components to be UL listed. 9 Y P PP P P PO Box 1596 GREENVII_LE, SG E. The T&B covers all heating and air-conditioning, and exhaust ventilation systems. A certified report Duct Wrap Insulation 2.10 UNIT CONTROLS shall be submitted to the General Contractor and a co to DARD£N within 2 weeks of completions. facing with tape or mastic to provide a vapor tight system. 1.06 OPERATION AND MAINTENANCE DATA PY P A. Provide all temperature control and interlocking devices necessary to perform the specified control 2.02 RANGE EXHAUST DUCT A. Furnish to the Owner four 4 sets of Operation and Maintenance Manuals. sequence. DESIGNED BY: EKB F. In jurisdictions where the Health or Mechanical inspector test the hoods, the General Contractor shall O P notify Melink and attempt to schedule the T&B date concurrently with the inspector's visit - to ensure A. The kitchen range hood exhaust duct shall be insulated with 2-inch thick, U.L approved, rigid a B. Space thermostat mounted in office with remote sensor to provide staged heating, cooling, automatic CHECKED BY: TPM there are no questions or problems. Also, if the certified report is needed by the inspector sooner than 9 he 9 type B. Indicate unit model numbers, serial numbers, sizes and types. changeover and fan control. Provide matching sub base as required. Fans to run continuous) during calcium silicate insulation with a .20 BTU per pound per degree Fahrenheit specific heat 1,000 degree g 9 q Y 9 the standard 2-week turnaround, the General Contractor shall notify Melink when confirming the T&B date. design. Insulation shall be installed over all kitchen exhaust ductwork located above finished ceiling, in full C. Indicate name and address of service company. occupied hours. accordance with the published instructions from the manufacturer. Insulation shall be covered with fire G. If upon arrival at test and bathe jobalala the project is not complete enough for Melink to fulfill their obligations retardant treated canvas jacket. Installation shall comply with the U.L approval. Altemate: Thermal D. A description of service maintenance required weekly, monthly, quarterly, semi-annually and annually to C. Control conduit and wiring shall be by Division 16. for the complete tence, Melink will have the opportunity to inform the GC that he will have to Ceramics - Firemaster U.L approved duct wrap, (thickness and quantity of layers shall be verified with be included along with type of lubrication recommended. return. This return visit will be at the GC's expense. local Building Department). Part 3 Execution H. Melink will perform a follow up check of the complete system within 30 to 60 days after its first Part 3 Execution 1A7 GUARANTEE 3.01 INSTALLATION .9 y inspection. If major punch list items still have not been completed or if new major items are found, a _ 80427PE mandato revisit will be required b Melink. This next visit will be at the GC's expense. Each revisit will A Provide a warranty on the rooftop units for a period of one year after acceptance by the Owner. O' q Y P 3.01 MANUFACTURERS AND INSTRUCTIONS A. Install all units as indicated on plans and according to the unit manufacturer's instructions. be at the GC's expense until all major punch list items have been satisfied. B. Include all the cost of the parts and labor for any and all work the rooftop unit manufacturer and/or OREGON B. Set and install pitched based roof mounting curb level as an integral member of the building roof 1 A The insulation hereinbefore specified shall be famished and installed by a contractor whose principal Contractor has to accomplish to repair a malfunctioning unit or piece of equipment famished by the v'�iy �3,Zo� Part 2 Products structure roof curb shall offset roof slope). y _ business is the application and installation of thermal materials on piping systems. All material shall be rooftop unit manufacturer. The warranty shall not cover normal maintenance such as changing of the ( O Not Used manufactured by one of the listed approved manufacturer's instructions, except where these instructions filters, cleaning of coils, and replacement of belts and lubrication of bearings. P. M0 conflict with the specifications hereinafter stated, in which case the specifications shall govem. All work C. Set and install units level on roof mounting curbs. L• 0 shall be performed in a neat workmanlike manner and all adhesives, bands and other fastening materials C. Unit manufacturer to include an additional (4) year warranty for all refrigeration compressors. ExPlRES: i2/3ij20i2 v Part 3 Execution and devices shall be supplied as required to properly install the insulation materials being furnished. D. Install all ductwork, electrical and piping connections to the unit as shown on the plans and as ca required to complete the installation. ADJUSTING AND BALANCING Part 2 Products 3.01 TESTING, B. Approved Manufacturers: Armstrong Co., Certain Teed, Manville Co., Owens-Corning Fiberglas, PABCO, Pittsburgh-Coming, and Knouf. 2.01 MANUFACTURER E. The unit manufacturer and/or his representative shall calibrate all control devices and adjust unit C A. GENERAL: The T&B work shall be in accordance with the following checklist: automatic dampers to insure proper operation of the system. END OF SECTION A. Design Basis: Trane as scheduled, no substitutions. 1. Inquire about any problems or complaints. F. Install space thermostats as shown on the drawings. 2. Compare mechanical plans to installed system. 2.02 CASINGS `- 3. Document design specifications for report. G. Mount units at proper height above roof so that proper trap depth is provided in the condensate drain Q 3 4. Ensure all fans are running for balance. A. Casings to be completely weatherproof and constructed of heavy gauge galvanized steel phosphatized line. C 5. Measure in'rtiol building pressure. with a baked enamel finish. 0 H. Contact for pricing information: N B. INSPECT ROOFTOP EQUIPMENT: Inspect units and note any deficiencies. B. Access doors to be heavy gauge galvanized or phosphatized zinc coated steel complete with hinges Trane Company . Chris St. John and fasteners to secure door in open or closed positions 0 1. Record unit nameplate data. 407-660-1111 0' 0. 2. Check thermostats for proper settings. C. Access doors and removable panels to have neoprene gaskets. 3. Check for correct fan rotation (include condenser fans). 3.02 KiTCHEN HOOD EQUIPMENT AND EXHAUST FANS 4. Check conditions of filters and coils. D. Insulate all interior surfaces of the cabinet with a minimum of 1' glass fiber insulation. 3 5. Check position of outside air dampers. A. Kitchen hoods, the hood fire suppression systems, kitchen supply, exhaust, make-up air heaters and // oo 6. Check gas lines and condensate lines. E. The base of the cabinet to be a one-piece welded assembly and constructed so as to mate and seal toilet exhaust fans all complete with roof mounting curbs, back draft dampers and starters where required 00 7. Check belt tension and pulley alignment. with the roof-mounting curb. Provide a sealing gasket for a positive, waterproof seal when the unit is shall be provided by the owner (Darden Restaurants, Inc.) and installed by this contractor. The contractor OO -fl 8. Check disconnect switches and covers. installed on the curb. shall set all fans, hang the hoods, and install all interconnecting ductwork and accessories for proper 3 9. Check any fan noise and vibration. operation as required by code and recommended by the hood manufacturer for proper operation of the 10. Check heat/cool modes of BTU's. 2.03 SUPPLY AIR FANS systems. The fire suppression system (supplied with the hoods) shall be installed complete with mechanical ( 9 a? and electrical gas valves for each riser and remote manual pull release stations. �I o C. TEST AND BALANCE KITCHEN HOOD SYSTEM: A. The supply air fans to be double width, double inlet centrifugal type with adjustable V-belt drives. 0 0- B. The kitchen hood equipment shall be manufactured by Captive-Aire Systems, Inc. Contact Steve Luddy 1. Measure exhaust CFM in hoods. B. A!I fans to be statically and dynamically balanced and tested in the factory. at (407) 682-3100 or FAX (407) 682-2820 for information. -0 2. Observe hood smoke capture with equipment on. o 0 3. Adjust exhaust RPM, as required. C. Entire fan and drive assemblies to be mounted on a common base and be completely isolated from 3.03 FOOD SERVICE EQUIPMENT REFRIGERATION * �' Ca. Check actual amps venus motor FLA. the unit by factory mounted vibration isolators to eliminate vibration. •• �' �? b. Note adjustments made on pulleys. A. The contractor is to set all refrigeration compressors for the food service equipment. He is to run the 0 c. Measure final RPMs. 2.04 MIXED AIR SECTION refrigerant piping and supply the proper refrigerant charges. 0 4. Evaluate duct system design and installation [� 5. Ensure that final smoke tests are satisfactory. A. Unit mixed air section to include O.A. damper and 30% filter section. 3.04 REFRIGERANT PIPING AND ACCESSORIES 0 L D. TEST AND BALANCE HEATING/COOLING SYSTEM: 2.05 FILTERS A. Refrigerant piping and connections shall be made with Type "K' hard drawn copper tubing, specially cleaned and sealed for refrigerant service recessed solder joint fittings of wrought copper, assembled with cc 1. Measure RTU supply and return airflows. A. Filters to be an integral part within the unit and to be easily accessible from both sides of the unit silfos in an atmosphere of dry nitrogen using no flux. 2. Check for drafts and hot/cold spots. via hinged access doors. -� 3. Adjust RPM as necessary to achieve design. B. Stop valves shall be of back seating key operated seal cap type except those which must be closed rn B. Provide units with 2' glass fiber throwaway filters equal to Farr 30-30. or opened during normal operation of the system which shall have hand wheels and shall be of the pack a. Check actual amps versus motor FLA. less type. b. Note adjustments made on pulleys. C. Replace all filters with the specified Farr 30-30 filter, in all units, prior to substantial completion. C. Refrigerant strainers shall be of the angle type, cleanable without disturbing piping connections, U C c. Measure final RPM's. D. Provide the Owner with one (1) complete set of Farr 30-30 spare filters for each unit. constructed of brass with solder joint connections. Screen shall be constructed of monel with perforations M 4. Damper at branch takeoff's first and diffusers second. not to exceed 0.01 inch and free area not less than 5 times the area of inlet pipe. 0 5. Evaluate duct system design and installation. 2.06 HEATING SYSTEM 6. Ensure slightly positive building pressure. D. Refrigerant filter-dryer shall be of the straight type with permanent cartridges. Dryers shall have brass 0 A. Gas Heating: bodies and solder joint connections. Cartridges shall be capable of removing moisture and acids and filter Issue Date: 3-23-2012 > a. Fine tune position of OA dampers. foreign matter. a) b. Measure final building pressure. 1. Provide manufacturer's standard gas fired heating system integral with unit as part of the complete REVISION INFORMATION CL package unit. E. Expansion valves shall be of the thermal, gas charged type with external equalizer connections, external 1. Review report and data for completeness. super heat adjustments with seal caps, solder joint or flanged connections, capable to move from fully 0. 0 2. Discuss results and findings with superintendent. 2. Comply with oil applicable AGA standards. Be UL listed. closed to fully opened, with 40super heat change. Super heat setting shall be 100at full load. m Air qualities shall be balanced to within +/- 5% of design as a general rule. However, in some cases, 3. Provide all necessary controls, safeties, interlocks and other accessories to provide a completely F. Solenoid valves shall be selected for a pressure drop not to exceed #2 per square inch pressure drop. cc the air quantities may need to be adjusted differently in order to ensure acceptable comfort levels, hood operable gas fired heating system which will operate in a coordinated sequential manner with the DX Valves with port area 5/32 inch and smaller shall be direct acting type. Above 5/32 inch port area, 0capture performance, positive building pressure, etc. Melink shall notify the superintendent of any cooling portion of the unit. valves shall be pilot operated and floating piston type. Connections shall be solder joint or flanged with C deficiencies needing immediate attention, and the General Contractor shall have the mechanical and manual lift stem. electrical contractors available on call to promptly correct any such problems (i.e. replace burned out 4. Provide all necessary gas accessories including shut off valves, pressure-reducing valves and other motors, failed thermostats, incorrect wiring, bad circuit breakers and starters, dirty filter, missing dampers, similar devices as required by local codes and as required for proper operation and service at the unit. G. Combination moisture and liquid indications shall be installed between the expansion valve and solenoid © undersized RTU outside air intake). valve and shatl be provided with seal caps with solder joints connections. Liquid indicators only shall be 5. Provide minimum two-stage capacity control. Capacity shall be as scheduled. installed as indicated on drawings. 1n the event Melink needs to reschedule a follow up visit to test and balance any equipment not ready on 2.07 COOLING SYSTEM H. Approved Manufacturers: Alco, Henry, Metrex, Mueller Brass, and Sporlon. i-- the originally scheduled T&B date, the General Contractor shall pay for the additional cost involved, including travel. A. Direct Expansion Refrigerant Cooling: 3.05 REFRIGERANT AND OIL T All data required by these specifications shall be typed on white bond paper in triplicate and submitted to 1. The cooling system to be direct expansion type, factory charged with R-410A refrigerant and fully A. The Contractor shall fumish for each of the new machines, and each of the relocated refrigeration CL o the Owners Representative for approval. Complete approval will be necessary before final payment can be tested. machines, an adequate supply of refrigerant and oil, and shall guarantee to maintain refrigerant and oil in v' U made. The contractor shall then make such instruments as are required for spot checks on the system. the system in proper quantities for one year from the date of acceptance by the Engineer for the Owner. END OF SECTION 2. The system is to include refrigeration compressors, evaporator coil, air cooled condenser assembly, thermal expansion valves, liquid line valves, sight glass, filter dryer, liquid and suction line service valves B. At the end of one year's operation, and inspection of the system shall be made. At that time the v and insulated interconnecting refrigerant piping. refrigerant charge shall be brought up to the full charge, oil shall be brought to full charge, labor and material costs involved shall be borne by the Contractor. Any refrigerant and oil used during the one year 3. Evaporator coils to be non-ferrous construction with 5/8' OD seamless copper tubes, mechanically period from the date of acceptance to the date of inspection, shall be furnished free of charge by the bonded to configurated aluminum fins. Provide adequate refrigeration circuits, each with thermostatic Contractor for both labor and material, provided the loss of refrigerant has not been due to the misuse r expansion valve and solenoid valve for proper system part load operation. Provide technicoated coil if site of equipment. Excessive refrigerant loss shall be investigated, the source of leakage determined and is within 20 miles of an ocean. repaired, the warranty period shall be extended by 3 months. At the end of 3 months an inspection shall be made and refrigerant shall be brought up to full charge, etc. (similar to at the end of one year). Restaurant#: 0457 4. Provide fully insulated drain pan fabricated from zinc coated steel with an additional coat of insulating sealer. Extend drain pan into fan section. END OF SECTION V 5. Compressor to be hermetic or semi-hermetic type, designed to operate 1750 RPM. RED LOBSTER 457 n 0 6. Furnish compressor lubrication system of the forced feed type with a positive displacement reversible RENOVATION oil pump, filter, oil pump magnets, crankcase sight glass and a crankcase heater. 7. Condenser coils to be 3/8' OD seamless copper tubing mechanically bonded to heavy duty configurated aluminum fins. Provide hail guards and technicoated coil if site is within 20 miles of an ocean. 10330 8. Condenser fans to be of the propeller type with all exposed fan and shaft surfaces suitably x weatherproofed. Fan motors to be provided with normal and current overload protection. SOUTHWEST II9. Refrigeration operation and safety controls to include high and low pressure cutout, oil pressure cutout, G RE EN B U RG ROAD o, no-recycling pumpdown, manual lockout reset relay, compressor overload protection magnetic contactors � and low voltage Transformer. 10. Furnish each unit with a fully automatic capacity control system. 11. Capacity control to be accomplished by compressor cylinder unloading system. TIGARD, OR s m 12. Provide the system with necessary controls to maintain head pressure at ambient to 0 degrees F. �I 2.08 ROOF MOUNTING CURBS MECHANICAL A. Construction of roof mounting curb to mote and seal with the unit-casing base. Curb to have a minimum height of fourteen (14) inches. SPECIFICATIONS S B. Construct the curb to support the perimeter of the entire unit. Form the cross section of the curb members to accept wood nailing strips and insulation. Form the top curb members to provide counter o flashing. The curb shall offset the roof slope. I v C. Unit manufacturer to furnish matching roof mounting curbs. Curbs to be approved by National Roofing Contractor's Association. E 9 D. The curly to be built and furnished by this Contractor and then turned over to the General Contractor for installation. c N ACS2 E. This Contractor to submit final curb construction shop drawings to the equipment manufacturer and w design Engineer so as to obtain their approval before final curb construction. ev0 a