Plans FPS2014 00002
RVId"TED
VN' 022014
iOFTIGARI)
2
RULDING DIVISION
_J L--------i
TM
Exiting Horn Strobe N
10
Change from wail to coiling mount. Exiting Fiore Strobe- 0,
Change from wall to coiling mount.
Ankrom Moisan
6720 SW MACADAM AVENUE,SUITE 100
Exiting Horn Strobe-
PORTLAND,OR 97219
Change from wall to coiling mount. J 'r 503.24S-7100
117 SOUTH MAIN STREET,SUITE 400
SEATTLE,WA 98104
206-576-1600
----------------- ----------
------------------
------------
0
N
8� � / / f%� � I� �i /fir�i,/' � >� �`
IX
6
77
-- --- --------
;- ---
r----------- I
itt---------------
ii t If
Exiting Horn Strobe-Move and ►
Change from wall to coiling mount.
L
FEq(
Exiting Horn Strobe-Move to
the other side of wall
-- ----------
L-------j L JI
' '
z' I
V !L 0
C
U 44
If If
-1 4
1iit
z
X,
I M
X,
U-1
r
Z
LLJ
Qa
rM
Ln I;
DEMOLITION PLAN C:� - rn
V) Ln
V T- 1/8
2-7 11=1 LU
ry0
> a- rn
DEMOLITION SCOPE DEMOLITION PLAN SYMBOLS DEMOLITION PLAN KEYNOTES
1. PARTITIONS,DOORS,RELITES&ITEMS SHOWN AS DASHED ARE TO BE REMOVED OR EXISTING'WALL REMOVE CARPET AND UTILIZE FOR PATCHING AT AREAS OF WALL DEMO.
REVISION DATE REASON FOR ISSUE
RELOCATED,REUSABLE MATERIALS TO BE RETURNED TO BUILDING STOCK, REMOVE CARPET TILES AT LIMITS OF NEW CONFERENCE ROOMS AND UTILIZE FOR
(D PATCHING AT AREAS OF WALL DEMO,
--------------
2. REMOVE ALL POWER SIGNAL,SWITCHING&OTHER PERTINENT ITIEMS FROM WALLS TO BE ..... WALL OR ITEM TO BE REMOVED
-----------------
DEMOLISHED. T REMOVE SLATE TILE FLOOR AND PREPARE TO RECEIVE NEW TILE,
-----------
3, REMOVE EXIST ING FLOOR FINISH THROUGHOUT AREA OF WORK.PREP TO RECEIVE NEW GLASS RELITE REMOVE SLATE TILE FLOOR AND PREPARE TO RECEIVE CARPET TO MATCH,
FLOOR FINISHES AS INDICATED ON FINISH PLAN, ------
OFFICE ROOMTAMEDEMO PARTIAL HEIGHT WALL AND SHELF•PREP FOR NEW PULL HEIGHT WALL TO
4. DEMOLITION CONTRACTOR IS NOT TO REMOVE ANY STRUCTURAL ELEMENTS WITHOUT PRIOR UNDERSIDE OF CEILING GRID AS SHOWN ON PRICING PLAN
[_22�_J ROOM NUMBER
DIRECTION AND AUTHORIZATION BY A STRUCTURAL ENGINEER,CONDUCT DEMOLITION To DOOR TO BE REMOVED AND RELOCATED 0 OPEN OFFICE SIDE OF SERVER ROOM REFER
AVOID DAMAGE TO EXISTING BUILDING SHELLJ STRUCTURE,CEASE OPERATION AND NOTIFY TO PRICING PLAN I/T-I POP LOCATION.
OWNER IMMEDIATELY IF SHELL/STRUCTURE APPEARS TO BE IN DANGER KEYNOTE
5. CARE HAS BEEN TAKEN TO FORESEE ALL PERTINENT CONSTRUCTION CONDITIONS.HOWEVER,
FIELD CONDITIONS MAY OCCUR WHICH WILL CAUSE A CONFLICT.IT IS THE RESPONSIBILITY OF ON E INDICATES NO WORK CITY F TIGARD
THE GENERAL CONTRACTOR OR THEIR SUBCONTRACTOR TO ALERT THE ARCHITECT OF ANY Approved...... ..
SUCH DISCREPANCIES OR CONFLICTS PRIOR TO PERFORMING WORK.FAILURE TO DO SO MAY
LEAD TO WORK IN QUESTION BEING REJECTED BY TENANT OR ARCHITECT. Conditionally Approved.......
See LAW to:Follow........
6, DISMANTLE AND REMOVE ALL ITEMS NOT INCLUDED OR REUSED AS A PART OF NEW
CONSTRUCTION,COORDINATE SALVAGE OF MATERIALS/ITEMS WITH TENANT.
z
y Ad - " DEMOLITION PLAN
7. CARE SHOULD BE MADE IN CAPPING OFF ALL UNUSED ELECTRICAL AND PLUMBING FEEDS.
CL,
rN WHERE POSSIBLE ALL ABANDONED UTILITY FEEDS TO BE REMOVED BACK TO THE SOURCE OF By.
o ORIGINATION.REMOVE CONDUITS WHERE POSSIBLE.
UJ Approved plans
CL 8. CARE TO BE TAKEN DURING WALL DEMOLITION WHERE NEW WALL CONSTRUCTION IS shall be on job site,
00
0 PROPOSED TO INTERSECT OR JOIN EXISTING OR ADJACENT CONSTRUCTION.THE
CONTRACTOR'S DISCRETION IS REFERRED TO FOR INTERPRETATION OF THE LIMITS UNDER
MOct
E; WHICH WALLS TO REMAIN ARE TO BE DEMOLISHED ENTIRELY,TO BE REUSED OR TO PROVIDE
SELECTIVE DEMOLITION.PATCH/REPAIR EXISTING SHEET ROCK AT AREAS OF DEMOLITION,
OFFICE COPY
PRICING PLAN
0 Z 9. THE PREMISES AND THE JOB SITE SHALL BE MAINTAINED IN A REASONABLY NEAT AND
ORDERLY CONDITION AND LEFT FREE FROM ACCUMULATIONS OF WASTE MATERIALS AND
RUBBISH DURING THE ENTIRE CONSTRUCTION PERIOD.REMOVE CRATES,CARTONS,AND DATE REVISION
z OTHER FLAMMABLE WASTE MATERIALS OR TRASH FROM THE WORK AREA AT THE END OF
z EACH WORKING DAY,PIPE AND DUCT SHAFTS,CHASES,FURRED SPACES,AND SIMILAR SPACES 07.22.13
0 SHALL BE CLEANED AND LEFT FREE OF RUBBISH,LOOSE PLASTER,MORTAR DRIPPINGS,
EXTRANEOUS CONSTRUCTION MATERIAL,DIRT,AND DUST, PROJECT NUMBER SHEET NUMBER
134750
55
10, CARE TO BE NOT TO DAMAGE CEILING TILE AND GRID TO REMAIN. SCALE -0
H T
N/A