Loading...
Plans Bt P2015 00190 i 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ---- --------- - -------- J9 GENERAL NOTES MALL SOFFIT 1' F/// %"GYP. BD.TAPED& T.O.BARRICADE D 101 BEDDED JOINST TO PREVENT 1, IT IS THE INTENT OF THESE DRAWINGS THAT THE ENTIRE SPACE IS TO BE CLEARED OF ALL LEASE LINE 14'-8"A.F.F. --� TOBARRICADEON _ - __ . __ _ DUST PASS THRU w(TWO PARTITIONS, FIXTURES, FINISHES;STOREFRONT AND SIGNAGE(U.O.N.)THE REMAINING SPACE FRCH I . . ----- COATS PAINT(COLOR AS SHOULD CONSIST OF EXISTING PERIMETER WALLS,STRIPPED COLUMNS,CONCRETE FLOOR,AND B.O.MALL BULKHEADf f - - I !"1 DIRECTED BY LL) EXPOSED UNDERSIDE OF STRUCTURE(U.N.O.). COORDINATE WITH M.E.P.DRAWINGS IF EXISTING DESIGN WORLDWIDE L B.O.MALL BULKHEAD ` EQUIPMENT IS TO REMAIN. 14'-7"A.F.F.(V.LF.)Y � ,. I �. 14'-7"A.F.F.(V.LF,) '' ' i DETAIL INTENDED FOR DESIGN INTENT ONLY; ', 2. GENERAL CONTRACTOR SHALL VERIFY FIELD CONDITIONS AND NOTIFY THE ARCHITECT OF ALL 311 Elm Street Suite 600 BARRICADE GR.APFiC•- ACTUAL SITE CONDITIONS MAY VARY;TENANT DISCREPANCIES BEFORE PROCEEDING WITH WORK. �- BARRICADE GRAPHIC Cincinnati OH 45202 BY OWNER / G.C.SHALL VERIFY RESPONSIBILITIES AND ALL 3. PREVENT MOVEMENT OR SETTLEMENT OF EXISTING STRUCTURE(S). PROVIDE AND PLACE BRACING `�.,-` BY OWNER REQUIREMENTS WITH LANDLORD PRIOR TO BID �r� OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORT OF STRUCTURE. ASSUME LIABILITY 513 2413000 . 1 , FOR SUCH MOVEMENT,SETTLEMENT,DAMAGE OR INJURY. www.frch.com ' 4. HVAC SUBCONTRACTOR TO INSPECT EXISTING CONDITIONS AND DETERMINE WHETHER ANY SUPPORT KICKERS ;r' COMPRESSOR REFRIGERANT LINES ARE PRESENT THAT MUST BE PROPERLY DRAINED(TO E.P.A. I�ZQ�s lUI ' AS REQ. ' %"GYP. BD.TAPED& STANDARDS)PRIOR TO DEMOLITION. 3 8"METAL STUDS @ ' BEDDED JOINST TO PREVENT 5. BURNING OF MATERIALS ON SITE IS NOT PERMITTED. 2. ' w , i + E DUST PASS-THRU w/TWO 6, NO WORK IS TO BE PERFORMED OUTSIDE THE LEASE LINE AS DEFINED BY THE LANDLORD. A O 24"O.C. ' ' ' > COATS PAINT(COLOR AS 7. REPAIR ALL DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED AT NO COST TO THE OWNER. _ K !I I DIRECTED BY LL) 8. TENANT TO COORDINATE BARRICADE AND BARRICADE GRAPHICS WITH OPERATIONS MANAGER. JUL 201 1 MALL TENANT'S G.C.TO COORDINATE BARRICADE LOCATION WITH FACILITY OPERATION MANAGER. TENANT'S LEASED MALL COMMON AREA 9. PLACE MARKERS TO INDICATE LOCATIONS OF DISCONNECTED SERVICES. IDENTIFY SERVICE LINES 1TV Of Y IGAKI) JC is I SPACE AND CAPPING LOCATIONS ON PROJECT RECORD DOCUMENTS. DING DLII®� 10. CEASE OPERATIONS AND NOTIFY THE OWNER IMMEDIATELY IF SAFETY OF STRUCTURE APPEARS TO i I I LEASE LINE ', 2x4 PLATE.SECURE TO BE ENDANGERED. TAKE ALL NECESSARY PRECAUTIONS TO PROPERLY SUPPORT THE STRUCTURE. PLYWOOD FROM UNDERSIDE, DO NOT RESUME OPERATIONS UNTIL SAFETY IS RESTORED." f I , NAIL OR SCREWS TO BE 11, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXTENT OF DEMOLITION WITH THE �` L0L�x �e ` FLUSH SET OWNER AND THE LANDLORD AND BRING ANY DISCREPANCIES TO BOTH PARTIES ATTENTION PRIOR - 1FINISH FLOOR ;,' ; TO FINALIZING THE BID AND COMMENCEMENT OF WORK. Y 0'-0" MALL FINISH FLOOR Y/4"PLYWOOD wl % , MALL TILE 12. A FIRE EXTINGUISHER MUST BE KEPT ON THE PREMISES AT ALL TIMES. 0'-0" 3'-0" NON-ABRASIVE Y4"+ 13. EXCEPT WHERE NOTED OTHERWISE,MAINTAIN POSSESSION OF MATERIALS BEING DEMOLISHED, ALIGN C/L OF CUSHION BACKING 3'-0" BARRICADE DOOR 3'0"MAX IMMEDIATELY REMOVE FROM SITE 2x4 STOP:SECURE TO ENSURE 10'4'MIN.CLEARANCE 14. PROVIDE TEMPORARY SERVICES AS NECESSARY FOR CONTINUOUS OPERATION FOR ALL J WITH CIL OF NEW CONC.SLAB TO MALL OBSTRUCTIONS • LIFE/SAFETY DEVICES. , ENTRANCE. 15. WHERE THE EXISTING CONCRETE SLAB IS TO BE PATCHED AND REPAIRED,THE GENERAL J1 Barricade Elevation J6 Barricade Elevation J9 Section at Construction Barricade CONTRACTOR SHALL MAINTAIN THE EXISTING FIRE RATING OF THE EXISTING SLAB,PATCH WORK TO D-101 SCALE:1/4"=1'-0" D-101 SCALE: 1/4"=V-0" D-101 SCALE:N.T.S. BE STRUCTURALLY SOUND AND CAPABLE OF SUPPORTING LIVE LOADS FOR MERCANTILE OCCUPANCIES AS PER LOCAL CODES AND JURISDICTION. ae 16. GENERAL CONTRACTOR TO COORDINATE ALL WORK BELOW SLAB WITH LANDLORD AND SHALL �J ! O KEY NOTES PATCH&REPAIR ANYIALL DAMAGE THAT MAY OCCUR DURING DEMOLITION WORK. 17. ARRANGE&PAY FOR DISCONNECTING,REMOVING&CAPPING UTILITY SERVICES WITHIN AREAS OF 1. LEASE LINE. DEMOLITION,DISCONNECT&STUB-OFF, NOTIFY AFFECTED UTILITY COMPANY&BUILDING 2. (E)STOREFRONT ROLLING GRILL&ALL ITS COMPONENTS TO BE REMOVED. MANAGER IN ADVANCE&OBTAIN APPROVAL BEFORE STARTING THIS WORK. • 3. ALL(E)INTERIOR WALL CONSTRUCTION,FIXTURES,FLOORING,ETC.TO BE REMOVED IN ITS 18. DEMOLISH IN AN ORDERLY AND CAREFUL MANNER AS REQUIRED TO ACCOMMODATE NEW WORK, ! ENTIRETY(U.N.O,).PREP AS REQ.TO ACCEPT NEW WALL CONSTRUCTION/FINISHES, INCLUDING THAT REQUIRED FOR CONNECTION TO THE EXISTING BUILDING, PROTECT EXISTING • H 4. CONSTRUCTION BARRICADE AND DOOR;G.C.TO COORDINATE WITH MALL REQUIRED BARRICADE FOUNDATIONS AND SUPPORTING STRUCTURAL MEMBERS. PHASE DEMOLITION IN ACCORDANCE CONTRACTOR. WITH CONSTRUCTION SCHEDULE. 5. (E)STOREFRONT GLAZING SYSTEM&CONSTRUCTION TO BE REMOVED IN ITS ENTIRETY. 19, G.C.TO COORDINATE ALL WORK BELOW SLAB W/LL&SHALL PATCH&REPAIR ANY/ALL DAMAGE 6. (E)NEUTRAL PIER CONSTRUCTION TO REMAIN,NEUTRAL PIERS ARE TO BE BUILT OUT FOR NEW THAT MAY OCCUR DURING DEMO WORK LOCATION OF LEASE LINE.REFER TO A-101 20. ALL EXISTING ELECTRICAL OUTLETS THAT WILL BE HIDDEN/COVERED BY EXISTING WALL 7. (E)DOOR AND FRAME TO BE REMOVED. CONSTRUCTION,NEW FIXTURES,ETC SHALL BE REMOVED IN THEIR ENTIRETY 8. (E)ELECTRICAL EQUIPMENT TO REMAIN.SEE ELECTRICAL DRAWINGS. 9. (E)COLUMN TO REMAIN,REMOVED EXISTING FINISHES AND PREP TO RECEIVE NEW FINISHES AS DEMOLITION LEGEND REQ. 10. (E)DEMISING WALL TO REMAIN.PREP TO RECEIVE NEW FINISHES AS REQ.PATCH&REPAIR AS REQ. TO MAINTAIN(E)FIRE RATING. INDICATES EXISTING CONSTRUCTION TO REMAIN 11. CENTER OF FIXTURE THAT WILL NEED TRENCHING/CORE DRILLING FOR POWER AND DATA ISSUE INFORMATION 12. EXISTING PLUMBING FIXTURES TO BE REMOVED.REMOVE AND OR CAP EXISTING PLUMBING LINES G AS REQUIRED. _ _ _ - _ _ _ - INDICATES EXISTING CONSTRUCTION TO BE DEMOLISHED 05/08/15 REVISIONS 1 LANDLORD!OWNER CHANGES 05/291_1.5 2 BID SET 06/12/15 A OB B *6" M./MIRR. I 1 10 111'-6" I LL TO LL 1 10 F 10-2" 98'-10" ! 6 - a - ------ ff {'f�f'lf�1_.. l ,rf 10 Ir ,I� r ' ii'i 2 10 12 O 1 , 7 `1 E E --- -------J 1 1 1 I o l i 1 1 2'-9Y8" 3 i�i'� o 1 1 ------------ T-1Y2" J9 FRCH J ARCHITECTURE, INC., P.C. 10 i + 1'-4,'ve° �.J 1 Y 3 + 1 1 ' 5'-9%" i t a n O A m 9 I J1 N J J D. ° D 11 I 9 4 N D•101 1 1 1 I I 1 9 1 ��1r<�✓irsT,.<, ,< � 1 1 I 1 i s i - - i i i - �%/�///iY//s�Y/// _� p/ . C♦ r.. 8 1 1 1 1 1 1 /iiiiiiiiiiiirii, 1 \ ' / -7 N ♦♦ 1 1 3 ♦♦`♦ E ? `♦♦ i� I 3 i i ���♦ ° ♦y 10 i i ' ♦��♦ PROJECT INFORMATION 7 C 5 1 1 1 BUILD-A-BEAR WASHINGTON SQ. ♦♦ , /,�. 9585 SW WASHINGTON SQUARE RD. Q PORTLAND, R 97223 D. 0 o , PROJECT#: _ 29349,000 3 10'-7" 15'-3" `` _ I o 83'-2" 2'.6" 3 B ' 10 1 6 J6 SHEET INFORMATION D-1o1 DEMOLITION LL 0 g ( PLAN a � ..... ... .�.. ...._ .__ ..._ ._-. ... .. .... ...... � of co DRAWN BY: I I ! B.Goodwin!A.Davis N REVIEWED BY: J.Rolke 0 IL A SCALE: o As Noted a AUTHORIZED FOR: Al Demolition Floor Plan LL/Permit 3 a NORTH D-101 SCALE: 1/4"=1'-0" D-101 N 0 N 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15