Loading...
Report Il r , oi =-QoI_St(' ldK v I May 11, 2016 _ James G. Pierson, Inc. Community Development Attention: Special Inspection Section NQ1Ne� w. 13125 SW Hall Blvd4 Tigard, Oregon 97223 Final Summary Report Westlund Residence 10465 SW Highland Dr, Tigard, Oregon 97224 Permit MST2016-00156 This memorandum will confirm that substantial structural construction is complete on the above project and to the best of our knowledge as Structural Engineer of Record, has been accomplished in accordance with our design intent and in compliance with the contract documents of the above permit. Special Inspection of an anchor install was provided by James Pierson, Inc. via phone and photos in accord with the permit requirements of the project. The chimney anchors were installed to a torque that is equivalent to 50 kips of capacity or 6x the design load requirement and the sunroom anchors installed to an equivalent load of 16 kips or 6x the design load. As such, no anchor testing was done. There are no outstanding issues in regard to tests or inspections reported therein or know by us to exist. Based upon this information and upon our knowledge of the foundation work completed, we believe that the construction delineated by the above noted permit is satisfactorily completed, and we recommend that the permit be closed out in accord with the City of Tigard procedures. Sincerely yours, ., 4., ��F4 18346P XL14 ft Peder Golberg, P.E., S.E. OREGON Principal < ''"c6 �9, ' p �,i) R cc: Earth Anchors ' � EXPIRES 6-30-11 Consulting Structural Engineers 610 S .Alder Street,Suite 918, Portland,Oregon 97205 Tel.(503)226-1286 Fax.(503)226-3130 A -,T641;r7 --?,.iiiiii<L)CTO, May 11, 2016 James G. Pierson, Inc. • Community Development „: Attention: Special Inspection Section °NQ'"e& 13125 SW Hall Blvd Tigard, Oregon 97223 Final Summary Report Westlund Residence 10465 SW Highland Dr,Tigard, Oregon 97224 Permit MST2016-00156 This memorandum will confirm that substantial structural construction is complete on the above project and to the best of our knowledge as Structural Engineer of Record, has been accomplished in accordance with our design intent and in compliance with the contract documents of the above permit. Special Inspection of an anchor install was provided by James Pierson, Inc. via phone and photos in accord with the permit requirements of the project. The chimney anchors were installed to a torque that is equivalent to 50 kips of capacity or 6x the design load requirement and the sunroom anchors installed to an equivalent load of 16 kips or 6x the design load. As such, no anchor testing was done. There are no outstanding issues in regard to tests or inspections reported therein or know by us to exist. Based upon this information and upon our knowledge of the foundation work completed, we believe that the construction delineated by the above noted permit is satisfactorily completed, and we recommend that the permit be closed out in accord with the City of Tigard procedures. 49 T pp,a so PRO,��, �C �GtNtF �* Sincerely yours, 4,.. C .p f C' 18346P ( 114k Peder Golberg, P.E., S.E. ,0 4,, OREGON t Principal 1<'' ' rch 19 �,4. 0 R. cc: Earth Anchors � F)<P I RES: 6-30-II Consulting Structural Engineers 610 S W.Alder Street,Suite 918, Portland,Oregon 97205 Tel (503)226-1286 Fax (503)226-3130