Loading...
Report 6-41 RECEIVED COMcheck Software Version 4.0.1 AUG 3 1 2015 1111;6(11 Interior Lighting Compliance BCLD D f ` RD Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Sleep Train Project Type:Addition Construction Site: Owner/Agent: Designer/Contractor: 6600 SW Bonita Road Gregory R.Schnackel P.E. Tigard,OR 97224 Schnackel Engineers,Inc. 3035 South 72nd Street Omaha,NE 68124 402.391.7680 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Retail:Sales Area(Ceiling Height 10 ft.) 8184 1.5 12276 Common Space Types:Active Storage(Ceiling Height 10 ft.) 325 0.63 205 Common Space Types:Corridor/Transition(Ceiling Height 10 ft.) 70 0.41 29 Total Allowed Watts= 12509 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Retail:Sales Area(8184 sq.ft.) Linear Fluorescent:A:2'x4'Troffer:48"T8 32W:Electronic: 3 74 93 6882 Linear Fluorescent:AE:2'x4'Troffer:48"T8 32W:Electronic: 3 9 93 837 Common Space Types:Active Storage(325 sq.ft.) ) Linear Fluorescent:A:2'x4'Troffer:48"T8 32W:Electronic: 3 3 93 279 Linear Fluorescent:AE:2'x4'Troffer:48"T8 32W:Electronic: 3 1 93 93 Common Space Types:Corridor/Transition(70 sq.ft.) Linear Fluorescent:A:2'x4'Troffer:48"T8 32W:Electronic: 3 1 93 93 Total Proposed Watts= 8184 Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Lighting Wattage: • 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage: 12509 Proposed Wattage:8184 Complies:YES Mandatory Requirements: • 2. Exit signs.Internally illuminated exit signs shall not exceed 5 watts per side. Plans reference page/section: E1.0 • 3. Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non-daylight zone.In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic OFF control, Project Title: Sleep Train Report date: 08/13/15 Data filename:V:\Energy_Calculation Data Files\Comcheck v4.0.1.0\150671_revl.cck Page 1 of 3 F 4 while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations(i.e.,north,east, south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. Plans reference page/section: E1.0 • 4. Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are • a remote switch that identifies the lights served and indicates their status. Plans reference page/section: E1.0 ✓ 5. Sleeping unit controls.Master switch at entry to hotel/motel guest room. Plans reference page/section: E1.0 ✓ 6. Egress lighting.Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied. Plans reference page/section: E1.0 ✓ 7. Additional controls.Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. Plans reference page/section: E1.0 ✓ 8. Light reduction controls.Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 1)controlling(dimming or multi-level switching)all luminaires;or 2)dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps;or 3)switching the middle lamp luminaires independently of other lamps;or 4)switching each luminaire or each lamp. Plans reference page/section: E1.0 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic control device shall function on either: 1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor;or 2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or 3)a signal from another control or alarm system that indicates the area is unoccupied. Plans reference page/section:E1.0 ✓ 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Plans reference page/section: E1.0 ✓ 11 An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. Plans reference page/section:E1.0 12Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and supply rooms up to 1000 square feet. Plans reference page/section:E1.0 ✓ 13.Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device that: 1)is readily accessible,2)is located so that a person using the device can see the lights or the area controlled by that switch,or so that the area being lit is annunciated,3)is manually operated,4)allows the lighting to remain on for no more than 2 hours when an override is initiated,and 5)controls an area not exceeding 2,000 square feet. Plans reference page/section: E1.0 • 14.Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours,then resumes the normally scheduled operation. Plans reference page/section: E1.0 • 15.Exterior lighting controls.Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a photosensor and a time switch,or an astronomical time switch.Lighting designated for dusk-to-dawn operation shall be controlled by an astronomical time switch or photosensor. Plans reference page/section: E1.0 16.Tandem wiring.The following luminaires located within the same area shall be tandem wired: 1.Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet center-to-center of each other. Project Title: Sleep Train Report date: 08/13/15 Data filename:V:\Energy_Calculation Data Files\Comcheck v4.0.1.0\150671_revl.cck Page 2 of 3 2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted .• within 1 foot edge-to-edge of each other. Plans reference page/section: E1.0 17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Plans reference page/section: E1.0 ✓ 18.Each dwelling unit in a building is metered separately. Plans reference page/section: E1.0 Interior Lighting PASSES Design 35%better than code. Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consi• • OA ,•. .tans,specifications and other calculations submitted with this permit application.The proposed lighting system h- •... •_w-71 - 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.1 and to comply wit : .: . reg •. he Requirements Checklist. �94E 'A r Gregory R. Schnackel P.E.-President I! �� I A *Lis 13,2015 Name-Title Sig ature D e Y SC Project Title: Sleep Train Report date: 08/13/15 Data filename:V:\Energy_Calculation Data Files\Comcheck v4.0.1.0\150671_revl.cck Page 3 of 3