Below you will find our installation instructions for our external halyard flagpoles.
For internal halyard flagpole instructions,
SVLITA-RY&HISTORICAL FLAGS please contact us at 800.805.9728
ISO/QS FLAGS
WORLD FLAGS
CUSTOM FLAGS
FLAGPOLE HARDWARE&ACC Parts Diagram c-)
1111=11.11111 ' ---Finial(Typically a Ball) O
FLAG ETIQUETTE
WIND SPEED CHART IN_
• Truck Assembly(Typically Single Revolving)
--- TECH SUPPORT � "� Il..i'• O
nt. a s illar: 6
FAQ ABOUT OUR FLAGPOLES ! —
CUSTOMER TESTIMONIALS
9/11/2001 TRIBUTES ! R` Halyard(Typically#10-5116"Diameter,Polypropylene)
INSTALLATION INSTRUCTIONS \\\
I
CONTACT US I
f
OPEN BOX ON SALE ITEMS ( L Snaphooks(Typically Chrome Plated Bronze)
And Neoprene Covers
Show Order . ---ti-
k 2. 0
Privacy Polity li & ,:/
•
0it , Imo Insert snap in cover Slip a loop through eyes
. 111E=1111111111111111.
Index 3. 4.
•
' SHOPPING Put loop over snap Draw Tight
OF
GARD
Cast Aluminum Cleat _� I
Approvedoot -3 L t4----
♦ ....._-__-./S.S.Screws --IAS
CoSee Letter
g low. ,j I
See Letter tic►:Follow.
Ito lied _ - Spun Aluminum Collar
C_ ► 4 . ..ke / 1..
� _
�� ��, h,- { �-Ground Sleeve Assembly
By ,J ) (Typically Corrugated Steel Sleeve)
(Or PVC Plastic Sleeve)
Approved pians
shall be onJob sI e. For Quick and Professional Installation,Read All Instructions Before Proceeding.
04---,ti "//o//�
�— ay all flagpole components out.If missing a part from the attached parts diagram,
please call 800.805.9728 for the replacement parts.
OFFICE COPY
STEP 1-Remove all wrapping materials and place unwrapped pole on cribbing or
{ other wood support on ground(preferably in a covered dry area).If Pole is Multi
1 Section, carefully lay sections out in proper order,grouping poles with like match
marks. Sections MUST BE STRAIGHT&LEVEL while sliding together.Line up
match mark numbers, imprinted at each section, for proper fit. Lightly sand away
• any burrs that may be present on the male section or in the upper section of the
joint.A small amount of lubrication(silicone or dish washing liquid-by others)
maybe applied to the male portion of the joint for easier fitting. Start with the
bottom sections and work toward the top. Begin sliding the two sections,rolling
the pole by 180°with every 2 to 3 inches to facilitate an easier fit. (If EXTREME
http://www.theflagpoleco.com/inin.html 1/8/2014
INSTALLATION INSTRUCTIONS Page 3 of 4
40'-0" 4'-0" 4'-6" 45" 36"
45'-0" 4'-6" 5'-0" 45" 36"
0 50'-0" 5'-0" 5'-6" 50" 42"
55'-0" 5'-6" 6'-0" 50" 42"
•
60'-0" 6'-0" 6-6" 60" 48"
65'-0" 6'-6" 7-0" 60" 48"
70'-0" 7'-0" 7'-6" 60" 48"
75'-0" 7'-6" 8'-0" 60" 48"
80'-0" 8'-0" 8'-6" 72" 48"
`"Please Note:20'&25'Flagpoles with 4"Butt Diameters will come with a
Corrugated Ground Sleeve With Spike Arrestor.No Support Plate Available.
Please dig footing accordingly.
Suggested minimums are based on recommendations found in the Metal Flagpole
Manual published by NAAMM(The National Association of Architectural Metal
Manufacturers,printed version 1980).Foundation size depends on local soil
conditions and building codes.Dimensions "C"and"D"are the recommended
minimums for use in good, firm, dry soil only. When dealing with soil conditions
that are other than optimum(ie wet, unstable,in a frost area, etc.) consult a
foundation engineer for a design appropriate to the location and loads acting on
the flagpole.
A
Caulk around top of collar
• after Installation
Flash Collar
Cement or Waterproof Compound
;. •• in top 2"of ground sleeve
Wood Wedges(by installer)
8 .A 4 Tamped with screened dry sand
(by installer)Ground Sleeve Assembly
,: (Galvanized Corrugated Tube)
Concrete Foundation(by installer)
3/16"Steel Plate Welded to Sleeve
12'
3/16"Steel Plate Welded to Spike
Lightning Spike(314•'Steel)
�x
Installation Method for PVC Ground Sleeves
If collar is provided,caulk around
top to prevent water entry.
I Thin layer ofa around
oWaterproofingrounsieve
around top of ground sieve
uA u Dry, P Fill Void with Tamped Sand
Ground Sleeve Assembly(PVC Pipe)
� TTT i
Concrete Foundation (by installer)
•
http://www.theflagpoleco.com/inin.html 1/8/2014
INSTALLATION INSTRUCTIONS Page 2 of 4
difficulty is found in fitting the first 6 inches together,pull back apart and cool the
male section with ice for several minutes).A sledgehammer and block of wood(to
protect the pole from direct impact)maybe necessary on larger poles to complete
the assembly of joints. The Flagpole Co.suggests the use of an epoxy adhesive for
aluminum with poles of 60'length.
} STEP 2-Identify parts and place them along the pole according to the parts
i diagram.
STEP 3-Starting with the finial ball(part A),screw the ball's spindle into truck(part
B). Do not grip ball to tighten,grip spindle/rod with vise grips and tighten. Tighten
all nuts and set screws. (Epoxy or loc-tite type product is recommended on all
connections, this material not furnished by The Flagpole Co.)
STEP 4-Attach the truck(part B)with ball by screwing into the threaded top of the
flagpole(Do not epoxy spindle of truck).If truck(part B)is a stationary truck, be
sure to secure all set screws.
STEP 5-Feed the polypropylene rope(part C), around the pulley of the truck(part
B)and down the side of the flagpole to the cleat area. Tie both ends together
forming a complete loop.Space the snap hooks and neoprene covers(part D)at
equal distance on either side of the knot to accommodate flag size(refer to
diagram on parts page for snap hook attachment).
STEP 6-Fasten cleat(s) (part E)into position using the self-drilling screws
provided.IMPORTANT NOTE: The cleat(s)are typically installed at 4'-6"ABOVE
FINISHED GRADE. When installing the cleat prior to setting the pole,MAKE SURE
TO ALLOW FOR DEPTH OF SLEEVE. Use cleat as template for installation.A pilot
hole or drilling oil may be used to facilitate installation.If a second cleat is desired,
it is typically mounted at 180 degrees from the first. For installations involving
more than two cleats,refer to shop drawings for correct positioning and
orientation.For cleat box installation, use drill and tap kit to prepare holes in shaft.
Align box and cleat over holes,and fasten to pole using provided bolts.
f STEP 7-Before standing flagpole,slide the flash collar(part F) up from bottom and
secure at the location of the cleat holes with tape on underside of flash collar to
f prevent slipping.
STEP 8-Stand flagpole into previously installed ground sleeve. (May require crane
or backhoe for larger flagpoles.Always choke multiple section poles below lowest
joint as a safety precaution). Caution: When installing, the pole should be
assembled as close as possible to the final support point.Professionals
experienced in such installations should perform rigging and lifting.During lift
keep clear of area and reach of pole path. Do not pass pole overhead. When
installing multi-piece flagpoles,arrange the rigging for the lift in such a way that
weight of the pole sections is supported from the bottom of the pole so that the
flagpole joints are pushed together not pulled apart during the lift.Keep clear of
power lines.
STEP 9-After inserting flagpole into ground sleeve(corrugated tube),plumb
flagpole with wooden wedges(supplied by others). Fill space between ground
sleeve and flagpole with screened dry sand. Fill ground sleeve 6"to 8"at a time
and tamp as you fill. Fill ground sleeve with sand to about 2"from top. Then cap off
with waterproof cement. For PVC ground sleeve, insert flagpole into plastic sleeve,
turn to align truck assembly with the wind,plumb pole, fill remaining void with dry
sand,and top off with thin layer of waterproof cement or caulking.
STEP 10-After waterproof cement and silicone has dried slide flash collar(part F)
down into position and caulk with matching color silicone around flagpole and
flash collar to seal the space between the flagpole and the flash collar.
Exposed Height "A" "B" "C" "D"
1 "20'-0" 2'-0" 2'-6" 30" 24"
• 25 0" 2'-6" 3'-0" 36" 24"
30'-0" 3'-0" 3'-6" 36" 24"
35'-0" 3'-6" 4'-0" 36" 30"