GDI Project: Polygon-122-04 Prepared By: Reed Kistler
Project Name: Polygon at Bull Mountain Date: 5/6/2016
Location: 1 5402 SW Seine Court, Tigard, Report#: 109
Oregon
Arrival: 1530 Departure: 1550
Weather: Sun, 80s Permit#: MST2016-00025
Site Visit Requested By: Jason (Polygon Homes) Met With (on site):
Purpose: Lot 52 Foundation Subgrade
Outstanding Issues:
Upon arrival, I observed the current grades of Lot 52 to be at approximately finished grade adjacent to Seine Court
and approximately 2 feet below finished grade adjacent to Tract D (see Site Plan). The exposed subgrade of Lot 52
appeared to consist generally of brown clay/silt.
While on site, I observed the footings of the proposed residence at Lot 52 had been cut.The exposed subgrade
within the excavations appeared to consist primarily of brown clay/silt. I used a W diameter steel foundation rod to
probe the subgrade exposed subgrade and based on penetrations the subgrade appeared generally stiff to very stiff.
Based on our observations, it is our opinion the subgrade of Lot 52's footing subgrade has been prepared in general
accordance with project specifications and our geotechnical recommendations. It is to our understanding that fill
placement to finished grade of Lot 52 will continue after placement of the footings.
550,4A- e i r +-t r co. 1-:1
Distribution:
Attachments: Site Plan (1)
Reviewed by: 9
This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and
specifications throughout the duration of the project irrespective of the presence of our representative Our work does not Include su• ,iretlkm of the contractor,the contractor's employees
or agents. Our firm is not responsible for site safety,This field report is a DRAFT representation of our field obsery :• T'%preliminary recom • r .The report can only be
considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By'
Signature: ;- ,..00111111.111111111101111)*
--
15575 SW Sequoia Parkway,Suite 100 I Portland,OR 97224 I Off 503.968.8787 I Fax 503.968.3068
N,
718-2591 J
-681-5144 43 42 4t 40 39 IA 37 36 35 t-'
•681-5100 TRACT 1,
P] 503-736-5450 _�._,._..._. 1
21-2512 sw T24AM L$I sat T AMES c SHEET IND
:, [P] 503-649-8577 _ to wATERQUJ
(P) 503-629-0111 45 19.1 SW HAWK R
/^- 19.2 SW HAWK R
3] 503-356=4500 43 41 65 66 47 66 69 717 71 72 73 32 33 34 i 14.2 SW PAW*R
ON. [P]503-645-6433 MKT A 20 SW PEACE A
46 at SW PUMA
r U swOMJ
03-531-6330 7i - 23.21 SW OANUBE
' 31 u.2 swOANIME
4l �"' et b. 721 7e 24.1 SW SER!d
< 62 n 24.2 SW SERIE UI
76 24.3 Sur SEINE 01
.g 61
46 SwAlISTK5pP1COURT75 5W154THiA
15S DISK SET ,--."1 76.1 SW THAMES
/ROY ROGERS 60 , 11r 27 SW maws
n SW Auszoul
49 = 7r ,1 15 PROFILE
1f ti 54-r 21 TREE PROM
58 57 i SI
29 PARK stow
50 59' J" - CR1 CURB REIUI
fTRACT O 1 � d 1A6L) ,�► 9 l 7 6 ';- CR7 CURa R[RY
Sw SERIE e V, i CR4 CURB RETLA
COURT J . CRS CURB RETUA
CR6 CURB RETU
SW DANUBE 0R3€ 1 E 1 CR7 CURB RETIA
Si •t1 et ed
53 56 24 1 CRB CURB RERJI
414t
4,��� 7RXT a ,9 to an -.11QTLtST1tEEu - OTLZ STRtE
3 CTL3 S'EWEF
2£21t I DTL4 St?WEF
1 W I! n lyWI DTLS SEM/ET
�I
2 ` Dra WATEI
IV \�,��v� "./..,7,4
21 8 OTl7 wATEI
voltroiC�-� / 17 123 Id' R01t50TH
Com) RD7 ,SOTN
TRACT D 3 j
ROI 150791
(i) 51 22 N i RD4 15tiTF1
TRACTC 16 2 � RDS 56LN-/
Im6 CROSS
RD7 COURT
23 III
15 21 4 I
ROI cow
R09 COIRY.
Immo,. ^t 8010 COIN
I f MALTS l
SCALE TRACT t 5w 1M14K RIME ROAD TRACT riTRACT T MAC r w SSI SIGIVAt
3 4 so t� \ -`� ss2 SIONA4
® } ss3 s6r�rw
i INCH-too FEETSHEET INDEX t L1.01 T t
I LOSHEET L1.02 TREE t
VER
LI.03 TREE t
7 GENERAL LHON NUTS
ANDSCAPE ARCHITECT: NATURAL RESOURCE CONSULTANT: 3 E305TING comonsoms It DEMOLITioNPAH L1_04 TIMI
4 PROPOSED SITE PLAN 1.1.01 TREE t
ACIFIC COMMUNITY DESIGN, INC SWCA ENVIRONMENTAL CONSULTANTS 5.1 PROPOSED GRADING PLAN L2.02 Off;
R_2 SOIL REMEDIATION PLAN .-...a MC11611