Report (49) 1�i ,i ?ft' '�41
y /
` ( c c5
CT ENGINEERING Del
INC 180 Nickerson Si,
Suite 302
Seattle,WA 98109
(206)285-4512(V)
(206)285-0618(F)
asolomon@ctengineering.corn
BULLETIN
Date: April 21,2016 Number:CT-03 Project#: 15238
Project Name: Polygon at Bull Mountain (River Terrace SF) Attached: CT-03.1
Subject: Concrete Stem Wall Height
Drawings Affected:
Description/Action:
This bulletin provides response to RFI, design clarifications and/or variation requests for the
'Polygon at Bull Mountain (River Terrace SF)' project located in Tigard, Oregon.
It's our understanding that there are some site conditions which require the concrete stem wall to
exceed 4'-0" in height. This is an acceptable revision for stem walls up to 8'-0" in height provided
the differential height between exterior finish grade and the soil elevation in the crawlspace does not
exceed 2'-0" as shown in the attached detail. Note that either finish grade or crawlspace soil
elevation may be at a higher elevation as long as the differential height between the two is not
greater than 2'-0".
PR°
X Y G NF��
c3� , 60
1 • ,
�DREG' Nk
. 2 2 1 <c.
'SFS T. GF
04/21/2016
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: April 21, 2016
Distribution:
Contact Information:
Chris Walther Polygon Northwest Company
Jason Canfield Polygon Northwest Company
Rick Tolleshauq Milbrandt Architects
Alexia Fukui Milbrandt Architects
R:\15238 River Terrace\Bulletins\15238_2016.04.21_CT03_Concrete Stem Wall Height.doc
Structural Engineers
CT-03.1
BALANCE PER 7/S6.0
EXTERIOR
4 HOR. CONT. AT
7—(r1?)
WW
FINISH GRADE _ y
I1=I�731iii-lfl1.
1II—
CRAWLSPACE
—I °•
X 4 CV
Q
_Q
IfT—�71.� 1�
• � III
ao d •
°` I 1=i11=III=1 11=
• 1 I I-
4Y, ;,III
ra G VERT. 0 18" O.C.
I 4
#4/ SID. HOOK
TIGHTLINE DRAIN RE: ARCH.
-Ti
8"
FOUNDATION DRAIN RE: / /
ARCH. 1'-4" (1) #4 HOR. CONT.
CONCRETE STEM WALL