PROJECT ID DATE REPORT NO.
Summit Ridge April 25, 2016 15
OWNER/CLIENT OWNER/CLIENT REPRESENTATIVE DAY OF WEEK PAGE
D R Horton (DRH) Reed Couch Monday 1 of 1
GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME
DHI Don Durst 1315 1345
GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT
G-Cam Excavation Sergey Partly Cloudy, 70' F
TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE
Subgrade NA Brad L. Hupy, PE GE
LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE
Lot 162
CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS:
I made this visit at the request of Don Durst to observe the subgrade for lot 162 a single family residential lot at
Summit Ridge. While on site, I met with Sergey of G-Cam.
At the time of my arrival, the contractor was just completing excavation of the lot to subgrade elevation.
I observed and probed the subgrade with a Y-inch diameter steel foundation probe. The subgrade was medium stiff to
stiff silt fill and native silt.
In my opinion, the lot has been prepared in general accordance per our recommendations and will support lightly
loaded residential foundations as intended. Lot 162 is ready for the placement of foundation forms.
A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations
® FINAL 0 PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report.A final report is an instrument of
professional service.Any condusions drawn from this report should be discussed with and evaluated by the professional involved.
ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT
I\JO iqn
FIELD REPRESENTATIVE SIGNATURE f DATE
Brad Hupy, PE /a-7-/
GCN's professionals are represented on site solely to observe operations• re contractor ' ntified,to form opinions about the adequacy of those operations,and to report those opinions to our client.
The presence and activities of our field representative do not relieve any contractor -• Its obligation to meet contractual requirements.We rely on the contractor to comply with the plans and
soedfications throughout the duration of the oroiect.irrespective of the presence of our representative.The contractor retains sole responsibility for site safety and the methods.operations.and seauences.