Loading...
Report (4)z ‘r��ot3- Vc7 J 74 5S SCJc &frt7r' -- IVED COMcheck Software Version 3.9.2 APR 18 2013 Envelope Compliance Certifi GTI; v s�oN 2010 Oregon Energy Efficiency Specialty Code Section 1: Project Information Project Type:Alteration Envelope Compliance Method:Prescriptive Project Title:LaCie Warehouse Improvements Construction Site: Owner/Agent: Designer/Contractor: 7555 SW Tech Center Drive Erica Jankowski Tigard,OR Group Mackenzie 1515 SE Water Ave,Suite 100 Portland,OR 97214 503-224-9560 ejankowski@grpmack.com Section 2: General Information Building Location(for weather data): Tigard,Oregon Climate Zone: 4c Building Space Conditioning Type(s): Nonresidential Activity Type(sl Floor Area Unspecified 0 Section 3: Requirements Checklist Envelope PASSES Climate-Specific Requirements: R-Value Proposed Max.Allowed Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC Exterior Wall 1:Solid Concrete:5"Thickness,Furling:Metal — — — — — — Exemption:No cavity will be created. Comments:Exisitng unisulated warehouse wall-no changes to wall or conditioning Door 1:Insulated Metal,Swinging — — 0.140 — 0.700 — Exterior Wall 2:Solid Concrete:5"Thickness,Furring:Metal 13.0 0.0 0.146 — 0.150 — Comments:New furred wall at space with future conditioning In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Fenestration Product Rating: 1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited, independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame. The temporary label afixed to the fenestration products must not be removed prior to inspection. Exception(s): U Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: A`1.1 Project Title: LaCie Warehouse Improvements Report date: 04/18/13 Data filename: Untitled.cck Page 1 of 3 • 2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The overall values must consider type of frame material and operator for the SHGC at normal incidence. Exception(s): 0 Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: A i. I Air Leakage, Insulation,and Component Certification: 14 3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow for expansion and contraction of the construction materials. Plans reference page/section: A M 4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and labeled and certified by the manufacturer. Exception(s): ❑ Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3. Plans reference page/section: A°,I O 5. Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing, the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area. Exception(s): Requirement is not applicable. A' Plans reference page/section: N /A- '4 ,6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12 inches or greater in width.Altemately,the insulation installers have provided a signed,dated and posted certification listing the type, manufacturer and R-value of insulation installed.Refer to code section for blown or sprayed insulation installation/settling depths and marker requirements. V7. Insulation mark installation.Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon inspection. 8. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S.FTC R-value rule. txt 9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the International Building Code. O 10.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. Exception(s): Requirement is not applicable. Plans reference page/section: ❑ 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles are parked in the doorway. Exception(s): Requirement is not applicable. Plans reference page/section: O 12.Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are sealed with a gasket or caulk between the housing and interior wall or ceiling covering. Exception(s): Requirement is not applicable. Project Title: LaCie Warehouse Improvements Report date: 04/18/13 Data filename: Untitled.cck Page 2 of 3 r Plans reference page/section: D 13.Vestibules.Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously. Exception(s): NO Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms. U Doors opening directly from a sleeping unit or dwelling unit. o Doors that open directly from a space less than 3000 sq.ft.in area. J Revolving doors. T Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors. O Requirement is not applicable. Plans reference page/section: ❑ 14.'Other'components have supporting documentation for proposed U-Factors. Exception(s): fRequirement is not applicable. lans reference page/section: Section 4: Compliance Statement Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application.The proposed envelope alteration project has been designed to meet the 2010 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements Checklist. -FIt� ill\tq►e sw1 tj ialI3 l Name-Title Signatur- Date Project Title: LaCie Warehouse Improvements Report date: 04/18/13 Data filename: Untitled.cck Page 3 of 3