Plans (17) ( CEIVEJel
- PEC 15 2014 i DATE:
I. i
VO 1IGARD PROJECT:
BINr DIVISION
ELECTRIC INITIAL INITIAL
a
Wa - ,
NI c
I i Lc, - -. .- \
CD 0
>"'.2 m W
N Y o co r
', ca CD
II
CD I
x0 0 1 c N
I �x +
i z
i x3
1 ¢ o v
O1 : - Dcr o o
0 � r
2
- -
20985 Butteville Road NE, Donald, Oregon 97020 • phone 503.678.1355 • fax 503.678.1108
www.bearelectric.com
House Panel I Panel Schedule I Red Rock
120/208V 3PH 4 Wire 100A MLO Flush 7/8/2014
CKT Description/ Load Load C.B. C.B. C.B. C.B. Load Load Description/ CKT
No. Location VA Type Amp Pole Phase Pole Amp Type VA Location No.
1 ,botl(,.cc) Iicp.cS 800 20 1 A 1 20 600 Outdoor lights 2
3 Parking lot lights 800 20 1 B 1 20 600 Outdoor lights 4
5 Temp Lights 1000 20 1 C 1 20 1000 WP Outlets 6
7 A 1 20 1000 WP Outlets 8
9 B 1 20 1000 WP Outlets 10
11 C 12
13 A 14
15 B 16
17 C 18
19 A 20
21 B 22
23 C 24
25 A 26
27 B 28
29 C 30
31 A 32
33 B 34
35 C 36
37 A 38
39 B 40
41 C 42
Total Connected Load Ph A 2400 VA
Total Connected Load Ph B 2400 VA Drawn By Gene Szekely
Total Connected Load Ph C 2000 VA Supervisor # 5259S
Maximum Phase Connected Load 2400 VA
Total Connected Load (3X Maximum) 7200 KVA 360 Volt 20.0 Amps Bear FI etric, I _
Signature /1440Z
Date 7r ( ��