Loading...
Report (9) /3/iCJKvs)`� / Por4ciar,d',or Avenue 91214 GEO Consultants Tel(503)616-9425 FIELD OBSERVATION REPORT Northwest, Inc. www.gcnweb.com PROJECT ID DATE REPORT NO. Summit Ridge April 6, 2016 12 OWNER/CLIENT OWNER/QJENT REPRESENTATIVE DAY OF WEEK PAGE D R Horton (DRH) Reed Couch Wednesday 1 of 1 GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME DHI Don Durst 1415 1500 GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT O'Rear Excavating and Construction John Kangus Sunny, 70'F TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE Subgrade NA Brad L. Hupy, PE GE LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE Lot 147 CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS I made this visit at the request of Don Durst to observe the subgrade for lot 147 a single family residential lot at Summit Ridge. While on site, I met with the excavation contractor and with Don Durst of DRH. At the time of my arrival,the contractor had just completed excavation of the lot to subgrade elevation. I observed and probed the subgrade with a Y2-inch diameter steel foundation probe. The subgrade was medium stiff to stiff native silt except at the lowest bench, for the rear continuous footing,which was weathered rock on the western half. In my opinion,the lot has been prepared in general accordance per our recommendations and will support lightly loaded residential foundations as intended. Lot 147 is ready for the placement of foundation forms. A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations ® FINAL [] PRELIMINARY conveyed in the final report may vary from and shall takence over those indicated In a precedepreliminary report A final report is an Instrument of professional service.Any condusions drawn from this report should be discussed with and evaluated by the professional Involved. ITEMS TO OBSERVE,CHECK,OR TEST DURING ND(T VISIT ...emmillinami, /Mk FIELD REPRESENTATIVE SIGNA • / DATE Brad Hupy, PE C//7/Z-17/(0 GCN's professionals are represented on site solely to observe operations of the contractor identified,to form opinions about the adequacy of those operations,and to report those opinions to our diens The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements.We rely on the contractor to comply with the plans and specifications throughout the duration of the project.Irrespective of the presence of our reoresentative.The contractor retains sole responsibility for site safety and the methods.operations.and sequences.