Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (19)
RECOVERY WORKS HVAC TIGARD, OR RECEIVE!) STRUCTURAL CALCULATIONS MAR 2 4 2016 ''i" ' DESIGN CRITERIA: DC1 BUILDING 1W131(ri RTU CALCULATIONS: RC1-4 SKETCHES: SK1-2 THE ACTIVATION OF A DUCT SMOKE DETECTOR SHALL ACTIVATE A VISIBLE AND AUDIBLE SUPERVISORY SIGNAL AT A CONSTANTLY ATTENDED LOCATION (8 PAGES TOTAL INCLUDING COVER SHEET) OMSC 606.4.1 = LCTUg4 1r , February 19, 2016 /- ,�°RE ` PROJECT NUMBER: 160 .01 749 D Gf�� E:XPmES:41;Gf j I CITY OF TIGARD REVIEWED FOR CODE COMPLIANCE • Apples OTQ tII permit L-M2 15895 SW 72ND AVE SUITE 200Addams ZiViaWoWAMill PORTLAND,OR 97224 r_ 11 (f�f� PHONE:503.226.1285 By: Dates � � l l1, FAx:503.226.1670 INFO©CIDAINC.COM OFFICE COPY