Loading...
Permit (82) CITY OF TIGARD BUILDING PERMIT I' - COMMUNITY DEVELOPMENT Permit#: BUP2015 00359 T WARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/30/2016 Parcel: 151260000300 Jurisdiction: Tigard Site address: 9585 SW WASHINGTON SQUARE RD Y04 Project: Starbucks Kiosk Subdivision:VASHINGTON SQUARE ESTATES NO. Lot: S Project Description: New Starbucks kiosk and modifications to remote storage room. Contractor: WESTERN CONSTRUCTION SERVICES INC Owner: PPR WASHINGTON SQUARE LLC 2300 E 3RD LOOP SUITE 110 PO BOX 847 VANCOUVER,WA 98661 CARLSBAD, CA 92018 PHONE: 360-699-5317 PHONE: FAX: 360-694-7818 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB Permit Fee-Additions,Alterations, 03/29/2016 $1,130.11 Demolition Occupancy Grp: B Occupancy Load: 23 12%State Surcharge-Building 03/29/2016 $135.61 Dwelling Units: 0 Plan Review 12/30/2015 $734.57 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 03/29/2016 $452.04 Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 03/29/2016 $220.00 Value: $103,155 Info Process/Archiving-Lg$2.00(over 03/29/2016 $80.00 11x17) Metro Const.Excise Tax 03/29/2016 $123.79 Floor Areas: Total Area: 683 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,876.12 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATT ION: • -.on law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001- 010 through OA' •52-00 :090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. e- Issue By: f / Permittee Signature: Call 503.639.4175 by 7:00 a.m,for the next available in Oct n date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. •t Buildin Permit A lica CE1VE1 Commercial FOR OFFICE ISE ONLY City of Tigard i1 g 2015 Received Date/By /.. I 45-- I, Permit No.: `a "0/573e0557 13125 SW Hall Blvd.,Tigard,OR L� Plan Review- ' 0 Phone: 503.718.2439 Fax: 503.598.1960 DateBy' '-'9 I (�1 16j Other Permit: Inspection Line: 503.639.4175 r S*� T I G A R D p ��l j �J� Date luris: I ® See Page 2 for Internet: www.tigard-or.gov v Notified Method: �� Supplemental nformation BUILDING DI�Ji10] .. ' Sit: _ t I,�r II _ TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILYD * LING ®New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ElAccessory building ❑Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: q15.78 JOB SITE INFORMATION AND LOCATION Total number of floors: — Job site address:.,95-9-AV Washington Square Road New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Yo y Project name:Starbucks Kiosk Covered porch area: square feet Cross street/directions to job site:SW Greenburg Road/HWY 217 Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: 1 Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. New starbucks kiosk and modification of existing remote storage room within mall Valuation: $103155 Landlord to provide new utilities to serve kiosk and electricallhvac for remote Existing building area: square feet storage. New building area: 650 square feet "t< 0 PROPERTY OWNER ® TENANT Number of stories: 1 Name:Starbucks Type of construction: II-B i Address:2401 Utah S. Occupancy groups: City/State/ZIP:Seattle/WA/98134 Ex Phone:(206)318-0013 Fax:( New:isting: B ® APPLICANT,/ ®)CONTACT PERSON BUILDING PERMIT FEES* Business name:. Fe,cma rI AC�j (Pleaserejerrojeeschedule) t1� Contact name: c_\o E Cf c2.Q Structural plan review fee(or deposit): $822.89 ' FLS plan review fee(if applicable): II( Address: 13400 4te \t Or.. 42.0 a- — — Total fees due upon application: City/State/ZIP:l DWAIYI an petits C.4 Q I'2 3 �`� 5 714412, Amount received: Phone:( Fax: PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* P. E-mail: U.6J€CCOO4 1;etn ii--place•. C'oM Commercial and residential prescriptive installation of . CONTRACTOR 47, roof-top mounted Photo Voltaic Solar Panel System. 1 ; Business name: (NtS�r,, �vj r��t bt ✓1�S Submit two(2)sets of roof plan with connection details � 1 ., �� and fire department access,along with the Oregon Address: 364f) o, cy I d Solar InstallatiorkSsecialry Code ch est. k . City/State/ZIP: Jay-IJ L° - (.Jy9Permit fee(i ludes pl eview ( $�p(p � $180.00 Phone:( and ad i five fees): 3� `j c1 " �j 7 Fax:( ) State surcharge /o o •ermit fee): $21.60 CCB lic.: / p!' : 7/ � Tota..ee due upon app ,.tion: $201.60 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: �Q� �2 -,k Date: ..1/;0/�`` * Fee methodology set by Tri-County Building Industry p Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) y r.. City of Tigard i 71 s all COMMUNITY DEVELOPMENT DEPARTMENT TIGBuilding Permit Review — Commercial - No Land Use Building Permit #: ---6 u if 5—a 0 3 Site Address: 9x5 SW Wash►n Von SI,, Rd. Suite/Bldg#: N(Qy Project Name: 5+a,110vtek.S (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: i vJ kiosk in ex,is+1,9 kiosk \acai-1o1(1 Existing Business Activity: Sale-%-or ifi ec rek-al I Proposed Business Activity: }jN ani arinkin,) 1 6tccesso"1 -I-o scdes-cyr fin rP2 r i\ (0I0.1) ti Verify site address/suite#exists and active in permit system. River Terrace Neighborhood: ❑ Yes No 24 Zoning: M.v Vermitted Use: 'Yes ❑ No ❑ Spec Space LTJ Confirm no land use required. Business License: J Exists: ElYes M No, applicant notified to obtain business license Notes: Approved by Planning: \i/671rn t.-P trb4l.Gl'1 Date: 12 2 9 I i S Revisions (after Building Submittal only) Reviewer Date Revision 1: E Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: /0.../ /c— Site Plans: # 3 Building Plans: # Building Permit#: 42-/Enter building permit# above. Workflow Routing: [']Planning 0—Permit Coordinator D iilding Workflow Sign-off: 121'Sign-off for Planning(include notes from planning review) Route Application Documents: [fiBuilding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: i, , ,f Date: /44/5 l:\Building\Forms\BldgPermitRvw COM NoLandUse 070915.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes !' /A Tigard Trans SDC: ❑ Yes �� /A Parks SDC: ❑ Yes (IR:N/A OK to Issue Permit Approved by Permit Coordinator: Afrr---Date:/05- I:\Building\Fonns\BldgPennitRvw_COM_NoLandUse_0709I 5.docx nen Permit Place IECEIVE, December 28, 2015 DEC 2 8 2015 City of Tigard CITY ofGa Community Development BUILDINr UPVISIOit 13125 SW Hall Blvd. Tigard, OR 97223 503-718-2439 REF:AO-15-Starbucks(Kiosk)-Portland, OR We are enclosing the following: Sent Via: ® Plans ❑ Comments/Corrections ® Fed Ex ❑ UPS ❑ DHL ®Applications ❑ Permit ❑ Fax ❑ USPS Tracking#: ® Other:check Description of Items: r ) • 3 — Sets for review MA?' rov o Hand Delivered (print name): • 1 — Building application o14'6.7 4f, 4frele 4,1 • 1 — Electrical application --r • 1 _ Plumbing application Dr;Vri'/Al • 1 — Check #011059 ($822.89)t, ® For Submittal [' For Permit ❑As Requested ❑ For RE-Submittal ❑ For Construction ❑To Be Completed &Returned ❑ For Revision ❑ For Your Reference/Records [' Return Red-Lines ❑ For Approval ❑ Payment ❑ Other: Enclosed in this package are 3 sets of full plans for review; including applications for building, electrical, and plumbing and 1 check for$822.89 for plan check fees. Please email me the receipt upon intake to iose@permitplace.com and if you have any questions,feel free to contact me. Thank You Jose Castro Project Manager 818-574-4727 Jose@permitplace.com 818.786.8960 • 13400 Riverside Dr,Suite 202. Sherman Oaks, CA 91423 • www.permitplace.com 1 TM Permit Place February 17, 2016 RE CEIV ATTN: Dan Nelson Senior Plans Examiner FEB 18 2016 City of Tigard (503)718-2436111�� �U A dann@tigard-or.gov �Y� ��D1\1I�1dl� Community Development 13125 SW Hall Blvd. Tigard,OR 97223 RE:AO-15-Starbucks (Kiosk)-Portland, OR;2"d Submittal (BUP2015-00359)/9585 Washington Square Rd We are enclosing the following: Sent Via: ® Fed Ex ❑ UPS ❑ DHL ® Plans ❑ Comments/Corrections ❑Applications ❑ Permit ❑ Fax ❑ USPS Tracking#: n Other:check Description of Items: • 3 — Sets signed and sealedp for review ❑ Hand Delivered (print name): • 3 — Permit Record Status Sheet • 3 — List of affected sheets and changes made n For Submittal ❑ For Permit ❑ As Requested ® For RE-Submittal ❑ For Construction ❑To Be Completed &Returned ❑ For Revision ❑ For Your Reference/Records ❑ Return Red-Lines ❑ For Approval ❑ Payment ❑ Other: Dear Mr. Nelson, Enclosed in this package are 3 sets of revised full plans for review. Per our conversation,this project (BUP2015-00359) was previously approved on the 1St submittal but there have been revisions made per the owners request. Please recheck the plans and advise on any changes that are required. If you have any questions, please feel free to contact me. Thank You, Jose Castro Project Manager 818-574-4727 Jose@permitplace.com 818.786.8960 • 13400 Riverside Dr,Suite 202.Sherman Oaks,CA 91423 • www.permitplace.com . 1 Permit P laCe.M Starbucks Kiosk-Washington Square Mall Revisions February 16, 2016 Dear Mr. Nelson, Here is the list of affected sheets and their respective changes: 1. G-002.1 - Remote storage modified per landlord redlines. A demising wall was added to seclude the mall equipment from Starbucks storage and vice versa. 2. 1-112 - Removed managers desk (relocated to remote storage). 3. 1-121 - Added signage and menu boards. Removed canopy and lighting. 4. 1-211/1-212 - Added signage and menu boards. Removed canopy and lighting. 5. Utility tower height was reduced. 6. 1-301 - Remote storage modified per landlord redlines. A demising wall was added to seclude the mall equipment from Starbucks storage and vice versa. 7. Relocated managers desk and IT rack to remote storage (these items don't fit in the reduced height tower at the kiosk). 8. 1-501 - Added details 5, 6, 9 & 13 for new demising wall in remote storage. 9. M-2000 - relocated cassette fan coil due to demising wall addition. 10.P-3000 - revised location of floor sink in remote storage per demising wall addition. 11.E-0004 - revised lighting fixture schedule to omit canopy lights. 12.E-2000 - Remote storage modified per landlord redlines. A demising wall was added to seclude the mall equipment from Starbucks storage and vice versa. 13.Added signage and menu boards. Removed canopy and lighting. Revised keynotes accordingly. 14.E-3000 - . Relocated managers desk and IT rack to remote storage. Omitted outlets at kiosk accordingly. 15.E-5100 - Panel A Schedule - revised circuit 30 to spare due to lighting removal. Panel G -circuit 14, reduce lighting load due to reduced lighting in storage room. 16.E-6000 - revised lighting compliance certificate due to lighting reduction. If you have any questions, feel free to contact me. Kind Regards, Jose Castro Project Manager Permit Place 13400 Riverside Drive, Suite 202, Sherman Oaks, CA 91423 Office: 818.786.8960 x1140 Direct: 818.574.4727 Cell: 818.427.2938 Fax: 818.475.5303 E-mail: icastro(&permitplace.com 818.786.8960 • 13400 Riverside Dr,Suite 202. Sherman Oaks,CA 91423 • www.permitplace.com Tigard Triangle Urban Renewal Plan Technical Advisory Committee Group TAC Member Email Metro—Grant Chris Ford chris.ford@oregonmetro.gov Metro—TTSP 3/28 email to Brian Harper brian.harper@oregonmetro.gov ODOT 3/24 email to Lidwien Lidwien.RAHMAN@odot.state.or.us TVFR 3/24 email to Allen allen.kennedy@tvfr.com TTSD Kelly Hossaini Kelly.Hossaini@MillerNash.com CWS Damon Reische ReischeD@CleanWaterServices.org TVWD 3/28 email to Carrie carrie.pak@tvwd.org TriMet Kelly Betteridge BetteriK@trimet.org 503-962-2426 Reach Jessica Woodruff iwoodruff@reachcdc.org CPAH Rachael Duke rduke@cpahinc.org 503-293-4038 GBD Architects Need contact from Lloyd LO 3/28 emails planning@lakeoswego.city LO Chamber of Commerce (LO Staff—no) Igbaboard@gmail.com LO Transpo Advisory Board keith@lake-oswego.com(Chamber) Lake Grove Business Assoc Tigard Chamber of Commerce Debi Mollahan debi@tigardchamber.org 503-639-1656 PCC Celina Baguiao celina.baguiao@pcc.edu Community Relations Manager City Staff-CD Cheryl Caines cherylc@tigard-or.gov Sean Farrelly sean@tgard-or.gov Buff Brown buffb@tigard-or.gov City Staff- Finance 3/28 email to Toby City Staff- PW 3/28 email to Brian City Staff- Eng Lori Faha? Potential TAC Notification List Group Contact Person Email Beaverton School District Port of Portland Tualatin River Keepers Tualatin Watershed Council Tigard Tualatin Aquatic Center THPRD NW Regional ESD Washington County TWD 1 FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ith 11 g Transmittal Letter 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: �GL-,. DATE RRECKIVEP DEPT: BUILDING DIVISION FEB 18 2016 C(lYOI iiGAtt1U FROM: r. - BUILDING 9IVIS101� COMPANY: --P .., A iv‘„._1(------- Q _ PHONE: \'_--- S 1 CS _ 1-57 4 r 47,99,97 By RE: ( S LD2t). /05 &V.:905--eic 35-1 (Site Address) (Permitber) P� ki k� kipS -� ro�ect name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: 1 Additional set(s)of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. _ Beam calculations. Engineer's calculations. Other(explain): `` _1 REMARKS: (:- _ 4-5 -1Z�213 6)--✓`r01.5)t. ti?-0--4-b--16 i t-- +)- 4i". 'a W a:1Z H f , ,i:11`,,;; I Routed to Permit Technician:, Date: 'Z" (,(=, IMMEPPA1•,_ ' Fees Due: ■ Yes IlerTo Fee Descri.tion: Amount lue: $ $ $ $ Special Instructions: Re.rint Permit .er PE : ❑ Yes • No ❑ Done A. •licant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012 Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 9585 SW WASHINGTON SQUARE RD Y04, TIGARD, OR, 97223 Commercial - Building 299 Final inspection PASS - C of O BUP2015-00359 Jeff Grove Violation Summary: Inspector Contractor