Loading...
Specifications (8) frcs rocs= c 232 ? s, 5IL) J' i s7— �+� Delson Engineering, Inc. 1204 NE 146TH AVE VANCOUVER, WA.98684 PHONE: (360)944-7094 john@delsonengineering.com Structural Calculations For BLUME- FENCE REVISIQN 6875 SW PINE ST TIGARD, OR 97223 (JOB#: B15-11-145) REVISED 3/24/16 DESIGN CRITERIA: IBC 2012 SNOW 25 PSF Table of Contents: LATERAL LOAD ANALYSIS F-1 to F-8 PLANS COPY CP-1 to R-CP-2, .,ED ROA- CC • • „A 4 • 9,,.0 q9 ds. J. DE. -S [EXPIRES: 12/30//7 , '+. p of Tigard E^i'n',Ja(7?d Pial i; EXCLUSION OF LIABILITIES 1_,9-1)4 I. DISCLAIMER AND RELEASE BUYER HEREBY WAIVES,RELEASES AND RENOUNCES ALL WARRANTIES(EXPRESSED OR IMPLIED), OBLIGATIONS,AND LIABILITIES OF DELSON DESIGN&ENGINEERING,INC.AND ALL OTHER RIGHTS,CLAIMS AND REMEDIES AGAINST DELSON DESIGN&ENGINEERING,INC.(EXPRESS OR IMPLIED)WITH RESPECT TO ANY NONCONFORMITY,IMPROPER INSTALLATION,WORKMANSHIP OR MATERIALS. II.EXCLUSION OF CONSEQUENTIAL AND OTHER DAMAGES DELSON DESIGN&ENGINEERING,INC.SHALL HAVE NO OBLIGATION OF LIABILITY,WHETHER ARISING IN CONTRACT(INCLUDING WARRANTY),TORT(INCLUDING ACTIVE,PASSIVE OR IMPUTED NEGLIGENCE)OR OTHERWISE,FOR LOSS OF USE,REVENUE OR PROFIT,OR FOR ANY OTHER INCIDENTAL OR CONSEQUENTIAL DAMAGES.ADAPTATION OF THE DESIGN TO MEET SPECIFIC SITE CONDITIONS,SPECIFIC STATE OR LOCAL CODES AND REGULATIONS,IS THE RESPONSIBILITY OF THE BUYER. III.THIS PRODUCT IS FOR SINGLE USE ONLY AND IS NOT TO RE REUSED WITHOUT SPECIFIC AUTHORIZATION. DELSON ENGINEERING INC. JOB= .��_��j SNEET NO. OF 1204 NE 146T14 CT CALCULATED 8Y: J.3) DATE: 3®lr I�If VANCOUVER,WA 98684 SCALE: N/A(360)944-1094 LATERAL LOAD ANALYSIS FOR: jut -- rr icE L.00AT I ON: 6'015. s r- '7 'E sr 71‘.4g5 1yazs 1.) WIND ANALYSIS - PER 20 I L ISG, 120 m- EXPOSURE 3" ,Escf 7-1° 21 77-r Loa) To .SQL 777' ___. ` � r� C c. c . FRONT - SACK ‘ovaritAti _ .j, A (/ 012x,C = ‘c4 ,„sp /1.1 g , e7 tet' - c�ircr�, WJL 6 -(cfPA4 1>Tov' -(1'17b. u S JOE: 1 i -ii-i F ' _.m; DELSON ENGINEERING INC. SHEET NO, F OF l; I�104 NE 146TH CT CALCULATED 8Y: .J�, DATE: .3/24A ,-„ VANCOUVER, WA 98684 SCALE: N/A (360)944-'1094 may/ `: .C,. _ .. a el-- f - - C-1 77 G./it-pl.. N prow , �,, � 4 / 7 ,_ itstAp Tc i i) ( i) (ZI. I'ds°) .k — - /O /of ?i' 1,====ct 6 ' 44L ..1 •• ajt ,z,„C Fpfri- -fir 1 Ba At/ Flz.4"—.4")..0 i r 00.1 c) f 'sh Te, ‘- -r 7411-- 4-- X54 15 P 1 aSif 1 S X 3 6-.door :.(i D C. DELSON ENGINEERING INC. Project Title: BLUME FENCE 1204 NE 146 AVE Engineer: Project ID: B15-11-145 VANCOUVER WA 98684 Project Descr: 6875 SW PINE ST TIGARD 97223 360-944-7094 1", 3 JOHN@DELSONENGINEERING.COM Printed 28 NOV 2015.12;27 PM Wood Beam File=c:1B15-JOBS1815-CA-21B11F1F-11815-11-1.EC6 ENERCALC,INC.1983-2015,Build:6.15.10.6,Ver..6.15.10.6 Lic.#:KW-06002311 Licensee:JOHN DELSON Description: G-1 GIRD CHECK CODE REFERENCES Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10 Load Combination Set: IBC2012 Material Properties Analysis Method: Allowable Stress Design Fb-Tension 975.0 psi E:Modulus of Elasticity Load Combination IBC2012 Fb-Compr 975.0 psi Ebend-xx 1,300.0 ksi Fc-Prll 900.0 psi Eminbend-xx 470.0 ksi Wood Species :Alaska Cedar Fc-Perp 525.0 psi Wood Grade : No.1 Fv 165.0 psi Ft 525.0 psi Density 29.330pcf Beam Bracing : Completely Unbraced W(0.109) * * * * + 1 ro 2x6 Span=6.0 ft Applied Loads Service loads entered. Load Factors will be applied for calculations. Uniform Load: W=0.1090, Tributary Width=1.0 ft,(WIND) DESIGN SUMMARY Design OK Maximum Bending Stress Ratio = 0.987 1 Maximum Shear Stress Ratio = 0.251 : 1 Section used for this span 2x6 Section used for this span 2x6 fb:Actual = 1,867.95psi fv:Actual = 66.14 psi FB:Allowable = 1,891.71 psi Fv:Allowable = 264.00 psi Load Combination +D+0.60W+H Load Combination +D+0.60W+H Location of maximum on span = 0.000ft Location of maximum on span = 0.000 ft Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1 Maximum Deflection Max Downward Transient Deflection 1.126 in Ratio= 126 Max Upward Transient Deflection 0.000 in Ratio= 0 <120 Max Downward Total Deflection 0.676 in Ratio= 212 Max Upward Total Deflection 0.000 in Ratio= 0<120 Overall Maximum Deflections Load Combination Span Max.""Defl Location in Span Load Combination Max."+"Defl Location in Span W Only 1 1.1259 6.000 0.0000 0.000 Vertical Reactions Support notation:Far left is#1 Values in KIPS Load Combination Support 1 Support 2 Overall MAXimum 0.654 Overall MINimum 0.294 +D+H +D+L+H +D+Lr+H +D+S+H +D+0.750Lr+0.750L+H +D+0.750L+0.750S+H +D+0.60W+H 0.392 DELSON ENGINEERING INC. Project Title: BLUME FENCE 1204 NE 146 AVE Engineer: Project ID: B15-11-145 VANCOUVER WA 98684 Project Descr: 6875 SW PINE ST TIGARD 97223 C 360-944-7094 r JOHN@DELSONENGINEERING.COM Panted.28 NOV 2015.12:27PM File=c:\B15-JOBS1B15-CA-21811F1F-1\B15-11-1.EC6 Wood Beam ENERCALC,INC.1963-2015,Build:6.15.10.6,Ver..6.15.10.6 Lic.#:KW-06002311 Licensee:JOHN DELSON Description: G-1 GIRD CHECK Vertical Reactions Support notation:Far left is#1 Values in KIPS Load Combination Support 1 Support 2 +D+0.70E+H +D+0.750Lr+0.750L+0.450W+H 0.294 +D+0.750L+0.750S+0.450W+H 0.294 +D+0.750L+0.750S+0.5250E+H +0.60D+0.60W+0.60H 0.392 +0.60D+O.70E+0.60H D Only Lr Only L Only S Only W Only 0.654 E Only H Only • , DELSON ENGINEERING INC. Project Title: BLUME FENCE • 1204 NE 146 AVE Engineer: Project ID: B15-11-145 VANCOUVER WA 98684 Project Descr: 6875 SW PINE ST TIGARD 97223 360-944-7094 5" JOHN@DELSONENGINEERING.COM Printed.28 NOV 2015.12:28PM Wood Beam File=c:1815-JOBS1815-CA-21B11F1F-11815.11-1.EC6 ENERCALC,INC.1983-2015,Build:6.15.10.6,Ver.6.15.10.6 Lic.#:KW-06002311 Licensee:JOHN DELSON Description: P-1 POST CHECK CODE REFERENCES Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10 Load Combination Set: IBC2012 Material Properties Analysis Method: Allowable Stress Design Fb-Tension 1,150.0 psi E:Modulus of Elasticity Load Combination iBC2012 Fb-Compr 1,150.0 psi Ebend-xx 1,200.0ksi Fc-Prll 775.0 psi Eminbend-xx 440.0 ksi Wood Species :Alaska Cedar Fc-Perp 525.0 psi Wood Grade : No.1 Fv 155.0 psi Ft 475.0 psi Density 29.330pcf Beam Bracing : Completely Unbraced W(0.654) W(0.654) 1 "P 6x6 Span=7.50 ft Applied Loads _ Service loads entered. Load Factors will be applied for calculations. Point Load: W=0.6540 k j 0.50 ft,(WIND) Point Load: W=0.6540 k 7.50 ft,(WIND) DESIGN SUMMARYDesi n g OK Maximum Bending Stress Ratio = 0.738 1 Maximum Shear Stress Ratio = 0.157 : 1 Section used for this span 6x6 Section used for this span 6x6 fb:Actual = 1,358.51 psi fv:Actual = 38.92 psi FB:Allowable = 1,840.00 psi Fv:Allowable = 248.00 psi Load Combination +D+0.60W+H Load Combination +D+0.60W+H Location of maximum on span = 0.000ft Location of maximum on span = 0.000 ft Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1 Maximum Deflection Max Downward Transient Deflection 1.743 in Ratio= 102 Max Upward Transient Deflection 0.000 in Ratio= 0 <100 Max Downward Total Deflection 1.046 in Ratio= 172 Max Upward Total Deflection 0.000 in Ratio= 0<120 ........._........... Overall Maximum Deflections Load Combination Span Max.""Defl Location in Span Load Combination Max."+"Defl Location in Span W Only 1 1.7433 7.500 0.0000 0.000 Vertical Reactions Support notation:Far left is#1 Values in KIPS Load Combination Support 1 Support 2 Overall MAXimum 1.308 Overall MINimum 0.589 +D+H +D+L+H +D+Lr+H +D+S+H +D+0.750Lr+0.750L+H +D+0.750L+0.750S+H DELSON ENGINEERING INC. Project Title: BLUME FENCE ' 1204 NE 146 AVE Engineer: Project ID: B15-11-145 VANCOUVER WA 98684 Project Descr: 6875 SW PINE ST TIGARD 97223 360-944-7094 F.. C JOHN@DELSON ENGINEERING.COM Panted.28 NOV 2015.12 28PM Wood Beam File=c:1815-JOBS1815-CA-21B11F1F-1161511-1.EC6 ENERCALC,INC.1983 2615,8uild:6.15.10.6,Ver:6.15.10.6 Lic`#:KW-06002311 w.: Licensee:JOHN DELSON Description: P-1 POST CHECK Vertical Reactions Support notation:Far left is#1 Values in KIPS Load Combination Support 1 Support 2 +D+0.60W+H 0.785 +D+0.70E+H +D+0.750Lr+0.750L+0.450W+H 0.589 +D+0.750L+0.750S+0.450W+H 0.589 +D+0.750L+0.750S+0.5250E+H +0.60D+0.60W+0.60H 0.785 +0.60D+0.70E+0.60H D Only Lr Only L Only S Only W Only 1.308 E Only H Only , DELSON ENGINEERING INC. Project Title: BLUME FENCE 1204 NE 146 AVE Engineer: Project ID: B15-11-145 VANCOUVER WA 98684 Project Descr: 6875 SW PINE ST TIGARD 97223 360-944-7094 F -7 JOHN@DELSONENGINEERING.COM >r:nied'.25 MAR 2(118.1'14,11,k1 File=C:\815-JOBS\815-CA-21811 F1 F-1\B15-11-1.EC6 Pole Footing Embedded in Soil ENERCALC,INC.1983-2016,Build:6.16.3.4,Ver:6.16.3.4 ;E .,Yet Af-F16D€f231 a� .<'.,-. :. '''.-::-L Licensee.JOHN DELSON Description: F-1 POST FOOTING Code References Calculations per IBC 2012 1807.3, CBC 2013,ASCE 7-10 Load Combinations Used :ASCE 7-10 General Information Pole Footing Shape Rectangular Pole Footing Width 18.0 in Calculate Min.Depth for Allowable Pressures No Lateral Restraint at Ground Surface pp Allow Passive 450.0 pcf - - Max Passive 1,500.0 psf Controlling Values Governing Load Combination: +D+0.60W+H - Lateral Load 0.3924 k Moment 3.139 k-ft NO Ground Surface Restraint Pressures at 1/3 Depth Soil Surface No lateral restraint Actual 486.697 psf Allowable 490.565 psf - MinimumRequired Depth 3.375 ft Footing tGtth=1'-6' ' Footing Base Area 2.250 ft^2 Maximum Soil Pressure 0.0 ksf ................. __............ Applied Loads Lateral Concentrated Load (k) Lateral Distributed Loads (kit) Vertical Load (k) D:Dead Load k k/ft k Lr:Roof Live k k/ft k L:Live k k/ft k S:Snow k k/ft k W:Wind 0.6540 k k/ft k E:Earthquake k k/ft k H:Lateral Earth k k/ft k Load distance above TOP of Load above ground surface ground surface 8.0 ft ft BOTTOM of Load above ground surface ft Load Combination Results Forces @ Ground Surface Required Pressure,at 113 Depth Soil increase Load Combination Loads-(k) Moments-(ft-k) Depth-(ft) Actual-(psf) Allow-(psf) Factor +D+H 0.000 0.000 0.13 0.0 0.0 1.000 +D+L+H 0.000 0.000 0.13 0.0 0.0 1.000 +D+Lr+H 0.000 0.000 0.13 0.0 0.0 1.000 +D+S+H 0.000 0.000 0.13 0.0 0.0 1.000 +D+0.750Lr+0.750L+H 0.000 0.000 0.13 0.0 0.0 1.000 +D+0.750L+0.7505+H 0.000 0.000 0.13 0.0 0.0 1.000 +D+0.60W+H 0.392 3.139 3.38 486.7 490.6 1.000 +D+0.70E+H 0.000 0.000 0.13 0.0 0.0 1.000 +D+0.750Lr+0.750L+0.450W+H 0.294 2.354 3.00 439.3 440.9 1.000 DELSON ENGINEERING INC. Project Title: BLUME FENCE 1204 NE 146 AVE Engineer: Project ID: B15-11-145 VANCOUVER WA 98684 Project Descr: 6875 SW PINE ST TIGARD 97223 360-944-7094 F_� JOHN@DELSONENGINEERING.COM ?r ntee 25 MAR 2016.11 1,1AM Pole Footing Embedded in Soil File=C:1B15-J0BS\B15-CA-21811 F1 F-11815-11-1.EC6 ENERCALC,INC.1983-2016,Build:6.16.3.4,Ver:6.16.3.4 ._.MN: 6002311 a _; Licensee^JOHN DELSON. Description: F-1 POST FOOTING +D+0.750L+0.750S+0.450W+H 0.294 2.354 3.00 439.3 440.9 1.000 +D+0.750L+0.750S+0.5250E+H 0.000 0.000 0.13 0.0 0.0 1.000 +0.60D+0.60W+0.60H 0.392 3.139 3.38 486.7 490.6 1.000 +0.60D+0.70E+0.60H 0.000 0.000 0.13 0.0 0.0 1.000