Loading...
Report (21) xvu3TjotS - l>(X� ' Main 5t3 -17 Scv � v• t: sa cascaac Single 11-7/8" BCI® 5000-1.7 DF LeverFloor Joists\J1(i2455) Dry l 2 spans I No cantilevers 10/12 slope September 23,2015 12:57:52 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.m mdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Main Level\FloorJoists V1(12455) Address: LOT3 Specifier: PDG City,State,Tip:, Designer. Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE Bk11?r Code reports: ESR-1336 Alf sc: �1EJ) 1 OCT 52015 CIT OF 96,410) vt '--W - 1 W elf ' w '� a aWirgai ; 4 ,+ s � � �: .,�. �''w� ,��: 14-11-10 BO 61 14-00-12 B2 Total Horizontal Product Length=29-00-06 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8" 539/60 120/0 B1,5-1/2" 1,413/0 353/0 B2,3-12" 501 /76 106/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf.Lin.(lb/ft) L 00-00-00 28-11-06 80 20 n/a Disclosure 1 Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 1,974 ft-lbs 62.7% 100% 2 06-07-00 be verified by anyone w ho w ould rely on Neg.Moment -2,425 ft-lbs 77% 100% 1 14-11-10 output as evidence of suitability for End Reaction 659 lbs 462% 100% 2 00-00-00 particular application.Output here based Int.Reaction 1,766 lbs 69.9% 100% 1 14-11-10 on building code-accepted design End Shear 622 lbs 38.3% 100% 2 00-04-06 properties and analysis methods. Cont Shear 876 lbs 53.9% 100% 1 14-08-14 hstallation of BOISE engineered wood Total Load Dell. U798(0.22') 45.1% n/a 2 07-02-00 products must be in accordance with Live Load Defl. L/942(0.187) 51% n/a 5 07-04-05 current Installation Guide and applicable building codes.To obtain Installation Guide Total Neg.Defl. L/999(-0.038') n/a n/a 2 19-05-05 or ask questions,please call MaxDefl. 0.22" 22% n/a 2 07-02-00 Span/Depth 14.8 n/a n/a 0 00-00-00 (800)232-0788 before installation. BC CALM, BC FRAMER®,AJSTM', %Allow %Allow ALLJOIST®, BC RIM BOARD'"',BCI®, Bearing Supports Dim.(L xW) Value Support Member Material BOISEGLULAMTM',SIMPLE FRAMING BO V1FaII/PI ate 4-3/8"x 2" 659 lbs 17.7% 462% Unspecified SYSTEM®,VERSA-LAMS,VERSA-RIM B1 VVall/Plate 5-12"x2" 1,766Ibs 37.8% 69.9% Unspecified PLUS®,VERSA-RIMID, B2 Vliall/Plate 3-1/2"x 2" 607 lbs 20.4% 42.6% Unspecified VERSA STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Notes Products L.L.C. Design meets User specified (L/360)Total load deflection criteria. Design meets User specified (L/480)Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 IRA Cascade Single 11-7/8" BCI® 5000-1.7 DF Main LeveRFloor Joists1J4(i2491) Dry'1 span I No cantilevers 10/12 slope September 23, 2015 12:57:52 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Main Level\Floor Joists\J402491) Address: LOT 3 Specifier. PDG City,State,Zip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: ,, r, ,„; . ,, ,, v n ,, ', v 0\,_ , / ,j 1 1 - 1 ,, b ,, , ir�mo,„ .„, a .wst�o r .d ' Zie.',,, 4i . r': }y, 1 i »2 -, �� �- . e�r �rx te. - . im,n�c� ti.<n_� ky �a �1'%�b „- � & s f�-sr :y; , ,0,'- • 13-00-06 BO B1 Total Horizontal Product Length=13-00-06 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8” 524/0 131/0 B1,3-1/2" 627/0 167/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 13-00-06 80 20 n/a 1 10(i287) Conc.Pt.(lbs) L 12-10-10 12-10-10 109 37 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 1,953 ft-lbs 62% 100% 1 06-06-10 be verified by anyone w ho would rely on End Reaction 794 lbs 55.7% 100% 1 13-00-06 output as evidence of suitability for End Shear 619 lbs 38.1% 100% 1 00-04-06 particular application.Output here based Total Load Defl. U865(0.173") 41.6% n/a 1 06-06-10 on building code-accepted design Live Load Defl. U1,081 (0.139") 44.4% n/a 2 06-06-10 properties and analysis methods. Max Defl. 0.173" 17.3% n/a 1 06-06-10 Installation of BOISE engineered wood Span/Depth 12.6 n/a n/a 0 00-00-00 Products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide %Allow %Allow or ask questions,please call Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation. BO Wall/Plate 4-3/8"x2" 655 lbs 17.6% 46% Unspecified B1 A ll/Plate 3-1/2"x 2" 794 lbs 26.7% 55.7% Unspecified BC CALM, BC FRAMER®,AJST, ALLJOIST®, BC RIM BOARDTM',BCI®, Notes SYSTEMS GLULAMTM,SIMPLE FRAMING SYSTEMS,VERSA-LAND,VERSA-RIM Design meets User specified (L/360)Total load deflection criteria. PLUM,VERSA-RIMS, Design meets User specified(L/480)Live load deflection criteria. VERSA-STRANDS,VERSA-STUDS are Design meets arbitrary(1")Maximum total load deflection criteria. trademarks of Boise Cascade Wood Calculations assume Member is Fully Braced. Products L.L.C. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 (Ve�s eccascade Single 11-7/8" BCI® 5000-1.7 DF Main LeveRFloor Joists\J5(i2490) `����+�i�YY Dry I 1 span I No cantilevers I 0/12 slope September 23,2015 12:57:52 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Main Level\Floor Joists J5(i2490) Address: LOT3 Specifier. PDG City,State,Tip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: o :ale.„ , ' {�,., ''z�C, .�.. ,..= "`'."._aa{:,.a'a. c ,', ;� — "F „ 12-08-14 BO B1 Total Horizontal Product Length=12-08-14 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8" 480/0 120/0 B1,3-1/2" 469/0 117/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 12-07-14 75 19 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 1,747 ft-lbs 55.4% 100% 1 06-04-14 be verified by anyone w ho w ould rely on End Reaction 601 lbs 42.1% 100% 1 00-00-00 output as evidence of suitability for End Shear 566 lbs 34.9% 100% 1 00-04-06 particular application.Output here based Total Load Defl. L/982(0.149") 36.6% n/a 1 06-04-14 on building code-accepted design Live Load Defl. L/999(0.119") n/a n/a 2 06-04-14 properties and analysis methods. Max Defl. 0.149" 14.9% n/a 1 06-04-14 Installation of BOISE engineered wood Span/Depth 12.3 n/a n/a 0 00-00-00 Products must be in accordance with current Installation Guide and applicable % % building codes.To obtain Installation Guide Allow Allow or ask questions,please call Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation. BO VVaII/PI ate 4-3/8"x2" 601 lbs 16.2% 42.1% Unspecified B1 Wall/Plate 3-1/2"x 2" 586 lbs 19.7% 41.1% Unspecified BC CALC®,BC FRAMI72®,AJSTM', ALLJOIST®,BC RIM BOARDTm,BCI®, NotesBOISE GLULAMTM',SIMPLE FRAMING SYSTEMS),VERSA-LAME),VERSA-RIM Design meets User specified(L/360)Total load deflection criteria. PLUS® VERSA-RM® Design meets User specified (L/480)Live load deflection criteria. VERSA-STRAND®,VERSA-STUD®are Design meets arbitrary(1")Maximum total load deflection criteria. trademarks of Boise Cascade Wood Calculations assume Member is Fully Braced. Products L.L.C. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 L (Oeoiiecascadc Single 11-7/8" BCI® 5000-1.7 DF Main Level\Floor Joists\J3(i2590) Drys 1 span I No cantilevers 1 0/12 slope September 23,2015 12:57:52 BC CALC®Design Report 24 OCS I Repetitive I Gued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Main Level\Floor Joists\J3(i2590) Address: LOT 3 Specifier: PDG City,State,Zip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: ,i, ; J, v, I, si, 6 I„ , j„1, . .„, ,, ,I,0 i, ,i I iI, , „ „ 'moi a aF 1 ` � �'"�'Y^�y�''.1, 3�yi 11:�u^ ;as`h�"'�. �, - r. _ a., � - +i��u ,S.i� �� ,'sss � ,-f. r =.ay .,u ... ,.� 4.2 471�41a �& t3.b A 'l, rhe' .. w. 14-11-10 BO B1 Total Horizontal Product Length=14-11-10 Reaction Summary(Down/Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live BO,4-3/8” 604/0 151/0 61,2-3/4 593/0 148/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf.Lin.(lb/ft) L 00-00-00 14-11-10 80 20 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 2,628 ft-lbs 83.4% 100% 1 07-06-10 be verified by anyone who would rely on End Reaction 742 lbs 59.5% 100% 1 14-11-10 output as evidence of suitability for End Shear 719 lbs 442% 100% 1 00-04-06 particular application.Output here based Total Load Defl. U580(0.3') 62.1% n/a 1 07-06-10 on building code-accepted design Live Load Defl. 11724(0.24') 66.3% n/a 2 07-06-10 properties and analysis methods. Max Defl. 0.3" 30% n/a 1 07-06-10 Installation of BOISE engineered wood Span/Depth 14.7 n/a n/a 0 00-00-00 products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide %Allow %Allow or ask questions,please call Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation. BO Wall/Plate 4-3/8"x2" 7551bs 20.3% 53% Unspecified B1 Wall/Plate 2-3/4"x 2" 742 lbs 31.7% 59.5% Unspecified BC CALM,BC FRAMER®,AJSTM, ALLJOIST®,BC RIM BOARDTM', BCI®, Notes BOISE GLULAMTM',SIM'LEFRAMNG SYSTEM®,VERSA-LAM®,VERSA-RIM Design meets User specified (L/360)Total load deflection criteria. PLUS®,VERSA-RM®, Design meets User specified (L/480)Live load deflection criteria. VERSA-STRAND®,VERSA-STUD®are Design meets arbitrary(1")Maximum total load deflection criteria. trademarks of Boise Cascade Wood Calculations assume Member is Fully Braced. Products L.L.C. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 1 ctmoieeceseede Single 11-7/8" BCI® 5000-1.7 DF Main Level\Floor JoistslJ2(i2471) Drys 2 spans I No cantilevers I 0/12 slope September 23,2015 12:57:52 BC CALC®Design Report 24 OCS I Repetitive I Gued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Main Level\Floor Joists\J2(i2471) Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: 0 3 W xR s.. �.Au�xrww; ,. 'r e.e.,,. „��.aa, ..,a �.� .��_ V;106,:',.:Z.4e.1"+, �� ,� �� � � ,����-� ��a �, ._ 14-11-10 10-01-04 BO B1 B2 Total Horizontal Product Length=25-00-14 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8" 529/25 126/0 B1,5-1/2" 1,242/0 311/0 B2,2" 365/120 61 /0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start Bid 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf.Lin.(lb/ft) L 00-00-00 14-11-10 40 10 n/a 1 FC1 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 13-00-06 40 10 n/a 2 FC1 Floor Material Unf.Lin.(lb/ft) L 13-00-06 14-11-15 38 10 n/a 3 FC1 Floor Material Unf.Lin.(lb/ft) L 14-11-15 25-00-14 79 20 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 1,951 ft-lbs 61.9% 100% 2 06-05-09 Neg.Moment -1,962 ft-lbs 62.3% 100% 1 14-11-10 End Reaction 655 lbs 46% 100% 2 00-00-00 Int.Reaction 1,5531bs 61.5% 100% 1 14-11-10 End Shear 619 lbs 38.1% 100% 2 00-04-06 Cont.Shear 841 lbs 51.7% 100% 1 14-08-14 Uplift -58 lbs n/a 100% 2 25-00-14 Total Load Defl. L/810(0.217') 44.5% n/a 2 07-02-05 Live Load Defl. U987(0.178') 48.6% n/a 5 07-02-05 Total Neg.Defl. L/999(-0.031') n/a n/a 2 18-10-02 Max Defl. 0.217" 21.7% n/a 2 07-02-05 Span/Depth 14.8 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L xW) Value Support Member Material BO \Nall/Plate 4-3/8"x2" 655 lbs 17.6% 46% Unspecified I B1 \Nall/Plate 5-12"x2" 1,553 lbs 33.2% 61.5% Unspecified B2 Wall/Plate 2"x2" 4261bs 25% 39.8% Unspecified Cautions Uplift of-58 lbs found at span 2-Right. Notes Page 1 of2 ® Single 11-7/8" BCI® 5000-1.7 DF Main LeveltFloor Joists1J2(i247' Dry'2 spans I No cantilevers 10/12 slope September 23,2015 12:57:: BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Main Level\Floor Joists\J2(i247 Address: LOT3 Specifier: PDG City,State,Zp:, Designer. Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: Design meets User specified(L/360)Total load deflection criteria. Disclosure Design meets User specified(L/480)Live load deflection criteria. Completeness and accuracy of input rn. Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone whowould rely o Calculations assume Member is Fully Braced. output as evidence of suitability for Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. particular application.Output here basec Design based on Dry Service Condition. on building code-accepted design Deflections less than 1/8"were ignored in the results. properties and analysis methods. hstallation of BOISE engineered w ood products trust be in accordance with current Installation Guide and applicable building codes.To obtain Installation Gull or ask questions,please call (800)232-0788 before installation. BC CALL®,BC FRAMER®,AJSTm, ALLJOIST®,BC RM BOARDT'",BCI®, BOISEGLULAMT*',SMPLEFRAMING SYSTEMS°,VERSA-LAM,VERSA-RM PLUS®,VERSA-RIM, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 1 *Boi4ecoseedo Single 11-7/8" BCI® 5000-1.7 DF Main LeveRFloor Joists\J1(i2455) - 01 DryI 2 spans I No cantilevers 10/12 slope September 23,2015 12:57:52 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Main Level\Floor Joists\J1(i2455)- Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: 4cti-.: .,fix . .... .._,,. &r.3:;,.= i- ,3v. ,,7.77:112;,..4, -4-.7na ,�:?.. ,-.4S I,,, ......, ,s s"a.,.'� .,m46 ` 14-11-10 14-00-12 BO 61 62 Total Horizontal Product Length=29-00-06 Reaction Summary(Down/Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8" 539/60 120/0 B1,5-1/2" 1,413/0 353/0 B2,3-1/2" 501/76 106/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf.Lin.(lb/ft) L 00-00-00 28-11-06 80 20 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 1,974 ft-lbs 62.7% 100% 2 06-07-00 be verified by anyone who would rely on Neg.Moment -2,425 ft lbs 77% 100% 1 14-11-10 output as evidence of suitability for End Reaction 659 lbs 46.2% 100% 2 00-00-00 particular application.Output here based Int.Reaction 1,766 lbs 69.9% 100% 1 14-11-10 on building code-accepted design End Shear 622 lbs 38.3% 100% 2 00-04-06 properties and analysis methods. Cont.Shear 876 lbs 53.9% 100% 1 14-08-14 Installation of BOISE engineered wood Total Load Defl. L/798(0.22') 45.1% n/a 2 07-02-00 products must be in accordance with Live Load Defl. L/942(0.187') 51% n/a 5 07-04-05 current Installation Guide and applicable Total Neg.Defl. L/999(-0.038') n/a n/a 2 19-05-05 building codes.To obtain Installation Guide or ask questions,please call Max Defl. 0.22" 22% n/a 2 07-02-00 (800)232-0788 before installation. Span/Depth 14.8 n/a n/a 0 00-00-00 BC CALC®, BC FRAMER®,AJSTM', %Allow %Allow ALLJOIST®, BC RIM BOARD'",BCI®, Bearing Supports Dim.(L x W) Value Support Member Material BOISEGLULAMTM',SIMPLE FRAMING BO VVall/Plate 4-3/8"x 2" 659 lbs 17.7% 46.2% Unspecified SYSTE t),VERSA-LAMS),VERSA-RIM B1 VVall/Plate 5-12"x2" 1,766 lbs 37.8% 69.9% Unspecified PLUS®,VERSA-RMS, B2 WaII/Plate 3-1/2"x 2" 607 lbs 20.4% 42.6% Unspecified VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Notes Design meets User specified (L/360)Total load deflection criteria. Design meets User specified (L/480)Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 (Oso��ccascade Single 11-7/8" BCI® 5000-1.7 DF Main Level\Floor Joists\J4(i2492) �iJ Dry 1 1 span 1 No cantilevers 1 0/12 slope September 23,2015 12:57:53 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Main Level\FloorJoists'J4(i2492) Address: LOT 3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: ti, Ali .: j„, b ,I, ri ,l. c„„1i „ .7 i„1 ,1„5 ,, I 0,„ ..�� 1 1 I ,` ' .��17 v 1_1, v 4, v v v li ' � n. s ti .�, .. .;'; ',1:".;..-3k�+N,a,„(:iz k 1t x ., .` ft<PL. e`...n4,. _, ,-8,wv_ .'0 .. .1k ..:t._ 4 13-01-04 BO B1 Total Horizontal Roduct Length=13-01-04 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8" 524/0 131/0 B1,4-3/8" 524/0 131/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC1 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 13-01-04 80 20 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 1,953 ft-lbs 62% 100% 1 06-06-10 be verified by anyone who would rely on End Reaction 655 lbs 46% 100% 1 00-00-00 output as evidence of suitability for End Shear 619 lbs 38.1% 100% 1 00-04-06 particular application.Output here based Total Load Defi. L/865(0.173") 41.6% n/a 1 06-06-10 on building code-accepted design Live Load Defl. U1,081 (0.139") 44.4% n/a 2 06-06-10 properties and analysis methods. Max Defl. 0.173" 17.3% n/a 1 06-06-10 hstallation of BOISE engineered wood Span/Depth 12.6 n/a n/a 0 00-00-00 products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide %Allow %Allow or ask questions,please call Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation. BO Wall/Plate 4-3/8"x2" 655 lbs 17.6% 46% Unspecified B1 Wall/Plate 4-3/8"x 2" 655 lbs 17.6% 46% Unspecified BC CALM,BC FRAMER®,AJSTM, ALLJOIST®,BC RIM BOARDT'", BCI®, Notes BOISE GLULAMT"",SIMPLE FRAMING SYSTEM®,VERSA-LAME),VERSA-RIM Design meets User specified (L/360)Total load deflection criteria. PLUS®,VERSA-RIMS, Design meets User specified (L/480)Live load deflection criteria. VERSA-STRANDS,VERSA-STUDS are Design meets arbitrary(1")Maximum total load deflection criteria. trademarks of Boise Cascade Wood Calculations assume Member is Fully Braced. Products L.L.C. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 I *Boit*Cascade Double 1-3/4" x 11-7/8" VERSA LAM® 2.0 2800 DF Main Level\...\BM2(i2500) Dry' 1 span I No cantilevers 10/12 slope September 23,2015 12:57:53 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Main Level\Flush Beams\BM2(i2f Address: LOT3 Specifier: PDG City,State,Zip:, Designer. Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: J „ „ ,1 ,I, ; 1 4 .I, [ 1 ,I—L_,[, v � c7 cS ��� O �i b �7 %��L�i / V V t% 7 '.l � ,t a .. , z , - � � .,:.,,,,...), :,,,14-11,,,,-. .z.,„� s is � 10-08-13 BO 61 Total Horizontal Product Length=10-08-13 Reaction Summary(Down/Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,5-5/16" 208/0 110/0 B1,3-12" 207/0 108/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf.Lin.(Ib/ft) L 00-02-13 10-07-07 40 10 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 778 ft-lbs 4% 100% 1 05-05-05 End Shear 243 lbs 3.1% 100% 1 01-05-03 Total Load Defl. L/999(0.015") n/a n/a 1 05-05-05 Live Load Dell. L/999(0.01') n/a n/a 2 05-05-05 Max Defl. 0.015" n/a n/a 1 05-05-05 Span/Depth 10.2 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(LxW) Value Support Member Material BO Wall/Plate 5-5/16"x3-1/2" 318 lbs 4% 2.3% Unspecified B1 Wall/Plate 3-1/2"x 3-12" 315 lbs 6.1% 3.4% Unspecified Notes Design meets Code minimum (L/240)Total load deflection criteria. Design meets Code minimum (L/360)Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of2 00B•secascade Double 1-3/4" x 11-7/8" VERSA-LAM®2.0 2800 DF Main Levell...1BM2(i250( Drys 1 span I No cantilevers 10/12 slope September 23,2015 12:57:f. BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Main Level\Flush Beams\BK Address: LOT3 Specifier: PDG City,State,Zip:, Designer. Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: Connection Diagram Disclosure b F- h-d \ Completeness and accuracy of input m, a be verified by anyone who would rely o 4 • T• • 7^� output as evidence of suitability for 1 particular application.Output here basec c on building code-accepted design properties and analysis methods. • • hstallation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable a minimum =2" c=7-7/8" building codes.To obtain Installation Guil b minimum =3" d=24" or ask questions,please call Member has no side loads. (800)232-0788 before installation. Connectors are:16d Sinker Nails BC CALOS,BC FRAMER®,AJST"', ALLJOIST®,BC RIM BOARDT"",BCI®, BOISE GLULAMT",SIMPLE FRAMING SYSTEMS,VERSA-LAMS,VERSA-RIM PLUS®,VERSA-RIM, VERSA-STRANDS,VERSA-STUDS are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 ��ii��+i%%%%�'�eoi&ccaseade Double 1-3/4" x 11-7/8" VERSA LAM®2.0 2800 DF Main LeveR...\BM2(i2596) Dry l 2 spans 1 No cantilevers 10/12 slope September 23,2015 12:57:53 BC CALC®Design Report Build 3924 File Name: 15-969 RE\2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Main Level\Flush Beams\BM2(i2: Address: LOT3 Specifier: PDG City,State,Zp:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: V 0 I _ t i ; i 4 L 5 . I 05-02-04 p 04-11-00 BO 61 B2 Total Horizontal Product Length=10-01-04 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,2-3/4" 835/63 351/0 B1,3-12" 1,121/0 717/0 B2,2" 499/53 259/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf.Lin.(lb/ft) L 00-00-05 10-01-04 80 20 n/a 2 21(1915) Unf.Lin.(Ib/ft) L 00-02-12 10-01-04 57 n/a 3 21(i915) Unf.Lin.(lb/ft) L 00-02-12 07-05-10 80 22 n/a 4 21(i915) Unf.Lin.(lb/ft) L 06-10-08 08-02-08 115 38 n/a 5 21(i915) Unf.Lin.(lb/ft) L 07-07-06 10-01-04 116 33 n/a 6 E22(i268) Conc.Pt(lbs) L 00-00-04 00-00-04 478 148 n/a 7 21(i915) Conc.Pt.(lbs) L 10-01-00 10-01-00 14 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 750 ft-lbs 3.9% 100% 3 07-11-04 Neg.Moment -933 ft-lbs 4.9% 100% 1 05-02-04 End Shear 360 lbs 4.6% 100% 3 06-03-14 Cont.Shear 670 lbs 8.5% 100% 1 06-03-14 Total Load Defl. L/999(0.003') n/a n/a 3 07-09-11 Live Load Defl. L/999(0.002") n/a n/a 6 07-08-15 Total Neg.Defl. U999(-0.001") n/a n/a 3 03-11-09 Max Defl. 0.003" n/a n/a 3 07-09-11 Span/Depth 5.1 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L xW) Value Support Member Material BO \Nall/Plate 2-3/4"x3-1/2" 1,186 lbs 29% 16.4% Unspecified B1 Post 3-12"x3-1/2" 1,8381bs 18.8% 20% Unspecified B2 'All/Plate 2"x3-1/2" 758 lbs 25.5% 14.4% Unspecified Notes Page 1 of 2 ®Eoi$e Cascade Double 1-3/4" x 11-7/8" VERSA-LAM®2.0 2800 DF Main Leve11...\BM2(i259( Dry 12 spans I No cantilevers 10/12 slope September 23,2015 12:57:: BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush BeamsMain Level\Flush Beams\BIZ Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: Design meets Code minimum (L/240)Total load deflection criteria. Disclosure Design meets Code minimum (L/360)Live load deflection criteria. Completeness and accuracy of input mt, Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Calculations assume Member is Fully Braced. output as evidence of suitability for Design based on Dry Service Condition. particular application.Output here bases Deflections less than 1/8"were ignored in the results. on building code-accepted design properties and analysis methods. Connection Diagram hstaUation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable a b I I I ^° building codes.To obtain Installation Guil 4 • T• • • or ask questions,please call (800)232-0788 before installation. •1 • BC CALO®,BC FRAMBM,AJST*', ALLJOIST®,BC RM BOARD''A,BCI®, BOISE GLULAM"",SIvFLE FRAMING a minim urn =2" c=7-7/8" SYSTBVIe,VBZSA-LAMB),VERSA-RM b m inim um =3" d=24" PLUS®,VERSA-RM®, VERSA-STRANDS,VERSA-STUD®are Connection design assumes point load is top-loaded. For connection design of side-loaded trademarks of Boise Cascade Wood point loads,please consult a technical representative or professional of Record. Products L.L.C. Member has no side loads. Connectors are:16d Sinker Nails Page2 of2 ®KeiecscadeSingle 1-3/4" x 11-7/8" VERSA-LAMD2.0 2800 DF Main Level\...\BM1(i2483) Dry l 3 spans I No cantilevers 10/12 slope September 23, 2015 12:57:53 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Main Level\Flush Beams\BM1(i24 Address: LOT3 Specifier: PDG City,State,Tip:, Designer. Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: 8 �. ,.6 4 1 I � 02-12 81 05-02-04 2 05-00-08 B3 Total Horizontal Product Length=12-05-08 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,3-12" 431/60 161/0 B1,5-12" 699/0 414/0 B2,3-12" 429/0 475/0 B3,3-12" 309/11 232/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 12(i302) Unf.Lin.(lb/ft) L 00-00-00 12-05-08 57 n/a 2 12(i302) Unf.Lin.(Ib/ft) L 00-00-00 00-09-08 467 174 n/a 3 FC1 Floor Material Unf.Lin.(lb/ft) L 00-03-08 12-04-00 38 10 n/a 4 12(i302) Unf.Lin.(Ib/ft) L 01-04-04 02-08-04 36 n/a 5 12(i302) Unf.Lin.(Ib/ft) L 01-06-10 02-10-10 327 90 n/a 6 12(i302) Unf.Lin.(lb/ft) L 09-01-04 10-05-04 122 39 n/a 7 12(1302) Unf.Lin.(lb/ft) L 09-10-02 12-05-08 82 24 n/a 8 12(i302) Conc.Pt.(lbs) L 12-05-04 12-05-04 18 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 516 ft-lbs 5.4% 100% 2 10-02-09 1 Neg.Moment -482 ft-lbs 5% 100% 5 07-05-00 End Shear 277 lbs 7% 100% 2 01-03-06 Cont.Shear 416 lbs 10.5% 100% 5 08-06-10 Total Load Defl. L/999(0.004') n/a n/a 2 10-00-12 Live Load Defl. L/999(0.002") n/a n/a 7 09-11-14 Total Neg.Defl. L/999(-0.001') n/a n/a 2 06-01-04 MaxDefl. 0.004" n/a n/a 2 10-00-12 Span/Depth 52 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L x W) Value Support Member Material Page 1 of 2 ®BoiseCscade Single 1-3/4" x 11-7/8" VERSA-LAMB 2.0 2800 DF Main Levell...IBM1(i248: Dry'3 spans I No cantilevers 10/12 slope September 23,2015 12:57:1 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Main Level\Flush Beams\BM' Address: LOT 3 Specifier: PDG City,State,Zp:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: BO Wall/Plate 3-1/2"x 1-3/4" 591 lbs 22.7% 12.9% Unspecified Disclosure B1 Wall/Plate 5-12"x 1-3/4" 1,1131bs 27.2% 15.4% Unspecified Completeness and accuracy of input mx, B2 Post 3-1/2"x 1-3/4" 904 lbs 18.4% 19.7% Unspecified be verified by anyone who would rely o B3 Wall/Plate 3-12"x 1-3/4" 541 lbs 20.8% 11.8% Unspecified output as evidence of suitability for particular application.Output here basec Notes properties building code-accepted design properties and analysis methods. Design meets Code minimum (L240)Total load deflection criteria. hstaflation of BOISE engineered wood Design meets Code minimum(L/360)Live load deflection criteria. products must be in accordance with Design meets arbitrary(1")Maximum total load deflection criteria. current Installation Guide and applicable Calculations assume Member is Fully Braced. building codes.To obtain Installation Guif Design based on Dry Service Condition. or ask questions,please call Deflections less than 1/8"were ignored in the results. (800)232-0788 before installation. BC CALL®,BC FRAMER®,AJST"', ALLJOIST®,BC RIM BOARDTT",BCI®, BOISE GLULAMT"',SIMPLE FRAMNG SYSTEM®,VERSA-LAM,VERSA-RIM PLUS®,VERSA-RMS, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page2 of2 , '1)Boccascade Single 11-7/8" BCI® 5000-1.7 DF Upper Level\Floor Joists\J9(i2549) Dryj 1 span I No cantilevers 1 0/12 slope September 23,2015 12:58:38 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J9(i2549) Address: LOT 3 Specifier: PDG City,State,Zip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: 7 - as G k4'- T- Y d ` �r r4 '. , �,�-�us ,. ,., .-,..,,,,k. . .' ., n��� .,�v „4' d;,d.,,�'.sk'�3�� � �sw*ri �r ��z�` ,:�-.�r.� � ,#£t. mom: ..., �ur�e.. �- �_,., .�.,,. 13-01-04 BO B1 Total Horizontal Roduct Length=13-01-04 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8" 524/0 131/0 B1,4-3/8" 524/0 131/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 13-01-04 80 20 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 1,953 ft-lbs 62% 100% 1 06-06-10 be verified by anyone who would rely on End Reaction 655 lbs 46% 100% 1 00-00-00 output as evidence of suitability for End Shear 619 lbs 38.1% 100% 1 00-04-06 particular application.Output here based Total Load Defl. U865(0.173") 41.6% n/a 1 06-06-10 on building code-accepted design Live Load Defl. 01,081 (0.139") 44.4% n/a 2 06-06-10 properties and analysis methods. Max Defl. 0.173" 17.3% n/a 1 06-06-10 Installation of BOISE engineered wood Span/Depth 12.6 n/a n/a 0 00-00-00 products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide %Allow %Allow or ask questions,please call Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation. BO VVaII/PI ate 4-3/8"x2" 655 lbs 17.6% 46% Unspecified B1 Wall/Plate 4-3/8"x2" 655 lbs 17.6% 46% Unspecified BC CALM, BCFRAMER®,AJSTM', ALLJOIST®,BC RIM BOARDT*', BCI®, Notes BOISEGLULAMT,A,SIMPLE FRAMING SYSTEM®,VERSA-LAMB,VERSA-RIM Design meets User specified (L/360)Total load deflection criteria. PLUS® VERSA-RM® Design meets User specified(L/480)Live load deflection criteria. VERSA-STRAND®,VERSA-STUD®are Design meets arbitrary(1")Maximum total load deflection criteria. trademarks of Boise Cascade Wood Calculations assume Member is Fully Braced. Products L.L.C. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 *RA*cascade Single 11-7/8" BCI® 5000-1.7 DF Upper Level\Floor Joists J6(i2591) Dry 12 spans I No cantilevers 10/12 slope September 23,2015 12:58:38 BC CALCO Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J6(i2591) Address: LOT 3 Specifier: PDG City,State,Zip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: .„I, v v 7 ,i,—,,i,—,7 C, V ‘.1, v v ,7 ,'< <y ,IS v „ :ii, Ji o tz v i, lZ�i ` ? ,: ,1 7 ,7 ,,--L—i LI '%'=%. �+ti•. a ter§. _...... -21,< _,- ., £,; .. .. � •.. �.� .-. �'-.. .dna -d ',< `�'. ..�..,w�`.�.nr, a� s,� ..�sM.._ �„� u , .�s2. .. 11-00-04 I 14-00-00 BO B1 B2 Total Horizontal Product Length=25-00-04 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0, 1-3/4" 399/93 77/0 B1,3-12" 1,240/0 310/0 B2 491/36 114/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start Bid 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(lb/ft) L -00-00-00 25-00-04 80 20 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 1,768 ft-lbs 56.1% 100% 3 18-11-02 Neg.Moment -1,885 ft-lbs 59.8% 100% 1 11-00-04 End Reaction 605lbs 56.6% 100% 3 25-00-04 Int.Reaction 1,5501bs 68.9% 100% 1 11-00-04 End Shear 588 lbs 36.2% 100% 3 24-10-04 Cont Shear 816 lbs 50.2% 100% 1 11-02-00 Uplift -16 lbs n/a 100% 3 00-00-00 Total Load Defl. L/922(0.181") 39.1% n/a 3 18-04-08 Live Load Defl. U1,112 (0.15") 432% n/a 6 18-04-08 Total Neg.Defl. U999(-0.028") n/a n/a 3 07-00-03 Max Defl. 0.181" 18.1% n/a 3 18-04-08 Span/Depth 14 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L xW) Value Support Member Material BO WaII/PI ate 1-3/4"x2" 476 lbs 32% 47.1% Unspecified B1 Beam 3-12"x2" 1,550 lbs 54.7% 68.9% Unspecified B2 Hanger 2"x2" 605 lbs 47.8% 56.6% ITS2.06/11.88 Cautions Hanger ITS2.06/11.88 requires (2) 10dx1.5 face nails,(4)10dx1.5 TF nails,(2)Strong-Grip joist nails. Notes Page 1 of 2 �'/�esiscCascadc Single 11-7/8" BCI® 5000-1.7 DF Upper LevellFloor Joists\J6(i259' Dry'2 spans I No cantilevers 10/12 slope September 23,2015 12:58: BC CALCO Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.m mdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J6(i2E Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: Design meets User specified(L/360)Total load deflection criteria. Disclosure Design meets User specified(L/480)Live load deflection criteria. Completeness and accuracy of input nt Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Calculations assume Member is Fully Braced. output as evidence of suitability for Hanger Manufacturer Simpson Strong-Tie,Inc. particular application.Output here basec Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. on building code-accepted design properties and analysis methods. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. hstaRation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation GUI or ask questions,please call (800)232-0788 before installation. BC CALOS,BC FRAPV ,AJST"', ALLJOIST®,BC RM BOARDT",BCI, BOISE GLULAMT"',StAFLE FRAMING SYSTEMS,VERSA-LAM,VERSA-RIM PLUSe,VERSA-RMS, VERSA-STRAND®,VERSA-STUDS are trademarks of Boise Cascade Wood Products L.L.C. Paget of2 '�BoiseCascade. Single 11-7/8" BCI® 5000-1.7 DF Upper Level'Floor Joists\J8(i2564) ``��++�� Drys 1 span I No cantilevers 1 0/12 slope September 23,2015 12:58:39 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J8(i2564) Address: LOT 3 Specifier. PDG City,State,Zp:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: o ' 1 ._ ; °fs-,Y-u,` Y ,4 P.k - sF.,r.µ,7. 4N:' * i ,a3' T:✓iy,'`✓5 a ,r..; 14-01-14 BO B1 Total Horizontal Product Length=14-01-14 Reaction Summary(Down I Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live BO 567/0 142/0 B1, 1-3/4" 565/0 141/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 14-01-14 80 20 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must 0 100% Pos.Moment 2,439 ft-lbs 77.4% 1 07-01-01 be verified by anyone who would rey on End Reaction 707 lbs 70% 100% 1 14-01-14 output as evidence of suitability for End Shear 692 lbs 42.6% 100% 1 00-02-00 particular application.Output here based Total Load Defl. L1642(0.261") 56.1% n/a 1 07-01-01 on building code-accepted design Live Load Defl. L/802(0.209") 59.9% n/a 2 07-01-01 properties and analysis methods. Max Defl. 0.261" 26.1% n/a 1 07-01-01 hstallation of BOISE engineered wood Span/Depth 14.1 n/a n/a 0 00-00-00 products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide %Allow %Allow or ask questions,please call Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation. BO Hanger 2"x2" 709 lbs n/a 66.3% IUS 2.06/11.88 B1 Wall/Plate 1-3/4"x 2" 707 lbs 47.5% 70% Unspecified BC CALL®, BC FRAMER®,AJSTM', ALLJOIST®, BC RIM BOARDT"', BCI®, Cautions BOISE GLULA Wm,SIMPLE FRAMING SYSTEM®,VERSA-LAM®VERSA-RIM Hanger IUS 2.06/11.88 requires (10)10d face nails,(2) joist nails. PLUS®,VERSA-RM®, VERSA-STRAND®,VERSA-STUD®are Notes trademarks of Boise Cascade Wood Design meets User specified (L/360)Total load deflection criteria. Products L.L.C. Design meets User specified (L/480)Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Hanger Manufacturer: Simpson Strong-Tie,Inc. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 '*Base cascade Single 11-7/8" BCI® 5000-1.7 DF Upper Level1Floor Joists\J8(i2551) ``��++�� Dry' 1 span I No cantilevers 1 0/12 slope September 23,2015 12:58:39 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists U802551) Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: t 1 l r,.._,I,_ 1, ,, .i j, ,i, ,, ,I, „ „ .1-_ 6 0 ,:' `1 ,.L�I ,' ,1 , 1 ,I I 140&12 BO B1 Total Horizontal Product Length=14-08-12 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8" 597/0 149/0 B1 581/0 145/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start Bid 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(lb/ft) L 00-00-00 14-08-12 80 20 n/a 1 Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 2,564 ft-lbs 81.4% 100% 1 07-05-09 be verified by anyone who would rely on End Reaction 727 lbs 68% 100% 1 14-08-12 output as evidence of suitability for End Shear 710 lbs 43.7% 100% 1 00-04-06 particular application.Output here based Total Load Defl. L/599(0.287") 60.1% n/a 1 07-05-09 on building code-accepted design Live Load Defl. LJ749(0.229") 64.1% n/a 2 07-05-09 properties and analysis methods. Max Defl. 0.287" 28.7% n/a 1 07-05-09 Installation of BOISE engineered wood Span/Depth 14.5 n/a n/a 0 00-00-00 products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide %Allow %Allow or ask questions,please call Bearing Supports Dim.(L xW) Value Support Member Material (800)232-0788 before installation. BO Wall/Plate 4-3/8"x2" 746 lbs 20.1% 52.4% Unspecified B1 Hanger 2"x2" 727 lbs n/a 68% IUS2.06/11.88 BCCALM,BC FRAMER®,AJSTM', ALLJOIST®,BC RIM BOARD K,BCI®, Cautions BOISEGLULAMTM',SIMPLE FRAMING SYSTEMS),VERSA-LAME),VERSA-RIM Hanger IUS 2.06/11.88 requires (10) 10d face nails,(2) joist nails. PLUS® VERSA-RMS, VERSA-STRAND®,VERSA-STUD®are Notes trademarks of Boise Cascade Wood Design meets User specified(L/360)Total load deflection criteria. Products L.L.C. Design meets User specified(L/480)Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Hanger Manufacturer: Simpson Strong-Tie,Inc. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 '�soa �Ysccascade Single 11-7/8" BCI® 5000-1.7 DF Upper LeveRFloor Joists\J7(i2589) Dryl 2 spans 1No cantilevers 10/12 slope September 23,2015 12:58:39 BC CALC®Design Report 24 OCS I Repetitive 1 Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists J7(i2589) Address: LOT3 Specifier: PDG City,State,Zp:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: LI I , ,, ,i lT r, \,__ C�--„_� / „ , / ,I, s, „o �J i 7v., ,1 Ali ..L_1 i V V V Vl \, V V , ,y,; ' ;4,,,- s .: - . '`v0-" au"Z� - ., ' 06-09-13 IB14-00-00 BO 1 B2 Total Horizontal Product Length=20-09-13 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live BO 262/178 21 /0 B1,3-12" 1,132/0 283/0 B2 488/10 119/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start Bid 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(lb/ft) L 00-00-00 20-09-13 81 20 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 1,750 ft-lbs 55.5% 100% 3 14-10-14 Neg.Moment -1,663 ft-lbs 52.8% 100% 1 06-09-13 End Reaction 607 lbs 56.8% 100% 3 20-09-13 Int.Reaction 1,4151bs 62.9% 100% 1 06-09-13 End Shear 590 lbs 36.3% 100% 3 20-07-13 Cont.Shear 811 lbs 49.9% 100% 1 06-11-09 Uplift -157 lbs n/a 100% 3 00-00-00 Total Load Defl. L/937(0.178') 38.4% n/a 3 14-02-02 Live Load Defl. U1,160 (0.144") 41.4% n/a 6 14-02-02 1 Total Neg.Deli. U999(-0.016") n/a n/a 3 04-01-09 Max Defl. 0.178" 17.8% n/a 3 14-02-02 Span/Depth 14 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L x W) Value Support Member Material BO Hanger 2"x2" 282 lbs 29.1% 19.6% IUS2.06/11.88 BO Hanger Uplift 2"x2" 1571bs 66.9% n/a IUS2.06/11.88 B1 Beam 3-12"x2" 1,415 lbs 49.9% 62.9% Unspecified B2 Hanger 2"x2" 607 lbs 48% 56.8% ITS2.06/11.88 Cautions Uplift of-157lbs found at span 1 -Left. Web stiffeners required at bearing BO. Hanger IUS2.06/11.88 requires (10) 10dx1.5 face nails,(2)10dx1.5 joist nails. Hanger ITS2.06/11.88 requires (2)10dx1.5 face nails,(4)10dx1.5 TF nails,(2)Strong-Grip joist nails. Notes Page 1 of2 ® eisoCscadeSingle 11-7/8" BC ) 5000-1.7 DF Upper LeveltFloor JoistsJ7(i258Dry'2 spans I No cantilevers 10/12 slope September 23,2015 12:58:: BC CALC®Design Report MM 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.m mdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists`17(i2f. Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: Design meets User specified(L/360)Total load deflection criteria. Disclosure Design meets User specified(U480)Live load deflection criteria. Completeness and accuracy of input rrx, Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Calculations assume Member is Fully Braced. output as evidence of suitability for Hanger Manufacturer: Simpson Strong-Tie,Inc. particular application.Output here basec Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. on building code-accepted design Design based on Dry Service Condition. properties and analysis methods. Deflections less than 1/8"were ignored in the results. Installation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guii or ask questions,please call (800)232-0788 before installation. BC CALC®,BC FRAMER®,AJSTM, ALLJOIST®,BC RM BOARDTM,BCIB), BOISE GLUAMTM',SMPLE FRAMING SYSTEM/',VERSA-LAMB',VERSA-RM PLUS®,VERSA-RMB), VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page2 oft . Bosecascade Single 11-7/8" BCI® 5000-1.7 DF Upper LeveRFloor Joists\J11(i2488) `�+� Dry' 1 span I No cantilevers 10/12 slope September 23,2015 12:58:39 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J11(i2488 Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: ___,7__ I ,L 1, ,' '', 4. v , ,,,__L_, I „, ,� ,', I, ..,, cC „ ,,, < . _ ; .P,._. �w r_-__ ,� �.. .. . -- . , _ . te ,,r g, 07-04-14 BO B1 Total Horizontal A oduct Length=07-04-14 Reaction Summary(Down/Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live BO 309/0 77/0 B1 309/0 77/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(lb/ft) L 00-00-00 07-04-14 83 21 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 674 ft-lbs 21.4% 100% 1 03-08-07 be verified by anyone who would rely on End Reaction 386 lbs 36.1% 100% 1 00-00-00 output as evidence of suitability for End Shear 368 lbs 22.7% 100% 1 00-02-00 particular application.Output here based Total Load Defl. L/999(0.027") n/a n/a 1 03-08-07 on building code-accepted design Live Load Defl. L/999(0.021") n/a n/a 2 03-08-07 properties and analysis methods. Max Dell. 0.027" n/a n/a 1 03-08-07 Installation of BOISE engineered wood Span/Depth 7.3 n/a n/a 0 00-00-00 products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide %Allow %Allow or ask questions,please call Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation. BO Hanger 2"x2" 386 lbs 39.8% 36.1% IUS2.06/11.88 B1 Hanger 2"x2" 386 lbs 39.8% 36.1% IUS2.06/11.88 BC CALM),BC FRAMER®,AJSM, ALLJOIST®,BC RIM BOARD'', BCI®, CautionsBOISEGLULAMTM',SIM'LEFRAMING SYSTEMS,VERSA-LAMS,VERSA-RIM Hanger IUS2.06/11.88 requires (10) 10dx1.5 face nails,(2)Strong-Grip joist nails. PLUS®,VERSA-RIND, VERSA-STRAND®,VERSA-STUDIO are Notes trademarks of Boise Cascade Wood Design meets User specified (L/360)Total load deflection criteria. Products L.L.C. Design meets User specified(L/480)Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Hanger Manufacturer: Simpson Strong-Tie,Inc. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 wBOtSecascedc Single 11-7/8" BCI® 5000-1.7 DF Upper LeveRFloor Joists1.11802509) ICO Dry!1 span I No cantilevers 10/12 slope September 23, 2015 12:58:39 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J8(i2509) Address: LOT3 Specifier: PDG City,State,Zp:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: I 1 j 1I, n v ,-i ; v J ; j - . . 0 I mo; ; ; I ,i, 1 «moi Q I .I 77,71,7:i €' . wy.' `T s -nom Kr 7. 7, S ':,-.4,;-7,77--i-,.--„, r q -;,;,i,..1.1:.,-, .-7,7'77i-,Z T .w ,�.. ' 'k. ? l " ' 5,1r r m w k w 8 2 x .q, ' a w "rc :'. :1 ':". � µµ,,,, ,? :x, �&, k. "�.Y . , . ,.�. .arm_.,w`� �v'„ � Y`> '�i�',�r` s�+.. v�a�,....',','.4,.., ;�"Yr .. � •in �� w.ti ,� '� .. 14-ia10 BO B1 Total Horizontal Product Length=14-10-10 Reaction Summary(Down/Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8” 580/0 145/0 B1 565/0 141/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(lb/ft) L 00-00-00 14-10-10 77 19 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 2,518 ft-lbs 79.9% 100% 1 07-05-12 be verified by anyone who would rely on End Reaction 706 lbs 66% 100% 1 14-10-10 output as evidence of suitability for End Shear 690 lbs 42.4% 100% 1 00-04-06 particular application.Output here based Total Load Defl. L/606(0.287") 59.4% n/a 1 07-05-12 on building code-accepted design Live Load Defl. L/757(0.229") 63.4% n/a 2 07-05-12 properties and analysis methods. Max Defl. 0.287" 28.7% n/a 1 07-05-12 Installation of BOISE engineered wood Span/Depth 14.6 n/a n/a 0 00-00-00 products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guide %Allow %Allow or ask questions,please call Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation. BO Wall/Plate 4-3/8"x2" 725 lbs 19.5% 50.9% Unspecified B1 Hanger 2"x2" 706 lbs 72.8% 66% IU S2.06/11.88 BCCALM, BC FRAMER®,AJSTM', ALLJOIST®, BC RIM BOARDTM', BCI®, Cautions BOISE GLULAMTM',SIMPLE FRAMING SYSTEM®,VERSA-LAMJD,VERSA-RIM Hanger IUS2.06/11.88 requires (1 0) 10dx1.5 face nails,(2)Strong-Grip joist nails. PLUS® VERSA-RIM, VERSA-STRAND®,VERSA-STUD®are Notes trademarks of Boise Cascade Wood Design meets User specified (L/360)Total load deflection criteria. Products L.L.C. Design meets User specified (L/480)Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Hanger Manufacturer: Simpson Strong-Tie,Inc. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 ®Bo'seCscadeSingle 11-7/8" BCI® 5000-1.7 DF Upper LeveRFloor JoistsW12(i2568) Dry12 spans 1 Left cantileer 10/12 slope September 23,2015 12:58:39 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\FloorJoists\Upper Level\FloorJoists\J12(i2568 Address: LOT 3 Specifier: PDG City,State,Zp:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: Xe 0 I 1 � s rw u ' k �s � is � • z r^,' � cw� 'C p`" '4T4° 15A,,, ,>? x ��xi , a� � . z� ,:"'na� ��> ' . ,. "" �� .� � £ .k�z �� tr�.14;Leis" 01-01-10 04-09-06 B1 B2 Total Horizontal Product Length=05-11-00 Reaction Summary(Down/Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1,5-1/2" 163/0 41 /0 B2 124/7 29/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start Bid 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 01-01-10 11 3 n/a 1 FC2 Floor Material Unf.Lin.(lb/ft) L 01-01-10 05-11-00 51 13 n/a 2 FC2 Floor Material Conc.Pt.(lbs) L 00-00-04 00-00-04 25 6 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 169 ft-lbs 5.4% 100% 3 03-05-13 Neg.Moment -43 ft-lbs 1.4% 100% 1 01-01-10 End Reaction 153 lbs 14.4% 100% 3 05-11-00 Int.Reaction 204 lbs 6.8% 100% 1 01-01-10 End Shear 143 lbs 8.8% 100% 3 05-09-00 Cont.Shear 143 lbs 8.8% 100% 1 01-04-06 Total Load Defl. L/999(0.004') n/a n/a 3 03-05-13 Live Load Defl. L/999(0.004') n/a n/a 6 03-05-13 Total Neg.Defl. 2xU1,998(-0.001") n/a n/a 3 00-00-00 Max Defl. 0.004" n/a n/a 3 03-05-13 Cant.Max Defl. -0.001" n/a n/a 3 00-00-00 Span/Depth 4.7 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(LxW) Value Support Member Material B1 \Na ll/PIate 5-1/2x2" 204 lbs 4.4% 8.1% Unspecified B2 Hanger 2"x2" 153 lbs 12.9% 14.3% IUS2.06/11.88 Cautions Hanger IUS2.06/11.88 requires (10) 10d face nails,(2)Strong-Grip joist nails. Design assumes Top and Bottom flanges to be restrained. Notes Page 1 of2 ®BOisOCSC3dC Single 11-7/8" BCI® 5000-1.7 DF Upper LeveRFloor Joists1J12(i2561 Drys 2 spans 1 Left cantilever 10/12 slope September 23,2015 12:58: BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J12(i2 Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 M sc: Design meets User specified(L/360)Total load deflection criteria. Disclosure Design meets User specified(L/480)Live load deflection criteria. Completeness and accuracy of input rrt. Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Design meets arbitrary(1")Cantilever Maximum total load deflection criteria. output as evidence of suitability for Calculations assume Member is Fully Braced. particular application.Output here bases Hanger Manufacturer: Simpson Strong-Tie,Inc. on building code-accepted design Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. properties and analysis methods. Design based on Dry Service Condition. Installation of BOISE engineered wood Deflections less than 1/8"were ignored in the results. products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Gull or ask questions,please call (800)232-0788 before installation. BC CALL®,BC FRAMER®,AJSTM', ALLJOIST®,BC RIM BOARDTM,BCI®, BOISE GLULAMTM',SMPLE FRAMING SYSTEM®,VERSA-LAM®,VERSA-RIM PLUS®,VERSA-RM®, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page2 of2 . , ®BoiseCscdCSingle 1-3/4" x 11-7/8" VERSA-LAM& 2.0 2800 DF Upper LeveR... J1(i2507) Dryl2 spans I Leftcantilever 10/12 slope September 23,2015 12:58:40 BC CALC®Design Report 24 OCS 1 Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J1(i2507) Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: 1 rn °`r - kap. , X7m- 7i4,4'`-,;.1 , ,h ; r 'd . �+'' a : >iM .�' Y'�a 41'w ti P.�, �' �:.. li ,e� 4ss'� .. A,+ Y 6my .,.. n., 01-01-10 04-09-06 B1 B2 Total Horizontal Product Length=05-11-00 Reaction Summary(Down/Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1,5-1/2" 129/0 350/0 342/0 B2 99/6 0/38 0/66 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(lb/ft) L 00-00-00 01-01-10 11 3 n/a 1 FC2 Floor Material Unf.Lin.(Ib/ft) L 01-01-10 05-11-00 40 10 n/a 2 FC2 Floor Material Conc.Pt.(lbs) L 00-00-04 00-00-04 18 260 275 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 28 ft-lbs 0.3% 100% 3 04-08-10 Neg.Moment -6001t lbs 5.2% 115% 4 01-01-10 End Shear 97 lbs 2.1% 115% 4 02-04-04 Cont.Shear 482 lbs 10.6% 115% 4 -00-01-00 Uplift -105lbs n/a 115% 4 05-11-00 Total Load Defl. 2xU1,998(0.003") n/a n/a 4 00-00-00 Live Load Defl. 2xU1,998(0.002") n/a n/a 27 00-00-00 Total Neg.Defl. L/999(-0.002') n/a n/a 4 03-01-00 Max Defl. -0.002" n/a n/a 4 03-01-00 Cant.Max Defl. 0.003" n/a n/a 4 00-00-00 Span/Depth 4.7 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(LxW) Value Support Member Material B1 Wall/Plate 5-1/2"x 1-3/4" 703 lbs 17.2% 9.7% Unspecified B2 Hanger 2-1/2"x1-3/4" 60 lbs 3.8% 3.2% HU11 B2 Hanger Uplift 2-1/2"x1-3/4" 105 lbs 17.2% 3.2% HU11 Cautions Uplift of-105 lbs found at span 2-Right. Hanger HU11 requires (22) 10d face nails,(6)10dx1.5 joist nails. Notes Page 1 of2 *noise Cascade Single 1-3/4" x 11-7/8" VERSA-LAM® 2.0 2800 DF Upper LeveR...1J1(i2501 Dry)2 spans I Left cantil ever 10/12 slope September 23,2015 12:58: BC CALC®Design Report 1111 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J1(i2° Address: LOT3 Specifier: PDG City,State,Zp:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: Design meets User specified(2xL/360)Total load deflection criteria. Disclosure Design meets User specified(2)d_/480)Live load deflection criteria. Completeness and accuracy of input mc. Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Design meets arbitrary(1")Cantilever Maximum total load deflection criteria. output as evidence of suitability for Calculations assume Member is Fully Braced. particular application.Output here basec Hanger Manufacturer: Simpson Strong-Tie,Inc. on building code-accepted design Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. properties and analysis methods. Unbalanced snow loads determined from building geometry were used in selected product's hstallation of BOISE engineered wood verification. products crust be in accordance with Design based on Dry Service Condition. current Installation Guide and applicable Deflections less than 1/8"were ignored in the results. building codes.To obtain Installation Guil or ask questions,please call (800)232-0788 before installation. BC CALO®,BC FRAMER®,AJST", ALLJOIST®,BC RIM BOARDT",BCI®, BOISE GLULAMT",SIMPLE FRAMING SYSTEMS,VERSA-LAMS VERSA-RIM PLUS®,VB SA-RIMS, VERSA-STRANDS),VERSA-STUDS are trademarks of Boise Cascade Wood Roducts L.L.C. Page 2 of 2 ' ®Bi$eCascedo Single 11-7/8" BCI® 5000-1.7 DF Upper LeveRFloor Joists\J7(i2504) Dry l 2 spans I No cantilevers 10/12 slope September 23,2015 12:58:40 BC CALC®Design Report 24 OCS 1 Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.m mdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor JoistsV17(12504) Address: LOT 3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: ,, ,. , ,i i i v v i v ,1 -7 „ h -04J ,—.---_i , S 6 y v d b - I, b 6 6 a '` fin,. ', ,«f,f,-;14E.,4, 777-717;sad' - i ,-- s4 r s-.. rx ;:t, ;1r r"ur"" a 7� '.. „,""� 7_,-��` sA;144, is -*' ,: £.. � ,,. -- d , S ° �` .' • ,:v a P .*- ; .��. ��"{�iv::: :t'�8iu�',� „���,�....�,.2.,,,.-1}4f.,., � rc..`�.� :fin "rt'�"a.�&��.�',,r ,i��"�.,>,��� ,.� `;� s,'�?A.�`. .,�*tee .m� � : ?� '�e''n M.,'A -ate,; •- 12-10-10 07-04-10 BO B1 B2 Total Horizontal R oduct Length=20-03-04 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8" 455/13 111/0 B1,3-1/2" 1,023/0 256/0 B2,4-3/8" 285/129 39/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 20-03-04 80 20 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 1,433 ft-lbs 45.5% 100% 2 05-06-15 Neg.Moment -1,342 ft-lbs 42.6% 100% 1 12-10-10 End Reaction 566 lbs 39.7% 100% 2 00-00-00 Int.Reaction 1,2791bs 56.9% 100% 1 12-10-10 End Shear 529 lbs 32.6% 100% 2 00-04-06 Cont Shear 721 lbs 44.4% 100% 1 12-08-14 Uplift -90 lbs n/a 100% 2 20-03-04 Total Load Defl. U1,205 (0.125') 29.9% n/a 2 06-02-12 Live Load Defl. L/999(0.10Z') n/a n/a 5 06-02-12 Total Neg.Defl. L/999(-0.012") n/a n/a 2 15-08-07 Max Defl. 0.125" 12.5% n/a 2 06-02-12 Span/Depth 12.7 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L xW) Value Support Member Material BO Wall/Plate 4-3/8"x2" 566 lbs 15.2% 39.7% Unspecified B1 V\hall/Plate 3-12"x2" 1,279 lbs 43% 56.9% Unspecified B2 V\/all/Plate 4-3/8"x2" 324 lbs 8.7% 22.7% Unspecified Cautions Uplift of-90 lbs found at span 2-Right. Notes Page 1 of2 ® sisecscaae Single 11-7/8" BCI® 5000-1.7 DF Upper Level%Floor JoistsW7(i250Dry'2 spans I No cantilevers 10/12 slope September 23,2015 12:58:L BC CALC®Design Report 24 OCS I Repetitive I Gued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J7(i2E Address: LOT3 Specifier: PDG City,State,Zp:, Designer. Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: Design meets User specified(L/360)Total load deflection criteria. Disclosure Design meets User specified(L/480)Live load deflection criteria. Completeness and accuracy of input m t. Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Calculations assume Member is Fully Braced. output as evidence of suitability for Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. particular application.Output here basec Design based on Dry Service Condition. on building code-accepted design Deflections less than 1/8"were ignored in the results. properties and analysis methods. hstallation of BOISE engineered wood products must be in accordance w ith current Installation Guide and applicable building codes.To obtain Installation Guih or ask questions,please call (800)232-0788 before installation. BC CALM,BC FRAMER®,AJST"', ALLJOIST®,BC RIM BOA Ran",BCI®, BOISE GLULAMT"',SIVPLE FRAMING SYSTEM®,VERSA-LAM®,VERSA-RIM PLUS®,VERSA-RMV, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 .�Bo1socascade Single 11-7/8" BCI® 5000-1.7 DF Upper LeveRFloor JoistsW5(i2542) �iiY� Dry 12 spans I No cantilevers 10/12 slope September 23, 2015 12:58:40 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J5(i2542) Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: 0 1 1 � ,, , --,-;'";LES,,.��t : . , way_ , , ,..041.1Zed', 7— _- fi ,.,.. n. 1 �e.. 12-10-10 13-09-08 BO B1 B2 Total l-br¢ontal Product Length=26-08-02 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8" 471/74 99/0 B1,3-12" 1,302/0 325/0 B2, 1-3/4" 487/52 109/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(lb/ft) L 00-00-00 26-08-02 80 20 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Corrpleteness and accuracy of input must Pos.Moment 1,728 ft lbs 54.9% 100% 3 20-08-03 be verified by anyone w ho w ould rely on Neg.Moment -2,053 ft-lbs 65.2% 100% 1 12-10-10 output as evidence of suitability for End Reaction 596 lbs 59.1% 100% 3 26-08-02 particular application.Output here based Int.Reaction 1,627 lbs 72.3% 100% 1 12-10-10 on building code-accepted design End Shear 582 lbs 35.8% 100% 3 26-06-06 properties and analysis methods. Cont.Shear 821 lbs 50.5% 100% 1 13-00-06 Installation of BOISE engineered wood Total Load Defl. L/950(0.173") 37.9% n/a 3 20-01-11 products must be in accordance with Live Load Defl. UI,127 (0.146") 42.6% n/a 6 20-01-11 current Installation Guide and applicable Total Neg.Defl. L/999(-0.028") n/a n/a 3 08-07-15 building codes.To obtain Installation Guide or ask questions,please call Max Defl. 0.173" 17.3% n/a 3 20-01-11 Span/Depth 13.9 n/a n/a 0 00-00-00 (800)232-0788 before installation. BC CALM, BC FRAMER®,AJS'', %Allow %Allow ALLJOIST®,BC RIM BOARDTM',BCI®, Bearing Supports Dim.(L xW) Value Support Member Material BOISEGLULAMTM',SIMPLE FRAMING BO Wall/Plate 4-3/8"x2" 570 lbs 15.3% 40% Unspecified SYSTEM,VERSA-LAMS),VERSA-RIM B1 V'Fall/Plate 3-12"x2" 1,627Ibs 54.7% 72.3% Unspecified PLUS®,VERSA-RNIB, B2 Beam 1-3/4"x2" 596 lbs 42.1% 59.1% Unspecified VERSA-STRANDS),VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Notes Design meets User specified (L/360)Total load deflection criteria. Design meets User specified (L/480)Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 • ®BisCCseødcSingle 11-7/8" BCI® 5000-1.7 DF Upper LevelRFloor Joists1J4(i2586) Dry 12 spans 1 No cantilevers 10/12 slope September 23,2015 12:58:40 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists U402586) Address: LOT3 Specifier: PDG City,State,Zp:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: «�> 1, til v v 0 li 1 b —�1 u kt, '" k,c7w � � sr x s 6 ,.. , idY t �� � r ` 7 r7-71, � . z, *° r .1.1,:: i�a� � 3i ?.t' �Pe. ' ..� � ^' � x � :ate „ 13-08-04 I 14-00-00 BO B1 B2 Total Horizontal Product Length=27-08-04 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,1-3/4" 487/68 105/0 B1,3-1/2" 1,361 /0 340/0 B2 497/63 109/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(Ib/ft) L -00-00-00 27-08-04 80 20 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 1,775 ft-lbs 56.3% 100% 3 21-07-02 Neg.Moment -2,245 ft-lbs 71.3% 100% 1 13-08-04 End Reaction 592 lbs 58.6% 100% 2 00-00-00 Int.Reaction 1,702 lbs 75.6% 100% 1 13-08-04 End Shear 590 lbs 36.3% 100% 3 27-06-04 Cont Shear 842lbs 51.8% 100% 1 13-10-00 Total Load Defl. L/918(0.182") 39.2% n/a 3 21-00-08 Live Load Defl. U1,078 (0.155") 44.5% n/a 6 20-10-05 Total Neg.Defl. L/999(-0.03") n/a n/a 3 09-05-02 Max Defl. 0.182" 18.2% n/a 3 21-00-08 Span/Depth 14 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(LxW) Value Support Member Material BO Beam 1-3/4"x2" 592 lbs 41.7% 58.6% Unspecified B1 Beam 3-12"x2" 1,702 lbs 60% 75.6% Unspecified B2 Hanger 2"x2" 606 lbs 47.9% 56.7% ITS2.06/11.88 Cautions Hanger ITS2.06/11.88 requires (2) 10dx1.5 face nails,(4)10dx1.5 TF nails,(2)Strong-Grip joist nails. Notes Page 1 of2 BoisoCascada. Single 11-7/8" BCI® 5000-1.7 DF Upper LeveltFloor JoistsW4(i258E Drys 2 spans I No cantilevers 10/12 slope September 23,2015 12:58:1 BC CALC®Design Report - 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor JoistsU4(i2E Address: LOT3 Specifier: PDG City,State,Zp:, Designer. Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: Design meets User specified(L/360)Total load deflection criteria. Disclosure Design meets User specified(L/480)Live load deflection criteria. Completeness and accuracy of input nx. Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Calculations assume Member is Fully Braced. output as evidence of suitability for Hanger Manufacturer: Simpson Strong-Tie,Inc. particular application.Output here basec Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. on building code-accepted design Design based on Dry Service Condition. properties and analysis methods. Deflections less than 1/8"were ignored in the results. hstallation of BOISE engineered wood products must be in accordance w ith current Installation Guide and applicable building codes.To obtain Installation Gull or ask questions,please call (800)232-0788 before installation. BC CA LOS,BC FRAMER®,AJSTK, ALLJOIST®,BC RM BOARDTM',BCI® BOISE GLULAMN,SMPLE FRAMING SYSTEMS,VERSA-LAMS,VERSA-RM PLUS®,VERSA-RMS, VERSA-STRANDS,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page2 of2 'IjTJ Nola*Cascade Single 11-7/8" BCI® 5000-1.7 DF Upper LeveRFloor Joists\J10(i2459) ��%% Dry'1 span I No cantilevers 10/12 slope September 23,2015 12:58:40 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists U1002459 Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: 0 I �� , -, ,, ,I h c5 cS ..I » ,I, b 1 7 �I' `i , -, 17 , 7 1o b ri, v , ,[ o ri . 10-02-04 BO B1 Total Horizontal A oduct Length=10-02-04 Reaction Summary(Down I Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live BO 409/0 102/0 B1, 1-3/4" 422/0 105/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 10-02-04 40 10 n/a 1 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 07-03-14 40 10 n/a 2 FC2 Floor Material Unf.Lin.(Ib/ft) L 07-03-14 10-00-08 42 10 n/a 3 FC2 Floor Material Conc.Pt.(lbs) L 10-01-06 10-01-06 17 4 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 1,254 ft-lbs 39.8% 100% 1 05-01-04 End Reaction 527 lbs 522% 100% 1 10-02-04 End Shear 498 lbs 30.7% 100% 1 10-00-08 Total Load Defl. L/999(0.078') n/a n/a 1 05-01-04 Live Load Defl. L/999(0.062') n/a n/a 2 05-01-04 Max Defl. 0.078" n/a n/a 1 05-01-04 Span/Depth 10.1 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L x W) Value Support Member Material BO Hanger 2"x2" 511 lbs n/a 47.8% IUS 2.06/11.88 B1 Wall/Plate 1-3/4"x 2" 527 lbs 35.4% 52.2% Unspecified Cautions Hanger IUS 2.06/11.88 requires (10) 10d face nails,(2) joist nails. Notes Page 1 of2 Boise cascade Single 11-7/8" BCI® 5000-1.7 DF Upper LevellFloor JoistsW10(i2451 Dry'1 span I No cantilevers 10/12 slope September 23,2015 12:58:4 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.m mdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor JoistsU10(i[ Address: LOT 3 Specifier: PDG City,State,Zip:, Designer. Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: Design meets User specified(L/360)Total load deflection criteria. Disclosure Design meets User specified(L/480)Live load deflection criteria. Completeness and accuracy of input n. Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Calculations assume Member is Fully Braced. output as evidence of suitability for Hanger Manufacturer: Simpson Strong-Tie,Inc. particular application.Output here basec Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. on building code-accepted design Design based on Dry Service Condition. properties and analysis methods. Deflections less than 1/8"were ignored in the results. hstalation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Guii or ask questions,please call (800)232-0788 before installation. BC CALO5,BC FRAMED,AJST", ALLJOIST®,BC RIM BOARDT",BCI ), BOISE GLULAMT"",SWPLE FRAMING SYSTEMS,VERSA-LAM®,VERSA-RAM PLUS®,VERSA-RMV, VERSA-STRAND®,VERSA-STUDS)are trademarks of Boise Cascade Wood Products L.L.C. Page2 of2 ®Boccede Single 11-7/8" BC ® 5000-1.7 DF Upper LevelFloor JoistsW3(i2574) Dry 12 spans I No cantilevers 10/12 slope September 23,2015 12:58:41 BC CALC®Design Report 24 OCS I Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.m mdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J3(i2574) Address: LOT 3 Specifier: PDG City,State,Zp:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: ., , „,7,, E ',.,. 1..,-..,. ..F. T .c ':, : .+;-•,: _ .;,,...3....,... .,.0 ,.r:1 . v, _ .. `.. a .'. 14-11-14 I 14-00-00 BO B1 B2 Total Horizontal Product Length=28-11-14 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,1-3/4" 523/51 118/0 B1,3-12" 1,336/0 334/0 B2 428/79 87/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-00-07 14-11-14 40 10 n/a 1 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-00-07 08-01-03 38 9 n/a 2 FC2 Floor Material Unf.Lin.(Ib/ft) L 08-01-03 14-11-14 42 10 n/a 3 FC2 Floor Material Unf.Lin.(Ib/ft) L 14-11-14 28-11-14 68 17 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 2,033 ft-lbs 64.5% 100% 2 06-06-14 Neg.Moment -2,321 ft lbs 73.7% 100% 1 14-11-14 End Reaction 641 lbs 63.5% 100% 2 00-00-00 Int.Reaction 1,670lbs 74.2% 100% 1 14-11-14 End Shear 623 lbs 38.4% 100% 2 00-01-12 Cont Shear 894 lbs 55% 100% 1 14-10-02 Total Load Defl. L/763(0.234') 47.2% n/a 2 07-02-11 Live Load Defl. L/909(0.197') 52.8% n/a 5 07-02-11 Total Neg.Defl. L/999(-0.046') n/a n/a 2 19-11-10 Max Defl. 0.234" 23.4% n/a 2 07-02-11 Span/Depth 15.1 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(LxW) Value Support Member Material BO Wall/Plate 1-3/4"x2" 641 lbs 43.1% 63.5% Unspecified B1 Beam 3-12"x2" 1,670 lbs 58.9% 74.2% Unspecified B2 Hanger 2"x2" 515 lbs 40.7% 48.2% ITS2.06/11.88 Cautions Hanger ITS2.06/11.88 requires (2)10dx1.5 face nails,(4) 10dx1.5 TF nails,(2)Strong-Grip joist nails. Notes Page 1 of2 ®BoiseCscede Single 11-7/8" BCI® 5000-1.7 DF Upper LeveRFloor Joists J3(i2574 Dry 12 spans I No cantilevers 10/12 slope September 23,2015 12:58:1 BC CALC®Design Report M 24 OCS I Repetitive I Gued&nailed construction Build 3924 File Name: 15-969 REV2.m mdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\l3(i2E Address: LOT3 Specifier: PDG City,State,Zp:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: Design meets User specified(L/360)Total load deflection criteria. Disclosure Design meets User specified(L/480)Live load deflection criteria. Completeness and accuracy of input mii. Design meets arbitrary(1")Maxim urn total load deflection criteria. be verified by anyone who would rely o Calculations assume Member is Fully Braced. output as evidence of suitability for Hanger Manufacturer: Simpson Strong-Tie,Inc. particular application.Output here basec Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. on building code-accepted design Design based on Dry Service Condition. properties and analysis methods. Deflections less than 1/8"were ignored in the results. hstallation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Gull or ask questions,please call (800)232-0788 before installation. BC CALM,BC FRAMER®,AJSTM', ALLJOIST®,BC RM BOARDTM',BCI®, BOISE GLULAM'',SMPLE FRAMING SYSTEME),VERSA-LAM®,VERSA-RM PLUS®,VERSA-RM8), VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page2 of2 ®800clscadoSingle 11-7/8" BCI® 5000-1.7 DF Upper LeveRFloor Joists\J2(i2587) Dry'3 spans I No cantilevers 10/12 slope September 23,2015 12:58:41 BC CALC®Design Report 24 OCS 1 Repetitive I Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor Joists\J2(i2587) Address: LOT 3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: F --"--'-----7— _ "#p - r- "l P , •r em -.7-7.„ -®�,.�.7 *: 0 �. � ..a. .'�, ... .0-r., � - '' .s .'i,:<.--':-':--:,":'. .. . ., 1law�# 3.k� � . .� iV�?f1.,T-As a.. l, ��'17;f .*nm e..w�s.��. �; ... t� r.0-'z.. a 7z .-.t r, BO 10-02-04 61 14-11-14 I 14- 0-00 B2 B3 Total Horizontal Product Length=39-02-02 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live BO 387/103 71 /0 B1,3-12" 1,190/0 280/0 B2,3-12" 1,122/0 271/0 B3 339/63 69/0 Live Dead Snow Wind Roof Live OCS Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 0 - Unf.Lin.(Ib/ft) L 00-00-00 25-02-02 80 20 n/a 1 FC2 Floor Material Unf.Lin.(lb/ft) L 25-02-02 39-02-02 54 13 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 1,514 ft-lbs 48.1% 100% 3 17-08-08 Neg.Moment -1,863 ft lbs 59.1% 100% 5 25-02-02 End Reaction 458lbs 42.9% 100% 2 00-00-00 Int.Reaction 1,470 lbs 65.3% 100% 4 10-02-04 End Shear 442 lbs 27.2% 100% 2 00-02-00 Cont.Shear 779 lbs 48% 100% 5 25-00-06 Uplift -32 lbs n/a 100% 3 00-00-00 Total Load Defl. U1,026 (0.175") 35.1% n/a 3 17-08-08 Live Load Defl. U1,197 (0.15") 40.1% n/a 8 17-08-08 Total Neg.Defl. L/999(-0.037") n/a n/a 3 30-01-14 Max Defl. 0.175" 17.5% n/a 3 17-08-08 Span/Depth 15.1 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L xW) Value Support Member Material BO Hanger 2"x2" 458 lbs n/a 42.9% IUS2.06/11.88 BO Hanger Uplift 2"x2" 32 lbs n/a n/a IUS 2.06/11.88 B1 Wall/Plate 3-12"x2" 1,470 lbs 49.4% 65.3% Unspecified B2 Beam 3-12"x2" 1,393 lbs 49.1% 61.9% Unspecified B3 Hanger 2"x2" 408 lbs 32.2% 38.2% ITS2.06/11.88 Cautions Hanger IUS 2.06/11.88 requires (10) 10d face nails,(2) joist nails. Hanger ITS2.06/11.88 requires (2) 10dx1.5 face nails,(4)10dx1.5 TF nails,(2)Strong-Grip joist nails. Page 1 of2 ;; RoiseCascade Single 11-7/8" BCI® 5000-1.7 DF Upper Level'Floor Joists1J2(i2581 Dry'3 spans I No cantilevers 10/12 slope September 23,2015 12:58:1 BC CALC®Design Report 24 OCS I Repetitive 1Glued&nailed construction Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Floor Joists\Upper Level\Floor JoistsU2(i2E Address: LOT3 Specifier: PDG City,State,Zip:, Designer. Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1336 Msc: Notes Disclosure Design meets User specified(L/360)Total load deflection criteria. Completeness and accuracy of input mi. Design meets User specified(L/480)Live load deflection criteria. be verified by anyone who would rely o Design meets arbitrary(1")Maxim urn total load deflection criteria. output as evidence of suitability for Calculations assume Member is Fully Braced. particular application.Output here basec Hanger Manufacturer: Simpson Strong-Tie,Inc. on building code accepted design Composite El value based on 1-1/8"thick OSB sheathing glued and nailed to member. properties and analysis methods. Design based on Dry Service Condition. Installation of BOISE engineered wood products must be in accordance with Deflections less than 1/8"were ignored in the results. current Installation Guide and applicable building codes.To obtain Installation Gull or ask questions,please call (800)232-0788 before installation. BC CAWS,BC FRAMER®,AJST"', ALLJOIST®,BC RM BOARDT",BCI®, BOISE GLULAMT"",SIMPLE FRAMING SYSTEMS),VERSA-LAM$,VERSA-RM PLUS®,VERSA-RIM, VERSA-STRANDS,VERSA-STUDS are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 ' ® w ®BeseCcede Single 5-1/2" x 21" BOISE GLULAME) 24F-V4/DF Upper LeveR...\BM6(i2588) Dry l 1 span 1No cantilevers 10/12 slope September 23,2015 12:58:41 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BM6(i: Address: LOT 3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: PR-L313 Msc: e A A v , ,1 v vr, ;,2 5 v , riNT4 », -,,,:i-.-'::.,... I'�f ax^' -' "fir& xk,� .r$ z n^x. ,.. ):::: ,.,,,',%¢ xr ,�..,. ter,..,._„ ,. .. ...,-., �r a«'�.«. .'3'c.,....r .. -. s 23-02-12 BO B1 Total Horizontal Product Length=23-02-12 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,3-7/16" 5,697/96 1,691 /0 B1,3-1/4" 6,359/21 1,893/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 Smoothed Load Unf.Lin.(Ib/ft) L 04-11-00 10-11-00 511 118 n/a 2 Smoothed Load Unf.Lin.(Ib/ft) L 10-11-00 20-11-00 589 148 n/a 3 - Conc.Pt.(lbs) L 01-11-00 01-11-00 1,018 255 n/a 4 - Conc.Pt.(lbs) L 03-11-00 03-11-00 997 223 n/a 5 - Conc.Pt.(lbs) L 03-11-00 03-11-00 -105 n/a 6 J8(i2521) Conc.Pt(lbs) L 05-11-00 05-11-00 -4 n/a 7 J8(i2521) Conc.Pt(lbs) L 07-11-00 07-11-00 -4 n/a 8 J8(i2570) Conc.Pt.(lbs) L 09-11-00 09-11-00 -4 n/a 9 - Conc.Pt(lbs) L 21-11-00 21-11-00 1,085 271 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 46,820 ft-lbs 62.3% 100% 1 11-11-00 End Shear 7,647 lbs 37.5% 100% 1 02-00-07 Total Load Defl. U481 (0.569') 49.9% n/a 1 11-08-00 Live Load Defl. U622(0.44') 57.9% n/a 3 11-08-00 Max Defl. 0.569" 56.9% n/a 1 11-08-00 Span/Depth 13 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L xW) Value Support Member Material BO VVall/Plate 3-7/16"x5-1/2" 7,388 lbs 92.6% 60.5% Unspecified B1 Wall/Plate 3-1/4"x5-1/2" 8,2531bs 108.6% 71% Unspecified Cautions Bearing B1 cannot supporta load of 8,253 lbs. Notes Page 1 of 2 *Boise cascade Single 5-1/2" x 21" BOISE GLULAMID 24F-V4/DF Upper Leve11...\BM6(i2581 Dry'1 span I No cantilevers 10/12 slope September 23,2015 12:58:4 BC CALL®Design Report M Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BP Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: PR-L313 Msc: Design meets Code minimum(L/240)Total load deflection criteria. Disclosure Design meets Code minimum(L/360)Live load deflection criteria. Completeness and accuracy of input mL. Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Calculations assume Member is Fully Braced. output as evidence of suitability for Design based on Dry Service Condition. particular application.Output here bases Deflections less than 1/8"were ignored in the results. on building code-accepted design properties and analysis methods. hstallation of BOISE engineered w ood products must be in accordance w ith current Installation Guide and applicable building codes.To obtain Installation Gui' or ask questions,please call (800)232-0788 before installation. BC CALM,BC FRAMER®,AJST'", ALLJOIST®,BC RM BOARDT'",BCI®, BOISE GLULAMT"',SIMPLE FRAMING SYSTEM®,VERSA-LAMA,VERSA-RIM PLUS®,VERSA-RM)D, VERSA-STRAND/0,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 ®RoisecscadoDouble 1-3/4" x 11-7/8" VERSALANI® 20 2800 DF Upper LeveR... BM2(i2601) Dry'1 span I No cantilevers 1 0/12 slope September 23,2015 12:58:41 BC CALC®Design Report Build 3924 File Name: 15-969 RE\2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beam s\BM2(i Address: LOT3 Specifier: PDG City,State,Zp:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: 171—q# m a 1 ays "gs€ a+ r��° art "s �£ t` 14-01-12 BO B1 Total Horizontal Product Length=14-01-12 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,3-1/2" 280/0 146/0 B1 280/0 145/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-01-12 14-01-12 40 10 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 1,447 ft-lbs 7.5% 100% 1 07-01-10 End Shear 3551bs 4.5% 100% 1 01-03-06 Total Load Defl. U999(0.051') n/a n/a 1 07-01-10 Live Load Defl. L/999(0.034') n/a n/a 2 07-01-10 Max Defl. 0.051" n/a n/a 1 07-01-10 Span/Depth 14 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L x W) Value Support Member Material BO Beam 3-1/2"x3-12" 426 lbs 8.6% 4.6% Unspecified B1 Hanger 2"x3-12" 425 lbs 33.6% 8.1% ITS3.56/11.88 Cautions Hanger ITS3.56/11.88 requires (2)10dx1.5 face nails,(4)10dx1.5 TF nails,(2) 10dx1.5 joist nails. Notes Design meets Code minimum (L/240)Total load deflection criteria. Design meets Code minimum (L/360)Live load deflection criteria. Design meets arbitrary(1")Maximum total load deflection criteria. Calculations assume Member is Fully Braced. Hanger Manufacturer: Simpson Strong-Tie,Inc. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of2 0 iso isoCascade Double 1-3/4" x 11-7/8" VERSA LAM®2.0 2800 DF Upper LeveR...\BM2(i260' Dry'1 span I No cantilevers 10/12 slope September 23,2015 12:58:' BC CALC®Design Report W, Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\ED Address: LOT3 Specifier: PDG City,State,Zp:, Designer. Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: Connection Diagram Disclosure r•i b d \ Completeness and accuracy of input mi. be verified by anyone who would rely o T. . output as evidence of suitability for 1 ^ particular application.Output here basec on building code-accepted design properties and analysis n thods • Installation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable a minimum =2" C=7-7/8" building codes.To obtain Installation Guil b minimum =3" d=24" or ask questions,please call Member has no side loads. (800)232-0788 before installation. Connectors are:16d Sinker Nails BC CALM,BC FRAMER®,AJST"', ALLJOIST®,BC RM BOARDT'",BCI®, BOISE GLULAMT"',SMPLE FRAMING SYSTEM,VERSA-LAM,VERSA-RM PLUS®,VERSA-RIM, VERSA-STRAND®,VERSA-STUDS are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 a. goisc cascede Single 1-3/4" x 11-7/8" VERSA-LAME) 2.0 2800 DF Upper LeveR...\BM3(12495) • Dry' 1 span I No cantilevers 1 0/12 slope September 23,2015 12:58:41 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BM3(i: Address: LOT3 Specifier: PDG City,State,Tip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: L i, e, , , „H'., ' I �ui b �7 ii b v' �< <S �;�;�� v �7 v �i ,1, b LI n 08-02-01 BO B1 Total Horizontal Product Length=08-02-01 I Reaction Summary(Down I Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,3-12" 464/0 138/0 B1 470/0 139/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-02-03 08-02-01 117 29 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 1,162 ft-lbs 12.1% 100% 1 04-01-12 be verified by anyone who would rely on End Shear 434 lbs 11% 100% 1 01-03-06 output as evidence of suitability for Total Load Defl. L/999(0.026') n/a n/a 1 04-01-12 particular application.Output here based Live Load Defl. L/999(0.02") n/a n/a 2 04-01-12 on building code-accepted design Max Defl. 0.026" n/a n/a 1 04-01-12 properties and analysis methods. Span/Depth 7.9 n/a n/a 0 00-00-00 Installation of BOISE engineered wood products must be in accordance w ith current Installation Guide and applicable %Allow %Allow building codes.To obtain Installation Guide Bearing Supports Dim.(L x W) Value Support Member Material or ask questions,please call BO Wa ll/Plate 3-12"x 1-3/4" 602 lbs 23.1% 13.1% Unspecified (800)232-0788 before installation. B1 Hanger 2"x1-3/4" 609 lbs n/a 23.2% HUCQ 1.81/11-SDS1.75 BC CALM, BC FRAMER®,AJSTM', ALLJOIST®, BC RIM BOARDT*',BCI®, DesignNotes BOISE meets Code minimum (L/240) SYSTEMS VERSA-LAM,Total load deflection criteria. ME,GL ,VT*',SIMPLE FRAMING ERSA-LAMS,VERSA-RIM Design meets Code minimum (L/360)Live load deflection criteria. PLUS®,VERSA-RMS, Design meets arbitrary(1")Maximum total load deflection criteria. VERSA-STRAND®,VERSA-STUDS are Calculations assume Member is Fully Braced. trademarks of Boise Cascade Wood Hanger Manufacturer: Simpson Strong-Tie,Inc. Products L.L.C. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 �� Bo • ise cascade Single 1-3/4" x 11-7/8" VERSA-LAM& 2.0 2800 DF Upper LeveR...\BM4(i2593) Dry 13 spans I Left&Right cantilevers 10/12 slope September 23,2015 12:58:41 BC CALL®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BM4(i: Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: V 9 9 9-, ^�"fil��yi� ;Y ;: +x�' r- ',!,,, ,„.„-, „,i. € rX k E .�' a «��+' �Sa,J' �' �'a' ' r'�t .�; a�?' MJJ�*, 'a y� d"„�; 4P:,..:,. ,., v',, h a ^ . n. j ��Y s ,,yw mr X4 4 ,) 9r } i n. "��� u, �,- ��p� ..v� '��r, �v.. r'N���s.,,'x�, ,. ���'. ..r'�;�,� � �nsd���. ,:���" _ ��ft.��' a".r���.z.,„ .' 00-07-01 I 03-00-11 I 00-05-06 B1 B2 Total Horizontal Product Length=04-01-02 Reaction Summary(Down I Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1,3-1/2" 501/184 87/0 B2,3-12" 917/339 179/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start Bid 100% 90% 115% 160% 125% 1 BM3(i2462) Conc.Pt(lbs) L 00-00-14 00-00-14 293 72 n/a 2 J7(i2589) Conc.Pt(lbs) L 01-11-00 01-11-00 261 16 n/a 3 J7(i2589) Conc.Pt(lbs) L 01-11-00 01-11-00 -197 n/a 4 - Conc.Pt.(lbs) L 04-00-00 04-00-00 731 156 n/a 5 - Conc.Pt.(lbs) L 04-00-00 04-00-00 -193 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 183 ft-lbs 1.9% 100% 4 01-11-00 Neg.Moment -357 ft-lbs 3.7% 100% 3 01-11-00 Cont Shear 214 lbs 5.4% 100% 5 01-08-11 Uplift -98 lbs n/a 100% 7 00-07-01 Uplift -160 lbs n/a 100% 8 03-07-12 Uplift -160 lbs n/a 100% 8 03-07-12 Total Load Defl. 2xU1,998(0.001') n/a n/a 3 00-00-00 Live Load Deli. L/999(-0.001') n/a n/a 11 02-01-04 Total Neg.Defl. L/999(-0.001") n/a n/a 3 02-01-12 Max Defl. -0.001" n/a n/a 3 02-01-12 Cant MaxDefl. 0.001" n/a n/a 3 00-00-00 Span/Depth 3.1 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(LxW) Value Support Member Material B1 Post 3-12"x1-3/4" 5881bs 12% 12.8% Unspecified B2 Post 3-1/2"x 1-3/4" 1,096 lbs 22.4% 23.9% Unspecified Cautions I Uplift of-98 lbs found at span 1 -Right. Uplift of-160 lbs found at span 2-Right. Uplift of-160 lbs found at span 3-Left. Notes Page 1 of2 sose Cascade Single 1-3/4" x 11-7/8" VERSA-LAND 2.0 2800 DF Upper LeveR...1BM4(i259: Dry'3 spans I Left&Rightcantilevers 10/12 slope September 23,2015 12:58:1 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams St Address: LOT3 Specifier: PDG City,State,Zip:, Designer. Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: Design meets User specified(2xL/240)Total load deflection criteria. Disclosure Design meets Code minimum (L/360)Live load deflection criteria. Completeness and accuracy of input mm. Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Design meets arbitrary(1")Cantilever Maximum total load deflection criteria. output as evidence of suitability for Calculations assume Member is Fully Braced. particular application.Output here basec Design based on Dry Service Condition. on building code-accepted design Deflections less than 1/8"were ignored in the results. properties and analysis methods. hstaflation of BOISE engineered w ood products mist be in accordance with current Installation Guide and applicable building codes.To obtain Installation Gull or ask questions,please call (800)232-0788 before installation. BC CALM,BC FRAME ,AJS7m, ALLJOIST®,BC RM BOARDTM,BCI®, BOISE GLULAM^",SMPLE FRAMING SYSTEMS),VERSA-LAM®,VERSA-RM PLUS®,VERSA-RIME), VERSA-STRANDS,VERSA-STUD®are trademarks of Boise Cascade Wood Products L.L.C. Page 2 of 2 i . ® . Boise Cascade Single 1-3/4" x 11-7/8" VERSA-LAM& 2.0 2800 DF Upper LeveR...\BM3(i2462) Dryl 2 spans I No cantilevers 10/12 slope September 23,2015 12:58:42 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BM3(i; Address: LOT3 Specifier: PDG City,State,Zip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: T 2 01-05-06 I 06-08-11 BO B1 B2 Total Horizontal Product Length=08-02-01 Reaction Summary(Down/Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,3-12" 76/324 0/78 B1,3-12" 721/0 225/0 B2 232/0 72/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start Bid 100% 90% 115% 160% 125% 1 FC2 Floor Material Unf.Lin.(Ib/ft) L -00-00-00 08-02-01 6 2 n/a 2 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-02-03 08-02-01 79 20 n/a 3 FC2 Floor Material Conc.Pt.(lbs) L 00-00-14 00-00-14 17 4 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 382 ft-lbs 4% 100% 3 05-05-14 Neg.Moment -521 ft-lbs 5.4% 100% 1 01-05-06 End Shear 385 lbs 9.7% 100% 3 01-03-06 Cont.Shear 412 lbs 10.4% 100% 3 00-03-12 Uplift -402 lbs n/a 100% 3 00-00-00 Total Load Defl. L/999(0.005') n/a n/a 3 05-01-12 Live Load Defl. U999(0.004') n/a n/a 6 05-01-12 Total Neg.Defl. L/999(-0') n/a n/a 3 00-11-03 Max Defl. 0.005" n/a n/a 3 05-01-12 Span/Depth 6.7 n/a n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L x W) Value Support Member Material BO VVall/Plate 3-12"x 1-3/4" 402 lbs 15.4% 8.7% Unspecified B1 Beam 3-12"x 1-3/4" 946 lbs 38.1% 20.6% Unspecified B2 Hanger 2"x1-3/4" 304 lbs n/a 11.6% HUCQ 1.81/11-SDS1.75 Cautions Uplift of-402 lbs found at span 1 -Left. Notes Page 1 of2 Eloise Costae* Single 1-3/4" x 11-7/8" VERSA-LAM& 2.0 2800 DF Upper Leve11...\BM3(i246' • Drys 2 spans I No cantilevers 10/12 slope September 23,2015 12:58:4 BC CALL®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BP Address: LOT 3 Specifier: PDG City,State,Tip:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: Design meets Code minimum(L/240)Total load deflection criteria. Disclosure Design meets Code minimum(L/360)Live load deflection criteria. Completeness and accuracy of input mi. Design meets arbitrary(1")Maximum total load deflection criteria. be verified by anyone who would rely o Calculations assume Member is Fully Braced. output as evidence of suitability for Hanger Manufacturer: Simpson Strong-Tie,Inc. particular application.Output here basec Design based on Dry Service Condition. on building code-accepted design Deflections less than 1/8"were ignored in the results. properties and analysis methods. Installation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable building codes.To obtain Installation Gull or ask questions,please call (800)232-0788 before installation. BC CALCI,BC FRAI U ,AJS'*', ALLJOIST®,BC RM BOARD"",BCI®, BOISE GLULAMTM',SF/FIE FRAMING SYSTEM&,VERSA-LAM®,VERSA-RM PLUS®,VERSA-RPM, VERSA-STRAND®,VERSA-STUD®are trademarks of Boise Cascade Wood Roducts L.L.C. Page 2 oft . , ® eiseCscade Single 1-3/4" x 11-7/8" VERSA-LAND 2.0 2800 DF Upper LeveR...\BM4(i2496) Dry 1 1 span 1No cantilevers 1 0/12 slope September 23,2015 12:58:42 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BM4(i; Address: LOT 3 Specifier: PDG City,State,Zp:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: W 3 n' 1 '" at ter*s. 3 -0; `14---34-'q::4'''''''''- ''-''' 4-1-`-'''''',"4-- a i' ` Y ',.:--i€y .,t 3 ,f i V";it "'r - 'F ,. ; 3 f.,4 %. z:-•''. i'X?<1 r -'''` .-A.....,;, t• 1,,i - ` ,°.y$, as • •';.« ,. _ .•. _ �, r«k ,. a #m v . '�. 2.�'a ?fr444 TY u'«r.,d . .3 9 ,. r .K � d ,,;01 04-01-12 BO B1 Total Horizontal Product Length=04-01-12 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,3-12" 436/0 120/0 B1,4-1/4" 446/0 123/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start Bid 100% 90% 115% 160% 125% 1 - Conc.Pt.(lbs) L 02-00-12 02-00-12 882 221 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 1,008 ft-lbs 10.5% 100% 1 02-00-12 be verified by anyone who would rely on End Shear 562 lbs 14.2% 100% 1 01-03-06 output as evidence of suitability for Total Load Defl. L/999(0.004") n/a n/a 1 02-00-12 particular application.Output here based Live Load Defl. L/999(0.003") n/a n/a 2 02-00-12 on building code-accepted design Max Defl. 0.004" n/a n/a 1 02-00-12 properties and analysis methods. Span/Depth 3.7 n/a n/a 0 00-00-00 Installation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable %Allow %Allow building codes.To obtain Installation Guide Bearing Supports Dim.(L x W) Value Support Member Material or ask questions,please call BO VVaII/Plate 3-1/2"x 1-3/4" 556 lbs 21.4% 12.1% Unspecified (800)232-0788 before installation. B1 VVaIl/Plate 4-1/4"x1-3/4" 569 lbs 18% 10.2% Unspecified BC CALC®,BC FRAMER®,AJSTM', ALLJOIST®,BC RIM BOARD"",BCI®, Notes BOISE GLULAMTM',SIMPLE FRAMING Design meets Code minimum (L/240)Total load deflection criteria. SYSTEMS),VERSA-LAMS,VERSA-RIM Design meets Code minimum (L/360)Live load deflection criteria. PLUS® VERSA-RMS Design meets arbitrary(1")Maximum total load deflection criteria. VERSA-STRANDS',VERSA-STUDS are Calculations assume Member is Fully Braced. trademarks of Boise Cascade Wood Design based on Dry Service Condition. Products L.L.C. Deflections less than 1/8"were ignored in the results. Page 1 of 1 1 � B• ojSeCOSt'0de Single 1-3/4" x 11-7/8" VERSA-LAMt) 2.0 2800 DF Upper LeveR...\BM1(i2534) • Dry' 1 span I No cantilevers 10/12 slope September 23,2015 12:58:42 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BM1(i: Address: LOT3 Specifier: PDG City,State,T.ip:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: 1t_sL�u��II _L i— 1 c7 `u ,, .; ,i 1 1 1 `7 1 .: ,7 i7 ,11 „fi o 7 '� , ,„„„,„1; v ' ;.cess 7:7Y''' ; a _`y r.r `Xr a'& tom , 77 r }+ rfn.,-,;,,:-..--,,,,,,:_. i �°-, --:::1--0:,$:.-._ r `a- s 7 -',,4,7,-1,,-2t rn 7, . " is b ''''' `:**%-.." a "s ` a' iZit-. i t ..i x �x 'z`*, m 'a • _# } : ! ss 14-10-10 BO B1 Total Horizontal Product Length=14-10-10 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,4-3/8" 284/0 106/0 B1,25-3/4" 361/0 135/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 FC2 Floor Material Unf.Lin.(lb/ft) L 00-00-00 14-10-10 43 11 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 1,162 ft lbs 12.1% 100% 1 06-06-10 be verified by anyone who would rely on End Shear 309 lbs 7.8% 100% 1 01-04-04 output as evidence of suitability for Total Load Defl. L/999(0.067") n/a n/a 1 06-06-10 particular application.Output here based Live Load Defl. L/999(0.049") n/a n/a 2 06-06-10 on building code-accepted design I Max Defl. 0.067" n/a n/a 1 06-06-10 properties and analysis methods. Span/Depth 12.6 n/a n/a 0 00-00-00 Installation of BOISE engineered wood I Distributed Load(B1) 54 lb/ft 0.3% 100% 0 n/a products must be in accordance with Concentrated Load(B1) -0 lbs n/a 100% 0 n/a current Installation Guide and applicable building codes.To obtain Installation Guide or ask questions,please call %Allow %Allow (800)232-0788 before installation. Bearing Supports Dim.(LxW) Value Support Member Material BO Wall/Plate 4-3/8"x 1-3/4" 390 lbs 12% 6.8% Unspecified BC CALM, BC FRAMER®,AJSTM', B1 Wall/Plate 25-3/4"x1-3/4" 496 lbs 2.6% 1.5% Unspecified ALLJOIST®,BC RIM BOARDTM', BCI®, BOISE GLULAMTM',SIMPLE FRAMNG Notes SYSTEM®,VERSA-LAMB),VERSA-RIM PLUS®,VERSA-RMS, Design meets Code minimum (L/240)Total load deflection criteria. VERSA-STRAND®,VERSA-STUD®are Design meets Code minimum (L/360)Live load deflection criteria. trademarks of Boise Cascade Wood Design meets arbitrary(1")Mabmum total load deflection criteria. Products L.L.C. Calculations assume Member is Fully Braced. Design based on Dry Service Condition. Deflections less than 1/8"were ignored in the results. Page 1 of 1 1 no�secascade Single 3-1/2" x 11-7/8" BOISE GLULAM® 24F-V4/DF Upper LeveR...�BM5(i2530) • Drys 1 span I No cantilevers 10/12 slope September 23,2015 12:58:42 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.m mdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BM5(i: I Address: LOT3 Specifier: PDG City,State,Zp:, Designer: Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD 1 Code reports: PR-L313 Msc: /A\\ ,e, 0 A A 0 I 1 I .?5,:,:9:::; ; - x` T z .✓ =:" tn ;¢r a, ,; '„� ; mef .. �� ^x L''',:•w 1.1. "t 4 -, eg .,:.;_;,- i F .IC tau "` ,zk � 3nr� : ` F 'f" ras S' x,�..:. 13-03-08 BO BI Total Horizontal Roduct Length=13-03-08 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,5-12" 650/34 157/0 0/69 B1,5-1/2" 689/36 166/0 0/69 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125% 1 FC2 Floor Material Unf.Lin.(Ib/ft) L 00-00-00 13-03-08 12 3 n/a 2 J12(i2510) Conc.Pt(lbs) L 02-00-00 02-00-00 175 38 -4 n/a 3 J12(i2510) Conc.Pt.(lbs) L 02-00-00 02-00-00 -10 n/a 4 J1(i2507) Conc.Pt.(lbs) L 03-05-08 03-05-08 101 -37 -65 Na 5 JI(i2507) Conc.Pt.(lbs) L 03-05-08 03-05-08 -6 n/a 6 J12(i2568) Conc.Pt(lbs) L 04-00-00 04-00-00 129 30 Na 7 J12(i2568) Conc.Pt(lbs) L 04-00-00 04-00-00 -8 n/a 8 JI 2(12503) Conc.Pt(lbs) L 06-00-00 06-00-00 203 48 Na 9 J12(i2503) Conc.Pt(lbs) L 06-00-00 06-00-00 -12 n/a 10 J12(i2499) Conc.Pt.(lbs) L 08-00-00 08-00-00 203 45 -3 n/a 11 JI2(i2499) Conc.Pt.(lbs) L 08-00-00 08-00-00 -12 n/a 12 J1(i2559) Conc.Pt(lbs) L 10-00-00 10-00-00 203 -14 -66 n/a 13 J1(i2559) Conc.Pt(lbs) L 10-00-00 10-00-00 -12 n/a 14 J12(i2528) Conc.Pt(lbs) L 12-00-00 12-00-00 167 39 n/a 15 J12(i2528) Conc.Pt(lbs) L 12-00-00 12-00-00 -10 n/a Controls Summary Value %Allowable Duration Case Location Pos.Moment 2,744 ft-lbs 16.7% 100% 1 06-00-00 End Shear 786 lbs 10.7% 100% 1 01-05-06 Total Load Defl. L/999(0.087") n/a Na 1 06-07-08 Live Load Defl. U999(0.0711 n/a n/a 18 06-07-08 Max Defl. 0.087" n/a n/a 1 06-07-08 Span/Depth 12.6 Na n/a 0 00-00-00 %Allow %Allow Bearing Supports Dim.(L xW) Value Support Member Material Page 1 of2 �Boisecascade Single 3-1/2" x 11-7/8" BOISE GLULAM®24F-V4/DF Upper LeveR...1BM5(i253( �/ Dry'1 span I No cantilevers 10/12 slope September 23,2015 12:58:4 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BP Address: LOT3 Specifier: PDG City,State,Zip:, Designer. Customer. PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: PR-L313 Msc: BO Wall/Plate 5-1/2"x3-1/2" 807 lbs 9.9% 6.5% Unspecified Disclosure B1 Wall/Plate 5-1/2"x 5-112"x3-1/2" 855 lbs 10.4% 6.8% Unspecified Completeness and accuracy of input nx, be verified by anyone who would rely o NOBS output as evidence of suitability for particular application.Output here basec Design meets Code minimum (L/240)Total load deflection criteria. on building code-accepted design Design meets Code minimum(L/360)Live load deflection criteria. properties and analysis methods. Design meets arbitrary(1")Maximum total load deflection criteria. hstaNation of BOISE engineered wood Calculations assume Member is Fully Braced. products must be in accordance with Unbalanced snow loads determined from building geometry were used in selected product's current Installation Guide and applicable verification. building codes.To obtain Installation Guil Design based on Dry Service Condition. or ask questions,please call Deflections less than 1/8"were ignored in the results. (800)232-0788 before installation. BC CALO®,BC FRAMER®,AJSTm, ALLJOIST®,BC RM BOA RDTM',BCI®, BOISE GLULAMTM',SNNPLE FRAMING SYSTEME),VERSA-LAM,VERSA-RM PLUS®,VERSA-RIME), VERSA-STRAND®,VERSA-STUDS)are trademarks of Boise Cascade Wood Products L.L.C. Page2 of2 1 it i Be•se case Single 1-3/4" x 11-7/8" VERSA-LAM& 2.0 2800 DF Upper LeveR...IBM4(i2489) cv Dry)1 span I No cantilevers 10/12 slope September 23,2015 12:58:42 BC CALC®Design Report Build 3924 File Name: 15-969 REV2.mmdl Job Name: WESTWOOD HOMES Description:Designs\Flush Beams\Upper Level\Flush Beams\BM4(i; Address: LOT 3 Specifier: PDG City,State,Zp:, Designer: Customer: PROBUILD-FOREST GROVE Company. BOISE CASCADE BMD Code reports: ESR-1040 Msc: W :3' :4` 41 ';44 Yf 44'*4: 7 17 ' 'S' ; "� :3 " VS'r7 S Ati,t ,T. et " ., ay . r, w,+..'„ 'k tir r " ,_" 4r� �& m . ���" �,. „ d; N '.,-.'1',,'.x, '? »a1 '''4,,_1"�uFr. _ � fr ..cif . .1,,: .u. Ps ",S¢} .s.1 'x1 `,ni4 -� ,3 , ,.. 04-02-12 BO B1 Total Horizontal Product Length=04-02-12 Reaction Summary(Down/ Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B0,3-1/2" 162/0 52/0 B1,3-1/2" 153/0 50/0 Live Dead Snow Wind Roof Live Trib. Load Summary Tag Description Load Type Ref. Start Bid 100% 90% 115% 160% 125% 1 JI 1(i2488) Conc.Pt.(lbs) L 02-00-12 02-00-12 315 79 n/a Disclosure Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must Pos.Moment 381 ft-1 bs 4% 100% 1 02-00-12 be verified by anyone who would rely on End Shear 207 lbs 5.2% 100% 1 01-03-06 output as evidence of suitability for Total Load Defl. L/999(0.002) n/a n/a 1 02-01-07 particular application.Output here based Live Load Defl. L/999(0.001") n/a n/a 2 02-01-07 on building code-accepted design Max Defl. 0.002" n/a n/a 1 02-01-07 properties and analysis methods. Span/Depth 3.8 n/a n/a 0 00-00-00 Installation of BOISE engineered wood products must be in accordance with current Installation Guide and applicable %Allow %Allow building codes.To obtain Installation Guide Bearing Supports Dim.(L x W) Value Support Member Material or ask questions,please call BO V\Fall/Plate 3-1t2"x 1-3/4" 214 lbs 8.2% 4.7% Unspecified (800)232-0788 before installation. B1 Wall/Plate 3-12"x 1-3/4" 203 lbs 7.8% 4.4% Unspecified BC CALM,BC FRAMER®,AJSTT", Notes ALLJOIST®,BC RIM BOARDT*',BCI®, BOISE GLULAMT*',SIMPLE FRAMING Design meets Code minimum (L/240)Total load deflection criteria. SYSTEM&,VERSA-LAME,VERSA-RIM Design meets Code minimum (L/360)Live load deflection criteria. PLUS® VERSA-MVO Design meets arbitrary(1")Maximum total load deflection criteria. VERSA-STRAND/9,VERSA-STUD®are Calculations assume Member is Fully Braced. trademarks of Boise Cascade Wood Design based on Dry Service Condition. Products L.L.C. Deflections less than 1/8"were ignored in the results. Page 1 of 1