Loading...
Report /3 a 3-0 /5&( cf(7' Mci ,,?00 iCaja 824 SE 12th Avenue Portland,Oregon Tell 43)616-94 52214 FIELD OBSERVATION REPORT GEO Consultants www.gcnweb.com Northwest, Inc. PROJECT ID DATE REPORT NO. Summit Ridge March 23, 2016 11 OWNER/CUENT OWNER/CUENT REPRESENTATIVE DAY OF WEEK PAGE D R Horton (DHI) Reed Couch Wednesday 1 of 1 GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME DHI Don Durst 1415 1500 GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT O'Rear Excavating and Construction John Kangus Overcast, 52`F TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE Foundation Backfill NA Brad L. Hupy, PE GE LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE Lot 159 (PH 5 Lot 24) Jumping Jack Compactor CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS: I made this visit at the request of Don Durst to observe the condition of crushed rock backfill for a portion of the foundation. While on site, I met with the contractor. I spoke with Mr. Durst by telephone. • The interior continuous footing for the home was excavated such that a near vertical slope several feet high was within about 1 foot of edge of footing. At the time of my arrival on site the contractor had placed a crushed rock sliver fill along the cut edge so that there was a 2 to 3 foot wide flat bench adjacent to the footing. The fill was then inclined downward at about 2H:1 V. I observed the operation of a jumping jack compactor and confirmed that the fill was well compacted. In my option, the backfill for the intermediate footing has been prepared in general conformance with my re commendations and will perform as intended to provide vertical and lateral support for the footing. • A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations ® FINAL PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report.A final report Is an instrument of professional service.Any conclusions drawn from this report should be discussed with and evaluated by the professional involved. ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISrr FIELD REPRESENTATIVE SIGNA DATE March 23, 2016 GCN's professionals are represented on site solely to obse • of the contractor identified,to form opinions about the adequacy of those operations,and to report those opinions to our client. The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements.We rely on the contractor to comply with the plans and soecifications throughout the duration of the project.irrespective of the presence of our representative.The contractor retains sole responsibility for site safety and the methods.operations,and sequences.