Loading...
Permit CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT 14 ' COMMUNITY DEVELOPMENT Permit#: FPS2016-00041 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/08/2016 Parcel: 2S 101 DA00104 Jurisdiction: Tigard Site address: 13333 SW 68TH PKWY, STE#310 Project: Spec Space Subdivision: VARNS ACRES Lot: 9 Project Description: Fire alarm-Space is being demoed to shell for build out by future tenant. relocate existing horn strobes to within 15'of entry/exit. Contractor: PORTER ELECTRIC INC Owner: TRIANGLE POINTE TWO LLC 7320 NE ST JOHNS RD 901 NE GLISAN ST, STE 100 VANCOUVER,WA 98665 PORTLAND, OR 97232 PHONE: 360-574-1366 PHONE: FAX: 360-573-3723 FEES Description Date Amount Specifics: Permit Fee-COM 03/08/2016 $56.47 12%State Surcharge-Building 03/08/2016 $6.78 Type of Use: COM Plan Review-Fire Life Safety-COM 03/08/2016 $22.59 Class of Work: ALT Type of Const: Info Process/Archiving-Sm$0.50(up to 03/08/2016 $0.50 Occupancy Grp: Height: ft 11x17) Stories: Commercial Sprinkler System: Sprinkler Required: Sprinkler Type: Standpipe Required: Hazard: Density: 0 Design Area: 0 K Factor: 0 Commercial Fire Alarm System: Fire Alarm Required: Alarm Type: Pull Station Required: Smoke Detectors Req: Battery Calcs Provided: Cut Sheets Required: Total $86.34 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: $0.00 Residential Square Footage: 0 Fire Alarm Valuation: $685.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct ques : OUNC by calling 503.232.1987 or 1.800.332.2344. Issued B : / / Permittee Signature: • Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Fire Protection System RECEIVEJ) I o►z()I 1( 1 ► '1 O\► City of Tigard Dam �Q/j0 -71 PermitNo.: 13125 SW Hall Blvd.,Tigard,OR 9y r Plan Review Phone: 503.718.2439 Fax: 503.59 .jzzJ76o g �j Date/I3 : Other Permit: I:1) Inspection Line: 503.639.4175 y Date Ready/By: Anis: gi See Page 2 for Internet: www.tigard-or.gov l A V 4)1 Notified/Method: Supplemental Information ? u C ,tt" • < 4 a 1 a Vc.% t� ❑New construction p Demolition Permit fees*are based on the value of the work performed. $[Addition/alteration/replacement 0 Other: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the '"'�. z '"�"" work indicated on this application. Valuation: El1-and 2-family dwelling ®Commercial/industrial $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: 7%. � s t kg) a t r, t�, "V °(r) Total number of floors: Job site address:13333 SW 68th Parkway New dwelling area: square feet City/State/ZIP:Tigard OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: 3(�I Project name. Tt 0.1,35(e 4 1O-;Alt. _ Covered porch area: square feet Cross street/directions to job site:Near 68th Parkway and SW Hampton Deck area: square feet Other structure area: square feet Subdivision: l Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all p a a y* equipment,materials,labor,overhead,and the profit for the l'Nt =et work•indicated on this application. Space is being demoed to shell for build out by future tenant- Valuation: $$685.00 Relocate exisiting ceiling mount horn strobes to with in 15 feet from entry/exit Existing building area: square feet New building area: square feet " . te:6�a . Number of stories: .c..,h.e s 6 ..=oat ,� ct Name: Type of construction: Address: Occupancy groups: City/State/ZIP: Existing: N. Phone:( ) Fax:( ) New: doNTAcc rLsoN Noi�ic 1 Business name: All contractors and subcontractors are required to be Contact name: licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: jurisdiction in which work is being performed.If the City/State/ZIP: applicant is exempt from licensing,the following reasons apply: Phone:( ) Fax::( ) E-mail: CONTRACTOR BUILDING PERMIT FEES* Business name:Porter Electric Inc (Please refer mfee schedule) Permit fee: Address:7320 NE St Johns Rd State surcharge(12%of permit fee): City/State/ZIP:Vancouver WA 98665 FLS plan review(40%of permit fee): Phone:(360)574-1366 Fax:(360)573-3723 (Due upon application submittal.) — CCB lic.:46678 Total permit fees: vb 8(o3� Authorized signature: y = Amount received: This permit application expires if a permit is not obtained Print name:Bill Robinson Date:2/29/16 within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Service Board. 1:'Building\Permits\FPS-PermitApp_071514.doc 440.4613T(11/02/COM/WEB) City of Tigard �Ql ;, i 13125 SW Hall Blvd.,Tigard,OR 97223 RECI L P Phone: 503.718.2439 Fax: 503.5 b ° 8 Permit No.: 1P 'h Date Received: e//e0 Inspection Line: 503.639.4175 lWII I:U',i I, Internet: www.tigard-or.gov By: kA t t IA +itJARO FIRE ALsd'it\ittW 'FIDAVIT FOR ALTERATIONS OR TENANT IMPROVEMENTS (MAXIMUM OF 5 DEVICES WITHOUT PLANS) Project Name:IilitNtit.a Pc40,-1-Space 300 Occupancy: Commercial Job Address: 13333 SW 68th Parkway, 97223 Suite: 300 Contractor: PORTER Electric Inc Phone: 360-574-1366 Valuation of work: $685.00 Type of System: (check one) gRequired ❑Non-required (check one) ['Automatic ❑Manual ['Both Total number of devices added or moved under this permit process is 5 total per tenant space. Number of Proposed Smoke/Heat Detectors: To be Added(max 5) 0 /To be Relocated(max 5) 0 Number of Proposed Manual Alarm Stations: To be Added(max 5) 0 /To be Relocated(max 5) 0 Number of Proposed Notification Appliances: To be Added(max 5) 0 /To be Relocated(max 5) 2 I, PORTER Electric Inc Oregon Construction Contractors Board No. 46678 certify the following is true and defines the scope of work for this project: a) All work complies with the current state-adopted NFPA-72 and the authority having jurisdiction. b) All notification appliances are located in accordance with the current state-adopted NFPA-72. c) Smoke/Heat detector spacing complies with current state-adopted NFPA-72 and the authority having jurisdiction. d) Exposed wiring will not be covered until inspected. e) Final approval shall be subject to on-site tests and inspections. f) Voltage drop is adequate to operate all appliances. g) Battery supplies are capable of supporting the system modifications. h) Compatibility of appliances and devices are in accordance with the FACP manufacturer's specifications. In addition, I understand the following is required: • Submit(3)copies of a sketch showing the area of work within the building's structure. • Building fire protection system permit. • Electrical permit. • A copy of this document with a copy of the sketch attached shall be available for all inspections. Signature: Vl,[ Date: 2/29/16 Print Name: Bill Robinson I:\Building\Forms\FireAlannAffidavit_071514.docx Page 1 of 1 Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 13333 SW 68TH PKWY STE 310, TIGARD, OR, 97223 Commercial - Fire Protection System 998 Alarm Final PASS - No C of O FPS2016-00041 Jeff Grove Violation Summary: Inspector Contractor