Loading...
Correspondence PWU ENGINEERING INC. ( 01 6.2. 6. -pi %,__c_ _=:-_-_ ,, Email: j/IA - Email: pwuengineerinq(c�comcast.net Ph: (503) 810-8309 Field Memo: Job # LEN15372 Date: 2/24/16 Project: Bainbridge A Master Reuse Garage Right Lot 3, Oak Crest, Tigard, OR Job # LEN15373 Project: Mulberry A Master Reuse Garage Right Lot 4, Oak Crest, Tigard, OR Lennar Homes Job # LEN15374 Project: Marquam A Master Reuse Garage Right Lot 5, Oak Crest, Tigard, OR Lennar Homes Lennar Homes Per your email Chuck, the sheathing edge nailed to the first sill plate is okay so long as the two top plates are properly stitch nailed together to transfer the shear. To insure this is the case, add 10d at 6" o.c. to the underside of the lower top plate to the upper top plate. If this nailing is added then the shear transfer will be okay. This issue is applicable at the one story areas only. Sincerely, n r.Y") R of r ��CG'�`tr N:..,//::: 1 Expires: 06/30'2016