Loading...
Permit IFL CITY OF TIGARD REROOF PERMIT COMMUNITY DEVELOPMENT Permit#: RER2016-00002 T1GARO 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/10/2016 Parcel: 25101 DC03703 Jurisdiction: Tigard Site address: 13500 SW 72ND AVE 100 Project: Beck Group Subdivision: None Lot: None Project Description: Remove all roofing to decking,install FR-10 fire retardant insulation,install Poli-Iso tapered insulation,R-25 GAF 60 mil TPO Contractor: INTERSTATE ROOFING INC Owner: BECK FAMILY PROPERTIES LLC 15065 SW 74TH AVE 16700 S GERBER RD PORTLAND, OR 97224 OREGON CITY, OR 97045 PHONE: 503-684-5611 PHONE: FAX: 503-639-3056 FEES Description Date Amount Permit Fee 03/10/2016 $608.23 Specifics: 12%State Surcharge-Building 03/10/2016 $72.99 Info Process/Archiving-Sm$0.50(up to 03/10/2016 $14.00 Type of Use: COM 11x17) Class of Work: OTR Type of Const: Occupancy Load: Stories: Height: 0 ft Project Valuation: $38,377.00 General Information Building Area: 0 Re-Roof Area: o Roof Class: Tear Off: Yes Overlay: Existing Roof Layers: Parapets: Total $695.22 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. - • Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 95 .01-0010 through•'- 95 :'1-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. I-sued By: / 7 — Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspe tion date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. BuildinE Permit Applicat4 CEj IV j D Commercial TORR (Hi It I. I '1. 0vl.1 City of Tigard MAR 10 2016 Received Date/By. 3 to /to ()y/ Permit No.:n Gp n6/�`eLJa � 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review 3 14�pA*�I, �I/ ARD Related Permit: Phone: 503-718-2439 Fax: 50 � '[I`Y 1� i1711IFiJr Date/By: Inspection Line: 503-639-417 T T 7�i(�DIVISION Date Ready/By: Jaris. ®See Page 2 for �l p FllILI)IN Notified/Method: Supplemental Information Internet: www.tigard-or.gov ai 1. i s l .J'9 ❑New construction 0 Demolition Permit fees*are based on the value of the work performed. ��77 Indicate the value(romded to the nearest dollar)of all ❑Addition/alteration/replacement 74 Other: equipment,materials,labor,overhead,and the profit for the x work indicated on this application. ID1-and 2-family dwelling ❑Commercial/industrial Valuation: $ ElAccessory building El Multi-family Number of bedrooms: ElMaster builder 74 Other: Number of bathrooms: $''`'` i I Total number of floors: Job site address: 3 G)d sl,4; ..7/4.0 . — New dwelling area: square feet City/State/ZIP: 77_ .RO " c R, AP 2 2'3 Garage/carport area: square feet Suite/bldg./apt.#: Project name:9c<, GRA ;31_ L) G Covered porch area square feet Cross street/diredions to job site: Deck area: square feet Other structure area: square feet Subdivision: Lot#: Permit fees*are based on the value of the work performed. Indicate the value(rotnded to the nearest dollar)of all Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the ;, work indicated on this r lication. Valuation: $ 38 3 7 7 'flit.tie •c.c. 'aise,d6 %a,pe e, ,0,4-"/ASL'LL, F•-16 >cl t?E Rei ' I ' /►.Sri, O AI n s7 4L.L ,o r 4/-,/s-6 Existing building area square feet ~ 4 ' Rep /itlsa.L 'f'25 4 <fig 461-04. 7Pb r New building area: square feet = , x f;; Number of stories: j. . Type of construction: Address: Occupancy groups: City/State/ZIP: Existing: Phone:( ) Fax:( ) New: Business name:/IUT4 S'T•TV- Resiseebl‘ Structural plan review fee(or deposit): Contact name: 46(A. c IQi'k.iehIj S FLS plan review fee(if applicable): Address: /51 (o $r,,.s 7 fi A ✓a City/State/ZIP: I pier/41'1,14 QQ • xz Y Total fees due upon application: ija Phone:(5.0) (p8 &5.4// Fax::(.5t2. 63f-3 4S Amount received: , E-mail: 'e c e • rr 6 ad/, ? )7E Rzycr'/AG l_A/`f Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name: it) ' T ��- :I� (r- and two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: / 4• S 4..0 7 U e • Solar Installation S,ecial Code checklist. City/State/ZIP: Permit fee(includes plan review $180.00 and administrative fees : Phone:0.0) 6 ay-,..5-6/ Fax:(S al 6,39-3/1-54 State surcharge(12%of permit fee): $21.60 CCB Lic.: 5.5' 6 5 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained — within 180 days after it has been accepted as complete. Print name:L.6 k/,5. o R/1 i-•45 Date: 3 vb /6j * Fee methodology set by Tri-County Building Industry Service Board I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 11 Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations [' 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE(ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PemritApp.doc Rev.12/18/2014 Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 13500 SW 72ND AVE 100, TIGARD, OR, 97223 Commericial - Reroof 299 Final inspection PASS - No C of O RER2016-00002 Jeff Grove Violation Summary: Inspector Contractor