Loading...
Plans (68) yc`°f/ii-o-)I2 CoP t(--1 /,v 1,2est EQ RECEIVED � D kb V3827 ia MAY 2 7 2014 1• `:40 i'' (E) ROOF SHEATHING IADD FULL DEPTH 2X CITY OF TIGARD Di•.i�_ , • -a . d (E)2X ROOF JOISTS WOOD BLOCKING EA BABUILD . 1 Date: '11-.15.22 . \ • (3)8d TOENAILS EA END. 14:46:14-07'00' .Y (2)#10 SCREWS TO EA II, 0 EXISTING WOOD JOIST { 1 METAL STUDS 600S250-43 18 GA DEEP LEG 2""SLIP" @ 16"O.C. j TOP TRACK W/(1)#10 SDS WAFER (-'- HEAD EA SIDE OF TRACK. GYPSUM BOARD II A CLIP ANGLE: 1iX1i"MIN X0'-4"X20 GA. W/(3)#8 SCREWS EA. LEG `., 6"X 16GA MIN TRACK AS METAL STUDS 600S250-43 -- BLOCKING AT MIDPOINT OF 1/2 j 20 GA X 1-1/2"CONTINUOUS @ 16"O.C. SPAN. PROVIDE BLOCKING AT I STRAP. PROVIDE ONE#10 EA END OF WALL AND AT 8'-0" I SCREW AT EACH STUD GYPSUM BOARD O.C. FLANGE AND FOUR AT EACH BLOCKING PIECE. 61 I 0 TYP. TOP TRACK - DEFLECTION B WALL BLOCKING 1 1/2"= 1'-0" LGMF-DTLS.DWG 1 1/2"= 1-0" LGMF-DTLS.DWG DRAWING: DATE: INEI . I 1 . 1 Light Gauge Framing Details 5/22/14 architecture - LLP 2525 Fast Burnside St PROJECT: SHEET: Portland,2phone Paradigm Construction 1 503.228.381Sl 9 7 phone 503.226.3715 fax Washington Square Remodel seaBp.e«" _ �, D kyr SPLIC _ I • ��! I TYP BOTTOM TRACK -•RTtA . i r• • OF 6( Digitally signed by Sid Scott ' Date: 2014.05.22 14:46:41-07'00' TYP. STUD NESTED BETWEEN LP VERTICAL STUDS i ( TYP STUD PER PLAN APPLIES AT TOP& BOTTOM TRACKS #8 EACH FLANGE ___\___ ) GYPSUM BOARD + #8 SCREWS @3"O/C q a + T T EA. SIDE '� u + a v CI 'JC a TRACK ANCHOR BY —_ "a V ° 2 ANCHOR PINS: 2"a a V1ITYP. (2) HILTI DN 32 P8 POWDER �ATYP"OTHER DETAIL DRIVEN FASTENERS W/1-8.1" EMBED. (.145"0) @ 32"0/C C( \ TYP. TRACKSPLICE D TYP. BOTTOM TRACK 1 1/2"= 1'-0" LGMF-DTLS.DWG 1 1/2"= 1-0" LGMF-DTLS.DWG DRAWING: DATE: Mill • 1 A , • Light Gauge Framing Details 5/22/14 arc I t e c u r e - LLP 2525 Fast Burnside s1 PROJECT: SHEET: Portland,017 97214 503.226 3617 phone Paradigm Construction 2 503.226.3715 fax Washington Square Remodel sow..... I W NM yaii 1 j'AM ApS8 PROF �NOTES: / FM 1 //1. DO NOT LOCATE OPENING BELOW -EXISTING GLULAM ROOF BEAM. ' 1 , - �/�� -mom r / 2 4 DO NOT LOCATE EET OFEXISTING OPENING WITHIN ;OPENING 9� ,, // //A / , , „ �' , „ , !Mr z 6 Z WALLWO // I Mai M%1%'✓ // // // A49, // // //1'MO 0 a, yT ° ' 7 --s, /1 - „ 2°°fir," � j ii� / / u' gNJ. HO �'� A!� L1L1 r.,r o-n'v-.r ,-I •#4X3'-0"REBAR WI ^ \ J r'^ SIMPSON AT-XP ADHESIVE V I r P i EXISTING MASONRY INTO UNDERSIDE OF(E)BOND BM % \ (E)#5 VERT 32"OC WALL TO BE INSTALL PER MFR :i r r \ / i / r�4' RNEW OORR GROUT VERTICAL CELL \ / #4 VERT BAR SIDE _ _.i.� ---_1 I_._.._ (E)g"CMU WALL ter---- --- - , AT UNDERSIDE R ID)DOOR %= � I-, { TO UNDERSIDE OF(E) �' \ / % fF BOND BEAM ABOVE DOOR ori TYP J , \ / y -- AM \ / f CUT OPENING IN(E) REMOVE FACE OF CELL AND GROUT ,, CMU WALL PER ARCH AT HORIZONTAL BOND BEAMS SO % U ���JJJ °0\ r--- --`---r@@�® \ / _ ---_-- , TO REMAINWLL THATAT MINIMUMUM UM OF SHALL ERTICAL // Y,�,$$// % \ l ,/,'. ,//. zt ,�? $�/S/�1 sw, SOLID GROUTED WWITH 2000 PSI E w Z t ed ! j / \ l _� / %/�I%Il%i GROUT 0 PM / �✓� SECTION �� �� /%\ W /li (E)#4HORI2�48 OC�� / / \ iii 314"=1.-0" MASONRY WEB AND OF CENTER BOND BEAM HOULD HORIZONTAL THA OAT / \ / , , (E)GROUTED CELL SHOWN #4 DOWEL MAY BE PLACED AS SHOWN. �ify��//, ,, AT SIDE OF(N)OPENING VERTICAL CELL SHOULD BEGROUTED WITH 2000 PSI GROUT %�f/40 % / \ WHERE DOOR IS NOT LOCATED NEXT TO GROUTED CELL,ADD T ._. .__111 / \ __._.--- #4 REBAR AND GROUT CELL AS / 0 V , F SHOWN ON OPPOSITE SIDE OF OPENING // \ T #4 REBAR W/SIMPSON L-_ INSTALL PER MFR �LL A I // , /j I / (E)8"CONC CURB AT-XP ADHESIVE •• / �' I // O w \ L \ r (E)CONCRETE FOOTING I3'-0"VERIFY VW ARCH 0.,INEW DOOR OPENING IN (E) MASONRY WALL 3/4"=1'-0" DETAILS SHEET NUMBER ;(7.>MngN 1022 SW SALMON STREET, SUITE 300 WASHINGTON SQUARE REMODEL EV' El zi\ HDEAN PORTLAND, ORS di EGON 97205 PREPARED FOR: sonlEavwa DRAWN BY: N.HOESLY SCALE: ae noted CONSULTING AND STRUCTURAL ENGINEERS SINCE 1919 TEL:503-274-1843 FAX: 503-273-5696 CHECKED: NHOESLY DATE: ,. JOBS 7292.07