Loading...
Report (53) PP75Ro`zi -- 0a/s- «20 o Sl" 7,z 56.0 PROFF $NGIN4 i LL KEN FUGLEE&ASSOCIATES,INC 17623 41. Fire Protection Engineering&Design Fire&Life Safety Code Consulting �0,, - System Evaluations-Failure Analysis OREGON •Litigation Support-Expert Witness July 01,2014 'YNFTN D. FG. To: Bruce Pearson EXPIRES:12131115 Cc: City of Tigard Building Department, Pactrust,Christenson Oil RE:Sprinkler Requirements for Christenson Oil at Oregon Business Park, Building#2 The requirements are based on the Christenson Oil Palletized Storage Layout plan,STOR-1, by Ken Fuglee&Associates, Inc.,dated 6/24/2014 with the following additional restrictions(see STOR-1, Rev.1): 1. There shall be a 6-inch transverse flue space between the plastic IBC Totes. 2. There shall be no drum storage adjacent to,or directly across the aisle from the IBC Totes. 3. Metal drums,when stacked,shall be on open-slatted wood pallets(no nesting of drums). From NFPA 30-2012,Table 16.5.2.2 for Palletized and Stacked Storage of Liquids in Metal Containers, Portable Tanks,and IBCs,for Relieving—Style Containers—Liquid Class IIIB: Metal Containers>5 gallons and<=60 gallons(55 gal.drums)at maximum storage height of 18 ft., using sprinklers with K>=8.0,SR(HT), [standard response-high temperature],0.35 gpm/sq. ft. over 3000 sq.ft. Where Quick-Response, High-Temperature(QR-HT)Sprinklers are used in the table, densities are 0.05 gpm/sq.ft.higher than SR sprinklers over the same design area. For Class IIIB(motor oil)in cartoned or uncartoned plastic HDPE containers, NFPA 30 only provides storage schemes for rack storage to unlimited storage and ceiling heights and has no criteria for single pallet storage of Class IIIB in these containers. The Directory of Fire Tests Involving Storage of Flammable and Combustible Liquids in Containers,3`d edition,is a 2004 compilation of fire tests by Aon Risk Consultants and lists tests performed for various sponsors. Fire Test P17 in the Directory was performed at UL for the National Fire Protection Fire Research Foundation (NFPRF)of NFPA. In P17,8 full pallet loads at a height of 11 ft.2-in.,of cartoned motor oil in 1qt.plastic containers resulted in a successful test at 0.30 gpm/sq.ft. using ordinary temperature, K=8.0,ceiling sprinklers. Sprinklers with a k-factor of K=11.2 typically show better control in storage fire tests than K=8.0 due to larger water drops that penetrate the fire plume. For composite IBCs(plastic with metal frame), NFPA 30 calls for listed containers and allows up to 793 gallon containers. However,testing by the NFPRF at UL has shown no difference between listed and unlisted containers in fire tests(From the risk engineering department of Zurich Insurance,Zurich Services Corp. Risk Engineering bulletin:"Risktopic 2-4.009".) For 793 gallon containers with either Class II or Class III liquids, NFPA 30 calls for a density of 0.45/3000 using K=11.2 sprinklers. Christenson Oil will have only Class IIIB, be limited to 275 gallons per composite IBC, and have only 300 to 675 sq.ft.of area. The K=11.2 sprinklers will provide a higher density over 2,000 sq.ft.than the original density of 0.495/2000 using K=8.0 sprinklers. The 0.40 gpm/sq.ft. over 3,000 sq.ft. (3072 sq.ft. calculated)design on the Oregon Business Park, Bldg. 2 plan,dated 6/5/14 and reviewed by Ken Fuglee&Associates, using the Tyco ELO-231, K=11.2,286 degree(high-temperature) FRB storage sprinklers(SIN TY5131)meets or exceeds the above criteria. KEN FUGLEE & ASSOCIATES, INC, 15814 NE Rose Parkway Portland Oregon 97230 (503)-866-5956 kenfuglee@comcast net /�1_.-- _ 24-7`� �' '.:----- _ _ .__. _. • , ..��� -. 24'-7 r_ 24-7" • STACKED DRUMS A-BE UN‘,, • 14'-7" - 24-7 __. _. NCSTING OR TTEDPRESSUREPALLETS(P I IFF, ' I } I �UF LOWER LEVELS/^, A "' trl n -s s n�, 1 1 • Of AR..A MA% 010(- /' (VEERSS P. NO 04OIACC '(WF'OSIIE 8 1A S FT. GF 5'.AL.TOTES r,4IlY ty K 50.81.2 M .FI OR2.H 7 MUM we-r PNSV RS Ur-F .-ENaMACTALES.TYPICAL. ! • CARTONS ON GALLON MIN • '5 ssw .695'E�ErvvEE Bcrores,lrPcry,.�--. !� �' CAuns 55 GAS NaeII • II MAXIMUM STORAGE HEIGHTS _. FLOOR SPACE -..MAX#OF PALLETS SII 17 x2= 34 (@/3-HIGH DRUMS) 18x2= 36 FLOOR=626 27x1= 27 .70x2=140 11x1= 11 +56X2=112 56x8=448 +56X4=224 I 35 x 2= 70 TOTAL=1.102 TOTAL=626 PALLETS/TOTES PALLET/TOTE j 1 FLOOR SPACES CLASS IIIB COMBUSTIBLE LIQUID CONTAINER TYPES • AND CAPACITIES/DESIGN QUANT.AND GAL.PER PALLET • 55 GAL.METAL DRUMS,4 DRUMS/PALLET = 220 GAL. • • 16 GAL.METAL"KEG"DRUM,5 DRUMS/PALLET=BO GAL. I 5 GAL.METAL BUCKET.24-36 PER PALLET = 180 GAL. 5 GAL.PLASTIC BUCKET,24-36 PER PALLET= 180 GAL. 12 X 1 QT.PLASTIC/CTN.,84 CTNS./PALLET =252 GAL. 6 X I GAL.PLASTIC/CTN..36 CTNSIPALL ET=216 GAL. 6 X 1 QT.PLASTIC/CTN.,125 CTNS./PALLET= 187.5 GAL. , 1 X 275 GAL.IBC PLASTIC TOTE = 275 GAL. II ' I, NOTES: vaz=v le.z=x4 1. LAYOUT IS BASED ON PRELIMINARY INFORMATION FROM • CHRISTENSON OIL. • 2. QUANTITIES SHOWN ARE DESIGN EXPECTED MAXIMUMS. I I 1— 8' 3. EXPECTED MAX.3 HIGH DRUMS ALONG WALL. I 4. EXPECTED AVERAGE DRUMS ALONG REAR IS 1-2 HIGH. aOLE nP.) OTHER PALLETS ARE 1-HIGH. VYAP, , 5. NON-COMBUSTIBLE ABSORBENT MAY BE HIGHER. I, I 6. LOCATIONS AND QUANTITIES WITHIN WAREHOUSE MAY VARY BASED ON PALLET DIMENSION AND RELATIVE QUANTITY OF DRUM PALLETS VS.CARTON AND BUCKET PALLETS- 7. VERIFY BUILDING DEIMENSIONS. ' I li 1.A EIUE • UFFIC MAX.ALLOWABLE QUANTITIES PER CONTROL AREA PER • AREA I OSSC TABLE 307151),NOTES a AND( ANDOFC TABLE ` I• re 2=1 izaa- .,, 1 Ill FE a.2-2e a.z 2f) a 2e n a 340434.1 WHEN BUILDING IS FULLY SPRINKLERED PER OSSC N IETs T IF15 P, 01 axs ea '.A xe.ea % nN •u I ' SECTION 90331.1: • '1.0081 I1'',IOW (S LDLIRF ,Al IS '12 A .FAL E 1 1 )P 19 .1 S { SPACES) I SPACES, SPACESI I I%FI.0. I( 510011 (N LOON Ill 001-1 I(SI F1 OOR SPACES) SPACES) sPAcesl SPACES, �PA.E sI I CLASS IIIA COMBUSTIBLE LIQUID,MAX.= 660 GAL. ,,, 1.510N s Ow nv+ � o nas ,FON BUG(I cARioNln s a DREW, I57.Inn cOL :xvuM^+'E" ! CLASS IIIB COMBUSTIBLE LIQUID,MAX.=UNLIMITED TO AL STORAGE ARCA ONiMNERs i5tl PALLETS 1'''.SO rT.,3 1". 2 o a k "PPF(Ox•,..;s0.F1. IMA.AVGF:TPI CI A'I]M1 GAL. M.AVG.E%PEGTEO le,:AUGAL (0 I CLASS III LIQUIDS, 1 coxa=zm MAX.HT.PER OFC TABLE 3404.3.6.351 j=t2 FT. PRS (IN SPRINKLERED BLDG MAX.HT.FOR CONTAINERS AND 0,0 PALLETIZED STORAGE LAYOUT PORTABLE TANKS NOT TO EXCEED GREATER OF HT.FOR • s A F I e_*m FIRE PROT.SCHEME IN NEPA 30 OR FULL-SCALE TEST). • ig��NGINFF�i _ 17623 PAL LET AND CONTAINER LEGEND KEN FUGLEE&ASSOCIATES,INC. CHRISTENSON K RKE EIKOE, /r ,'DLII Wit SC -.S.O SA OS 10NGU'2201,.OR I-01. Fire Protection Engineering&Design g g g PACTRUST PROPERTY / % ' HASIIf.CONTAINERS.OR SACKS 01 NON-COME AHSONBFNI --OO-- - - �I, I� II"' �, _ Fire& Safety Code Consulting r,% GA K:IBCITOTE 15814 NE ROSE PKWY.,PORTLAND.OR 97230 OREGON BUSINESS PARK,BLDG 2 ORE �H ' PALLET WITH EAE.E,AEI.MUMS. CeII:(503)-866-5956 kenfugleeLacomcast.net 1 I 16200 SW 72nd AVE.,PORTLAND,OR 97224 - STOR-1 • RGA.01.515.1.1 Mk -- _- 171° ti'DV 000 _ Ocl-1 Ir`cf-) Qi--ac r'OABA/Ifxlr" rUrs Alrlr Cr"A I C r HYDRAULIC DESIGN INFORMATION SHEET NAME 0/M40/4 SIDS/,JtiS ' 97ZZ4 DATE 6/x714• LOCATION .or ''s V4 Lil - • I., a BUILDING - d 0 1 . ,,R C. ' S 6 JO #!L SYSTEM NO. CONTRACTOR ATT F 't rareerla CONTRACT NO. CALCULATED BY i ' Cr '1C44240/1I DRAWING NO. CONSTRUCTION: % COMBUST;BLE ❑NON-COMBUSTIBLE CEILING HEIGHT 22' FT. OCCUPANCY Fl 0(• 445,6• ❑ NFPA 13: ❑ LT. HAZ. ORD. HAZ. GP. ❑ 1 ❑ 2 ❑ 3 ❑ EX. HAZ. Q NFPA 231 ❑ NFPA 231C: FIGURE CURVE 4Z^r ❑ OTHER rSv p=(`�:-- W 1 0 SPECIFIC RULING MADE BY DATE I 0 AREA OF SPRINKLER OPERATIONui 3o11 SYSTEM TYPE. H. DENSITY .4000/ 150 WET ❑ DRY ,J DELUGE ❑ PRE-ACTION coN AREA PER SPRINKLER %L q.fr SPRINKLER OR NOZZLE HOSE ALLOWANCE GPM: INSIDE MAKE TYCO Fig MODEL Pt/3-231M HOSE ALLOWANCE GPM: OUTSIDE Soo SIZE _3/4H ___ K- ACTOR 11..2- /1`� RACK SPRINKLER ALLOWANCE TEMPERATURE RATING T CALCULATION GPM REQUIRED 13510 PSI REQUIRED 140.34 AT .t L eF RISER . . SUMMARY "C" FACTOR USED: OVERHEAD UNDERGROUND Y{IAjER FLOW TEST PUMP_DATA T/'.NK_O;3EESEF..VCIP y. DATE & TIME /0/7.4P0 RATED CAPACITY CAPACITY -_ STATIC PSI 103 AT PSI ELEVATION - RESIDUAL PSI `]Z ELEVATION 41) GPM FLOWING 1744 REEL cc Lu ELEVATION ( PROOF FLOW GP'.! LOCATION 4e)it/ JIrE 5o'Souril c 611)4. 2 SOURCE OF INFORMATION COMMODITY_ CLASS _ LOCATIC'4 w STORAGE HEIGHT---- -- AREA A'SLE ILTii O STORAGE METHOD: SOLID PIED % PALLETIZED RACK Q �O ❑ SINGLE ROW ❑ CONVENTIONAL PALLET ❑ AUTOMATIC STCRAGE ❑ ENCAPSULATED cn DOUBLE ROW 0 SLAVE PALLET [.� SOLID SHELVING ' NC's 5- ❑ MULTIPLE ROW >- —_ OPEN ENCAPSULATED — — ' - --- — O Q FLUE PAC; :3 IN I'JCE'C1 r'.ySCE 1O OF JP: - Q L . O LONGITUDINAL TRANS_VRSE . _ — . - IN. HORIZONTAL BARRIERS PROVIDED _ ___ --- ------ --'— - _ . -Q,EU PRUFFs, <�5 krGINE ON ISO Forrn SPRS-9 ct 6 eA /' Y OREGON, /5, Av <9;eliv. EXPIRES: ' //A) HYDRAULIC CALCULATIONS JOB NO. DRAWING NO. SHEET NO. 1 OF .2 NAME OBP &t 6. 2 n/0077 6/a S"t r• BY B•P kosoAl LOCATION /6 Zoo SW-7241' 'arta 9 7n4DATE ( /6�/4- •406PM / 300o Set.Ft `J K Il•2 2S6°4S. 94, sQ.Fr f4b. NOZZLE FLOW FITTING FRICTION HYD. TYPE A IN PIPE A PIPE EQUIV. LOSS REQUIRED REFiPT. ELEV• NOTES LOCATION Q.P.N. SIZE DEVICES LENGTH P.S.I./FT. "-- C� Q , LOTH. MG PT 11.75 FIG. Q 38.4 l4" -Tor /I.& .114-PE 32 - 11.24r13.o7 Q 40.S LGTH. /Lip PT 13.07 Q l4 FTG. _ ! ,yPF 2,3$ �-, Q 7d.q I, TOT. / G •7.07 PE _ I/. .4IS,4% Q 44,0 LOTH. c.S PT /S. Q 127..9 Z" r FTG. IC' PF 2.1 TOT. 15.8 . 139 PE , )1Pe 3x40$ Q /7.2.9T LOTH. .1$ PT 1743' b14e. Loa Q Z4S.8 WA) TOT. 11./5 .2DS PE PF ?•32� , •76 Q LOTH. PT 7o.4 [v 4"1, MQ/wl 246,9 ----, FIG. Pr �- K=r4•14 Q ► TOT. PE Y zD (t Q LOTH. PT 4._ i22.9 FIG. PF Q TOT. PE ' ZD•(, K`Z'J.Oa Q LOTH. 4.$ PT 15.95 f NODE / Q 44.D Z. ;FTG. 0 .021 PE 33 /lona 2 f Q 44.0 - LOTH. r PT is s , G. 12.o PF o ,1 f Tilt �Q 2.0 ii. 1 .s TOT. /2.7r • 031 PE .32 -7S FT Q LOTH. PT //..S L U.b FTG. PF Q TOT. PE \(ILS Kr Z1.GG LOTH. S./7 PT 20.(a IZ FTG. Pr/x, 17, 19 Q q 4" TOT. Y.11 •OC' PE o4 f4.1Gr' Q LOTH. PT 11).44 to Y70.� _ FTG. _PF .33 9fbs T rAL Q368•q N TOT. 5.11 .04) PE ^ 54.16 70.91 Q 2.44 t LOTH. PT 2WA/ $ 1 ISI4c TOTAL Q 616.q 1 4" TOT. S. •/d4 PE - V.W11.4.1.4 Q l01•2 CLOTH. 144 PT 21.$4 !I M 2E,r FTG. 40 PF 3Y.76 , I7ues.Tonal Q 711. 1 4 TOT. 2$4. . /40 PE Q LOTH. PT (ft.L S FTG. PF Q TOT. PE 1 /`,lS Q LOTH. $.17 PT 20.4 12 FTG. PF .o4- , 3 As Q/22.4 4" 1 TOT. 1.17 ,boy PE - Aeu 6 tit i Q 04, LOTH. PT 2044 - /4 FTG. PF .33 9daS Mfg Q 34s.q 4" TOT. a.1'/ • 041 PE - ... hits 6 dos Q 2¢4 LOTN. Bo& PT 20./7 11, ZE 1 T FIG. 40 Pr 3b.b? - ices /omL Q414.9 4" TOT. 34L , lOG PE - Q LOTH. PT 51.0 6 4/&.9 FTG. PF I �/� g l•2$ Q TOT. PE 1/0.44' k PT HYDRAULIC CALCULATIONS JOB NO. DRAWING NO. SHEET NO. 2 OF NAME O$P 864. 2 Alan/ EA/6 sksr BY 13174.4eSOA) M LOCATION DATE G/S//4- NOZZLE FLOW FITTING FRICTION HYD. TYPE i IN PIPE . E PIPE EQUIV. LOSS REQUIRED REF=PT. ELEV. NOTES LOCATION O.P.M. SIZE DEVICES LENGTH P.S.I./FT. P.S.I. Q LOTH. PT FIG. Q I/g• I TOT. � -PE Q 631.3 LGTH. 33' PT 4q•to 5 Q f 3S4 G" E — FTG. 14 ,o� Pr Z 87 *TOT. III - Q LOTH. 20 PT b4.4') FTC 33 PF .23 Q /3S` al CYC vOT. 93 .o41 PE A•GL 7,0' @B4SE e RISEY Q LOTH. 32.5 PT �• 3 Q ►354 bo"a C 14o ToT. 383' •00¢ PE `•73 , 4' Q LOTH. 17S PT 79.&,3 7. `1 T FTG. 741 PF . 42 Q (3c6 i2 Cl c.140 TOT. 714• ' •1"11° PE - Flat Q 500 LGTH. SPT g0.0> I 1 2900 4PM Q /89i 1 TOT. J . PE AVAJIABLEago n Q LOTH. PT FTG. PF Q TOT. PE Q LOTH. PT FIG. PF Q TOT. PE Q LOTH. PT FTG. PF Q TOT. PE Q LOTH. PT FTG. Pr Q TOT. PE Q LOTH. PT FTG. PF Q TOT. PE Q LOTH. PT FTG. PF Q TOT. PE Q LOTH. j PT FIG. PF Q TOT. PE Q LOTH. PT FTG. PF Q TOT. PE Q LOTH. PT 1 FTG. PF Q TOT. PE Q -- LOTH. PT FTG. Pr Q TOT. PE _ Q LOTH. PT FIG. Pr . Q TOT. PE Q LOTH. PT FTG. PF . Q TOT. PE I PT v.r.m. PAUL.11YLY JI:ALt. by 0...12.---.1' 4 5 6 7 6 9 10 11 12 13 14 15 I 11■ ■■■■■■■ �MINwl�.'MIMIwl����MIw■■■■■w■ ■.■= ww■w—�■NMEI ww■w■■ �MEN ww.wwww� ------- mow■--- ■■■ww■ ■.■w NM 1== ���■—■.■�■■■■■■MN=wwww- 103PS! srATIC ------1--..._. --- .Nsmingm -w.--176*(4PM FLOW ■�Cil�■Cr�l.l�.�.�■..■.—..—.�.1 I -.-------l—w...r�-11■ww■w.■1■■—.- =I=EMI ■w-Mil ww■■.wlUM==I=ww■■w-w-. 1 -.-----------1nsi�MIN — - it ■- ■—■—■—■w■w—■w■www■■■wwww- 11111■■■■■■■■w.w...-----I� ---mow■■w ��■.���Zr : l',Gs�au4C—�C� ■w■ww■■■■=■—■■wwwwwww.ww■ .1111■■■■■■■■■w..-.------IMN—■■—�w■� w>r�-1'7_ ��■w■■■■� w■■■1•w■w�ww■ IIIMI 11111111116M.-1111 III IIIII■■■■.■■■www.-.---- ----- -- — •�� w— w—ww■ wwwwwwwwwwwwwwww.■ ■1111■■■■■■■■■www-.-----------.■wwwwa/111111111111111111111111.111111111111111101111111111111111.11111 w.w.w.w.w-w—w-wr.�� w—w—w—w�w—wwww=wwwww■MI=wwwNMI 11111■■■■■■■■www.-.-----------■■■■�-- -- �.■— ■—�w—MEM■w■■!•■�■w■ww■ww■ 11111111■■■■■ww..-.-----------w■w■wwwwww 11-.■w..-■1i�@:1=—w1■ii-- 1�-- `—w—w—w—.w■...wwwMI=ww■.w1.w.�■ ■111111■■.■■■w w..-.-----------■■wwww■w■.MIME�w-■— NNW w—MIN w—■-111Mft�MIN w—INN=■w■ww■wwwwMN=mom III1 I...aii=ii===■-■1-■1■—■—`■1MUMI■—■--■1--Mim M��--I1�1 NINNI .i-.—SS==w—E w-1�iimizz nom��s��O M co.1111..■■.■■■ —� • sic•=a■=.■•w..==- lite—MEIJMI■-■'�--h-----.-- --. -- —C=---------- 1111■■■■■■■■... . I■ — — ■.■w■■■■■. w—■— .�--w—w—■■■■■■■—MOM ww■■■ww— ■IIIIi■■■■■■■■.w.-. /■■-- —�w■wwrw.ww w—w—w—w—w—ww■ww■■wwww■ww■wwww- 11111 ■■■.■■■w.w.-. w■■-- — ---- �7r J. F/06411500 GPM f103& w—.—w---.—w—■—.�■.�.—.��. IrIIlicccucm=c====■�■_ -1111— __—_ II= ME 1■- - ■- -MEMN�������� I Ii111■..■■■www.-. -n4—■1 �■-....� w-w-w—w-■-1lw— ■w-■—w—■—w—w—NMI w—w—■— ■'111:■■■■!■■w.w..- �=rl—■: SPRINKLE( ILoLJ 1---11..1ww...= .=.■—w—w—■---w-1111-w—w■ ----- — n 1 i 1 011111111 .■w11./--- tal-- w.w. 1111 ■■■.■■■■I■ r11 -■.i-�--- /^� /� Re 1 •- ■—w— ■■■■m w-.w—w—wl—w-■w—■ 111 .....■u..�. wit•, -- !3 �`_ $D PJ I �� - _mamma E.= �=� www—www ■ II ■ ■■■■■ . _/ — — _�■- .T—■w■■■w■ = / �■■ ■w=w,■1�INERT. 1■Ti - - �� maii.,....NONMININnin=MOM=MINI MINNI 111 �C=cc:=%==___= A/ Z — limmill-L.-ii - _: _ .--_ -_ ■� 1'■■�1�-`i■��MINI��_�_-TA_�_ nu e i_i ih:::::h:::- , — — ■ =■i�w— --moi■--i■1�—■—■--■■—1 �::" iii=il==w=1� r - - .-- — — -- ' - — -- __ w— �1w..—w■www—w.■ MOM ■■■■w. .- ffl��w�w�■w■■—■■-■w.■ vl cic■ rINNI = T■ .. !. -_ _.. •— 111111111111111=111M11iINIMM tw— s.c;d::'�Q�:�=... rim di � _ : + � ��lli��_ 1111�1iccIli ilii ■ ■w I i.._I._ _— .._�.-- � � �9iccc��a� ��� a=��S 1 -_ - 11111111E=IMMEEMPIIII== in- ili ==1111111=1=1111111111111=I==MI NMI 1—E Emma= - -1 -■ w11. --1 w-1�■— ...... 1111 Eal_MIN MIR IMMIIIIIIIIIIIII 11•11111•1111111 ,y iniii6112:62222222121=21111EllillE■111 ■■■■■■r,w■= wl.-----------w■■wII=MINIM ■— ■—�■—■!•■—MI=1=NM■■w�■w.■w■ J i//11aim.■■' w. U-- ----- --11•111111111•1111 ww w. w- ■—■—w—w— ww.— .w■ < ries a=---- -■a■—■1 -li■T■—�1�-1 ■ri■—� -- cimw— ■-.ww■Iw—ww. �---� +R 1111icc■ ■I. ■1111 ■■ ■1■■■■ -- -- —� ■M ■■■ ■wwww■ MI me P OM oNIIIp Pin ai=.== jhowauel11111111 pp _ -:717 ._ _ ===- _ : : _ .� --� �1.1111■11 ■■■■ww. --- --- ---_ _ .w■wwwww■ • N i1111■'/■■ ■■ ■illmacialmoranni - -._ -_ __ �■■-■■.■■w ...rm. ■ . _ maima..... ME 11 111119111 1 • il y !iilHiIIH!II! ! 1I! IF ,RE4onI 8i5idES PARC BLt1. 2— --�� MON=111111111111= .1111■ ■■.■■■ w..- -- - w— =1111.■...■S = __�_-�_ !� GI __._ -_ � ..-�Ill======■1111111111 .� -■' _ � J �� ����� � - =EN= �iC��s�� ■IIII■■■■■■■■■■ -- - MINI �■■■■1♦■�■w11 111111,::::::=w -1: =-- =ill -_ -- = _ -_ --—BEI=����_�__ 0 C. tit un'V ins crurnt 44444.tnttts. .al sofgE i r . • . • LIJ r-- ,4 , - , 1• . Qum 5.00. CO.DM �,,- , t u NOTES: BLDG. SPRINKLERED-WET SYSTEM j ELECTRIC SERVICE 277-48D VOLTS CEILING HT. 20' UNDER BEAM VACANT PRODUCTION VACANT AMS OIL THE STASH EXPRESS FURNITURE (TUFCOAT,INC.) TOOLS & MAN. (STOUT TANKS) 16260 SW 72nd Ave TEA CO. RENTAL PORTLAND, LLC 16200 SW 72nd Ave 16240 SW 72nd Ave16250 SW 72nd Ave 14,000 SF TOTAL 16270 SW 72nd Ave 16290 SW 72nd Ave 24,500 SF TOTAL 17,500 SF TOTAL 10,500 SF TOTAL 1,432 SF OFFICE 7,000 SF TOTAL 17,500 SF TOTAL 1,125 SF OFFICE 2,220 SF OFFICE672 SF OFFICE 1,762 SF OFFICE • Z , OREGON BUSINESS PARK I BUILDING #2 (PTR #1 obp108) SCALE 1'= 70' 1 62 00-90 SW 72ND AVE. • ,nin_nn_ I°'lul` TAL-R'Irn °'ilii-Erj PORTLAND, OR 97224 M' na 6" 8(Y 100' 1.120 0' 70 140' A PACTRUST PROPERTY 5/30/14 • • Hydraulically Calculated System This system as shown on IJAt11f1 Ly U . It� • company print no 3dPF 3 dated WM= for oRf• 811StAWS PA 8 N at 10•10�0 50 - ZO contract no is designed to discharge at a rate of IIMIE gpm (L/min) per sq ft (m2) of floor area over a maximum area of 'Woo S4•Fr• sq ft (m2) when supplied with water at the rate of MEM gpm (L/min) at 8S•SJ psi (bars) at the base of the riser Hose stream allowance of coo gpm(L/min) is included in the above. Occupancy classification -1 Commodity classification Maximum storage height 201/0 k _ 5 Installed byde • . V t0• SP' •. -- • • • tL,CQ I Fire & Building Products Technical Services:Tel:(800)381-9312/Fax:(800)791-5500 Series ELO-231 FRB — 11.2 K-factor Upright and Pendent Sprinklers Quick Response, Standard Coverage ELO-231 FRB Pendent Sprinkler with General the WS-2 Shield.If there is a possibility of the pendent intermediate level ver- Description sion being exposed to mechanical ' ' ". damage, a G-2 Guard can be added. The 11.2 K-factor, Series ELO- 231 FRB, Quick Response, Standard WARNINGS Coverage,Upright and Pendent Sprin- The 11.2 K-factor, Series ELO- klers (Ref. Figure 1) are automatic 231FRB Upright and Pendent Sprin- sprinklers of the frangible bulb type. klers described herein must be in- They are "quick response - spray stalled and maintained in compliance sprinklers"that produce a hemispheri- with this document, as well as with the cal water distribution pattern below the applicable standards of the National deflector. Fire Protection Association,in addition The 11.2 K-factor, ELO-231 FRB Up- to the standards of any other authori- • right and Pendent Sprinklers were ties having jurisdiction. Failure to do subjected to full scale, high-piled stor- so may impair the performance of age,fire tests to qualify their use in lieu these devices. • of 5.6 or 8.0 K-factor standard spray The owner is responsible for maintain- sprinklers for the protection of high- ing their fire protection system and de piled storage. vices in proper operating condition. Higher flow rates can be achieved at The installing contractor or manufac- much lower pressures with the 11.2 turer should be contacted with any f ; K-factor, ELO 231 FRB Sprinklers questions. making their use highly advantageous Installation of Series ELO-231 FRB in high density applications, such as Pendent Sprinklers in recessed es- the protection of high-piled storage. cutcheons will void all sprinkler war ,,. For in rack applications an upright in- ranties, as well as possibly void the termediate level version of the Series sprinkler's Approvals and/or Listings. ELO-231 FRB Sprinklers can be ob '' tained by utilizing the Series ELO- Model/Sprinkler 231 FRB Upright Sprinkler with the WSG-2 Guard&Shield,and a pendent Identification intermediate level version of the Se- ries ELO-231 FRB Sprinklers can be Numbers obtained by utilizing the Series TY5131 - Upright 11.2K,3/4"NPT TY5231 -Pendent 11.2K,3/4"NPT IMPORTANT TY5131 is a redesignation for C5131. Always refer to Technical Data TY5231 is a redesignation for C5231, Sheet TFP700 for the "INSTALLER G1870, and S2551. WARNING" that provides cautions with respect to handling and instal- lation of sprinkler systems and com- ponents. Improper handling and in- stallation can permanently damage a sprinkler system or its compo- nents and cause the sprinkler to fail to operate in a fire situation or cause it to operate prematurely. • Page 1 of 4 MARCH, 2007 TFP344 Page 2 of 4 TFP344 SPRINKLER FINISH TYPE TEMPERATURE BULB NATURAL CHROME LIQUID BRASS PLATED 155°F/68°C Red UPRIGHT1,2,3,4 (TY5131) 200°F/93°C Green 286°F/141°C Blue 155°F/68°C Red PENDENT200°F/93°C Green 1,2,3,4 (TY5231) 286°F/141°C Blue NOTES: 1. Listed by Underwriters Laboratories, Inc.(UL Listed). 2. Listed by Underwriters Laboratories, Inc.for use in Canada(C-UL Listed). 3. Approved by Factory Mutual Research Corporation(FM Approved). 4. Approved by the City of New York under MEA 291-04-E. TABLE A LABORATORY LISTINGS AND APPROVALS FOR 11.2 K-FACTOR SERIES ELO-231FRB UPRIGHT AND PENDENT SPRINKLERS (Refer to the Design Criteria Section) Technical Design Criteria Installation Data UL and C-UL Listing The Series ELO-231 FRB Sprinklers Requirements must be installed in accordance with • Approvals The 11.2 K-factor, Model ELO the following instructions: UL and C-UL Listed. FM and NYC Ap- 231 FRB (TY5131 & TY5231) Sprin- proved. (Refer to Table A for complete klers are to be installed in accordance NOTES • approval information including corro- with NFPA 13 standard sprinkler posi- not install any bulb type sprinkler if sion resistant status. The approvals tion and area/density flow calculation the bulb is cracked or there is a loss of apply to the service conditions indi liquid from the bulb. With the sprinkler requirements for light, ordinary, or ex Gated in the Design Criteria section.) tra hazard occupancies, as well as held horizontally, a small air bubble Maximum Working Pressure high piled storage occupancies (solid shouldairbubblebepa approximatelyent. The diameter 1/16 itch 175 psi (12,1 bar) piled,palletized,rack storage,bin box, (1,6m ) is the155°F/68°C 1/t6 inch3 and shelf storage including but not lim- Discharge mm) for the to 3/32 Discharge Coefficient inch (2,4 mm) for the 286°F/141°C 1/z ited to Class I-IV and Group A plastics) K= 11.2 GPM/ps2 with a minimum residual (flowing) temperature ratings. (161,4 LPM/bar ) pressure of 7psi(0,5 bar)for wet pipe A leak tight 3/4 inch NPT s nnkler oint PP 9 P 1 Temperature Ratings systems only. should be obtained with a torque of 10 Refer to Table A to 20 ft.lbs. (13,4 to 26,8 Nm).A maxi- Finishes FM Approval mum of 30 ft.lbs. (40,7 Nm) of torque Sprinkler: Refer to Table A Requirements is to be used to install sprinklers with The 11.2 K-factor, Model ELO- 3/4 NPT connections. Higher levels of 231 FRB (TY5131 & TY5231) Sprin- torque may distort the sprinkler inlet Physical Characteristics klers are to be installed in accordance and cause leakage or impairment of Frame Bronze with the applicable"control mode den- the sprinkler. Cap Bronze sity/area" guidelines provided by Fac- Do not attempt to make-up for insuffi- Sealing Assembly tory Mutual for wet systems only. (FM cient adjustment in the escutcheon . . . . . Beryllium Nickel w/Teflont guidelines may differ from UL and C- plate by under- or over-tightening the Bulb (3 mm dia.) Glass UL Listing criteria.) sprinkler. Readjust the position of the Compression Screw Bronze sprinkler fitting to suit. Deflector Bronze - Operation The Series ELO-231FRB Upright t Registered trademark of DuPont. and Pendent Sprinklers must be in- The glass bulb contains a fluid that stalled in accordance with the follow- _ expands when exposed to heat.When ing instructions. the rated temperature is reached, the Step 1. Pendent sprinklers are to be fluid expands sufficiently to shatter the installed in the pendent position, and glass bulb, allowing the sprinkler to upright sprinklers are to be installed in activate and water to flow. the upright position. Step 2. With pipe thread sealant ap- I TFP344 Page 3 of 4 "Temperature rating is indicated on deflector. **Pipe thread connections per ISO 7/1 can be ` provided on special request. 3/4" ESCUTCHEON NPT SEATING • = SURFACE 1 /tlTTT�� THREAD / 2 Components: lit, F '= �t\ 1 Frame k+k` 2 - Seal 2-13/16" I WRENCH 3 IAssembly (71,4 mm) FLATS 2-1/16" 3 - Cap TYP. (52,4 mm) 4 I 4 Bulb Al _/k ��, 5 Compression _. _.. 5 __AWL__ Screw �C�___ 6 Deflector' • 6 • L1/2"(12,7 mm) NOMINAL MAKE-IN UPRIGHT PENDENT CROSS TY5131 TY5231 SECTION FIGURE 1 11.2 K-FACTOR SERIES ELO-231FRB UPRIGHT-3/4"NPT(TY5131)AND PENDENT-3/4"NPT(TY5231)SPRINKLERS plied to the pipe threads, hand tighten Careand "FITTING SIDE" the sprinkler into the sprinkler fitting. TOWARDS SPRINKLER Step 3. Tighten the sprinkler into the Maintenance FITTING sprinkler fitting using only the W-Type • 3 Sprinkler Wrench (Ref. Figure 2). Series ELO-231 FRB Sprinklers must With reference to Figure 1,the W-Type be maintained and serviced in accord- — / wRENCH 3 Sprinkler Wrench is to be applied to ance with the following instructions: the wrench flats. NOTES RECESS Before closing a fire protection system � (END"A ) control valve for maintenance work on the fire protection system that it con- FIGURE 2 trols, permission to shut down the of W_TYPE 3 SPRINKLER fected fire protection system must be WRENCH obtained from the proper authorities and all personnel who maybe affected by this action must be notified. their fire protection system and de- Sprinklers that are found to be leaking vices in compliance with this docu- or exhibiting visible signs of corrosion ment, as well as with the applicable must be replaced. standards of the National Fire Protec- tion Association (e.g., NFPA 25), in Automatic sprinklers must never be be addition to the standards of any other painted, plated, coated or otherwise authorities having jurisdiction. The in- altered after leaving the factory. Modi- stalling contractor or sprinkler manu- fied sprinklers must be replaced. facturer should be contacted relative Sprinklers that have been exposed to to any questions. corrosive products of combustion, but It is recommended that automatic have not operated,should be replaced if they cannot be completely cleaned sprinkler systems be inspected, by wiping the sprinkler with a cloth or tested, and maintained by a qualified by brushing it with a soft bristle brush. Inspection Service in accordance with local requirements and/or national Care must be exercised to avoid dam- code. age to the sprinklers—before,during, and after installation. Sprinklers dam- aged by dropping, striking, wrench twist/slippage, or the like, must be re- placed.Also,replace any sprinkler that has a cracked bulb or that has lost liquid from its bulb (ref. Installation Section Note). The owner is responsible for the in- spection, testing, and maintenance of