Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2016-00033 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/16/2016 Parcel: 2S 113AA00400 Jurisdiction: Tigard Site address: 16240 SW 72ND AVE B2 Project: Precision Packaging Subdivision: ROSEWOOD ACRE TRACTS Lot: C Project Description: Racking. Contractor: WAREHOUSE SOLUTIONS LLC Owner: PACIFIC REALTY ASSOCIATES PO BOX 1922 ATTN: N PIVEN OREGON CITY, OR 97045 15350 SE SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-734-9886 PHONE: 503-624-6300 FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 02/16/2016 $149.75 Demolition Occupancy Grp: S-1 Occupancy Load: 12%State Surcharge-Building 02/16/2016 $17.97 Dwelling Units: 0 Plan Review 01/27/2016 $97.34 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 01/27/2016 $59.90 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 02/16/2016 $2.00 Value: $4,700 11x17) Info Process/Archiving-Sm$0.50(up to 02/16/2016 $12.50 11x17) Floor Areas: Total Area: 0 Accessory Structs 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $339.46 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.234 Issued By: • ee Signature: ' 39.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. vic___ Building Permit Application Commercial .4.„:\ic$ City of Tigard Received Permit No.: nn y . 13125 SW Hall Blvd.,Tigard,OR 97223 -.� Plan Re t3`ew �� `� ��l+�U/6,....12,33 �-2 33 ��i.../// 11 Related Permit: Phone: 503-718-2439 Fax: 503-598-19 O\r0 Date/By: Z i� �^ (�GEo2(�4O( )$-j Inspection Line: 503-6394175 �1 e Reay : Juris: ® See Page 2 for p Internet: www.tigard-or.gov (nil Method: �L Supplemental Information 014 0 New construction 0 Demolitio# \. Permit fees*are based on the value of the work performed. a Indicate the value(rounded to the nearest dollar)of all ilk', ' Addition/alteration/replacement 0 Other: V` equipment,materials,labor,overhead,and the profit for the work indicated on this application. ❑ 1-and 2-family dwelling 01,v. Commercial/industrial Valuation: $ ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: Total number of floors: Job site address: /, , ,/j-• ),h New dwelling area: square feet City/State/ZIP: — / Qg 2 Garage/carport area: square feet Suite/bldg./apt.#: Project name: /1, — o yi M Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet Subdivision: Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the work indicated on this application. Valuation: $ '[l —WO r►. Existing building area square feet New building area: square feet Number of stories: Type of construction: Address: Occupancy groups: City/State/ZIP: Existing: Phone:(14 ) d'L/ -3 00 Fax:( ) New: 1 Business name: .. ? , IB Structural plan review fee(or deposit): Contact name: f j for q l-y FLS plan review fee(if applicable): Address: a 0 bti AnglINIIIIMM Total fees due upon application: 2 Li City/State/ZIP: 7 Amount received: Phone:( ) .Sj-f- j /--�7 Fax::( ) E-mail: B F — h X F Z sa - , r,r' Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name: / Submit two(2)sets of roof plan with connection details e ) ✓�J° and fire department access,along with the 2010 Oregon Address: i� 'e- /. . )� Solar Installation Specialty Code checklist. City/State/ZIP: Or si,. 1 n Permit fee(includes plan review $180.00 Q / and administrative fees): Phone:(,, D ) 2 ialtrfilM1Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lic.: ., Total fee due upon appication: $201.60 Authorized signature: x::: 4/ This permit application expires if a permit is not obtained �y.i within 180 days after it has been accepted as complete. Print name: �� —4 n ,�Q��4, ./--,x."--- 2 L� Date: j "7 ` / * Fee methodology set by Tri-County Building Industry / Ip Service Board. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ■ Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations H I:l) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014