Loading...
Specifications 5 TL c)I = 0 o;-c_o 5 PWU ENGINEERING INC. "`ECE V EP Email: muengineerinaCa�comcast.net DEC 2 2 2015 Ph: (503) 810-8309 01"9{/ o4' �vaA31b Structural Calculations: B!ll �� � rt �i4r � Job # LEN 15428 Date: 12/14/15 Project: Mulberry A Master Reuse Garage Right Lot 21, Oak Crest, Tigard, OR Lennar Homes c., �G �. 19421 PE 'Q 2 EGON y 22 1�v yILIP Expires: 06/30/2016 The following calculations are for lateral wind and seismic engineering and gravity loading of the beams and columns. Non-prescriptive foundations are outside the scope of this design and require approval from a geotechnical engineer. If the project is located on a sloping lot, the foundation system needs to be approved by a geotechnical engineer prior to construction. Failure to do so invalidates this design. The need for retaining walls for the project is the sole responsibility of the builder and a design will be included only if information provided by the builder,such as sections and drawings,are provided indicating where they are needed. All retaining wall designs should be verified by the geotechnical engineer of record for the subdivision or lot prior to construction. Failure to do so invalidates their design. The design is based on information provided by the client who is solely responsible for its accuracy. The engineering represents the finished product. Discrepancies from information provided by the client invalidate this design. PWU Engineering shall have no liability (expressed, or implied), with respect to the means and methods of construction workmanship or the actual materials used in construction. PWU Engineering Inc.shall have no obligation of liability,whether arising in contract(including warranty),Tort(including active, passive, or imputed negligence) or otherwise, for loss or use, revenue or profit, or for any other incidental or consequential damage. K<OPWU ENGINEERING INC. Ph: 503 810-8309, Email: pwuengineering@comcast.net The following calculations are for the Mulberry A Master Version stock plans for Plan approvals. Wind Loading: Per ASCE 7. Fig 6-2 See attached elevations for wind loading breakdown per level. 136mph Ultimate 3-sec gust Exposure B for Category I and 11 structure, Which is equal to 105mph ASD per the 2012 IBC and IRC with state amendments The mean roof height of the house h =28' approximately. C t,MVFRS A Direction _ ]End Zones 2a�'r 3a ) MVVFRS Direction End Zones Note: End zone may occur at any corner of the building. a= .10*40' =4' or for h=28' a=A(h) =.4(28')= 11.2' a=4' controls a must be larger than .04(40')= 1.6' and 3' Therefore: 2a=8' see Fig 6-2 ASCE 7, and Figure above. Seismic Loading: D1 seismic design category per the latest edition of the state adopted code based on the 2012 IBC and IRC SDs= .76, R= 6.5, W=weight of structure V= [1.2 SDS/(R x 1.4)] W V= .100 W Roof Dead load= 15 psf Floor Dead load= 15 psf Interior Wall Dead load= 6 psf Exterior Wall Dead load= 12 psf Veneer=40 psf J Wind per ASCE 7 �pwU ENGINEERING INC. Project Mulberry A V Direction Front to Back 3s Gust Roof A 21.3 psf Speed Exp. Angle A B 6.8 psf 105mph B 26.6 1.00 C 15.8 ps D 6:12 D 6.0 psf A C D,-tim End Lines �e Least a= 4.0 ft a L(ft) hAVG(ft) ora= 11.2 ft / NVWRS 40.0 28.0 and a> 1.6 ft za DirecYian and a> 3.0 ft bitlZ- Note:End zone may occv at any corner 0 the building 2al 8.0 ft WR L(ft)1 8.0 12.0 12.0 8.0 hA(ft) 4.0 4.0 hB(ft) 5.0 8.0 he(ft) 4.0 4.0 hD(ft) 5.0 8.0 W(plf) 0.01 118.91, 93.21 111.11 139.21 0.01 0.01 0.01 0.0 0.0 150.0 WR AVG 112.9 pIf 100.0 50.0 jam 0.0 W2 L(ft) 8.0 12.0 12.0 8.0 hA(ft) 10.0 10.0 hB(ft) he(ft) 10.0 10.0 hD(ft) W(plf) 0.01 212.61 158.41 158.41 212.61 0.01 0.01 0.01 0.0 0.0 300.0 W2.AVG 180.1 plf 200.0 100.0 mow, v 0.0 W1 L(ft) hA(ft) hB(ft) he(ft) hD(ft) W(plf) 0.01 0.0110.0 0.01 0.01 0.01 0.01 0.01 0.0 0.0 1.0 W1 AVG #�IV�01 0.5 0.0 e 111111 ILIJU 11 HU 11 Unit 11 Q�. AL JLILJILALU 11 H III Tor rua 10 s , ■ 11 11 IT I -3r i i D TOP PLATE ■ I I■ I - ®I ®I® ®® DD lib. TOOmItl�l• n FRONT (ELEVATION A) �4 •P-0 l Wind per ASCE 7 �PWU ENGINEERING INC. Project Mulberry A \V Direction Side to Side K3sGust Roof A 21.3 sEx . An le A B 6.8 sf B 26.6 1.00 C 15.8 psf el�d 6:12 D 6.0 psf grection \ Least a= 4.0 ft W(ft) hAVG(ft) or a= 11.2 ft Da-tion40.0 28.0 and a> 1.6 ft and a> 3.0 ft EndZ- Note:End zorc may occur at any coag of the buIdN. 2a 8.0 Ift WR L(ft) 8.0 20.0 8.0 hA(ft) 4.0 8.0 hB(ft) 6.0 he(ft) 8.0 hD(ft) 2.0 W(Plf)1 0.01 125.71 138.61i 170.11 0.01 0.01 0.01 0.01 0.0 0.0 200.0 WR AVG 142.7 plf " 100.0 amu` 0.0 IRMO W2 L(ft)l 8.0 20.0 8.0 11.0 8.0 hA(ft) 10.0 5.5 4.5 hB(ft) 7.0 he(ft) 10.0 4.5 4.5 hD(ft) 7.0 W(Plf) 0.01 212.61 158.41 188.21 113.11 143.11 0.01 0.0 0.0 0.0 300.0 W2 AVG 159.3 plf 200.0 100.0DO 0.0 W, L(ft) hA(ft) hB(ft) he(ft) hD(ft) W(Plf) 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 W1 AVG I # 1.0DIV/0! 0.5 0.0 0 Ll 11 TOP-MATE ■ Ll LU H 11 3P i sue4at • TOP raga -3r a s Ws-pm n RIGHT SIDE (ELEVATION A) V4,-P-0' mP ti� a 2 4 UP PLATE b lUSdLI�. REAR (ELEVATION A) 1/4' row U LI 11 11 U LU TOP RATE 1111�y 6 i SU04LPL TOP RATE T a -'s � 4 !MWM n LEFT SIDE (ELEVATION A) V,•.r.w Seismic & Governing Values �pWU ENGINEERING INC. Project Mulberry A Seismic Loading per latest edition of state adopted code based on 2012 IBC and IRC Design V= [1.2 SDs/(R x 1.4)]W Category R SDs D1 6.51 0.76 Roof Dead Load: 15psf Floor Dead Load: 15psf Interior Wall Dead Load: 6psf I V=J 0.100*W Exterior Wall Dead Load: 12psf Veneer:40psf Check Seismic Front to Back vs Wind Seismic Wind WR = [0.100 * (15+5+3) * 36 ft] = 83.0 pIf < r-112.9pIf Wind Governs W2 = [0.100 * (15+5+3+4+4) * 55 ft] + 83.0 pl = 253.9 plf < 293.0 plf Wind Governs W, _ [0.100 * (15+5+3+4) + 253.9 pl = 253.9 plf #DIV/01 #DIV/0! #DIV/0! Check Seismic Side to Side vs Wind Seismic Wind WR = [0.100 * (15+5+3) * 40 ft] = 92.2 pli < 142.7 plif Wind Governs W2 = [0.100 * (15+5+3+4+4) * 40 ft] + 92.2 pl = 216.5 pl < 302.1 pIf Wind Governs W, = [0.100 * (15+5+3+4) * + 216.5 pl = 216.5 pl #DIV/01 #DIV/0! #DIV/0! Redundancy factor= 1.0 per ASCE 7 section 12.3.4.2 Line Loads �PWU ENGINEERING INC. Project Mulberry A High Roof Diaphragm -Upper Floor Walls Line A P = 1.13 kLTOTAL = 10.0 ft v = 1.13k / 10.0 ft = 113 plf Type A Wall h = 8.0 ft LWORST = 10.0 ft MOT = 113 Of * 8.0 ft 10.0 ft = 9.03 kft MR = (15 psf * 2.0 ft + 12 psf * 8.0 ft) * (10.Oft)2 / 2 * 0.6 = 3.78 kft + 0 Ib * 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 3.78 kft = 3.78 kft T = 9.03kft - 3.78kft / 10.0 ft = 0.53 k + 0.00 k = 0.53 k No hd req'd Line B P = 2.26 k LTOTAL = 53.0 ft v = 2.26 k / 53.0 ft = 43 plf IType A Wall h = 8.0 ft LWORST = 12.0 ft MOT = 43 plf 8.0 ft * 12.0 ft = 4.09 kft MR = (15 psf * 2.0 ft + 12 psf * 8.0 ft) * (12.Oft)2 / 2 * 0.6 = 5.44 kft + 0 Ib 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 5.44 kft = 5.44 kft T = 4.09kft - 5.44kft / 12.0 ft = 0.00 k + 0.00 k = 0.00 k No hd req'd Line C P = 1.13 k LTOTAL = 34.0 ft v = 1.13 k / 34.0 ft = 33 plf IType A Wall h = 8.0 ft LWORST = 16.0 ft MOT = 33 plf * 8.0 ft * 16.0 ft = 4.25 kft MR = (15 psf 2.0 ft + 12 psf * 8.0 ft) * (16.Oft)2 / 2 0.6 = 9.68 kft + (Olb * 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 9.68 kft = 9.68 kft T = 4.25kft - 9.68kft / 16.0 ft = 0.00 k + 0.00 k = 0.00 k No hd req'd Line 2 P = 1.07 k LTOTAL = 12.0 ft v = 1.07 k / 12.0 ft = 89 plf IType A Wall h = 8.0 ft LWORST = 12.0 ft MOT = 89 plf * 8.0 ft * 12.0 ft = 8.56 kft MR = (15 psf 10.0 ft + 12 psf 8.0 ft) * (12.Oft)2 / 2 * 0.6 = 10.63 kft + 0 Ib * 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 10.63 kft = 10.63 kft T = 8.56kft - 10.63kft / 12.0 ft = 0.00 k + 0.00 k = 0.00 k No hd req'd Line 3 P = 2.57 k LTOTAL - 13.0 ft v = 2.57 k / 13.0 ft = 198 plf IType A Wall h = 8.0 ft LWORST = 13.0 ft MOT = 198 plf * 8.0 ft 13.0 ft = 20.56 kft MR = (15 psf * 8.0 ft + 12 psf 8.0 ft) * (13.Oft)2 / 2 0.6 = 10.95 kft + 0 Ib 0.0 ft + 500 Ib * 7.0 ft = 3.50 kft + 10.95 kft = 14.45 kft T = 20.56kft - 14.45kft / 13.0 ft = 0.47 k + 0.00 k = 0.47 k No hd req'd Line 4 P = 1.50 k LTOTAL = 19.5 ft v = 1.50 k / 19.5 ft = 77 plf IType A Wall h = 8.0 ft LWORST = 2.8 ft MOT = 77 plf * 8.0 ft * 2.8 ft = 1.69 kft MR = (15 psf 2.0 ft + 12 psf * 8.0 ft) * (2.8ft)2 / 2 * 0.6 = 0.29 kft + 0 Ib 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 0.29 kft = 0.29 kft T = 1.69kft - 0.29kft / 2.8 ft = 0.51 k + 0.00 k = 0.51 k No hd req'd Low Roof/Upper Floor Diaphragm -Main Floor Walls Line A P = 2.93 k LTOTAL = 49.0 ftv = 2.93 k / 49.0 ft = 60 plf Type A Wall h = 9.0 ft LwORST = 17.0 ft Mor = 60 plf 9.0 ft * 17.0 ft = 9.15 kft MR = (15 psf * 2.0 ft + 12 psf * 9.0 ft) * (17.Oft)2 / 2 * 0.6 = 11.96 kft + 0 Ib * 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 11.96 kft = 11.96 kft T = 9.15kft - 11.96kft / 17.0 ft = 0.00 k + 0.00 k = 0.00 k No hd req'd Line B P = 5.86 kLTOTAL = 32.0 ft v = 5.86 k / 32.0 ft = 183 pif Type A Wall h = 9.0 ft LwoRST = 12.0 ft Mor = 183 plf * 9.0 ft * 12.0 ft = 19.78 kft MR = (15 psf * 2.0 ft + 12 psf * 9.0 ft) * (12.Oft)2 / 2 * 0.6 = 5.96 kft + 0 Ib * 0.0 ft + 500 Ib * 12.0 ft = 6.00 kft + 5.96 kft = 11.96 kft T = 19.78kft - 11.96kft / 12.0 ft = 0.65 k + 0.00 k = 0.65 k No hd req'd Line C P = 2.93 k LTOTAL = 42.5 ft v = 2.93 k / 42.5 ft = 69 pif Type A Wall h = 9.0 ft LwORST = 5.0 ft Mor = 69 plf * 9.0 ft * 5.0 ft = 3.10 kft MR = (15 psf * 2.0 ft + 12 psf * 9.0 ft) * (5.Oft)2 / 2 0.6 = 1.04 kft + 0 Ib * 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 1.04 kft = 1.04 kft T = 3.1 Okft - 1.04kft / 5.0 ft = 0.41 k + 0.00 k = 0.41 k No hd req'd Line 1 See FTAO Calc Line 3 P = 7.55 kLTOTAL = 11.5 ft v = 7.55 k / 11.5 ft = 656 pif Type C Wall h = 9.0 ft Lw0RST = 11.5 ft Mor = 656 plf * 9.0 ft * 11.5 ft = 67.94 kft MR = (15 psf * 8.0 ft + 12 psf * 9.0 ft) * (11.5ft)2 / 2 0.6 = 9.05 kft + 0 Ib * 0.0 ft + 500 Ib * 11.5 ft = 5.75 kft + 9.05 kft = 14.80 kft T = 67.94kft - 14.800 / 11.5 ft = 4.62 k + 0.00 k = 4.62 k Use type 3 hd Line 4 P = 3.17 kLTOTAL = 9.5 ft v = 3.17 k / 9.5 ft = 334 plf Type A Wall h = 9.0 ft LWORST = 1.5 ft Mor = 334 pif * 9.0 ft * 1.5 ft = 4.51 kft MR = (15 psf * 2.0 ft + 12 psf 9.0 ft) * (1.5ft)2 / 2 0.6 = 0.09 kft + 0 Ib * 0.0 ft + 500 Ib * 1.5 ft = 0.75 kft + 0.09 kft = 0.84 kft T = 4.51 kft - 0.84kft / 1.5 ft = 2.44.k + 0.00 k = 2.44 k See FTAO Calc Use type 1 hd on garage piers only i �PWU ENGINEERING INC. Force Transfer Around Opening Method (FTAO) @ Main Floor Line 1 Worst Case L, = 7.0ft Lo= 8.6ft L2= 3.0ft V= 2.45 k vP= 132 plf vP= 132 plf vP= 132 plf hu = 1.0 ft F, = 1.18k F2= 0.51k ho= 5.0 ft n F, = 1.18k F2= 0.51k pf :. vP= 132 plf vP = 132 plf vP= 132 plf hL= 3.0 ft y T= 0.42k T= 0.42k VP= 2.45 k/ 18.5 ft= 132 plf H:W Ratios v=1 2.45k/ 10.0 ft=1 245plf Use: Type AWall 5.0ft : 7.0ft = 0.7 : 1 5.0 ft : 3.0 ft = 1.7 : 1 F, = (245plf- 132plf) * 7.0ft* 1.5= 1.18k F2= (245 plf- 132 pif) * 3.0 ft* 1.5= 0.51 k IUse: (2) Bays BLKG MOT= 2.45 k* 9.0 ft=1 22.01 kft MR= [( 15psf* 2 ft+ 12psf* 9.0 ft) (18.5 ft)^2 * 0.6/2] + (0.0 ft *5001b) = 14.17 kft T= (22.01 - 14.17)/ 18.5 ft 0.42k Nohdrea'd 1.0 0.51 k CL 0.5 �c 0.0 -0.5 ii -1.0 -1.5 -1.18 k �PWU ENGINEERING INC. Force Transfer Around Opening Method (FTAO) @ Main Floor Line 4 L, = 3.0ft Lo= 6.6ft L2= 3.0ft V= 2.00 k vp= 160 plf vp= 160 plf vp= 160 plf hu= 1.0 ft : F, = 0.78k F2 = 0.78k ho 6.0 ft ' F, = 0.78k F2 = 0.78k vp= 160 plf vp= 160 plf vp= 160 plf hL= 2.0 ft II T= 0.20k T= 0.20k v = 2.00 k/ 12.5 ft= 160 If a p H:W Ratios v=1 2.00 k/ 6.0 ft= 334 plf Use: Type A Wall 6.0 ft : 3.0 ft =2.0 : 1 6.Oft : 3.Oft =2.0 : 1 ' F, = ( 334pif- 160plf) * 3.0ft* 1.5= 0.78k F2= ( 334 plf- 160 plf) * 3.0 ft* 1.5 = 0.78 k Use: (2) Bays BLKG MOT= 2.00 k* 9.0 ft=1 18.04 kft MR= R15psf* 6ft+ 12psf* 9.0 ft) (12.5 ft)^2 *0.6/2] + ( 12.5 ft *5001b) = 15.53 kft T= ( 18.04- 15.53 )/ 12.5 ft= 0.20 k No hd req'd 1.0 0.78 k a 0.5 0.0 LL -0.5 -1.0 � - I I I I B _ I 2 I 6 L UPPER FLOOR LATERAL PLAN " Q ' A-.1 .9-A Bill f U-i O q big jib i . m Fr�4T a F -� F - - B Li 2 �IIl�MIDr _ u UPPER FLOOR LATERAL PLAN s i � I S � . . .- -® Q lJill, HOLDOWN SCHEDULE MARK Boundary Tension of DF Tension of HF Anchor Anchor Anchor Tensio NUMBER HOLDOWN Studs Allowable Lbs Allowable Lbs Mono Pour Two Pour End Corner S=2550, S=2550, 1 HDU2-SDS2.5 (2)2x 3075 2215 SSTB16 SSTB20L w=3610 w=3610 2 HDU4-SDS2.5 (2)2x 4565 3285 SB%X24 SB%X24 w=6675 w=6675 3 HDU5-SDS2.5 (2)2x 5645 4065 SB%X24 SB%X24 S= S=5730, w=66675675 w=6675 SSTB28 (NOTE 6.) SSTB34(NOTE 6.) S=6395, S=7315, 4 HDU8-SDS2.5 (3)2x 7870 5665 8"MIN STEMWALL 8"MIN STEMWALL w=7615 w=8710 8 HDU11-SDS2.5 (1)6x 9535 6865 PA138-36, 10"min PAB8-36, 10"min embed into 32"min embed into 32"min 9 HHDQ14-SDS2.5 (1)6x 14445 10350 width footing.If at width footing.If at retaining wall lap retaining wall lap anchor with vert reinf anchor with vert rein bar hooked to Ftg. bar hooked to Ftg. 5 MSTC28 (2)2x 3000 2590 N/A N/A 6 MSTC40 (2)2x 4335 3745 N/A N/A 7 MSTC66 (2)2x 5660 5660 N/A N/A Notes: 1 . Install all holdowns per manufactureer specificaiton per C-2011 Simpson Strong Tie catalog. 2. Match studs on schedule for walls below on all wall to wall holdowns. 3. (2)2x studs nailed together with (2) rows of 16d @ 3" o.c. staggered. Trimmer stud may be used as part of boundary member. 4. Refer to shearwall schedule and typical shearwall details for wall locations and configurations. 5. Refer to Simpson catalog for minimum embed of anchors into concrete. 6. Increase footing depth or stemwall height as required for 28%" minimum embedment depth. SHEARWALL SCHEDULE (a-m) ONLY REQ'DON INTERIOR SHEARWALLS. MARK REF NOTES: (a,i) Note: (b) EDGE NAILING FOLD NAILING SILL TO CONCRETESILL TO WOOD SHEAR TRANSFER CAPACITY CAPACITY NUMBER SHEATHING NAIL SIZE SPACING SPACING CONNECTION. Note: (c) CONNECTION. Note (g) CLIPS (h) Lb/Ft(SEISMIC) Lb/Ft(WIND) A 16'OSB (1) SIDE 8d 6" 12" z"Dia.A.B.@ 30"o/c 16d @ 4"o/c A35 @ 24"o/c 255 357 B6" OSB (1) SIDE(f) 8d 4" 12" 2"Dia.A.B. @ 18"o/c(m) 16d @ 2z"o/c A35 @ 15"o/c 395 553 C6" OSB (1) SIDE(e,f) 8d 3" 12" 2"Dia.A.B. @ 12"o/c (m) 16d @ 2"o/c A35 @ 12"o/c 505 707 D 16" OSB (1) SIDE(e,f) 8d 2" 12" 2"Dia.A.B. @ 11"o/c (m) 16d @ 2"o/c A35 @ 9"o/c 670 938 E 16"OSB (2) SIDE (d,e,f) 8d 6" 12" 2"Dia.A.B. @ 12"o/c (m) 16d @ 2"o/c A35 @ 12"o/c 510 714 F6"OSB (2) SIDE (d,e,f) 8d 4"Staggered 12" 2"Dia.A.B. @ 8"o/c(m) 16d @ 3"o/c(2) rows staggeredA35 @ 6"o/c 790 1106 G 16"OSB (2) SIDE(d,e,f) 8d 3"Staggered 12" 2"Dia.A.B. @ 7"o/c(m) 16d @ 2"o/c(2)rows staggered HGAI OKT @ 8"o/c 1010 1414 H 1e" OSB (2) SIDE(d,e,f) 8d 2"Staggered 12" 1"Dia.A.B. @ 52"o/c (m) 16d @ 12"o/c(2)rows staggered HGAI OKT @ 6"o/c 1340 1876 Notes: a) All wall construction to conform to SDPWS Table 4.3A. b) Use Common Wire Nails for all wood sheathing and cooler nails for gypboard sheathing. c) A.B. minimum 7"embed into concrete. 3"0"xy"plate washers req'd at all shear wall A.B. in seismic zone D, E, F. d) Panel joints shall be offset to fall on different framing members or framing shall be 3x or thicker and nails on each side shall be staggered. e) 3x or Dbl 2x framing at all panel edges and nails shall be staggered. f) All edges blocked. g) Common Wire Nails. h) Clip to be attached from continuous blocking to top of continuous top plates. Clips are not required at Gyp Bd walls but blocking is attached per the toenailing schedule. i) See attached typical shearwall details. j) Sheathing to be Structrual I Sheathing. k) Values are for framing of H-F. m) 3x, Dbl 2x, or 2x Flat at panel edges. Stagger nails. See note C for plate washers and details for plate washer edge distance. On sill plates of all walls use a single 2x sill and 2x blocking in between the studs for plywood edge nailing surface. I I PWS/ENG3'NEERING ZNC. i Ph: 503 810-8309, Email: pwuengineeringocamcast.net R= M. aq!* 49 8' k I1' A.Ak � R=:coy- �=ate Use `Yxg TSF,#2_t�1 alk fIP9 GL 27lk �Z=mak N1=z�'o1�--� ' T 12' 7.57k 67- ` 3.3ok T 12-' f 2.Cgk C40k 34�k r I � I �> PWU ENGINEERING INC. L Ph: 503 810-8309, Email: pwuengineering@oomcast.net L4' s7�iiv- Tra•218;,,y 0.+* Z71k L,- 4' l R=0-37k 1`1-d42kf# z T 1�►4 >P#2 Ir.f k r��k 6y.G3 W+ x21"67L o R=OZA M= 1,14k.9 2x14 PP-*z I.Nk T v' (80;Ay ���• � DF#2. MSN (Z) 2-A-Dr#2 M 4y Q.7/k PWU ENGINEERING INC Ph: 503 810-8309, Email: pwuenginsering6comcast.net 1.71k 2JGk '� p�•�''r'I T�S9k 5• T. 4 C-SX �/-21 �,s. ()k. 3s�k� Igor ; Ni= 3.02k4 (Z)Z-1q D{#Z Use OR AA5 AL i 7 �, t9 = /k"x 1q, VL S 'xrg hL ex 9/q",cI&" ,ol2a W 14' w= IGO Z 12wl�� #2 M. g.qb4 f.77k 2 _ 3• x12"6,L l�=l7bk� r PWU ENGlNEER?NG INC. Ph: 503 810-8309, Email: pwuenginewing@comcast.net 141 r L= = o X&Ok-'as$k M-ate 8 Dr I L- R Z•5 L; y 9"# _ayrME 73 k44 R1.73k t1 1. DF42 due L= 41� �/= 646 PX UIR= of 4*2- o.co R 6O.q9k CAO k 442k1�Df t-r2