Plans f 050?'o lS- Oohs
1.2-2-3 2 54--1 OX.-
_ Metals
t
Metals Prep Storage
Instruments �
4e
`Waste
processingBreak DI nim ADD SSP FOR
room EAractions WALL CHANGES
Office '. �s
OffiCo
Ik-in
Conference
oge
Office L
space — ADD SSP IN COOLER
office. ——— —
Office Office Semi Volatiles
Sample I a Space space Instrumentation
receiving ;
Sampie (ii(3V 9, 4
Ll
r ceiving
Office Office
space spate
AREA OF WORK VIKING MOD.VK180 SSP
W/.REC.ESC.
SCALE: NTS 1" DRYER PLATE (2)
SPRINKLERS
SSP - VIKING, SR, VK102, 155', 5.6k, CHROME 2" HOLE
DRY SSP - VIKING, SR, VK180, 155 , 5.6k, CHROME SPRAY FOAM
NOTE: DRY SSP DETAIL
ADD NEW DRY SSP HEADS FOR NEW COOLERS SCALE: NTS
ADD SSP HEAD FOR WALL CHANGES
STATE OF OREGON SEATTLE MEDFORD
PORTLAND LONGVIEW
LICENSE BOISE VIKING AUTOMATIC SPRINKLER COMPANY LODI
NO.64837 3245 NW FRONT AVENUE
Q
< PORTLAND,OREGON 97210•(503)227-1171
77
OREGON CCBi89B37 ME1FtO UC l2878�NMBHNlGTON LICi V4gNAS3TlNT
APEX LABS
66 12232 SW GARDEN PL. TIGARD,OR 97223
`n IMPORTANT: ADD 2 DRY SSP HEADS IN COOLER/ADD 1 SSP
0 THIS DRAWING IS THE PROPERTY OF VIKING AUTOMATIC SPRINKLER COMPANY.IT IS SUBMITTED IN CONFIDENCE AND JOB BY. We 1
10
IS NOT TO BE DISCLOSED OR UTILIZED WITHOUT THE WRITTEN PERMISSION OF VIKING AUTOMATIC SPRINKLER CO. OPT-51381 TIM C. 11/24/15 NTS 1 O F 1
(V