Field Memo:
Job # LEN 15352
Date: 1/19/16
Project: Mulberry E Master Reuse
Garage Left
Lot 28, Oak Crest, Tigard, OR
Lennar Homes
Per the attached photo the sheathing edge nailed to the first sill plate is okay so
long as the two top plates are properly stitch nailed together to transfer the shear.
To insure this is the case, add 10d at 6" o.c. to the underside of the lower top
plate to the upper top plate. If this nailing is added then the shear transfer will be
okay. This issue is at the one story areas only.