Loading...
Report (59) TTwPWU ENGINEERING INC. Email: pwuenginee rinq6�comcast.net Ph: (503) 810-8309 . Field Memo: Job # LEN 15352 Date: 1/19/16 Project: Mulberry E Master Reuse Garage Left Lot 28, Oak Crest, Tigard, OR Lennar Homes Per the attached photo the sheathing edge nailed to the first sill plate is okay so long as the two top plates are properly stitch nailed together to transfer the shear. To insure this is the case, add 10d at 6" o.c. to the underside of the lower top plate to the upper top plate. If this nailing is added then the shear transfer will be okay. This issue is at the one story areas only. Sincerely, PRO , S'9 21 I AHIL I P 7XP i res: DG/30/201 ' a t f � a rr lj 11115 01 x �� .:: � .moi:• ••..., ', � s'ti r f.. �� �� ' �.:� �� �. ✓ ,i' r 'T / / /y /y Al 21.1 r •e