Report (58) ;?e 15, 001-71
�PWU ENGINEERING INC. &7 71-1 Arr -
Email: muengineering(a.comcast.net
Ph: (503) 810-8309
Structural Memo:
Job # LEN 15352
Date: 1/25/16
Project: Mulberry E Master Reuse
Garage Left
Lot 28, Oak Crest, Tigard, OR
Lennar Homes
In lieu of balloon framing the 2x4 stud wall at the staircase, a rim may be
used on top of the 2x4 stud wall per attached detail 3. See attached plan and
detail.
`�"Dp R
I Nee,
19 21'FIE
GGN
Y 22
/L P
Expires: 06/30/2016
J.
CRIMMAr
BALLaaKI -�RAMING1 -f7{E k-r' -rkc. ✓TAiRo6c A (3) 2>.hq usEo oN 7a 0� -rNE 2xy Stip Pr "A�cH61J D 1�tL 3
H0214-2 E
J
54�:oepi FRIAME 2X4 W, �Y�
2x4 Im WA
TOP OF FL r
2x14 DF
.
TO EACH STUD IN SALOON
FRAMING (2) 2x4 BLW
FRI
J
X
POST ABV P T ABV
:ONT. 2x6 I 936 OAD FROMVE-
H 2 N !
(2) 2 gM
(2) 2
I I I I I I I I
�� I I
CONTRACTOR TO
2x6 STUD WALL ABOVE VERIFY PLYWOOD IS
EDGE NAILED w/ Sal
SILL NAILING, * 6" O.C. MIN TO SILL
Ibd • 4" O.G.MIN AND TO RIM
2x6 SILL -
LOW ROOF TRUSS
PER MANUFAC.
(3)2x14 RIM w/ V FUR TRUSS HANGER PER
CONTRACTOR TO VERIFY MANUFAC., CONTRACTOR
EACH MEMBER IS STITCH TO VERIFY HANGER IS
NAILED TO NEXT MEMBER ATTACHED t0 RIM w/
w/MINIMUM (2) ROWS OF
Ibd • 6" O.C. MINIMUM IOd NAILS
PROVIDE MP4F FLAT
CLIPS ® 24" O.C.FROM
RIM t0 TOP PL
DBL 2x4 TOP PL EDGE NAILING,
Sd • 6" O.C.MIN
2x4 STUD WALL BELOW
(: LOW ROOF
3 SCALE: N.T.S.