Loading...
Report (58) ;?e 15, 001-71 �PWU ENGINEERING INC. &7 71-1 Arr - Email: muengineering(a.comcast.net Ph: (503) 810-8309 Structural Memo: Job # LEN 15352 Date: 1/25/16 Project: Mulberry E Master Reuse Garage Left Lot 28, Oak Crest, Tigard, OR Lennar Homes In lieu of balloon framing the 2x4 stud wall at the staircase, a rim may be used on top of the 2x4 stud wall per attached detail 3. See attached plan and detail. `�"Dp R I Nee, 19 21'FIE GGN Y 22 /L P Expires: 06/30/2016 J. CRIMMAr BALLaaKI -�RAMING1 -f7{E k-r' -rkc. ✓TAiRo6c A (3) 2>.hq usEo oN 7a 0� -rNE 2xy Stip Pr "A�cH61J D 1�tL 3 H0214-2 E J 54�:oepi FRIAME 2X4 W, �Y� 2x4 Im WA TOP OF FL r 2x14 DF . TO EACH STUD IN SALOON FRAMING (2) 2x4 BLW FRI J X POST ABV P T ABV :ONT. 2x6 I 936 OAD FROMVE- H 2 N ! (2) 2 gM (2) 2 I I I I I I I I �� I I CONTRACTOR TO 2x6 STUD WALL ABOVE VERIFY PLYWOOD IS EDGE NAILED w/ Sal SILL NAILING, * 6" O.C. MIN TO SILL Ibd • 4" O.G.MIN AND TO RIM 2x6 SILL - LOW ROOF TRUSS PER MANUFAC. (3)2x14 RIM w/ V FUR TRUSS HANGER PER CONTRACTOR TO VERIFY MANUFAC., CONTRACTOR EACH MEMBER IS STITCH TO VERIFY HANGER IS NAILED TO NEXT MEMBER ATTACHED t0 RIM w/ w/MINIMUM (2) ROWS OF Ibd • 6" O.C. MINIMUM IOd NAILS PROVIDE MP4F FLAT CLIPS ® 24" O.C.FROM RIM t0 TOP PL DBL 2x4 TOP PL EDGE NAILING, Sd • 6" O.C.MIN 2x4 STUD WALL BELOW (: LOW ROOF 3 SCALE: N.T.S.