Loading...
Plans (180) , �3 ARI AR1 N CM DEC 3 0 2 15 CITY OF TIG RD BUILE DIV SION q JI J1 JJ2 J3 J4 A Jr. N7: 2 A XG. R JS ja J9 J1 J10 JI AI J1 R 7: 2 J12(10, 113 (5) 11:12 1 :1 7 � � ® CONFORMS TO DESIGN CONCEPT — ❑ CONFORMS TO DESIGN CONCEPT WITH GARAGE RIGHT ®CONFORMS TO DESIGN CONCEPT REVISIONS AS SHOWN E]CON REVIRMS NOTED DESIGN CONCEPT WITH ❑ NON-CONFORMING-R ❑NON-CONFORMING—REVISE&RESUBMIT THIS SHOP DRAWING H.AS BEEN REVIEW D FOR GENERAL CGIiFOR6tANCE 20' cv x us eee E.EM :Y n Eca '.— x..e o-; Wi-H"HE DES.GN COYGE?T CNL AND OES NOT RE_IEVE IHC kt O }H �IJJl :2'L hL- K Y.iY'.•E FA3RICATORIVENDIOR OF RESPONSIBIL: Y FOP.CONFOR MCE WITH THE n> aH DESIGN DPAWIN^u-5 AND 5?ECIFICATION _Lr By Alexia Fukui Dace 9/22/14 OVER THIS SHO?DRAWING, CONTRACTOR SHALL VERIFY ALL DIMENSIONS. MILBRANDT A R C H I T E C T S By: Todd R. Eaton Date: September 19, 2014 CT ENGINEERING INC ®copyright CompuTrus Inc.2006 E DATE: ABOVE PLAN PROVIDED FOR TRUSS PLACEMENT ER POLYGON NW 03/27/14 TR C�TIo SAAND° CTURAL PROJECTTITLE, REVISION-1: DRAIMNJENGIN AEERED LL FURTHER FREC Peafi umber PLAN 5-A COFFER INFORMATION.BUILDING DESIGNER/ENGINEER OF RECORD SS PLAN: DRAWN BY:JP REVISION-2: TO�TRUSS COONBLE FN°ECTI'IOONS.BUILLDING 5-A / A-A CHECKED BY: °EREVIEW�AND"APPPRo E OCAALRDL TO R TUSt COMPANY DELIVERY LOCATION: SCALE: REVISION-3: DESIGNS PRIOR To CONSTRUCTION. 1 I[ 1/8"=1' All designs are property of-Pacific Lumber and Truss. All designs are null and void If not fabricated by-Pacific Lumber and Truss. J1 Hyl J2 \kN J3 A J5 7 12 R J7 A N N A A My J9 m J10 ° J10 J11 J11 $ !PJ10 J9 A J7 7 12 J6 J12R10) \\ - '-. J1 (5) 14: 2 C3f2) IPO I - I i 2 J13 12 ® CONFORMS TO DESIGN CONCEPT GARAGE LEFT CONFORMS TO DESIGN CONCEPT WITH 1 SIONS ASS OWN ®CONFORMSTODESWNCONCEPT GGNFG"G-REVISE AND RESUBMIT CONFORMS TO DESIGN CONCEPT WITH � THIS SHOP DRAR'iNG HAS DEE'REVIEWED FOR GENERAL CONFORMANCE REVISIONS NOTED WITH THE DESIGN CONCEPT O LY AND DOES NOT RELIEVE THE NON{ANFORMING—REVKEi RESUBMR IAr FABRICATORIVENO'DR OF RESP SIBILITY FOR CONFORIUMCE WITH THE `!V DESIGN DRAWINGS AND SPEC' ICA-IONS ALL OF WHICH HAVE PRIORI7 OVER THIS SHOP DRAWING. NT TOR.SHALL VERIFY ALL DII�NSIONS. hx T=*x--sem, E..............___Alexia F.W. Cate.._9(.M114 M I Lilt A N D T ARCHITECTS By; Todd R. Eaton C T ENGINEERING 11flT�pp�dght CompuTrus Inc.2006Date: September 19, 2014 BUILDER: ISSUE DATE: ABOVE PLAN PROVIDED FOR TRUSS 1�VC� POLYGON NW 03/27/14 TR�USSCCAALLCULATIOONS REFAND ENGINEERED STRUCTURAL PROJECT TITLE: REVISION-f: pRAWINGSTI N.BU LDINGFURTHER PLAN 5—A COFFER INFORMATION.BUILDING DESIGNERIQJCINEER OF RECORD RESPONSIBLE FOR ALL NON-TRUSS cm PLAN: DRAWN BY:JP REVISION-2: TO TRUSS CONNECTIONS.BUILDING Uumber RVIWAND APPROVE PDESIGNER/ENGINEER OF RECORD TO T R U S S COMPANY 5-A / A-A CHECKED BY: REVIEwANDROFRECOALL DELIVERY LOCATION: SCALE: REVISIONS: DESIGNS PRIOR TO CONSTRUCTION. 1/8"= 1' All designs are property of-Pacific Lumber and Truss. All designs are null and void N not fabricated by-Pacific Lumber and Truss. L iTek USA Inc. l Com M uTrus Software p Warnings & General Notes WARNINGS: 1. Builder and erection contractor should be advised of all General Notes and Warnings before construction commences. 2. 2x4 compression web bracing must be installed where shown+. 3. Additional temporary bracing to insure stability during construction is the responsibility of the erector.Additional permanent bracing of the overall structure is the responsibility of the building designer. 4. No load should be applied to any component until after all bracing and fasteners are complete and at no time should any loads greater than design loads be applied to any component. 5. CompuTrus has no control over and assumes no responsibility for the fabrication,handling,shipment and installation of components. 6. This design Is furnished subject to the limitations set forth by TPI/V TCA in BCSI,copies of which will be furnished upon request. GENERAL NOTES, unless otherwise noted: 1. This design is based only upon the parameters shown and is for an individual building component.Applicability of design parameters and proper incorporation of component is the responsibility of the building designer. 2. Design assumes the top and bottom chords to be laterally braced at 2'o.c.and at 10'o.c.respectively unless braced throughout their length by continuous sheathing such as plywood sheathing(TC)and/or drywall(BC). 3. 2x Impact bridging or lateral bracing required where shown++. 4. Installation of truss is the responsibility of the respective contractor. 5. Design assumes trusses are to be used in a non-corrosive environment, and are for"dry condition"of use. 6. Design assumes full bearing at all supports shown. Shim or wedge if necessary. 7. Design assumes adequate drainage is provided. 8. Plates shall be located on both faces of truss,and placed so their center lines coincide with joint center lines. 9. Digits indicate size of plate In inches. 10. For basic connector plate design,values see ESR-1311,ESR-1988(MiTek). 10 x tt C: Nva 24N2 10 )126," �k1NA1. t;lr�"'!3 EXPIRES 6!3{3tla IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 43'- 9.5' IBC 2012 MAX MEMBER FORCES 4WR/DOF/C =1.00 TO: 2x4 KDDF M1&BTR LOAD DURATION INCREASE = 1.15 1- 2=( 0) 114 2-10=(-799) 2686 3.10=?•300) 336 BC: 2x4 KDDF Al&BTR SPACED 24.0" O.C. 2- 3= •3018 1136 10.11=(-562) 2250 10- 4=1.235 629 WEBS: 2x4 KDDF STAND; 3. 4= •2885 1241 11.12=(•258) 1671 4.11= -736 574 20 OF STAND A LOADING 4- 5= •2255 1147 12.13= -597 2094 11. 5= -460 1077 LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 5. 6= •2255 1147 13- 8= -834 2444 5.12= -460 1077 TO LATERAL SUPPORT <= 12'OC. UON. DL ON BOTTOM CHORD = 10.0 PSF 6- 7= •2885 1241 12- 6= -736 574 BC LATERAL SUPPORT <= 12'OC. UON. TOTAL LOAD = 42.0 PSF 7. 8= •3018 1136 6-13= •235 629 8- 9= 0 114 13. 7=(•300) 336 OVERHANGS: 24.0' 24.0' LL = 25 PSF Ground Snow (Pg) C�CNeC18 Cctor Np18t(eorrnolpretix natCampuTrus, Inc LIVE OM CHORD CHECKED LOAD AT LOCATION(S) A 20 PSF SPECIFIEDLBYIIBC STORAGE BEARING MAX VERT MAX LOCATIONS REACTIONS REACTIONS SIZE SO INpEDBRG(SPECIESA M,M20HS,M18HS,1116 = MiTek M series THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. 01• 0.0' -378/ 2067V -323/ 323H 5.50' 3.31 KDDF ( 625) JT 2, 8: Heel to plate corner 2.25' 431- 9.5' -378/ 2067V 0/ OH 5.50' 3.31 KDDF ( 625) = ICOND, 2D Design checked for net(-5 psf) uplift at 24 *oc spacing.1 VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.036' @ -21- 0.0' Allowed = 0.200' MAX TL CREEP DEFL = •0.043' @ -2'- 0.0' Allowed = 0.267' MAX LL DEFL = -0.167' @ 17'- 11.0' Allowed = 2.144' MAX TL CREEP DEFL a -0.321' @ 17'- 11.0' Allowed = 2.858' MAX LL DEFL = •0.036' @ 451• 9.5' Allowed = 0.200' MAX TL CREEP DEFL = -0.043' @ 45'- 9.5' Allowed = 0.267' MAX HORIZ. LL DEFL = 0.076' @ 43'- 4.0' 21-10-12 21-10-12 MAX HOAIZ. TL DEFL = 0.121' @ 43'- 4.0' 7-05-13 7-02-08 7-02-08 7-02-08 7-02.08 7-05-13 NOTE:Design assumes moisture content does not exceed 194 at time of manufacture. 12 12 Design conforms to main windforce-resisting 7.00 M-4X6 Q 7 00 system and components and cladding criteria. 4.0" Wind: 140m h h=25.6ft, TCDL=4.2,BCDL=6.0 ASCE 7.10r 5 All Heights), Enclosed, Cat.2, Exp. , MWFAS(Dir), sad duration factor=l.6, M-W(S) Truss designed for wind loads 1 in the plane of the truss only. 0.25" M-5x8(S) 0.25" 0 + + co I? M-1.5x3 M-1.5x3 v 0 0 A A � 2 113 M M3x4 M 3x4 M-3x8 B o0 M-5x8(8) M-5x8(S) L L 8-11-01 8-11-15 7-11-08 8-11-15 8-11-01 .-� 2-00 43-09-08 WEDGE REQUIRED AT HEEL(S). 2-00 JOB NAME : 5-A POLYGON NH - B2 Eo PRO Scale: 0.1445 � �'N�L�p_ s�Qy WARNINGS: GENERAL NOTES,unless otherMse noted: 9/ I j/P�IEy B i.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and is for an Individual �' 9r Truss: E!2 and Warnings before construction commences. bulling component.Applicability of design parameters and proper 2.2s4 compression web bracing moat be Installed where shown+. Incorporation of component Is the responsibility of the building designer. ^-�, r. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top end bottom chords to d t muggyaterally braced at DES. BY' E E Is the responsibility of the erector.Additional permanent bracing of r o.c.sous at 10'hies respectively as ply unless braced throughout their length by DATE: 8/22/2014 g 2x Impact bridging or such ea adng req head where s own-dryweA(BC). Q Me overall structure le the responsibility of the bWldl designer. 3,ar I act i or lateral brad required where shown+ 4.No load should be applied to any component until after all bradrig and 4.Installation of truss Is the rasponalbllty of the respective contractor. OREGON SEQ. : 6037152 fasteners are complete and at no time should any bads greater then 5.Dealgn assumes trusses are to be used In a non-corrosive environment. 4 ,�b design loads be applied to any component and are for'dry condition'of use. / '9 y TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes Lull bearing at all supports shown.Shim or wedge It O 14 2 fabrication,handing,shipment and Installation of components. necessary. �` 7.Design assumes adequate drainage la pwlded. `'R R t 1��^ 6.This design is furnished subject to the limitations set forth by 8.Plates shall be located on both faces of toss,and placed so their center IIII VIII VIII VIII IIII VIII VIII IIII IIII TPINYfCA in SCSI,copes of which will furnished upon request. Dig coincide with joint center Ines. 9.Dipils indicate size of plate in Inches. MITek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311,ESR-1988(MiTek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by , PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 43'- 6.2' IBC 2012 MAX MEMBER FORCES 4WR/DDF/C =1.00 TC: 20 KDDF M16BTR LOAD DURATION INCREASE = 1.15 1. 2= 0) 114 2. 9=(-843) 2654 3- 9=(-300) 335 7. 8=(-2357) 628 WEBS: 2x4 KDDF STANDp SPACED 24.0' O.C. 3- 4= -2865 11127 9.1 232 10.11=1- 267) 1637 4.10=(-607) 2217 9- 234 630 737 574 2x4 OF STAND A LOADING 4. 5= -2234 1138 11.12= -584 2045 10. 5= -460 1077 LL( 25.0)+DL(( 7.0) ON TOP CHORD = 32.0 PSF 5- 6= -2229 1164 12. 8= -829; 2355 5.11= -450 1055 TC LATERAL SUPPORT - 12'OC. UON. 6L ON BOTTOM CHORD = 10.0 PSF 6- 7= -2794 1278 11- 6= -713 566 BC LATERAL SUPPORT <= 12'OC. UON. TOTAL LOAD = 42.0 PSF 7- 8= -595 713 6.12= -258 552 12- 7=(-240) 354 OVERHANGS: 24.0' 0.0' LL = 25 PSF Ground Snow (Pg) plate BEARINGONS MAX VERT MAX HORZ BRG REQUIRED BRG AREA ConnPECIES C,CNeC18,,CN18Leorrno1prefixgnatCompuTrus, Inc LI E0�ADORD CHECKED AT LDCATION(SR A 20 PSF SPECIFIEDLBYITED IBC STORAGE1 . LO01- 0.01 -380/ACTIONS 2064V -302/ 316H 5NS .50' 3.30ZE N KDRF 625 M,M20HS,M18HS,�16 = MiTek MI series THE BOTTOM CHORD DEAD LIAD IS A MINIMUM OF 10 PSF. 431- 6.2' -281/ 1855V 0/ OH 5.50' 2.97 KDDF f 625 JT 2: Heel to plate corner = 2.25' ** For hanger specs. - See approved plans VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.036' @ -21- 0.0' Allowed = 0.200' MAX TL CREEP DEFL = -0.043' @ -2'- 0.0' Allowed = 0.267' MAX LL DEFL= -0.163' @ 171- 11.0' Allowed = 2.130' MAX TL CREEP DEFL = -0.314' @ 17'- 11.0' Allowed = 2.840' MAX HORIZ. LL DEFL = 0.074' @ 43'- 0.7' MAX HORIZ. TL DEFL = 0.117' @ 43'- 0.7' NOTE:Design assumes moisture content does not exceed 19,assumes of manufacture. 21-10-12 21-07-08 Design conforms to main windforce-resisting 7-05-13 7-02-08 7-02-08 7-02-08 7-04 7-01 system and components and cladding criteria. Wind: 140 m ht h=25.8ft, TCDL=4.2,BCDL=6.0, ASCE 7.101 12 12 (All Heights), Enclosed, Cat.2, Exp.B, MWFAS(Dir), y Tr 7.00 M-4X6 Q 7 00 load duration factor=l.6 5 440" inuthedplaneeoffthewtrusso nly. M-5x8(S) 1 M-5x8(S) 0.25" 0.25" 0 o M-1.5x3 M-3x5 .5x CO o 0 A r 12 M-3x8 M 3x4 0.25" 0.251" M-3x4 M-4x66" o M-5x8(S) M-5x8(S) 8-11-01 8-11-15 7-11-08 8-11-15 8-07-13 L 2-00 43-06-04 0 PROF�ss JOB NAME : 5-A POLYGON NH - B1 Scale; 0.1411 ��� WARNINGS: GENERAL NOTES,unless otherwise noted: 92. P E 1.Builder and erection contractor should be advised of all General Notes 1.This design is based only upon the parameters shown and is for an Individual 1� Truss: Ell and Warnings before construction commences. building component.Appacabill of design parameters and proppeer 2.20 compression web bracing must be Installed where shown+. Incorporation of component is the responsibility of the building dealliner. 1.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE le the nspons MWy of the erector.Additlonel pe m�nent bracing of 2'o.c.and at 10'o.c.respectively unless braced throughout their lenggth by dwnbnwm sheathing such as plywood sheathirg(lC)and/or drywai(BC). DATE: 8/22/2014 the overall structure Is the responsibility of the bulking designer. 3.2x Impact bridging or lateral bracing required where shown++ Q 4.No bad should be appied to any component until after all bracing and 4.Installation of truss Is the responsibility of the respective contractor. '� OREGON ((� SEQ. : 6037153 fasteners are complete and at no time should any loads greater than 5.Design assume trusses are to be used in a noncorrosive environment, design bads be applied to any component. and are for"dry condition'of use. / 0 TRANS I D: 406556 5.CompuTrus has no control war and assumes no responsibility for the 6.Design assumes full bearing at all supports shown.Shim or wedge If fabrication,herds necessary. (� ng,shipment and installation of components. 7.Design assumes adequate drainage Is provided, S.This design is furnished subject to the Imitations set forth by 8.Plates shag be locatedonboth faces of truss,and placed so their center lines nc ide with IIIIII IIII VIII VIII VIII VIII VIII IIII IIII MT)TPekUSA,IncJCompuT s Software 7 6 6(1 L EI,copies of which will be furnished upon request 10.Forr basiic con ectoraplato decenter sign veto"see ESR-1311,ESR-1988(MITek) 9.Digits Indicate size of late In Inches. EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 43'- 6.3- IBC 2012 MAX MEMBER FORCES 4WR/DDF/C =1.00 TO: 2x4 KDDF A16BTR LOAD DURATION INCREASE = 1.15 1- 2= 0) 114 2-11= -1431 2572 3-11=( -152 192 15-10=(-182) 108 BC: 2x4 KDDF #16BTR SPACED 24.0' O.C. 2- 3= -3025) 992 11.12= -1288 2429 11. 4=( -49I 296 4= WEBS: 2x4 KDDF STAND; 3- -2875) 987 12.13= -1034 2330 4.12=( -445 367 2x4 OF STAND A; LOADING 4- 5= -2453 910 13.14= -850 2024 12. 5= -216 868 2x4 KDDF A168TR B LL( 25.0)+DLI 7.0) ON TOP CHORD = 32.0 PSF 5. 6= 0 0 14.15= -541; 1259 12- 7= -443 150 L ON BOTTOM CHORD = 10.0 PSF 5. 7= -2076 878 7.13= -254 324 TO LATERAL SUPPORT <= 1210C. UON. TOTAL LOAD = 42.0 PSF 7. 8= -2241 822 13- 8= -226 582 BC LATERAL SUPPORT <= 1210C. UON. 8. 9= -1563 594 8.14=( -966 497 LL = 25 PSF Ground Snow (Pg) 9.10= -141 157 14- 9=( -329 1300 9.15=(-2078) 770 NOTE 2x4 BRACING AT 24'OC UON. FOR BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE ALL FLAT TOP CHORD AREAS NOT SHEATHED LIVE LOAD AT LOCATION(S) SPECIFIED BY IBC 2012. BEARING MAX VERT MAX HORZ ERG REQUIRED BRG AREA THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES) 01- 0.0' -340/ 2071V -179/ 367H 5.50' 3.31 KODF 625) OVERHANGS: 24.0" 0.0" 43'- 6.3" -259/ 1936V 0/ OH 5,50' 3.10 KDDF � 625) M-1.5x4 or equal at non-structural vertical members (uon). ICOND. 2: Desion ch Connector pplate prefix designators: VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 C,CN,CI8,CN18 (or no prefix) = CompuTrus, Inc MAX LL DEFL = -0.036' @ -2'- 0.0' Allowed = 0.200' M,M20HS,MIBHS,M16 = MiTek M series MAX TL CREEP DEFL = -0.043' @ -2'- 0.0' Allowed = 0.267' MAX LL DEFL = 0.165' @ 15'- 9.7' Allowed = 2.130' JT 2: Heel to plate corner = 2.25" MAX TL CREEP DEFL = -0.296' @ 22'- 6.6' Allowed = 2.840" " For hanger specs. - See approved plans MAX HORIZ. LL DEFL = -0.080' @ 43'- 2.8' MAX HORIZ. TL DEFL = 0.114' @ 43'- 2.8' 0-04-15 NOTE:Design assumes moisture content does (( not exceed ill, at time of manufacture. 19-11-11 23-06-09 Design conforms to main windforce-resisting 5-03-05 5-00 5-03-08 6-06-14 6-11-13 6-11-13 7-00-01 system and components and cladding criteria. Wind: 140mph h=23.9ft, TCDL=4.2,BCDL=6.0, ASCE 7.10, All Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), 15 09 12 load duration factor=1.� Truss designed for wind ioads 12 in the plane of the truss only. 7.00 M-4x6 M-5x6(S) M 3x4 =M- 0BP5" 9x4 M 1�0 x3 M-5x6(S) 0.25" v v 0 0 c° M-1.5x3 + + + o + On 0 2 M-3x8 13 M 3x4 10.25" M-3x4 0 25t4 ts• =M-4x4 M-5x8(S) M-5x8(S) L L 7-11 7-06 9-05-08 9-03-12 9-04 2-00 43-06-04 JOB NAME : 5-A POLYGON NH - AH3 � PROF�s Scale: 0.1504 � GIN s�O WARNINGS: GENERAL NOTES,unless otherwise noted: 4y �/Z 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and is for an individual 92 PE 9r Truss: AH 3 and Warnings before construction commences, building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be installed where shaven+, Incorporation of component Is the responslblAty of the building designer. 3.Additional temporary bracing to Irreurs stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE is the responelbllly of the erector.Additional permanent bracing of c nfin end at ta'o.c,respectively plywood Warad throughout their length). DATE: 8/22/2014 gH 9 9 continuous bridginsheag such ea bracing where s and/or drywaN(BC). the overall structure la the responsibility of the building designer. 3.D�Impact b I or lateral Wed required where shown++ �Q�" 4.No bad should be appled to any component until after all bracing and 4.Installation of truss Is the responsibllly of the reapective contractor. -�` OREGONO� �+v SEQ. : 6037154 fasteners are complete and at no time should any loads greater than 5.Design assumes trusses are to be toed In a non-conoolve environment, v b design bads be applied to any component and are for'dry condition"of tae. / TRANS I D: 406556 5.CompuTmc has no control over and assumes no responsibility for the 6.Design assumes full bearing at sA supporta shown.Shim on wedge Ifneco `Z fabdcaVon,handing,shipment and Installation of components. 7.Design assumes adequate drainage Is provlded. `- 6.This design Is fumlahed subject to the Imitations set forth by 8.Plates shall be locatedonboth faces of trues,and placed so their center rl CA In I,copies of ch will be furnished IIIIII IIII VIII VIII VIII VIII VIII IIII IIII MiiTPekU SA,Inc./CompuT S)Software 7.6.6(1 L Zn request. 10 For basiccconnector pale design values see ESR-1311,ESR-1988(MITsk) joint center In". 9.Dlglts Indicate size of Tats In Inches. EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 43'• 6.3' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF #16BTR LOAD DURATION INCREASE = 1.15 1- 2= 0) 114 2.11= -1431) 2572 3.11=( -152 192 15-10=(•182) 108 BC: 2x4 KDDF #16BTR SPACED 24.0' O.C. 2- 3= -3025) 992 11.12= -1288 2429 11. 4=� -49 296 WEBS: 2x4 KDDF STAND; 3- 4= -2875) 987 12.13= -1034 2330 4.12= -445 367 2x4 OF STAND A; LOADING 4. 5= -2453 910 13.14= -850 2024 12- 5= -216 868 2x4 KDDF #16BTR B LL( 25.0)+DL� 7.0) ON TOP CHORD = 32.0 PSF 5- 6= 0 0 14.15= -541 1259 12. 7= -443 150 L ON BOTTOM CHORD = 10.0 PSF 5- 7= -2076 878 7.13= -254 324 TC LATERAL SUPPORT <= 12'OC. ION. TOTAL LOAD = 42.0 PSF 7- B= •2241 822 13. 8= •226 582 BC LATERAL SUPPORT <= 12'OC. UON, 8. 9= -1563 594 8.14= -966 497 LL = 25 PSF Ground Snow (Pg) 9.10= •141; 157 14. 9= -329 1300 9.15=( 2078 770 NOTE: 2x4 BRACING AT 24'OC UON. FOR BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE ALL FLAT TOP CHORD AREAS NOT SHEATHED LIVE LOAD AT LOCATION(S) SPECIFIED BY IBC 2012. BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA __________ THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES) 01- 0.0' -340/ 2071V -179/ 367H 5.50' 3.31 KDDF 625 OVERHANGS: 24.0" 0.0' 43'• 6.3' -259/ 1936V 01 OH 5.50' 3.10 KDDF 625 Connector plate prefix designators: C,CN,CI8,CN18 for no prefix) = CompuTrus, Inc M,M20HS,M18HS, 16 = MiTek MT series VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.036" @ -21- 0.0' Allowed = 0.200' JT 2: Heel to plate corner = 2.25" MAX TL CREEP DEFL= •0.043' @ -2'- 0.0' Allowed = 0.267' •" For hanger specs. See approved plans MAX LL DEFL= 0.165' @ 15'- 9.7' Allowed = 2.130' MAX TL CREEP DEFL= -0.296' @ 221- 6.6' Allowed = 2.840' MAX HORIZ. LL DEFL = -0.080' @ 43'- 2.8' MAX HORIZ. TL DEFL = 0.114' @ 43'• 2.8' NOTE:Design assumes moisture content does 0-04-15 not exceed 19% at time of manufacture. 15-11-11 f5 27-06-09 Design conforms to main windforce-resisting system and components and cladding criteria. 5-03-05 5-00 5-03-08 6.06-14 6-11-13 6-11-13 7-00-01 Wind: 140mp h h=23.9ft, TCDL=4.2,BCDL=6.0, ASCE 7-10t (A11 Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), load duration factor=l.A 15-09-12 Truss designed for wind loads in the plane of the truss only. 12 M-5X6(S) 7.00 p M-4x6 6 M-3x40825" =M-9x4 M-1 o x3 M-5x6(S) 0.25" v � 0 + o + +M-1.5x3 + B o o + 0 A 13 M•3x8 M-3x4 10.25" M-3x4 0.25(4 =M-4x41s• M-5x8(S) M-5x8(S) L L 7-11 7-06 9-05-08 9-03-12 9.04 2-00 43-06-04 JOB NAME: 5-A POLYGON NH - AH2 PROFFss Scale: 0.1504 � G�N ! WARNINGS: GENERAL NOTES,unless othervAse noted: 92 P E 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and Is for an Individual C� Truss: AH 2 and Warnings before construction consrences. building component.Applicability of design parameters and proper 2.2x4 compression web bredng must be installed where shorn Incorporation of component is the responsibility of the building designer. 3.Additional m onal temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE Is the responsibility of the erector.Additional pemsnenl bracing of 2'o.c.and at 10'o.c.respectively unless braced throughout their lenggth by continuous sheathing such as plywood sheathing(TC)and/or drywall BC). DATE: 8/22/2014 the overall structure Is the responsibility of the building designer. 3.2x Impact bridging or lateral bracing required where shown++ !r 4.No bad should be applied to any component unlit after all bracing and 4.Installation of truss is the responsibility of the respective contractor. -� OREGON 1(f SEQ. : 6037155fasteners are complete and at no Lim should any bads greater than 5.Design assumes busses are to be used In a non-corroaive amm ironent, L �tk design bads be appled to any component. and are for"dry condition"of use. 1 4 TRANS I D: 406556 5.CompuTrus has no control over and assumres no responsibility for the 6.Design assume*full beadng at ati supports shown.Shim or wedge If (j ` { fabrication,handing,shipment and installation of components. necessary. adequate.Design assurnes pr 6.This design is furnished subject to the Irritations set forth by 8.Plain shag be locatedondrainage i both faces of truss, placed so their center TPIANfCA in BCSI,copies of which will be furnished upon request. Ins*coincide with joint center Ines. 9. Digits Indicate size of plate In Inches. MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311,ESR-1988(MITe1) EXPIRES:12/3112015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS 43.06.04 MONO HIP-D SETBACK 6-00-00 FROM END WALL IBC 2012 MAX MEMBER FORCES 4WR/DDF/C =1.00 TC: 2x6 KDDF M18BTR; LOAD DURATION INCREASE = 1.15 (Nan-Rep) i- 2= 0 114 2.11= -1639 4875 11. 3= 0) 300 9-16=(-4391) 1805 2x4 OF 240OF TI 2. 3= -5879 1836 11.12= -1642 4872 3.12= -366 286 16-10= -342) 255 BC: 2x6 KDDF 818BTR LOADING 3- 4= -5549 1890 12.13= -2387 5968 12. 4= •428` 1623 WEBS: 2x4 KDDF STAND; LL = 25 PSF Ground Snow (Pg) 4- 5= 0 0 13.14= -2428 5968 12. 6= •1761 953 2x6 KODF M2 A, TC UNIF LL� 50.0J+DL� 14.0 = 64.0 PLF 0.0' TO 12'- 0.0' V 4. 6= -4731 1764 14-15= -2082 4966 6-13= 0 419 2x4 OF STAND TC UNIF LL 100.0 +DL 28.0 = 128.0 PLF 12'- 0.0' TO 43'- 6.3' V 6- 7= -6028 2379 15-16= -1257 2945 13. 7= 4 166 2x4 KDDF STUD BC UNIF LL 0.0 +DL 40,0 = 40.0 PLF 0'- 0,0' TO 43'- 6.3' V 7. 8= •5543 2225 7.14= -967 519 I- 9= -3514 1448 14. 8= -312 1314 TC LATERAL SUPPORT <= 12"OC. LON. TC CONIC LL( 500.0)+DL( 140.0)= 640.0 LBS @ 121- 0.0' 9.10= -100 112 8-15= -2455 1086 BC LATERAL SUPPORT <= 12'OC. UON. 15. 9= •684) 2397 BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE LIVE LOAD AT LOCATION(S SPECIFIED BY IBC 2012. BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA NOTE 2x4 BRACING AT 24'OC LON. FOR THE BOTTOM CHORD DEAD L AD IS A MINIMUM OF 10 PSF. LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. SPECIES) ALL FLAT TOP CHORD AREAS NOT SHEATHED 01- 0.0' -1099/ 3690V -131/ 270H 5,50' 5.90 KDDF ( 625) _ _ _ _____---- 43'- 6.3' -1506/ 3729V 0/ OH 5.50' 5.97 KDDF ( 625 OVERHANGS: 24.0' 0.0' 1COND. 2o Design checked for net(-5 psf) uplift at 24 "oc lw� Connector plate prefix designators: VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L1180 C,CN,CI8,CN18 (or no prefix = CompuTrus, Inc MAX LL DEFL = -0.032' @ -2'• 0.0' Allowed = 0.200' M,M20HS,M18HS,M16 = MIT it M series MAX TL CREEP DEFL = -0.039' @ -2'- 0.0' Allowed = 0.267' ** For hanger specs. - See approved Tans MAX LL DEFL = 0.290' @ 19'- 5.3' Allowed = 2.130' 9 P PP P MAX TL CREEP DEFL = -0.569' @ 19'- 5.3' Allowed = 2.840' MAX HORIZ. LL DEFL = •0.108" @ 43'- 0.8" MAX HORIZ. TL DEFL = 0.171' @ 43'- 0.8' NOTE:Design assumes moisture content does not exceed 19� at time of manufacture. Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 140 mphh=22.7ft, TCDL=4.2,BCDL=6.0, ASCE 7.10 All Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), 11.11-11 load oad duration factor=l.6, 5-11-14 5-05-02 0-06-10 5-10.05 6-05 6-05 6.05 6-05-04 Truss designed for wind loads in the plane of the truss only. 11-09-12 640q 12 M-7x8(S) 7.00 M-5x10 5 =M-6x6 0,,25" =M-86x6 =M-10x10 M-130x6 M-3x4 v C + A o o A r• m o M-4x12 B 2 11 12 1 14 I5 1Ss M-1.5x3 M-3x10 �•25" =M-4x4 0.25 M-4x10 ::M-W(S) =M-10x10(S) L L 5-10.02 5-05-02 8-02 8-00-04 8-00-04 8-00-08 L 2-00 43-06-04 PR JOB NAME: 5-A POLYGON NH - AW ox�ss Scale: 0.1519 �j ('jIN WARNW03: GENERAL NOTES,unless otherwise noted: �4.1� v /r�2 ZI O-r'fr 1.Builder and erection contractor should be advised of as General Notes 1.This design is based only upon the parameters shown and Is for an Individual 9L P E Truss: AH 1 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression we bredrp must be Installed where shown+, Incorporation of component is the responsibility of the building designer. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords c be throughout braced at DES. BY: EE by Is the responsibility of the erector.Additional permanent bracing of continuous and at 10'sheathing respectively unless braced throughout their length). continuous bridging or such as plywood quired here s own + C). DATE: 8/22/2014 the were)structure Is the responsibility of the building designer. 3.2n Impact brldglrq or lateral bracing required where shown++ 4.No bad should be applied to any component unlit seer all bracing and 4.Into etlon of truss Is the responalbllty of the respective contractor. '� OREGON L(/ SEQ. : 603 715 6 fasteners are complete and at no time should any loads greater than 5.Design assumes trusses are to be used In a non-corroslve environment, design bads be applied to any component. and are for"dry condition"of use, TRANS I D: 406556 5.Comm puTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at all supports shown.Shim or wedge If [1 14 P fabrication,handing,shipment and Installation of components. necessary. 7. assumes adequate drainage M wised. furnished B.This design Is furnished subject to the limitations Desig m mitetiorre set larch by 8.Plates shall be bested on both heel of fuss,and placed so their center ch will be furnished upon lin nt VIII VIII VIII VIII VIII VIII VIII IIII IIII MTiTPBSAlnBCSI,copies of lnc/CompuT 9lSoflWefe 7.6.6(1 L)E request 10.For beak coincide rd etcenter design elves see ESR-1311,ESR-1988(MITek) 9.Digits Indicate size of to in Inches. EXPIRES:12/31/2015 IIIIIII I�IIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 43'- 9.5' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 20 KDDF R18BTR LOAD DURATION INCREASE = 1.15 1. 2= 0) 114 2.11= -1212) 3463 11. 3=( -236) 849 17. 8=(-300) 336 BC: 2x4 OF 240OF0 KOOF 111 1 BTR;B5 SPACED 24.0' O.C. 3- 4= •3073 1177 12.14= -7971544 11-12= ) 2720 12) 3226 -14=( 500; 350 348 WEBS: 2 x 4 KDDF STAND; LOADING 4. 5= -2541 1132 13.15= 0 0 4.14-( •567 259 2x4 OF STAND A LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 5. 6= -2298 1240 14.15= -626 2374 5.14=( -288 1055 L ON BOTTOM CHORD = 10.0 PSF 6- 7= -2207 1142 15.16= -261 1600 5.15=(•1419 749 TC LATERAL SUPPORT <= 12'OC. LON. TOTAL LOAD = 42.0 PSF 7- 8= -2812 1243 16-17= •595 2048 15. 6=( •558 995 BC LATERAL SUPPORT <= 12'OC. UON. 8. 9= -2957 1138 17. 9= -836) 2403 6.16=( •434) 1178 LL = 25 PSF Ground Snow (Pg) 9.10= 0 114 16. 7= -722) 578 OVERHANGS: 24.0' 24.0' 7.17=( -243) 599 BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE Connector pplate prefix desi nators: LIVE LOAD AT LOCATION(S SPECIFIED BY IBC 2012. BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA C,CN,CI8,CN18 (or no prefix = CompuTrus, Inc THE BOTTOM CHORD DEAD LAD IS A MINIMUM OF 10 PSF. LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES M,M20HS,M18HS, 16 = MiTek M series 01• 0.0' -379/ 2067V -323/ 323H 5.50' 3.31 KDDF 625 JT 9: Heel to plate corner 2.25' 43'• 9.5' •378/ 2067V 0/ OH 5.50' 3,09 OF � 670 = VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.036' @ -21• 0.0' Allowed = 0.200' MAX TL CREEP DEFL = -0,043' @ -2'- 0.0' Allowed 0.267' MAX LL DEFL = 0.211' @ 14'• 6.0' Allowed = 2.144' MAX TL CREEP DEFL = -0.393' @ 14'- 6.0' Allowed = 2.858' 21-10-12 21-10-12 MAX LL DEFL = -0.036' @ 451- 9.5' Allowed 0.200' MAX TL CREEP DEFL = •0.043' @ 45'- 9.5' Allowed = 0.267' 2-09 5-10-08 5-10-08 7-04-12 7-02-08 7-02-08 7-05-13 MAX HORIZ. LL DEFL = 0.102' @ 43'- 4,0' 12 1 12 MAX HORIZ. TL DEFL = 0.166' @ 43'- 4,0' 7.00 M-4X6 Q 7.00 NOTE:Design assumes moisture content does 4.0" not exceed 19% at time of manufacture. 6 N Design conforms to main windforce-resisting system and components and c M-5x8(S) M-5x8(S) ladding criteria. 1 Wind: 140 mph h=25.6ft, TCDL=4.2,BCDL=6.0, ASCE 7.10 load Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), 0.25" 0,25" load duration factor=l.6 Truss designed for wind loads in the plane of the truss only. 0 m M-3x4 M-1.5x3 c M-3x4 M-4x6 A u; 2 M 5x6 M 3x4 o M-5x1015 0.25)6 M-317 x4 M- X8 9 0 0 0 2 75x6 + 2.04 aM-4x10 M18HS-506(S) 12 12 ?t-05-01 5-10-08 6-02 0-11-1? 10-04-12 8-11-15 8-11.01 L L ?-05-08 12-00-08 1 10-04 27-05-04 �2-00 L2-00 14-06 29.03.08 2-00 43-09-08 2-00 JOB NAME : 5-A POLYGON NH - B3 �o PRo�Fts Scale: 0.1309 � GN��p_ s�O� WARNINGS: GENERAL NOTES,unionotherwise noted: Zlel y 0 1.Builder and erection contractor should be advised of all General Notes 1.IN*design is based only upon the parameters shown and is for an IndMdual �' 92 W P E 9� Truss: 03 and Warnings before construction commences. bulking component.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+. incorporation of component Is the responsibility of the building designer. 3.Additional temporary bracing to Insure stability during construction 2•Design assumes Me top and bottom chords to be laterally braced at e DES. BY: EE le the responaibillly of the erector.Additional permanent bracing of 2'o.c.and at 10'o.c.respectively unless braced throughout their length by DATE: 8/22/2014 9 continuous sheathing such as plywood sheathing(TC)and/or dryweN(BC). the overall structure Is the responsibility of the build designer. 3.2x Immppact b Ir or lateral bracing required where shown++ Q 4.No bad should be applied to any component until after all bracing end 4.Inste agon of Wait is the reaponaibik of the respective contractor. OREGON SEQ. : 6037157 fasteners are complete and at no time should any lads greater than 5.Deaign assumes trusses are to be used In a non-corrosive environment ��„ design bads be applied to any component. and are for"dry condition-of use. TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at all supports shown.Shim or wedge If P- fabrication,handing,shipment and Installation of components. necessary. 7.Design assumes adequate drainage is provided. S.This design is furnished subject to the imitations set forth by 8. Plates shall be located on both faces of tans,and placed so their center n 04 IIIIII VIII VIII VIII VIII VIII VIII IIII IIII TPIANfCA In SCSI,copies of which will famished upon request. ansa coincide wJoint center ices. B.Digits Indicate size of late in Inches. M ITek USA,Inc./Com uTrus Software 7.6.6(1 L)-E 10.For basic connector 4e design values see ESR-1311,ESR-1988(MITek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 43'- 6.2' IBC 2012 MAX MEMBER FORCES 4WR/DDF/C'o1.00 TC: 2x4 KDDF 816BTR LOAD DURATION INCREASE = 1.15 1. 2= 0) 114 2.15=(-1177) 3199 15- 3=( -99 614 22.13=( 87 221 BC: 2x4 KDDF X18BTR SPACED 24.0' O.C. 2. 3= •3891) 1497 15.16= 931 2763 15. 4= •277 430 13-14=(-2471 843 WEBS: 2x4 KDDF STAND; 3. 4= -3508) 1481 16-18=' -757 2413 4.16=!•342 253 20 OF STAND A LOADING 4- 5= -29381219 17.19= 0 0 i6- 5= -121 527 LL( 25.0)+DL( 7.0) ON TOP CHORD= 32.0 PSF 5- 6= •2368 1115 18.19=' -556 2143 5.18= -543 368 TC LATERAL SUPPORT <= 12'OC. UON. dL ON BOTTOM CHORD = 10.0 PSF 6. 7= 0 0 19.20=( -544 2087 18. 6= -405 964 BC LATERAL SUPPORT <= 12'OC. UON, TOTAL LOAD = 42.0 PSF 6. 8= -2028 1048 20-21=( -542 2142 18. 8= -92 159 113 LL = 25 PSF Ground Snow (Pg) 9.111= -1914 1992 22-14=' 16-818) 2248 045 21-22m -720) 211218.20=( 493 265 NOTE: 2x4 BRACING AT 24'OC UON. FOR 10-11= 0 0 20- 9= -33 154 ALL FLAT TOP CHORD AREAS NOT SHEATHED BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE 11-12= -2294 1043 9-21= 49;5 193 LIVE LOAD AT LOCATION(S) SPECIFIED BY IBC 2012. 12-13= -2668 1116 11.21= -327 826 THE BOTTOM CHORD DEAD LEAD IS A MINIMUM OF 10 PSF. 13-14= -367 444 21.12= •434 341 OVERHANGS: 24.0' 0.0' 12-22=( -68 268 11-1,51401.:g'al at non-structural BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA verical ms (uon). LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES 01- 0.0' -349/ 2064V -211/ 224H 5.50' 3.30 KDDF ( 625` Connector plate prefix desi nators: 431- 6.2' -254/ 1828V O/ OH 5.50' 2.92 KDDF ( 625) C,CN,CI8,CN18 or no prefix4 =CompuTrus, Inc M,M20HS,M18HS, 16 = MiTek M series 1COND. 2a Design checked for nett-5 psf) uplift at 24 'oc 4ma-mi For hanger specs. - See approved plans VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 19-11-11 3-10-02 19-08-07 MAX LL DEFL = -0.036' @ -2'- 0.0' Allowed = 0.200' MAX TL CREEP DEFL = -0,043' @ -2'- 0,0" Allowed = 0.267' 4-02-11 4-04-07 1-08-13 4-07-09 5-03-08 4-10-08 MAX LL DEFL = 0.174' @ 17'• 8.5' Allowed = 2.130' -,�� ���� MAX TL CREEP DEFL = -0,335' @ 22'- 10.8' Allowed = 2.840' 2-07-4 4-04-07 0-04-15 5-05.12 0-04-15 5-01-08 MAX HORIZ. LL DEFL = 0.095' @ 43'• 0.7' 1,-� '� 1`-� MAX HORIZ. TL DEFL = 0.158' @ 43'- 0.7' 15-09-12 15-06.08 NOTE:DesigIt assumes moisture content does not exceed 19� at time of manufacture. 12 M-3x8 M-3x4 12 Design conforms to main windforce-resisting 7.00� Q 7.00 system and components and cladding criteria. M 5X6(S) M-467 8 9 M-40 Wind: 140 m ht h=23.9ft, TCDL=4.2,BCDL=6.0, ASCE 7.101 M-5X6(S) (All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), load duration factor=l.6 0.25" Truss designed for wind loads 0.25" in the plane of the truss only. 2 o M-3x4 M + + + + ?-3x5 M-1.5x3 M-1.5x3 M-4x6 0 °D CD 0 2 M-5 x10 M-3x4 0 17 19 20 ) 22 1a" n 0 M-4x6+ o M-500 M-3x4 0.252' M-3x4 M-4x6 0 a 2,75 1,89- M-4x8 M-5x8(S) 12 12 6 6 1-QOti 2 R-05-00 6-06-10 5-05-14 8-O? 5-07-14 5-05-12 7-06 7-07-12 -05-08 13-01-04 2-00 25-11-08 14-06 29-00-04 2-00 43-06-04 �9 PRoxFss JOB NAME : 5-A POLYGON NH - BH3 Scale: 0.12865 Gi N}ati'/(p7�_' WARNINGS: GENERAL NOTES,unless otherwise noted: 1.Builder and erection contractor should be sdvised of all General Notes 1.This design is based only upon the parameters shown and Is for an IndMdual 92 PE 91'" Truss: B H 3 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing moat be Installed where shown*. Incorporation of cto antis the responsibility of the building designer. 3.Addltlonal temporary bracing to Insure stability during conatmctlon 2.Design assumes the top and venom chords c d t Toughy braced at DES. BY: EE 2'ntinendat10'hin such as y oodsaeagedthroughouttheirlen@Qth). '7 Is the responsibility of the erector.Additional permanent bracing of continuous sheathing such as plywood sheathing(TC)and/or drywaA(9C). DATE: 8/22/2014 the overaA structure is the responsibility of the bulkNng designer. 3.2x Impact bridging or lateral bracing required where shown++ it 4.No bad should be appled to any component until after all bracing and 4.Installation of truss is the responsibility of the respective contractor. '� OREGON SEQ. : 6037158 fasteners are complete and at no time should any bads greater than 5.Design assumes trusses are to be used In a noncorrosive environment, L, 4 �tK design bads be applied to any component. and are for"dry condition"of use. / 1✓ rLO.TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the S.Design assumes NII bearing at all supports shown.Shim or wedge If 14 P fabrication,handing,shipment and Installation of components. necessary. MFS (��0 7.Design as eadequate drainage le provided. r'1 B.This design le furnished subject to Me Imiletiona set hath by 8.Plates shag bb le located on both feces of tuns,and placed so their center VIII VIII VIII VIII VIII VIII VIII IIII IIII TPIANICA In SCSI,copies of which will be furnished upon request. lines coincide with joint center Ines. 9.Digits Indicate size of plateIn Inches . MITek USA,Inc./CompuTrus Software 7.6.6(1 L)-Z 10.For basic connector plate design values see ESR-1311,ESR-1988(MITek) EXPIRES:12/31/2015 IIIIIIIIIInII This design prepared from computer input by N PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 43'• 6.2' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF A16BTR LOAD DURATION INCREASE = 1.15 1- 2= 0) 114 2-15=(-1177) 3199 15- 3=( -99 614 22.13=( 87 221 BC: 2x4 KDDF N18BTR SPACED 24.0' O.C. 2. 3= -3891 1497 15-16= 931 2763 15. 4= •277 430 13-14=(-2471) 843 WEBS: 2x4 KODF STAND; 3- 4= -3508 1481 16.18= •757j 2413 4.16=1•342 253 2x4 OF STAND A LOADING 4. 5= -29381219 17.19= 0 0 16. 5= -121 527 LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 5. 6= -2388 1115 18.19= .5561 2143 5.18= -543 368 TC LATERAL SUPPORT <= 1210C. UON. DL ON BOTTOM CHORD = 10.0 PSF 6- 7= 0 0 19-20= •544)) 2087 18- 6= •405 964 BC LATERAL SUPPORT <= 1210C. UON, TOTAL LOAD = 42.0 PSF 6- 8= •2026 1048 20.21= -542 2142 18. 8= -92 159 8- 9= -2115 1045 21-22= -720 2182 19- 8 486 183 LL = 25 PSF Ground Snow (Pg) 9-11= -1914 992 22-14= -818 2248 8.20=' -93 265 CING T 24'OC EATHED BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE 1 1 01 10403 271� 5 193 49 ALLEFLAT4TOPACHORDAAREAS NOTOSH------ LIVE EHE BLOAD AT LOCAORDDEAD(LOADSPECIFIED S A MINIMUIBC OF2012.10 13.14= -?387 1116 11-21z 434 82 341 OVERHANGS: 24.0' 0.0' 12.22=( -68 268 Connector plate prefix designators: BEARING MAX VERT MAX HORZ BAG REQUIRED BAG AREA C,CN,CI8,CN18 (or no prefix) = CompuTrus, Inc LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES) M,M20HS,M18HS,M16 = MiTek M series 01• 0.0' -349/ 2064V -2111 224H 5.50' 3.30 KDDF ( 625` 43'- 6.2' •254/ 1828V 0/ OH 5.50' 2.92 KDDF ( 625) *` For hanger specs. - See approved plans VERTICAL DEFLECTION LIMITS: LL=L1240, TL=L1180 MAX LL DEFL = •0.036' @ -21- 0.0' Allowed = 0.200' MAX TL CREEP DEFL = -0.043' @ -2'- 0.0' Allowed = 0.267' MAX LL DEFL = 0.174' @ 17'- 8.5' Allowed = 2.130' 15-11-11 11-10-02 15-08-07 MAX TL CREEP DEFL = -0.335' @ 22'- 10.8' Allowed = 2.840' 4-02-11 4-04-07 1-08-13 4-07-09 5-03-08 4-10-08 MAX HORIZ. LL DEFL = 0.096' @ 43'- 0.7' ���� ���� MAX HORIZ. TL DEFL = 0.158' @ 43'• 0"7' 2-07-04 4-0 0-04� 15 5-05-12 0-0 15 5-0 notE xceedn assumes moisture content does not exceed 19+k at time of manufacture. 15-09-12 15-06-08 Design conforms to main windforce-resisting system and components and cladding criteria. 12 M-5X6(S) M-4X6 7 M-iX8 MT4 1 -4x 12 12 Wind: 140 a ht h=23.9ft, TCDL=4.2,BCDL=6.0, ASCE 7.101 7.00 M-5X6(S) Q 7.00 All Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), load duration factor=l.bt 0.25" Truss designed for wind loads 0.25" in the plane of the truss only. 2 v M-3x4 + + + + 3x5 0 o M-1.5x3 M-1.5x3 � 3AL--.- ,tw:? - 7�24M 0 111 0M-3x4 o 1920 ,� 221x10 c M-4x6+ o M-5x10 M-3x4 0.2� M-3x4 M-4x6 0 M-5x8 a 2.75 1.89-M-4X8 (S) 12 -0I L L L L ?1-05-0 6.06-10 5-05-14 11L08.0F 5-07-14 5-05-12 7-06 7-07-12 ?x•05-08 13-01-04 L 2-00 25-11-08 � 14-06 29-00-04 � L 2-00 43-06-04 IED JOB NAME : 5-A POLYGON NH - BH2 1 E 'Jso Scale: 0.1286 � �`�IZZ�� 2 WARNINGS: GENERAL NOTES,unless otherwise noted: -7 92 P E 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and Is for an Individual r Truss: BH 2 and Warnings before construction commences, building component.Applicability of design parameters and proper 2.2x4 compression wale bredrq must be Installed where shown+, Incorporafion of component Is the responsibility of the building designer. 3.Addibona[temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords c d t roughoaterally braced at DES. BY: EE Is the res sdbi of the erector.Additional permanent brad of 7 continuous and et to'hino.csuchrespas plyely ood sheathing(TC)and/or dryweA(BC). DATE' 8/22/2014 the overall structure Is the responsibility of the building designer. 3.2x Imppact bridging or lateral bracing required where shown++ Q 4.No bad should be appled to any component until after all bracing and 4.Installation of truss Is the responsibility of the respective contractor. 'j7 OREGON�� S E: dv should at no time shouany bus ads greater than 5.Design assumes trusses are to be ed In a non<onrmive environment, L" t' design bads be applied to any component and are for"dry condition"of use. /O TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at all supports shown.Shim or wedge If fabrication,handl necessary. ng,shipment and Installation of components. 7.Design assumes adequate drainage is previded. fiR R►��- S.This design is furnished subject to the Imltabons set forth by 8.Plates shall be located on both faces of truss,and placed so their center lllill till lllll VIII I'll IIID VIII(III IIII TPINYTCA In BCSI,copies of which will be famished upon request. Anes coincide wjcenter Ines. 9. Digiti Indicate size of pe of plate In Inches. MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311,ESR-1988(MiTek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS 43.06-04 HIP-D SETBACK 6.00.00 FROM END WALL IBC 2012 MAX MEMBER FORCES 4WR/DDF/C =1.00 TC: 2x4 OF 240OF; LOAD DURATION INCREASE = 1.15 (Non-Rep) 1. 2= 0 114 2.15= -1844) 6771 15- 3=( -359) 1675 21.13=(-366) 278 2x6 KDDF #18BTR T2, T3 2. 3= -8240I 2291 15.16= •1727 6287 3-16=1 •728) 178 13.22=( 0) 299 BC: 2x6 KDOF #16BTR LOADING (( 3. 4= -6514 2010 16.17= -1666 5567 16. 4= 0 371 WEBS: 2x4 OFFDSTANDNA; TC UNIF LL 50.0 +DLLL =14SOPSF Ground PLF Snow lYP9) 0.0' TO 12'- 0.0" V 5. 6= -6050 2100 16.19= -2095 619207 4 17-15= -494 262 631 2092 2x6 KDDF STAND B TC UNIF LL 100.0 +DL 28.0 = 128.0 PLF 12'- 0.0' TO 31'- 8.2" V 5. 7= -5197 1853 19.20= -201 8298 17. 7= -1786 823 TC UNIF LL 50.0 +OL 14.0 64.0 PLF 31'- 6.2' TO 43'- 6"2' V 7. 8= •6026 2221 20-21= -2060 5951 7.18= -465 1243 TC LATERAL SUPPORT <= 12'OC. UON. BC UNIF LL( 0.0 +OL 40.0 = 40.0 PLF 0'- 0.0' TO 43'- 6.2' V I. 9= -5957 2233 21-22= •1418 4762 18. 8= -19 222 BC LATERAL SUPPORT <= 12'OC. UON. 9.10= -6194` 2281 22-14= -1415 4785 19. 8= •779) 384 TC CONC TC CONC LL( 500.0`+DL' 140.1 40 0= 640.0 LBS @ 31'- 6.2' 10_;2= -47490 1690 19.20= -282 35411 3817 NOTE: 2x4 BRACING AT 24'OC LION. FOR 12.13= •5572 1920 20.10= -89 673 ALL FLAT TOP CHORD AREAS NOT SHEATHED BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE 13-14= -5833 1764 10.21= -1904 912 LIVE LOAD AT LOCATIONS) SPECIFIED BY IBC 2012. 12.21= •481 1760 THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. OVERHANGS: 24.0' 0.0" BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES Connector pplate prefix desi nators: O'- 0.0' -1078/ 3764V -151/ 164H 5.50' 6.02 KODF 625) C,CN,CI8,CN18 (or no prefix4 = CompuTrus, Inc 431- 6.2' •994/ 3527V 0/ OH 5.50' 5.64 KOOF 625) M,M20HS,M18HS,:16 = MiTek M series *• For hanger specs. - See approved plans ICOND. 24 Design checked for net(-5 patl uplift at 24 'oc VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.036' @ -2'- 0.0' Allowed = 0.200' MAX TL CREEP DEFL = -0.043' @ -2'- 0.0' Allowed = 0.267" MAX LL DEFL = -0.350' @ 21'- 11"8' Allowed = 2.130' MAX TL CREEP DEFL = -0.695' @ 21'- 11.8' Allowed = 2.840' MAX HORIZ. LL DEFL = 0.150' @ 43'- 0.7' MAX HORIZ, TL DEFL = 0.249' @ 43'- 0"7' 11-11-11 19-10-02 11-08-07 NOTE:Design assumes moisture content does 4-04 0-06-10 2-03-08 5-02-05 0-06-10 5-08-10 not exceed 19" at time of manufacture. 2-09 4-04 02 1 5-05-13 - 1 4-07-11 f 5-05-02 f Design conforms to main windforce-resisting system and components and cladding criteria. 11-09-12 11.06.08 Wind: 140 mph h=22.7ft, TCDL=4,2,BCDL=6.0, ASCE 7-101 (All eights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), 640# � 40# load duration factor=l.6 12 M-7x8 S 12 Truss designed for wind loads 7.00 M•5 12 M-3x5 ( ) M-5x10 Q 7.00 in the plane of the truss only. 7T 9 0.25" ::M 10x4 112 M-3x4 d M-3x4 + + + o M•3x8 °D M18HS-3x18 M-7x12 00 16 -AB �o 2 =M-8x8 M 3x4 M-417 ::=M-8x8 19 0,2,r M•21 M-1225x3 14 • o M-4x6+ M-4x6+M18HS-7x14 a 2.75 2.75- -M-M(S) 12 12 L L L -05-01 4-04 4-05-12 3-02.11 L2-OOL 8-01 7-11-04 5-05-02 5-06-14 L2-01-05-08 12-00-08 2-00 27-00.04 L 2-00 43-06-04 JOB NAME : 5-A POLYGON NH - BH1U PROF�srs Scale: 0.1366 ��CJ lZZ�� WARNINGS: GENERAL NOTES,unlessotherwlse noted: /!G 1.Builder and erection contractor should be advised of all General Notes 1.This design is based only upon the parameters shown and Is for on Individual 92 PE 9{' Truss: B H 1 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x{compression web bracing rout be Installed where shown�. Ineorporatlon of component Is the responsibility of the building designer. 3.Additional temporary bracing to Insure stability during construction 2.Design:.and at 10'the lop and bosom chorda c be throughout braced at DES. BY: EE Is the responsibility of the erector.Additional 2'o.c.and at 1a'o.c.respectively unless braced throughout their length)y po ty permanent bracing of continuous sheathing such as plywood sheathing(TC)and/or drywall(C). DATE: 8/22/2014 the overall structure is the responsibility of the building designer. 3.2x Impact bridging or lateral bracing required where shown++ 4.No bad should be applied to any component until after all bracing and 4.Installation of truss is the responsibiRy of the respective contractor. '� OREGON SEQ. : 6037160fasteners are complete and at no me should any bads greater than 5.Design assumes trusses ere to be used In a noncorrosive environment. ,�b design bads be applied to any component. and are for"dry condition"of use. TRANS I D: 406556 5.CompuTrus has na control over and assumes no responsibility for the 6.Design assumes full bearing at all support shown.Shim or wedge If 14 2 fabrication,handlrg,shipment and Installation of components. necessary. 7.Design assumes adequate drainage b provided. �n`4� 6.This design is furnished subject to the Imitations set forth by 6.Plates shall be located on both faces of rub ss,and placed so their center rl IIIIII VIII VIII VIII VIII VIII VIII IIII IIII TPIANTCA In SCSI,copies of which will be famished upon request. Tines coincide with Joint center Ines. - 9,Digits Indicate size of plate In Inches. MiTek USA,Inc./Com uTrus Software 7.6.6(1 L)-E 1a,For basic connector plate design values see ESR-1311,ESR-1966(MRek) EXPIRES:12/31/2015 IIIIIIIIIIII�I This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 20'- 6.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KODF N18BTR LOAD DURATION INCREASE = 1.15 1- 2=( 0 86 2. 8=(-10a 734 3. 8=(-401 388 BC: 2x4 KDDF M13BTR SPACED 24.0' O.C. 2- 3= -1004 238 8. 9=( _48I 481 8. 4=�-295 595 WEBS: 2x4 KDDF STAND 3- 4= -885 459 9- 6= 74 602 4. 9= -294 595 LOADING 4- 5= -885 459 9. 5=(•401 388 TC LATERAL SUPPORT <= 12'0C. UON. LL( 25.0)+DLI 7.0) ON TOP CHORD = 32.0 PSF 5- 6= -1004 238 BC LATERAL SUPPORT <= 12'OC. LION. L ON BOTTOM CHORD = 10.0 PSF 6- 7= 0 86 TOTAL LOAD = 42,0 PSF OVERHANGS: 12.0' 12.0' p LL= 25 PSF Ground Snow (Pp) BEARING MAX VERT MAX HORZ ERG REQUIRED BRIG AREA Connector IES C,CN,C18 CN18t(e(orrrno1prefix1g1natCompuTrus, Inc BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE L00CATIONO' -184EACT975V -360/ONS ACT360H 5IONS .50' 1ZE o56N KD�FPEC625 M,M20HS,M18HS,416 = M1Tek MT series LIVE EBLOAD AT LOCAORD DEAD(LOADPICIFIEDS A BY IBC OF2012.10 20'- 6.0' -184/ 975V 0/ OH 5.50' 1.56 KODF 625THE I 10-03 10-03 VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = •0.002' @ -1 - 0.0' Allowed= 0.100" 5.02 5-01 5-01 5-02 MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX LL DEFL = -0,024' @ 6'- 10.9' Allowed = 0,979' MAX TL CREEP DEFL = -0.043' @ 6'- 10.9' Allowed = 1.306" MAX LL DEFL = -0.002' @ 211• 6.0' Allowed = 0.100' 12 M-4X6 12 MAX TL CREEP DEFL = -0.003' @ 21'- 6.0' Allowed = 0.133' 14.00 4.0' 14.00 MAX HORIZ. LL DEFL = 0.011" @ 20'- 0.5' 4 MAX HORIZ, TL DEFL = 0.015' @ 20'- 0.5' NOTE:Design assumes Moisture content does not exceed 19% at time of manufacture. Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 140 ■pht h=25.2ft, TCDL=4.2,BCDL=6.0, ASCE 7.1Ot All Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), load duration factor=1.6 Truss designed for wind loads in the plane of the truss only. M-1.5x3 M-1.50 v u; 0 c%> C' _ o o g g o C3 M-3x4 0.25" M-30 M-3x4 0 M-5x6(S) 6-10-15 6-08-02 6-10-15 1-00 20-06 1.00 JOB NAME: 5-A POLYGON NH - C2 ,tD PRpF�ss Scale: 0.20aa � � GINE /Q� WARNINGS: GENERAL NOTES,unless otherwise noted: 9 �+ 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and is for an Individual P E 7 2 ♦' Truss: C2 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+. incorporation of component Is the responsibility of the building designer. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE is the responsibility of the erector.Additional permanent bracing of 'oA ntlnuoua sheathing such:respectivelyunless:rnl�l(Tcj a�cior a IrynBcj DATE: 8/22/2014 the overall structure is the responsibility of the bulling designer. 3.2x Ing act bridging or lateral bracing required where shown++ 4.No bad should be applied to any component until after all bracing and 4. Installation of truss Is the responsibility of the respective contractor. -F7 OREGON SEQ. : 6037161 fasteners are complete and at no time should any loads greater than 5.Design assumes trusses are to be used In a nonorrosive environment, design bads be appled to any component and are for"dry condition"of use. ..Fr- TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes mil lees ng at ail supporta shown.Shim or wedge If O 14 0P fabrication,handl necessary. r ` ng,shipment and installation atlon of components. 7.Design assumes adequate drainage le provided. a C R R V 04 S.This design le famished subject to the limitations sat forth by a.Platen shah be located on boil feces of true,end placed so their center IIIIII VIII VIII VIII VIII VIII VIII IIII IIII TPIANTCA in BCSI,copies of which will famished upon request. Mmes coincide with Joint center Ines. 9. Digits Indicate size of a In Inches. MiTek USA,Inc./Com uTrus Software 7.6.6(1 L)-E 10.For basic connector to design values sea ESR-7311,ESR-1988 QvliTek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 20'- 6.0' ICOND. 2: Desion checked for net(-5 pal) uplift at 94 loc-1plining TC: 2x4 KDDF A18BTR LOAD DURATION INCREASE = 1.15 BC: 2x4 OF N16BTR; SPACED 24.0' O.C. NOTE:Design assumes moisture content does 2x4 KDDF M18BTR B2 not exceed 19% at time of manufacture. LOADING Desi n conforms to main windforce-resitting TC LATERAL SUPPORT <= 1210C. UON. LL( 25.0)+DL 7.0) ON TOP CHORD = 32.0 PSF 9 9 BC LATERAL SUPPORT <= 1210C. UON. OL ON BOTTOM CHORD= 10.0 PSF system and components and cladding criteria. TOTAL LOAD = 42.0 PSF Connector pplate prefix designators: Wind: 140 mph h=25.2ft, TCDL=4.2,BCDL=8.0, ASCE 7.101 C,CN,Cl8,CN18 (or no prefix) = CompuTrus, Inc LL = 25 PSF Ground Snow (Pg) IAll 94ghts), Enclosed Cat,2, Exp.B, MWFRS(D1r), M,M20HS,M18HS,M16 = MiTek M series load duration factor=l.� LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL Truss designed for wind loads REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET, in the plane of the truss only. BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP Gable end truss on continuous bearing wall UON. AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. M-1x2 or equal on at stud verticals. Refer to CompuTrus gable end detail for cont late Co late 10-03 10-03 12 M-4x4 12 14.00 14.00 v ro 0 m o M-3x4 0 Ct 0 o M-W(S) o M•3x4 L L � 6-10-15 13-07-01 1-00 20-06 1-00 JOB NAME : 5-A POLYGON NH - C1 �D PROFFs Scale: 0.2158 5 ! GIN WARNINGS: GENERAL NOTES,unless otherwise noted: <tr� v /2Z1 / O 1.Builder and ereW on contractor should be advised of as General Notes 1.This design Is based only upon the parameters shown and is for an individual 92 P E { Truss: C 1 and Warnings before construction commences. building component.Applicability of design parameters and proppeer . 2.2x4 compression web bracing moat be Installed where shown+. Incaporatlon of component is the responsibility of the building dedgner. 3.Additional temporary bradrg to insure stability during construction 2.Design assumes the top and bottom chords c d t laterally braced at gth by DES. BY: EE is the responsibility of the erector.Additional permanent bracing of continuous and at 10'o.c.respectively woods bathed throughout their IKB by DATE: 8/22/2014 a g ro continuous sheathing such ea acing required whore s and/or drywell(BC). the overaN structure Is the rs nsibil of the bulking designer. 3.2x 1rtq act bridgingor lateral brad required where shown++ 4.No load should be applied ro any component unlit after al bracing and 4.Insteaatlon of truss Is the responsibilty of the respective contractor, "�L ,/_QRE:GON� SEQ. : 603 716 2 fasteners are complete and at no time should any bads greater than 5.Design assumes"am are to be used In a noncorrosive emironment, '7� tk design bads be appled to any component and are for"dry condition"of use. n S TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsidaly for the 6.Designecen assumes full bearing at al supports shown.Shim or wedge If /O 14 4��AT fabrication,trending,shipment end Installation of component. 7.Dealgn assume adequate drainage is provided. b p 1 `- 6.Thy. is design is furnished subject to the initstions set forth by 8.Plates shag be locatedonboth faces of truss,and placed au their center rl R 4 lines de IIIIII IIII VIII I III VIII VIII IIII IIII IIII MiTPI/WrCA In ek SA,Inc.6I,copies of/CompuTr s which Softw B 7.6 6(1 L Eupon request 10 For basica connectltordplate design values see ESR-1311,ESR-1 Us(MITek) nt center Ines. a.Digits Indicate size of late in Inches. EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS 20-06.00 GIRDER SUPPORTING 43-09.08 FROM 7.00.00 TO 20-00.00 IBC 2012 MAX MEMBER FORCES 4WR/DDF/CV.00 TC: 2x4 KDDF #16BTR LOAD DURATION INCREASE = 1.15 (Non-Rep) 1. 2=( O) 86 2. 9=(-1252 5318 1: 3= -8954) 2004 12. 7- -820) 282 BC: 2x8 KDDF #18BTR 2- 3= -8954 2004 9-10= -1252 5318 9. 3= -102 114 7.13= -474 2142 WEBS: 2x4 KDDF STAND; LOADING 3. 4= •6738 2060 10.11=�-1284 5552 3.10= •192 616 7- B= -10200` 2302 2x6 KDDF #2 A LL = 25 PSF Ground Snow (Pg) 4- 5= -6390 1840 11-12= -1154 5472 10. 4= •900 3994 TC UNIF LL 50.0 +DL 14.0 = 64,0 PLF 0'• 0.0' TO 20'- 6.0' V 5. 6= -6390 1640 12-13= -1320 6044 4.11= -2838 804 TC LATERAL SUPPORT <= 12'OC. UO N. BC UNIF LL O.OI+DLI 20.0 = 20.0 PLF 0'- 0.0' TO 7'- 0.0' V 6- 7= -8600 2028 13. 8= -1324 6066 11. 5= -2388 9292 BC LATERAL SUPPORT - 12'OC. UON. BC UNIF LL 522.4 +DL 375.2 = 897.6 PLF 7'- 0.0' TO 201- 0.0' V 7- 8= -10200 2302 11. 6= -2680 760 BC UNIF LL 0.0)+DL( 20.0 = 20.0 PLF 201- 0.0' TO 201- 6.0' V 6.12= -842 3752 OVERHANGS: 12.0' 0.0' p ADOL: BC CONC LL+DL= 3751.0 LBS @ 61- 0.0' BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA Connector C,CN,C18 CN19teoprno1prefix1gnatCompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL LOCATIONS' 0.00 1718/AC7507V -337IONS 1ACT345H 5IONS .50' 12ZE a61N KDUPEC825 M,M20HS,M18HS,�16 = MiTek MT series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. 20'• 6.0' -2153/ 9494V 0/ OH 5.50' 15"19 KDDF S 625I M ) complete trusses required. BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP n together 2 ply with 3'x.131 DIA GUN AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. nails staggered at: VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 9' oc in 1 row(sI throughout 2x4 top chords, MAX LL DEFL = -0.001' @ -1'- 0.0' Allowed = 0.100' 5' oc in 2 rowlla throughout 2x8 bottom chords, MAX TL CREEP DEFL = -0.001' @ -11- 0.0' Allowed = 0.133' 9' oc in 1 row s throughout 2x4 webs, +++ HANGER TO APPLY CONC. MAX LL DEFL = •0.069' @ 14'- 7.7' Allowed = 0.979' 9' oc in 2 row(s) throughout 2x6 webs. LOAD(S) EQUALLY TO ALL MEMBERS. MAX TL CREEP DEFL = -0,175' @ 10'- 3.0' Allowed = 1.306' MAX HORIZ. LL DEFL = -0.016' @ 20'- 0.5' 10-03 10-03 MAX HORIZ. TL DEFL = 0.034' @ 20'- 0.5' 3-02-04 2-11-08 4-01-04 4-01-04 2-09-12 3.04 NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. 12 12 Design conforms to main windforce-resisting M-5X8 system and components and cladding criteria. 14.00� 5.0, �14.00 5Wind: 140111 h=25.2ft, TCDL=4.2,BCDL=6.0, ASCE 7-101 (A1ights), Enclosed Cat.2, Exp.B, MWFRS(Dir), Iced duration factor=l.I Truss designed for wind loads 5. " in the plane of the truss only. M-3x8 M-3x6 v + A 0 m M-4x12 M-5x12 M-5x16 M-5x16 0 0 o __ �o C) M-1 50 M- x12 10.25" M-61x10 M- x10 6 Co 3751VM-1Ox10(S) L3-02-04 2-08 4-04-12 4-04-12 2-08 3-02-04 L 1-00 20-06 JOB NAME : 5-A POLYGON NH - C3 �g PRO�Fss Scale: 0.1681 � /�NQ.� WARNINGS: GENERAL NOTES,unlessotherwise noted: qty 1.Bulkier and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and Is for an Individual 92 PE 9f Truss: C3 and Warnings before construction commences. building component.Applicability of design parameters and paper 2.2x4 compression web bracing must be Installed where shown+. Incorporation of component is the responsibility of the bWlding designer. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: E E 2'o.c.and at 10'o.c.respectively unless braced throughout their length by Is the responsibility of the erector.Additional permanent bracing of continuous sheaths such as DATE: 8/22/2014 responsibility g b d8 n9� plywoodghaed where show lir drywa#(Bc). � the overall structure la the res naibili of the building designer. 3.Zz Immppel bri i or lateral Marin required where shown++ n 4.No bad should be applied to any component until after all bracing and 4.Instellabon of truss Is the responsibility of the respective contractor. '�! OREGON SEQ. : 6037163 fasteners are complete and at no time should any bade greater than S.Design assumes trusses are to be used in a noncorrosive environment. L Rb design beds be applied to any component and are for"dry condition"of use. / .9 TRANS I D: 406556 5.CompuTnn has no control over and assumes no responsibility for the 6.Design assumes IuN bearing st an supports shown.Shim or wedge If 14 fabrication,handling,shipment and installation of components. necessary. 7.Design assumes adequate drainage is pwiled. r�1 8.This design is fumished subject to the Imitations set forth by 8. Plates shall be located on both feces of fuss,and placed so their center `r r'1 1 IIIIII VIII VIII I III VIII VIII VIII IIII IIII TPINVTCA In BCSI,copies of which will be famished upon request. vines coincide with joint center ices. 9.Ugite Indicate size of�late in Inches. MiTek USA,Inc./CompUTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR•1311,ESR-1988(MITek) EXPIRES:12/31/2015 IIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 11'- 8.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF #18BTR LOAD DURATION INCREASE = 1.15 1-2= 0) 86 2-6=(-24) 286 6.3=(0) 307 BC: 2x4 KDDF #16BTR SPACED 24.0' O.C. 2.3= -506) 111 6.4=(-24) 286 WEBS: 2x4 KDDF STAND 3-4= -506) 111 LOADING 4.5= 0) 86 TC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF BC LATERAL SUPPORT <= 12'OC, UON. L ON BOTTOM CHORD = 10,0 PSF TOTAL LOAD = 42.0 PSF BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA OVERHANGS: 12,0' 12.0' LOCATIONS REACTIONS REACTIONS SIZE SO IN. 1(SPECIES LL = 25 PSF Ground Snow (Pg) 01- 0.0' -111/ 604V -210/ 210H 5.50' 0.97 KDR ( 625 Connector pplate prefix designators: 111- 8.0' -111/ 604V 0/ OH 5,50' 0.97 KDDF ( 625 C,CN,CI8,CN18 �or no prefix) = CompuTrus, Inc BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE M,M20HS,M18HS, 16 = MiTek MT series LIVE LOAD AT LOCATION($1 SPECIFIED BY IBC 2012. iCOND. 2: Design checked for net(-5 pstl uplift t 24 loc ivu� THE BOTTOM CHORD DEAD LbAD IS A MINIMUM OF 10 PSF. 5-10 5-10 VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002' @ -11- 0.0' Allowed = 0.100' Ir f MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX LL DEFL = -0.002' @ 121- 8.0' Allowed = 0.100' 12 M-4X6 12 MAX TL CREEP DEFL = -0.003' @ 12'- 8,0' Allowed = 0.133' 14.00 14.00 MAX TC PANEL LL DEFL = 0.281' @ 8'- 6.5' Allowed = 0.557' 3 4.0a MAX TC PANEL TL DEFL = 0.497' @ 8'- 4.1' Allowed = 0.835' MAX HORIZ. LL DEFL = 0.003' @ 11'- 2.5' MAX HORIZ. TL DEFL = 0,004' @ 11'- 2,5' NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 140 11'. ph h=22.6ft, TCDL=4.2,BCDL=6.0, ASCE 7.10 lAll Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), oad duration factor=1.6 Truss designed for wind loads in the plane of the truss only. 0 u1 0 o 0 0 Ln o - -9\_ o 0 6 0 M-3x4 M-1.5x3 M-3x4 5-10 5-10 L � 1-00 11.08 1-00 Eo PRO JOB NAME: 5-A POLYGON NH - D2 GIN Scale: 0.3596 ��`J WARNINGS: GENERAL NOTES,unless otherwise noted: 92 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and Is for an Individual 7 r pE Truss: D2 and warnings before construction commences. building component.Applicability of design parameters and proper 2.�4 compression web bracing must be Installed where shown�. Incorporation of componerd Ili the responsibility of the bulldi ng dealpner. 3.Additional temporary bracing to Insure stability during construction 2.Dedgn and at 1,the top and twdom chords c be laterally braced at by DES. BY: EE is the responsibility of the erector.Addmonal permanent bracing of 2•continuous and at 10'sheathing respectively unless braced throughout their length). continuous aidging r such as plywood aired sheathing(TC))erwn,drywati(BC). DATE: 8/22/2014 tM overall structure le the responsibility of the building designer. 7.an Imp ed bridging or lateral bracing required where shown++ Q 4.No load should be applied to any component until after as bracing and 4.Installation of truss Is the responsibility of the respective contractor. -}a A_OREGON L(/ SEQ. : 6037164 fasteners are complete and at no time should any loads greater than 5.Design assumes trusses are to be used In a non-corrosive environment, design bads be applied to any component and are for"dry condition'of use. TRANS I D: 406556 5.CompuTrus has no control war and assumes no responsibility for the 6.Design assumes full bearing at as supports shown.Shim or wedge If Q 14 ` 0P fabrication,handl necessary. ng,sMpment and Installation o1 components. 7.Design assumes adequate drainage is provided. FR R 1��- 6.This design Is furnished subject to the Imitations set forth by 8.Plates shall be located on both faces ofrtruss,and placed so their center IIIIII VIII VIII VIII IIII VIII VIII IIII IIII TPINVECA In SCSI,copies of which wil be famished upon request. lines coincide with joint center aces. , e.lines IM1Icale adze of plate to In". MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values me ESR-1311,ESR-1988(MTek) EXPIRES:12/31,12015 IIIIIII II IIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 11'- 8.0' ICOND. 2: Design checked for net(-5 psf) uplift at 24 -oc iiiii—aJ TC: 2x4 KDDF 816BTR LOAD DURATION INCREASE = 1.15 NOTE:Design assuees moisture content does BC: 2x4 KDDF NIABTA SPACED 24.0' O.C. not exceed 19� at time of manufacture. TC LATERAL SUPPORT <= 12'OC. UON. LOADING Design conforms to main windforce-resisting BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD= 32.0 PSF system and components and cladding criteria. DL ON BOTTOM CHORD = 10.0 PSF Connector pplate prefix designator:: TOTAL LOAD= 42.0 PSF Wind: 140 mph h=22.6ft, TCDL=4.2,BCDL=6.0, ASCE 7.10 C,CN,CI8,CN18 (or no prefix) = CompuTrus, Inc (All Heights), Enclosed Cat.2, Exp.B, MWFAS(Dir), M,M20HS,M18HS,M18 = MiTek M series LL = 25 PSF Ground Snow (Pg) All duration factor=l.� LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL Truss designed for wind loads REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET, in the plane of the truss only. BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP Emplete ble end truss on continuous bearing wall LION. AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. 1x2 or equal typical at stud verticals. fer to CompuTrus Bible end detail for 5-10 5-10 specifications. 12 1iM-4x4 12 14.00 V 14.00 0 v� 0 co 0 0 0 0 C3 M-3x4 M-3x4 1-00 11-08 1-00 fl PR JOB NAME : 5-A POLYGON NH - D1 Scale: 0.3526 � IN WARNINGS: WARNINGS: GENERAL NOTES,unless otherwise noted: �� 1.Builder and erection contractor should be advised of all General Notes 1.This design is based only upon the parameters shown and Is for an Individual 92 P E Truss: D 1 and Warnings before construction commences. =comp Applicability,of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+. incorporation of oomponam is the responsibility of the building lesigner. 2.Design assumes the top and bottom chords to be laterally braced at 7.Additional temporary bracing to Insure stability during construction DES. BY: EE Is the responsibility of the erector.Additional permanent brad of 2'o.c.and et 10'o.c.respectively unless braced throughout their length by .+t�►"' bracing continuous sheathing such as plywood sheething(TC)and/or drywall(BC). DATE' 8/22/2014 the overall structure Is the responsibility of the bulking designer. 3.2x Impact bridging or lateral bracing required where shown++ Qr 4.No bad should be applied to any component until after as bracing and 4.Installation of truss is the responsibility of the respective contractor. '� OREGON SEQ. : 6037165 fasteners are oomplete and at no time should any loads greater than 5.Design assumes trusses are to be used In a non-corrosive environment, L, r�� design bads be applied to any component. and are for"dry condition"of use. /^ r TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 8.Design assumes Poll beadng at all supports shown.Shim or wedge If fabri bon,handing,shipment and installation of components. Design ass 7.Design assumes adequate drainage Is provided. 6.This design is furnished subject to the Imitations set forth by 8.Plates shall be located on both faces of Was,end placed so their center IIIIII VIII VIII VIII VIII VIII VIII III IIII TPIA1n'CA In SCSI,copies of which will be tumlahed upon request. linesDigit coincide with Joint center Inas. 9.gglb Indicate size of plate center to Inches. MITek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design vokies see ESR-1311,ESR-1988(MITek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS 11-08.00 GIRDER SUPPORTING 43.09.08 FROM 0.00.00 TO 4.08.00 IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF #16BTR LOAD DURATION INCREASE= 1.15 (Non-Rep) 1. 2= -5126 1156 1. 7=(-684) 2978 7. 2=( •566) 2502 BC: 2x6 KDDF #16BTR 2- 3= -3372 842 7- 8= 680 2954 2- 83=1-11360 424 WEBS: 2x4 KDDF STAND; LOADING 3- 4= -3378 838 8. 9=�-372i 1990 8- 3=�-1214 4854 2x8 OF SS A; LL = 25 PSF Ground Snow �Pg) 4- 5= -3446 750 9. 5=(-370) 1988 8. 4= •156 306 2x6 KDDF #2 B TC UNIF LL(( 50.0 +DL 14.0 = 64.0 PLF 0.0' TO 11'• 8.0' V 5- 6= 0� 86 4. 9=' -176; 84 BC UNIF LL( 522,4+DL( 375.2= 897.6 PLF 0'• 0.0' TO 4 - 8.0' V TC LATERAL SUPPORT <= 12'00. UON. BC UNIF LL11 0,0 +DL 20.0 = 20.0 PLF 4'- 8.0' TO 11'- 8.0' V BC LATERAL SUPPORT <= 12'OC. UON. BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA ADDL: BC GONG LL+DL= 3551.0 LBS @ 5'- 8.0' LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES) OVERHANGS: 0.0' 12.0" 0'• 0.0' -1280/ 5692V •197/ 189H 5.50' 9.11 KDDF 625 LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 11'- 8.0' -688/ 3059V 01 off 5.50' 4.89 KDDF 625) Connector pplate prefix desiQnators: REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. C,CN,CI8,CN18 (or no pretixl = Cc puTrus, Inc M,M20HS,M18HS,M16 = Mi Tek M series BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOPICOND. 9: Oasion checked for net(-5 psf) uplift at 24 'oe AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = 0.021' @ 3'- 1.3' Allowed = 0.537' � 2 ) complete trusses required. MAX TL CREEP DEFL = -0.058' @ 3'- 1.3' Allowed = 0.717' oin together 2 ply with 3'x.131 DIA GUN MAX LL DEFL = -0.001' @ 121- 8.0' Allowed = 0.100' nails staggered at: MAX TL CREEP DEFL = -0.001" @ 12'- 8.0' Allowed = 0.133' 9' oc in 1 rows throughout 2x4 top chords, 5' oc in 2 rows throughout 2x6 bottom chords, *** HANGER TO APPLY CONC. 9' oc in 1 row's throughout 2x4 webs, MAX HORIZ. LL DEFL = -0.005' @ 11'- 2.5' LOAD(S) EQUALLY TO ALL MEMBERS. 9' oc in 2 row(s) throughout 2x6 webs. MAX HORIZ. TL DEFL = 0.011' @ 11'- 2.5' NOTE:Design assumes moisture content does 5-10 5-10 not exceed 19% at time of manufacture. 3-03 2-07 2-07 3-03 Design conforms to main windfarce-resisting system and components and cladding criteria. 12 12 Wind: 140 mphl h=22.6ft, TCDL=4.2,BCDL=6.0, ASCE 7-101 M-4X6 All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), 14.00� 4'0„ 14.00 load duration factor=l.6 3 Truss designed for wind loads in the plane of the truss only. M-3x5 M-3x5 o B CD 0 ao M-5x10 C) r . A A o i � N 0 1 u7 7 u7 8 9 0 M-3x8 M-800 M-1.50 M-5x10 c L ***j3551# L � 3-01-04 2-08-12 2-08.12 3-01-04 11-08 WEDGE REQUIRED AT HEEL(S). 1-00 JOB NAME : 5-A POLYGON NH - D3 ��g�o PRo�fis Scale: 0.2557Gj ! (�j,�I}Nq WARNINGS: GENERAL NOTES,unbaa othervdae noted: �� v V/LG O� 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and Is for an Individual 2QWQPE Truss: D3 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+, 2 DesiIncogn assunnofs the top and bottom chords to lest the building py braced signer. at DES. BY: E E 3.Additional resp temporary bracing to sir.Ad stability during construction 2'o.c.and at 10'o.c.respectively unless braced throughout their length by Is the responsibility of the erector.Additional pemanant Ixadng at continuous sheathing such as plywood sheathing(TC)and/or drywall C). !� DATE: 8/22/2014 the overall structure Is the responsibility of the building designer. 3.2x Impact bridging or lateral bracing required where shown++ Q 4.No bad should be applied to any component unlit after all bracing and 4.Installation of truss is the responsibility of the respective contractor.SEQ. : 6037166 yL� OREGONO� fasteners are complete and at no time should any bus ads greater then 5.Design assumes trusses are to be ed In a noncorrosive environment, b design bads be applied to any component and are for"dry condition'of use. TRANS I D: 406556 5.CompuTrus has no control war and assumes no responsibility for the 6.Design assumes full boadng at all supports shown.Shim or wedge If fabric lion,handing,shipment and Installation of components. necessary. 7.Design assumes adequate drainage Is provided. 8.This design Is furnished subject to the Imitations act forth by 8.Plates shag be located on both faces of truss,and placed so their center 1•• IIIIII VIII VIII VIII VIII VIII VIII IIII IIII TPIANfCA In BCSI,copies of which will be Wmished upon request linea coincide wjoint center lines. 9.Olgda Indicate size of plate in Inches. MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311,ESR-1988(MITek) EXPIRES:12/31/2015 IIIIIIIII�IIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF A18BTR LOAD DURATION INCREASE = 1.15 1-2=1 O) 86 2.4=(0) 0 BC: 2x4 KDDF Ili SPACED 24.0' O.C. 2-3= -217) 180 TC LATERAL SUPPORT <= 1210C. UON. LOADING BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL� 7.0) ON TOP CHORD = 32.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA L ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. SPECIES OVERHANGS: 12.0' 0.0' TOTAL LOAD = 42.0 PSF 01- 0.0' -32/ 399V -117/ 260H 5.50' 0.64 KDDF ( 625 5'- 9.2' -164/ 198V 0/ OH 1.50' 0.32 KDDF 625 Connector plate prefix dasi nat0rs: LL= 25 PSF Ground Snow (Pg) 61- 0.0' 0/ 139V 01 OH 5.50' 0,22 KDDF 625 C,CN,CI8ICN18 ((or no prefix = CompuTrus, Inc M,1120HS,M18HS,1116 = MiTek M series BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE ICOND. 2e Design checked for net(.5 psfl uplift at 242A"Pilciii] LIVE LOAD AT LOCATIONS) SPECIFIED BY IBC 2012. 5-10 THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX TC PANEL LL DEFL = 0.300' @ 31- 6.1' Allowed = 0.559' MAX TC PANEL TL DEFL = -0.260' @ 3'- 4.1' Allowed = 0.838' MAX HORIZ. LL DEFL = -0.004' @ 5'- 9.2' MAX HORIZ. TL DEFL = -0.004' @ 5'- 9.2' NOTE:Design assumes moisture content does not exceed 194 at time of manufacture. 12 Design conforms to main windforce-resisting 14.00 7system and components and cladding criteria. Wind: 140 m ht h=22.6ft, TCDL=4.2,BCDL=6.0, ASCE 7.10 lAll Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), oad duration factor=l.6 Truss designed for wind loads o in the plane of the truss only. Cl) 0 o � U1 0 co 0 Cn - un 0 4 M-3x4 i. I. 1-00 6-00 Ea PROFEss JOB NAME: 5-A POLYGON NH - J13 Scale: 0.4281 �� ! GIN� �Q WARNINGS: GENERAL NOTES,unless otherwise noted: v(]�� 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameter:shown and Is for an Individual 92 PE { and Warnings before construction commences. building component.Applicability of design parameters and Truss: J13 2.2x4 compression web bracing muproper met be Installed where shown+, Incorporation of component Is the responsibility of the building designer. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE le the reaponsibiwy of fhe erector.Additional pe manent bracing of 2'o.c.and at 10'o.c,respectively union braced throughout their le�$hg by continwua sheathing such as plywood sheathing(TC)endlor drywal(BC). DATE: 8/22/2014 the overall structure Is the responsibility of the building designer. 3.2x Int act bridging or lateral bracing required where shown++ 4.No bad should be applied to any component until after all bracing and 4.InstalPetion of truss is the responsibility of the respective contractor. OREGON b, SEQ. : 603 7169 fasteners are wmplete and at no time should any bads greater than 5.Design assumes trusses are to ba used in a noncorrost"environment, design bads be applied to any component and are for-dry condition'of use. IO �Y '4 TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at all supports shown.Shim or wedge If �yPa fabrication,handing,shipment and installation of components. necessary. /i„fC`H R I�� V 7.Design assumes adequate drainage is provided. ` 6.This design is furnished subject to the Imitations set forth by 8. Plates shag be located on both faces of truss,and placed so their center IIIIII VIII VIII VIII VIII VIII VIII IN IIII TPINVECA In BCSI,copies of which will be famished upon request. tines coincide vjoint center Ines. g. Diene Indicate size of plate In Inches. MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311,ESR-1988(MITeI) EXPIRES:12/31/2015 11111 111111111 This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 10'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF 816BTR LOAD DURATION INCREASE = 1.15 1.2=( 01 86 2.6=(0) 0 BC: 2x4 KDDF N16BTR SPACED 24.0" O.C. 2.3=1.581 500 3.4= •164 90 TC LATERAL SUPPORT <= 12'OC. UON. LOADING 4.5=( -21 0 BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF tlL ON BOTTOM CHORD = 10.0 PSF OVERHANGS: 12.0' 3.0' TOTAL LOAD = 42.0 PSF BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. ((SPECIES) Connector pplate prefix designators: LL = 25 PSF Ground Snow (Pg) 0'- 0.0' -22/ 375V -204/ 454H 5.50' 0.60 KOOF ( 625) C,CN,CI8,CN18 (or no prefix) = CompuTrus, Inc 5'- 9.2' 0/ 138V 0/ OH 5.50' 0.22 KDDF ( 625) M,M20HS,M18HS,M16 = MiTek M7 series BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE 51- 11.2' -421/ 476V 0/ OH 1.50' 0.61 KDDF t 6251 LIVE LOAD AT LOCATION(S)1 SPECIFIED BY IBC 2012. 101- 0.0' -125/ 122V 0/ OH 1.50' 0.16 KDDF i 625 THE BOTTOM CHORD DEAD �OAD IS A MINIMUM OF 10 PSF. 1COND. 2e Design checked for neti-5 nsf) uplift at 24 'oc spacing.] VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002' @ -11- 0.0" Allowed = 0.100' MAX TL CREEP DEFL = •0.003' @ -1'- 0.0' Allowed = 0.133' MAX LL DEFL = •0.000' @ 101- 3.0' Allowed = 0.025' MAX TL CREEP DEFL = -0.000' @ 10'- 3.0' Allowed = 0.033' MAX TC PANEL LL DEFL = 0.144' @ 3'- 4.8' Allowed = 0.576' MAX TC PANEL TL DEFL = -0.145' @ 3'- 2.5' Allowed = 0.864' MAX HORIZ. LL DEFL = -0,012' @ 9'- 11.2' MAX HORIZ. TL DEFL = -0.012' @ 9'- 11.2' NOTE:Design assumes moisture content does 12 not exceed 19% at time of manufacture. Design conforms to main windforce-resisting 14.00 system and components and cladding criteria. o Wind: 140 Isht h=25.2ft, TCDL=4.2,BCDL=6.0, ASCE 7-10t (All eights), E Hnclosed Cat.2, Exp.B, MWFRS(Dir), Lo load duration factor=l.� T Truss designed forwind loads o a in the plane of the truss only. 0 uj 0 6 C> M-3x4 1-00 6-00 4-03 JOB NAME : 5-A POLYGON NH - J 12 ���''Ed PROFFs Scale: 0.2960 � lZi�� WARMNGS: GENERAL NOTES,unless otherwise noted: k,y � WW/ 1.Builder and erection contractor should be advised of all General Notes 1.This design is based only upon the parameters shown and Is for an Individual Q 92 PE { Truss: J12 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+, Incorporation of component Is the resporrsibiBty of the building designer. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be throughout braced at DES. BY: EE is the responsibility of the erector.Additional permanent bracing of o o.c.and at 10'hies such as wows braced throughout their length by Jr�amr� the overall structure le the responsibility of the builds designer. continuous sheathing or such es acingptywr uir ed where s andlor drywaA(BC). DATE: 8/22/2014 Pe lir ng b 3.ar ImpactofIrbridging s the re pradnp required where Live c ++ (r 4.No bed should be applied to any component until after all bracing and 4.DesigInstallationss of truss is the re t responsibility of the respective contractor. �L OREGON �((� SEQ. : 6037170 fasteners are complete and at no time should any loads greater than 5.Design assumes huesea are to l»used In a noncorrosive environment, a design bade be applied to any component. and are for"dry condition"of use. TRANS I D: 406556 5.CompuTrus has no control war and assumes no responsibl8y for the 6.Design sesames fuH bearing at as supports shown.Shim or wedge If �Q 1.q 2Q fabrication, handing,sN necessary. pment and Installation of components. 7.Design assumes adequate drainage is provided. Me. 6.This design Is furnished subject to the imitations set forth by 8.Plates shelf be locatedonboth faces of trues,and placed so their center R F3 1- lin IIIIII VIII IIIII IIII IIII IIIII IIIII IIII IIII MiTek USA,Inc./CopuT s Software 7 6(1 L)-E of which will be furnished upon request. 10.For basic cionnector;9te design values see ESR-1311,ESR-1988(MITek) de with joint center Ones. 9.Digits Indicate size of late in Inches. EXPIRES:12!31!2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 10'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KODF /16BTR LOAD DURATION INCREASE = 1.15 1.2= 0) 86 2.6=(0) 0 BC: 2x4 KDDF N18BTR SPACED 24.0' O.C. 2.3=I-636) 500 3.4= -243) 97 TC LATERAL SUPPORT <= 12'0C. UON. LOADING 4-5=( -76) 0 BC LATERAL SUPPORT <c 12'OC. UON, LL( 25.0)+DL(( 7.0) ON TOP CHORD = 32.0 PSF tlL ON BOTTOM CHORD = 10.0 PSF OVERHANGS: 12.0' 10.6' TOTAL LOAD = 42.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA LOCATIONS REACTIONS REACTIONS SIZESQ.IN. SPECIES Connector plate prefix designators: LL = 25 PSF Ground Snow (Pg) 01- 0.0' -22/ 376V -213/ 495H 5.50' 0.60 KDOF ( 625` C,CN,CI8ICN18 (or no prefix) = CompuTrus, Inc 5'- 9.2' 01 138V 0/ OH 5.50' 0.22 KDDF ( 625 M,M20HS,M18HS,M16 = MiTek MT series BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE 5'- 11.2' -415/ 473V 0/ OH 1.50' 0.61 KDDF 625 LIVE LOAD AT LOCATIONS) SPECIFIED BY IBC 2012. 101- 0.0' -210/ 207V 0/ OH 1.50' 0.27 KDOF 625 THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. 5 VERTICAL DEFLECTIONLIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002' @ -1'- 0.0' Allowed = 0,100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX LL DEFL = -0.002' @ 101- 10.6' Allowed= 0.088' MAX TL CREEP DEFL = -0.002' @ 10'- 10.6' Allowed= 0.117' MAX TC PANEL LL DEFL = 0.144' @ 3'- 4.8' Allowed = 0,576' MAX TC PANEL TL DEFL = -0.145' @ 3'- 2.5' Allowed= 0.864' MAX HORIZ. LL DEFL = -0.014' @ 9'- 11.2' MAX HORIZ. TL DEFL = -0.014' @ 9'- 11.2' NOTE:Design assumes moisture content does not exceed 1996 at time of manufacture. 12 Design conforms to main windforce-resisting system and components and cladding criteria. 14.00 Wind: 140 m h h=25.6ft, TCDL=4.2,BCDL=6.0, ASCE 7-10f rn (All Ne�ghts), Enclosed, Cat,2, Exp.B, MWFRS(Dir), load duration factor=l.6 Truss designed for wind toads o in the plane of the truss only. ci C; 0 v 0 o 6 C) M-3x4 k--,6 L 1-00 6-00 4-10-09 ��E° PR JOB NAME: 5-A POLYGON NH J11 Scale: 0.2753 GJ� !``1�fG,IN s/ WARNINGS: GENERAL NOTES,unless otherwise noted: �� v vl�yZ O� 1.Builder and erection contractor should be advised of as General Notes 1.This design is based only upon the parameters shown and is for an Individual ridual 9 P E Truss: J 11 and Warhirgs before construction commences. building component.Applicability of design parameters and proppesr 2.2x4 compression web bracing must be Instaled where shown+. Incorporation of component Is the responsibility of the bulldkg d ner. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally brach ai DES. BY: E E is the responsibility of the erector.Additional permanent bracing of 2'o.c.and at t0'o.c.respectively unless braced throughout their length by DATE: 8/22/2014 qtly bulking g 2K Imp us sheathing or each ea plywood sheathing(TC)uwhsowndrywaA(BC). the overall structure Ili the responsibility of the bulks designer. 3.co Impact bridgingor lateral bred required where shown and/or d Q 4.No bad should be applied to any component until after all bracing and 4.Instalotion of truss is the responsibility of the respective contractor. "� OREGON SEQ. : 6037171 fasteners are compote and at no time should any loads greater than 5.Design assumes trusses are to be used In a noncorrosive environment, design bads be applied to any component. and are for"dry condition"of use. / Q TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6. Design assumes full beadng at aA supports shown.Shim or wedge If Q 1 4 Z nP fabrication,handing,shipment and Installation of components, necessary. pr { ` V 6.This design la fumished subject to the Irritations set forth by 8,Design be locatessurnes d uoneboth faasi of trusldseand placed so their center R I yy IIIIII IIII 11111111111111111111111111111 III VIII VIII ILII VIII IIII IIII TPINVECA In SCSI,copes of which wiA famished upon request sines coincide v size joint center Anes. 9. Digits Indicate size of plate in Inches. MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311,ESR-1988(MiTek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 9'- 11.6' IBC 2012 MAX MEMBER FORCES 4WRIDDF/Cq=1.00 TC: 2x4 KDDF k1&BTR LOAD DURATIONINCREASE = 1.15 1.2=( O� 86 2-5=(0) 0 BC: 2x4 KDDF IfI&BTR SPACED 24.0' O.C. 2-3=5.562 497 3.4= -139 88 TC LATERAL SUPPORT <= 12'0C. UON. LOADING BC LATERAL SUPPORT <= 12'OC. LION, LL( 25.0)+DLI 7.0) ON TOP CHORD = 32,0 PSF L ON BOTTOM CHORD = 10.0 PSF BEARING MAX VERT MAX HORZ BAG REQUIRED BAG AREA OVERHANGS: 12.0' 0.0' TOTAL LOAD = 42.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES) 0'- 0.0' -22/ 375V -199/ 435H 5,50' 0.60 KDDF 625) Connector pplate prefix designators: LL = 25 PSF Ground Snow (Pg) 5'- 9.2' O/ 138V 0/ OH 5.50' 0.22 KDDF 625 C,CN,CIB,CN18 or no ref lx1 = Cols uTrus, Inc 5'- 11.2' -417/ 474V 0/ OH 1.50' 0.61 KDDF 625 M,M20HS,Ml8HS,M16 = M1Tek MT series BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE 9'- 11.6' -94/ 108V 0/ OH 1.50' 0.17 KDDF ' 825` LIVE LOAD AT LOCATION(S) SPECIFIED BY IBC 2012, THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. ICOND. 2, Design checked for net(-5 psf) uplift at 24 "oc 411-4:1 VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -11- 0.0' Allowed = 0.133' MAX TC PANEL LL DEFL = 0.144' @ 3'- 4.8' Allowed = 0.576' MAX TC PANEL TL DEFL = -0.146' @ 3'- 2.5' Allowed = 0.864' MAX HORIZ. LL DEFL = -0.012' @ 9'- 10.8' MAX HORIZ. TL DEFL = -0.012' @ 9'- 10.8' NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. Design conforms to mein windforce-resisting system and components and cladding criteria. 12 Wind: (140 Tih=25ft, TCDL=4.2,BCDL=6.0, ASCE 7-10, hts14.00 load duration factor=ld6 Cat.2 , Exp.B, MWFAS(Dir), AllTruas designed for wind coeds C? in the plane of the truss only. v 0 N N O O M-3x4 1-00 6-00 3-11-09 [PROVIDE FULL BEARING;JtsD2.5.3.41 PR JOB NAME : 5-A POLYGON NH - J10 �g otherwiseIZz OF�Ss Scale: 0.2937 � �` C IN WARNINGS: GENERAL NOTES,union otherwise noted: �/ 9/ P G -� 1.Builder and erection contractor should be advised of all General Notes t.This design Is based only upon the parameters shown and is for an Indivldual r Truss: J 1 0 and Warnings before construction commences. b�INal .-mponent.A -1.1aly of design parameters and proper 2.28x4 compresslom web bracing mxnt be Installed where shown+. incotlon of component Is the respunalbmly of the building designer. 3.AdAibmal temporary bracing to Insure stability during conatmcdon 2.Design assumes the top and bottom chorda to be lalereay braced at DES. BY: E E la the responsibility of Me erector.Additional pemnenant bracing of T o.c.and at to'o.c.respectively union braced throughout their length by wntInuous sheathing such as plywood sheathlrg(TC)and/or drywall BC). DATE: 8/22/2014 the overall structure Is the responsibility of the building designer. 3.Dr Impact bridging or lateral bracing required where shown++ 4.No bad should be applied to any component until after all bracing and 4.Inste stlon of truss Is the responsibl: of the respective contractor. -� OREGON SEQ. : 603 717 2 fasteners are complete end at no time should any loads greater than 5.Deaign assumes trusses are to be used In anon-corroaNso environment design bads be applied to any comporent. and are for"dry condition"of use. TRANS I D: 406556 S.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at aN supports shown.Shim or wedge If V �� fabrication,handing,shipment and installation of component&. necessary. 7. m Design assumes adequate drainage Is provided. 6.This design la furnished subject to the Irritations set forth by 8.Plates shall be locatedonboth faces of truss,and placed so their center TPI CA In BCSI,copies of ch will be ished lines nt IIIIII VIII VIII VIII VIII 11111111111111 IIII MiTakU A,Inc./CompuT 9lSoftw a 7.6.6(1 L En request 10.Far basic coincide plate design values see ESR-1311,ESR-1988(MITeW r Inn. 9.Digits indicate size of to In Inches. EXPIRES:12/31/2015 - IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 8'- 11.6' IBC 2012 MAX MEMBER FORCES 4WR/DOF/Cq=1.00 TC: 2x4 KDOF M/&BTR LOAD DURATION INCREASE = 1.15 1-2=(( 0 86 2.5=(0) 0 BC: 2x4 KDDF q1&BTR SPACED 24.0' O.C. 2.3=I-483I 427 3.4= -111) 48 TC LATERAL SUPPORT <= 12'OC. UON. LOADING BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL(( 7.0) ON TOP CHORD = 32.0 PSF bL ON BOTTOM CHORD = 10.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA OVERHANGS: 12.0' 0.0' TOTAL LOAD = 42.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES) 0'- 0.0' -24/ 378V -1791 391H 5.50' 0.60 KDDF ( 625 Connector pplate prefix designators: LL = 25 PSF Ground Snow (Pg) 5'- 9.2' 0/ 138V 0/ OH 5.50' 0.22 KDDF ( 625i C,CN,CI8,CN18 (or no prefix) = CompuTrus, Inc 5'- 11.2' -3771 439V 0/ OH 1.50' 0.56 KDDF 625 M,M20HS,M18HS,M16 = MiTek M7 series BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE 8'- 11.6' -50/ 55V 0/ OH 1.50' 0.09 KDDF ' 625` LIVE LOAD AT LOCATIONS) SPECIFIED BY IBC 2012. THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. licked for net(-5 psf) uplift at 24 'oc jjjEjjj:1 VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002' @ -11- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX TC PANEL LL DEFL = 0.153' @ 3'- 4.8' Allowed = 0.576' MAX TC PANEL TL DEFL = -0.156' @ 3'- 2.5' Allowed = 0.864' MAX HORIZ. LL DEFL = -0.009' @ 8'- 10.8' MAX HORIZ. TL DEFL = -0.009' @ 8'- 10.8' NOTE:Design assumes moisture content does not exceed 19b at time of manufacture. Design conforms to main windforce-resisting 12 system and components and cladding criteria. 14.00 Wind: 140 mph h=24.5ft, TCDL=4.2,BCDL=6.0, ASCE 7-101 (All Ne�ghts), Enclosed, Cat.2, Exp.B, MWFRS(Dir), load duration factor=1.6, No Truss designed for wind loads in the plane of the truss only. v 0 0 O N O 7 O O 5 M-3x4 L L L �. 1-00 6-00 2-11-09 JOB NAME: 5-A POLYGON NH - J9 ����a PRQ�Fss Scale: 0.3208 CJ GIN � WARNINGS: GENERAL NOTES,unless otherwise noted: �./� 4 /2Z Z 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and Is for an Individual 92 P E 9{ Truss: J9 and Warnings before construction commenoes. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+. Incorpore8on of component Is the responsibility of the building designer. 3.Additional temporary bracing to Insure stability during construction 2•Design assumes Me toD and bottom chords to be laterally braced at DES. BY: EE le the responalbilny of the erector.Addltlonal permanent braclrg of 2'o.%and at 10'o.c.respectively unless braced throughout their length by DATE: 8/22/2014 9 9 continuous sheathing such as plywood hesthing(TC)and/or drywalIMC). the overall structure is the responsibility of the bulking designer. 3.2x Impad bridgingor lateral brad required where shown++ Q 4.No bad should be applied to any component until after as bracing and 4.Instapation of truss is the responsibility of the respective contractor. '� OREGON 1(/ SEQ. : 6037173 fasteners are complete and at no time should any loads greater then 5.Design assumes trusses are to be used In a noncorrosive environment, design bads be applied to any component and ere for"dry condition"of use. / -7 r Q TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at all supports shown.Shim or wedge If Q 1 4 fabdcation,handing,shipment and Installation of components. necessary. 7.Design assumes adequate drainage Is provided. p f �, 6.This design Is furnished subject to the imitations set forth by 8.Plates shell be locatedonboth faces of truss,and placed so their center ++ll R 1� ch will be e with nt center Inn. IIIIII VIII VIII VIII VIII VIII VIII IIII IIII MTekU SA, cCA In s/COmpuT s I,copies of (Software 7.6.6(1 L)_E upon request 10.Forlinbasicbasiicconnectorapfais design values see ESR-1311,ESR-1988(MITeIQ 9. Digits Indicate size of to In Inches. EXPIRES:12/31/2015 11111111111111 This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 7'- 11.6' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF A16BTR LOAD DURATION INCREASE = 1.15 1.2=� 0) 86 2.5=(0) 0 BC: 2x4 KDDF N15BTR SPACED 24.0' O.C. 2.3= -4171) 361 3.4= -107 44 TC LATERAL SUPPORT <= 12'OC. UON. LOADING BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL� 7.0) ON TOP CHORD = 32.0 PSF L ON BOTTOM CHORD = 10.0 PSF BEARING MAX VERT MAX HORZ ERG REQUIRED BRG AREA OVERHANGS: 12.0' 0.0' TOTAL LOAD = 42.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES) 01- 0.0' -24/ 378V -159/ 348H 5.50' 0.60 KDDF 625) Connector plate prefix designators: LL = 25 PSF Ground Snow (Pg) 5'- 9.2' 0/ 138V 0/ ON 5.50' 0.22 KDDF ' 625) C,CN,CI8,CN18or no refix = Com uTrus, Inc 5'- 11.2' -359/ 432V 0/ OH 1.50' 0.55 KDDF 625 M,M20HS,MIBHS,M16 = MiTek MT series BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE 7'- 11.6' -20/ 11V 0/ OH 1.50' 0.02 KOOF 825` LIVE LOAD AT LOCATION(S) SPECIFIED BY IBC 2012, THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. CQND2: Design ch acked for net(-5 psf) uplift at 24 'oj: VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = •0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX TC PANEL LL DEFL = 0,197' @ 2'- 11.6' Allowed = 0.576' MAX TC PANEL TL DEFL = 0.178" @ 2'- 11.6' Allowed = 0.864' MAX HORIZ. LL DEFL = -0.008' @ 5'- 11.2' MAX HORIZ. TL DEFL = •0.007' @ 5'- 11.2' NOTE:DesAn assumes moisture content does not exceed 19, at time of manufacture. 12 Design conforms to main windforce-resisting 14.00 system and components and cladding criteria. Wind: 140 mph h=23.9ft, TCDL=4.2,BCDL=6.0, ASCE 7.101 (All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), load duration factor=1,6 o Truss designed for wind loads o, in the plane of the truss only. 0 0 0) 0 0 Ln7J� � C? 0 5 M-3x4 L 1, L 1-00 6-00 1-11-09 PROVIDE FULL BEARING;Jts:2T5.3T4 JOB NAME: 5-A POLYGON NH - J8 PROF�ss Scale: 0.3559 ��cJ /��� WARNINGS: GENERAL NOTES,unless otherwise noted: -y 1.Builder and erection contractor should be advised of al General Notes 1.This design is based only upon the parameters shown and Is for an Individual /dual 7 PE Truss: J 8 and Warnings before construction commences. building componam.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+. Incorporation of component Is the responsibility of the buildh g designer. 3.Additional temporary bracing to Insure stability dudng construction 2.Design assumes the top and bottom chords to be laterally braced at _ 2'o.c.and at 10'o.c.respectively unless braced throughout their fanpth by DES. BY: E E Is the responddlly of the erector.Additional permanent bract g of continuous sheathing such as plywood sheathing(TC)and/or drywaa(BC). DATE: 8/22/2014 the moral structure Is the responsibility of the building designer. 3.2x Impact bridging or lateral bracing required where shown*+ Q 4.No bad should be applied to any component until after as bracing and 4.Inste stion of truss Is the responsibility of the respective contractor. '�7OREGON �(,y 6037174 fasteners ars complete and at no time should any loads greater than 5.Design assume trusses are to be used in a non-corresWe actor. L, .4- SEQ. : design bads be applied to any component. end are for"dry condition"of use. TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at all supports shown.Shim or wedge If �A fabrication,handing,shipment and installation of components. necessary. 7.Design assumes adequate drainage Is provided. 'R S.This design Is furnished subject to the imitations set forth by a.Plates shelf be located on both faces of truss,and placed so their center CA In lin s coincide IIIIII VIII VIII VIII VIII VIII VIII IIII IIII MTek USA,Inc.S/CompuT s which Softw B 7.6 6(1 L)-E request. 10.For basic connector late design values see ESR-1311,ESR-1988(MiTek) , center Inn. 9.Digits indicate size of a in Inches. EXPIRES:12/3112015 II�IIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0" IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF M18BTR LOAD DURATION INCREASE = 1.15 1.2= 0 86 2.5=(0) 0 BC: 2x4 KDDF MIABTR SPACED 24.0" O.C. 2.3=I-334I 185 3.4=( 83 0 TC LATERAL SUPPORT <= 12'OC. LON. LOADING SC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF DL ON BOTTOM CHORD = 10.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA OVERHANGS: 12.0' 11.6' TOTAL LOAD= 42.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES) 01- 0.0' -34/ 393V -133/ 325H 5,50' 0.63 KDDF ( 625 Connector pplate prefix designators: LL = 25 PSF Ground Snow (Pg) 5'- 9.2' 0/ 146V 0/ OH 5.50' 0.23 KDDF ( 625` C,CN,CI8,CN18 (or no prefix) = CompuTrus, Inc 61- 0,0' -288/ 272V 0/ OH 1.50' 0.35 KDDF ( 625) M,M20HS,M18HS,M16 = MiTek MT series BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE LIVE LOAD AT LOCATION(S) SPECIFIED BY IBC 2012. THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. 1COND. 2@ Design checked for net(-5 pof) uplift at 24 'oc 4 VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002" @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX LL DEFL = -0.002' @ 61- 11.6' Allowed = 0,096' MAX TL CREEP DEFL = -0.003' @ 6'- 11.6' Allowed= 0.128' MAX TC PANEL LL DEFL = 0.295' @ 3'- 7.3' Allowed = 0.576' MAX TC PANEL TL DEFL = -0.290' @ 3'- 5.2' Allowed = 0.864' MAX HORIZ. LL DEFL = -0,006' @ 5'- 11.2' MAX HORIZ. TL DEFL = -0.006' @ 5'- 11.2- 12 NOTE:Design assumes moisture content does not exceed 194 at time of manufacture. 14.007 Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 140 mphh=23.3ft, TCDL=4.2,BCDL=6.0, ASCE 7.101 o IAll Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), load duration factor=l.6 c Truss desid for wind �oetls gne in the plane of the truss only. co cc 0 o> 0 71 0 0 5 M-3x4 1-00 6-00 0-11-09 JOB NAME: 5-A POLYGON NH - J7 ����o PRfifiOFFs Scale: 0.3882 � /ZZ�! WARNINGS: GENERAL NOTES,unless otherMse noted: ZL/ L. Ill 7 1.Builder and erection contractor should be advised of as General Notes 1.This design is based only upon the parameters shown and Is for an Individual Q' 92 PE �{ Truss: J7 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be installed where shown a. incorporation of component is the responsibility of the building designer. DES. BY: EE 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be late braced at -� M the responsibilly of the erector.Additional permanront biadrg of 2'o.c.and at 10'o.c.respectively unless braced throughout their le 1 continuous sheathing such as plywood sheathing(TC)and/or drywal(BC). DATE: 8/22/2014 the overall structure is the responsibility of the building designer. 3.2x Imp actbridging or lateral bracing required where shown++ Q 4.No bad should be applied to any component until after all bracing and 4.Instadoil. of Was Is the responsibility of the respective contractor. "� OREGON SEQ. : 6037175 fasteners are complete and at no time should any loads greater than 5.Design assumes trusses are to be used in a non-cormalve environment, �, O,�D design bads be applied to any component. and are for"dry condition"of use. / y TRANS I D: 406556 5.Coml has no comma over and assumes no responsibility for the S. Design assumes PoII bearing at all supports shown.Shim or wedge If Q 14 fabrication,handing,shipment and installation of components. necessary. �1 �n'�+ `- 7.Design assumes adequate drainage le provided. fl 1. 8.This design Is furnished subject to the IrNtetlona sat forth by B. Plates shag be locatedonboth faces of truss,and placed so their center IIIIII IIII VIII VIII VIII IIIc VIII IIII IIII MTiTpekU SA,IncCA In ./COmpuT s Software 7.6.6(1 L)-E I,copies of which will be furnished upon request. 10.For basic connlines coincide ector gtjoint center design values see ESR-1311,ESR-1988(MITek) 9. Digits Indicate size of late In inches. EXPIRES:12/31/2015 IIIIIII II IIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 VAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF 816BTR LOAD DURATION INCREASE = 1.15 1-2=( 0) 86 2.4=(0) 0 Be: 2x4 KDDF NIRBTR SPACED 24.0' O.C. 2-3=(-223) 184 TC LATERAL SUPPORT <= 1210C. LION. LOADING Be LATERAL SUPPORT <= 1210C. UON. LL( 25.0)+DL7.0) ON TOP CHORD = 32.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRIG AREA k ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SG.IN. SPECIES OVERHANGS: 12.0' 0.0' TOTAL LOAD = 42.0 PSF 01- 0.0' -34/ 402V -1191 265H 5.50' 0.64 K06F ( 625` 5'- 9,2' O1 145V 01 OH 5.50' 0.23 KDDF 625 Connector pplate prefix designators: LL = 25 PSF Ground Snow (Pg) 5'- 11.6' -1641 201V 0/ OH 1.50' 0.32 KDDF 625 C,CN,CI8,CN18 (or no prefix) =CompuTrus, Inc M,M20HS,M18HS,M16 = MiTek M series BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE ICOND, 21 Design checked for net(-6 psf) uplift at 24 cc sw� LIVE LOAD AT LOCATION(S) SPECIFIED BY IBC 2012. 5-11-09 THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX TC PANEL LL DEFL = 0.333' @ 3'- 7.0' Allowed = 0.572' MAX TC PANEL TL DEFL = -0.285' @ 3'- 4,9' Allowed = 0.858' MAX HORIZ. LL DEFL = -0.004' @ 5'- 10.8' VAX HORIZ. TL DEFL = -0.004' @ 5'- 10.8' NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. 12 Design conforms to main windforce-resisting system and components and cladding criteria. 14.00 Wind: 140 mht h=22.7ft, TCDL=4.2,BCDL=6.0, ASCE 7.101 lAll Heights), Enclosed Cat.2, Exp.8, MWFRS(D1r), oadduration factor-1.k Truss designed for wind ioads o in the plane of the truss only. u7 0 Go Q - o - 0 4 M-3x4 7 L L L 1-00 6-00 PROVIDE FULL BEARIjC2EE'ZK� JOB NAME: 5-A POLYGON NH - J6 PRo�fiss Scale: 0.4179 r_5 GIN WARNINGS: GENERAL NOTES,unless otherwise noted; �Jv v✓l �r I , v� 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and Is for an Individual 92 PE "Sym Truss: J 6 end Warnings before construction commences. building component.Applicability of design parameters and proper 2.2z4 compression web bracing must be Installed where shown�. Incarporatlon of component is the responsibility of the building dealgnor. 3.Additional temporary bracing to insure afahtNly during conatmction 2.Design assumes the lop end bottom chords to he fatereNy braced et DES. BY: EE Is the responsibility of the erector.Additional permanent bracing of Y o.c.end at 10'o.c.respedlvey unless Laced throughout their le ptl by continuous sheathing such as plywood sheething(rC)and/or drywel(BC). DATE: 8/22/2014 the overall structure Is the responsibility of the building designer. 3.2x Impact bridging or lateral bracing required where shown++ Q SEQ. 4.No bad should be applied to any component unfit after all bracing and 4.Installation of truss Is the responsibility of the respective contractor. "'� OREGON S E Q. : 6037176 fasteners are complete and at no time should any bads greater than 5.Design assumes trusses are to be used In a noncorrosive emtronment, design bads be applied to any component and are for"dry condition"of use. / Q TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes fug bearing at all supports shown.Shim or wedge If Q 14 fabrication,handing,shipment and Installation of components. 7.resign as.surnes provided. f- S.This design Is furnished subject to the limitations set forth by 8.Plain sap beateedpuoneboth faces of truss, nd paced so their center PINVrCA In SCSI,coples of which will be furnished r Inn. VIII VIII VIII VIII VIII VIII VIII IIII IIII Mi7T@k USA,Inc./CompuT s Software 7.6.6(1 L En request. 10 For basic connector plate deesign values see ESR-1311,ESR-1988 p 1iTe Q 9.Digits Indicate size of late In Incas. EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 20 KDDF #16BTR LOAD DURATION INCREASE = 1.15 1.2= 0 86 2.4=(0) 0 BC: 2x4 KDDF #1&BTR SPACED 24.0' O.C. 2-3=5.180] 157 TC LATERAL SUPPORT <= 12'OC. UON. LOADING BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL7.0) ON TOP CHORD = 32.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA L ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SGAN. (SPECIES OVERHANGS: 12.0' 0.0' TOTAL LOAD = 42.0 PSF 01- 0.0' -22/ 375V •100/ 227H 5.50' 0.60 KDDF 625 4'- 10.8' "166/ 179V 0/ OH 1.50' 0.29 KOOF 625 Connector plate prefix designators: LL =25 PSF Ground Snow (Pg) 61- 0.0' 0/ 70V 0/ ON 5.50' 0.11 KDDF 6255 C,CN,CI8IC118 Sor no prefix' =CompuTrus, Inc M,M20HS,M18HS, 16 MiTek M series LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 1COND. 29 Design checked for net(-5 psf) uplift at 24 *oc saw� REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP MAX LL DEFL = -0.002' @ -1'- 0.0" Allowed = 0.100' 4-11-09 AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = "0.003' @ •1'• 0.0' Allowed = 0.133' MAX LL DEFL = 0.000' @ 0'- 0.0' Allowed = 0.029' MAX TL CREEP DEFL = 0.000' @ 0'- 0.0' Allowed = 0.039' MAX TC PANEL LL DEFL = 0.140' @ 2'- 10.1' Allowed = 0.470' MAX TC PANEL TL DEFL = "0.132" @ 2'- 10.3' Allowed = 0.705' MAX HORIZ. LL DEFL = -0.003' @ 4'- 10.8' MAX HORIZ. TL DEFL = -0.003' @ 4'- 10.8' 12 NOTE:Design assumes moisture content does not exceed 19� et time of manufacture. 14.00 Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 140 mphh=22.1ft, TCDL=4.2,BCDL=6.0, ASCE 7.101 All Heights), Enclosed, Cat.2, Exp.B, MWFRS(D>r), o load duration factor=l.6 Truss designed for wind loads CO in the plane of the truss only. � o � I 0 n C. Lo - o - 0 4 M-3x4 1-00 6-00 JOB NAME: 5-A POLYGON NH - J5 PROF�ss Scale: 0.45495 ! GINE'/iJ�7]�y_q WARNINGS: GENERAL NOTES,unless otherwise noted: 4.t� v✓ Zl 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and Is for an Individual 92 PE 9r Truss: J5 and Warnings before construction commences, building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+. Incorporation of component Is the responsibility of the building dealpner. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE s the responsibil ly of the erector.Add tional pe manenl bred g of 2'o.c.and at IT o.c.respectively unless braced throughout their length by the overall structure is the responsibility of the building designer. continuous sheathing such as plywood aired where s own+drywa BC). DATE: 8/22/2014 Po ty 9 9 3.In Imp act of true or lateral predrg required where shown++ y OREGON ((/� �]7 4.No load should be applied to any component until eller all bracing and 4.InstaAatlon of truss Is the responsibility of the respective contractor. SEQ. : 603/1 77 fasteners are complete and at no time should any bads greater than S.Design assumes trusses are to M used In a noncorrosive environment, design bads be applied to any component and are for'dry condition"of use. TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6. Design assumes full beading at eA supports shown.Shim or wedge If O 14 fabdcation,handing,shipment and Installation of components, necessary. p 7.Design assumes adequate drainage Is provided. 6.This design Is furnished subject to the imitations set forth by 8. Plates shall be located on both faces ofrutr ss,and placed so their anter (VIII VIII VIII VIII VIII IHII Iglu Ilii IIII TPIANfCA In SCSI,copies of which will be furnished upon request. Ines coincide IwithJoint center e.9. Digits indicate size of plate In Inches. MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311,ESR-1988(MITsk) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF M18BTR LOAD DURATION INCREASE = 1.15 1.2=( 0 86 2.4=(0) 0 BC: 2x4 KDDF H18BTR SPACED 24.0' O.C. 2.3=(-132 131 TC LATERAL SUPPORT <= 12'OC. LON. LOADING BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL 7.0) ON TOP CHORD = 32.0 PSF BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA �L ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE $0 IN SPECIES OVERHANGS: 12.0' 0.0' TOTAL LOAD = 42.0 PSF 0'- 0.0' -10/ 346V -81/ 189H 5.50' 0.55 04 ( 625 31- 10.8' -165/ 160V 0/ OH 1,50' 0.26 KDDF 825 Connector plate prefix desi ,,tors: LL = 25 PSF Ground Snow (Pg) 6'- 0.0' 0/ 60V 0/ OH 5.50' 0.10 KDDF 625 C,CN,CI8,CN18 (or no prefix4 = CompuTrus, Inc M,M20HS,M18HS, 16 = MiTek M series LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL COND. 2, Design checked for net(-5 psf) uplift at 24 'oc spacing.] REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET, VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP MAX LL DEFL = -0.002' @ -1'- 0.0' Allowed = 0.100' 3-11-09 AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0,133' MAX LL DEFL = 0.000' @ 0'- 0.0' Allowed = 0.079' MAX TL CREEP DEFL = 0.000' @ 0'- 0.0' Allowed = 0.105' MAX TC PANEL LL DEFL = 0.054' @ 2'- 2.1' Allowed = 0.367' MAX BC PANEL TL DEFL = -0.037' @ 3'- 1.4' Allowed = 0.339' MAX HORIZ. LL DEFL = -0.002' @ 3'- 10.8' 12 MAX HORIZ. TL DEFL = -0.002' @ 3'- 10.8' 14.00 NOTE:Design assumes moisture content does not exceed 196 at time of manufacture. Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 140 mphh=21.5ft, TCDL=4.2,BCDL=6.0, ASCE 7-101 0 lAll Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), oad duration factor=l.6, Truss designed for wind loads v o in the plane of the truss only. u7 N O r0 O C O 0 4 7 M-3x4 7 4 ,L ,L 1-00 6-00 JOB NAME: 5-A POLYGON NH - J4 �Eo PRG � Gx z �0� WARNmJ68: GENERAL NOTES,unless otherwise 0.5091 noted: 1.Builder and emotion contractor should be advised of a,General Notes 1.This design Is based only upon the parameters shown and is for an Individual 92 PE Truss: J4 and Warnings before construction commences. building component.Applicability of design parameters and proger 2.20 compression web bracing must be Installed where shown*. 2.DDesip assam�n,:%P and bottoresponsibility be laterally braced mer. 3.Additional temporary bracing to Insure stability during construction 2'o.c.and at 10'o.c.respectively union braced throughout their Is pth by DES. BY: E E Is the responsibility of the erector.Additional permanent bracing of continuous sheathing each as plywood sheathlrq(TC)andlor drywnm(eC). DATE: 8/22/2014 the overall structure is the responsibility of the building designer. 3.2s Impact bridging or lateral bracing required where shown.♦ Q /1 4.No bad should be applied to any component until after al bracing and 4.Installation oftrun Is the responsibility of the respective contractor. OREGON 1(� SEQ. : 6037178 fasteners are compote and at no time should any loads greater then 5.Design assumes trusses are to be used in a noncorrosive environment, ,G/ �� O,�b design bads be applied to any component and are for"dry condition'of nee. /1 TRANS I D: 406556 5.CompuTrus hes no control over and assumes no responsibility for the 6.Design rym ues full bearing at all supports shown.Shim or wedge If Q 14 fabrication,handing,shipment and installation of components. 7,Design resumes adequeta drsinage is provided. 6.This design is furnished subject to the Imitations set forth by 6.Plates ahaA be located on bond faces of truss,and placed so their canter IIIIII VIII VIII VIII VIII VIII VIII IIII IIII TPINVECA In BCSI,copies of which be furnished upon request. ,nes coincide with joint center Ines. 9.Dlgiln Indicate size of plate in Inches. MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311.ESR-1 988(MiTek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'• 0.0' IBC 2012 MAX MEMBER FORCES 4WRIODF/Cq=1.00 TC: 2x4 KDDF #18BTR LOAD DURATION INCREASE = 1.15 1-2= O) 86 2.4=(0) 0 BC: 2x4 KDDF #1&BTR SPACED 24.0' O.C. 2-3= 1) 106 TC LATERAL SUPPORT <= 12'OC. UON. LOADING BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL� 7.0) ON TOP CHORD = 32.0 PSF BEARING MAX VERT MAX HORZ BRG REOUIRED BRG AREA L ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES OVERHANGS: 12.0' 0.0' TOTAL LOAD = 42.0 PSF 01- 0.0' -5/ 318V •621 153H 5.50' 0.51 KDOF ( 625 2'- 10.8' •160/ 141V 01 OH 1.50' 0.23 KDDF 625 Connector plate prefix designators: LL = 25 PSF Ground Snow (Pg) 6'- 0.0' 01 53V 01 OH 5.50' 0.09 KDDF S 625 C,CN,CI8,CN18 (or no prefix, =CompuTrus, Inc M,M20HS,M18HS,M16 MiTek M series LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. VERTICAL DEFLECTION LIMITS: LL=L1240, TL=L/180 BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP MAX LL DEFL = -0.002' @ -1'- 0,0' Allowed = 0.100' AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX LL DEFL = 0.000' @ 01- 0.0' Allowed = 0.129' 2-11-09 MAX BC PANEL LL DEFL = •0,009' @ 2'- 8.6' Allowed = 0.254' MAX TC PANEL TL DEFL = -0.016' @ 1'- 8,2' Allowed = 0.398' MAX BC PANEL TL DEFL = •0.030' @ 3'- 1.4' Allowed = 0.339' 12 MAX HORIZ. LL DEFL = -0.001' @ 2'- 10.8' MAX HORIZ. TL DEFL = 0.001" @ 2'- 10.8' 14.00 NOTE:Design assumes moisture content does not exceed 19k at time of manufacture. Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 140 mphh=21ft, TCDL=4.2,BCDL=6,0, ASCE 7-10, C1.1 All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), load duration factor=1.6 Truss designed for wind loads in the plane of the truss only. v cj 0 0 LO C> 7[ LO o - 0 4 /7 M-3x4 7 1-00 IPROVIDE FULL BEARING 6-00 JOB NAME: 5-A POLYGON NH - J3 ���' PR1c�Ffiss Scale: 0.5712GIN � Z��WARNINGS: GENERAL NOTES,unless otherMse noted: I/11�7 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and Is for an individual 2 PE Truss: J3 and Warnings before construction commences. building component.Appicabimy of design parameters end proper 2.2x4 compression web bracing meet be Installed where shown+. Incorporation of component Is the responsibility of the building designer. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE is the responalbinty of the erector.Additional permanent bracing of 2'o.c.end at 10'o.c,respectively unless braced throughout their length by G continuous sheathing such as plywood sheathing(TC)andlor drywan(BC). T DATE: 8/22/2014 the overall structure Is the responsibility of the building designer. 3.2x Impact bridging or lateral bracing required where shown i+ ,s 4.No bad should be appled to any component until after an bracing and 4.Installation of truss Is the responsibility of the respective contractor.SEQ. : 6037179 "� OREGON fasteners are complete and at no time should any bads greater than 5.Design aaaumee trusses are to be used In a non-corrosNe environment, ` design bads be appled to any component. and are for-dry condition'of use. TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the S.Design assumes Nn bearing at an supports shown.Shim or wedge If Q 14 fabrication,handing,shipment and installation of components. necessary. f- 7.Design assumes adequate drainage is prmolded. e.[f p`�� 8.This design In furnished subject to the imltetiore set forth by S.Plates shag be located on both faces of fuss,and placed so their center �rll R 1 Ililll VIII VIII IIID VIII VIII(IIII IIII IIII TPINVTCA In SCSI,copies of which will be famished upon request. Imes coincide with Joint center Ines. 8.Digits indicate size of plate in Inches. MiTek USA,Inc./Com uTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311,ESR-1688(MiTek) 1 EXPIRES:12131/2015 IIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DOF/Cq=1.00 TC: 2x4 KDDF M16BTR LOAD DURATION INCREASE = 1.15 1.2=( O� 86 2.4=(0) 0 BC: 2x4 KDDF 816BTR SPACED 24.0' O.C. 2.3= -62 83 TC LATERAL SUPPORT <= 12'0C. UON. LOADING BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL� 7.0) ON TOP CHORD = 32.0 PSF BEARING MAX VERT MAX HORZ BAG REQUIRED BAG AREA L ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZESQ.IN. SPECIES OVERHANGS: 12.0' 0.0' TOTAL LOAD = 42.0 PSF 01- 0.0' -34/ 295V -44/ 117H 5.50' 0.47 KDDF ( 626) 11- 10.8' -139/ 127V 0/ OH 1.50' 0.20 KDDF ( 625 Connector plate prefix n demi ators: LL = 25 PSF Ground Snow (Pg) 61- 0.0' 0/ 50V 0/ ON 5.50' 0.08 KDDF ( 625 C,CN,CI8,CN18 (or no prefix = CompuTrus, Inc M,M20HS,M18HS,M16 = MiTek MT series LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL ICOND. 2: Desinn cited for net(-5 psfi uplift at 24 'oc REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. chi VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP MAX LL DEFL = -0.002' @ -1'- 0.0' Allowed = 0.100' AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' 1-11-09 MAX TC PANEL LL DEFL = 0.004' @ 0'- 12.0' Allowed = 0.163' MAX TC PANEL TL DEFL = -0.005' @ 1'- 1.4' Allowed = 0.244' MAX BC PANEL LL DEFL = 0.009' @ 2'- 8.8' Allowed = 0.254' MAX BC PANEL TL DEFL = -0.023' @ 3'- 3.8' Allowed = 0.339' 12 MAX HORIZ. LL DEFL = -0.000' @ 1'- 10.8' 14.00 MAX HORIZ. TL DEFL = 0.000' @ 1'- 10.8' NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 140 m h h=20.4ft, TCDL=4.2,BCDL=6.0, ASCE 7.101 04 All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), o load duration factor=1.6 Truss designed for wind loads o in the plane of the truss only, N O M O O - 0 4 M-3x4 1-00 IPROVIDE FULL BEARI 6-00 JOB NAME : 5-A POLYGON NH - J2 PROFFss Scale: 0.6380CjIN�' / WARNINGS: GENERAL NOTES,unlesa otherwise noted: 44.t�� v r�/Z O� �f 1.Bulkier and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and Is Mr an Individual �' 92 PE �{ Truss: J 2 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be installed where shown+, Incorporation of component Is the responsibility of the bulldlrg designer. 3.Addss Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced et DES. B Y: EE Is the responsibility of the erector.Additional pesnent bracing of 2'o.c.and at 1 or o.c,respectively unless braced throughout their length by DATE: 8/22/2014 lir g W continuous sheathing ouches acing required where and/or drywag(BC). Q the werea structure M the responsibility of the building designer. 3.2x I ct bri l or lateral bred r uirad where shown rd 4.No bad should be applied to any component unlit after as bracing end 4.Insta anon of Watt Is the responsibility,of the respective conb.aor. '� OREGON 4t/ SEQ. : 6037180 fasteners are complete and at no time should any loads greater than 5.Design assumes trusses are to be used In a no"ormalve environment, 4 �b design Mads be applied to any component and are for"dry condition"of use. TRANS I D: 406556 5.CompuTrus has no control wer and assumes no responsibility for the S.Design assumes full bearing at a8 supporta shown.Shim or wedge If Q 14 fabrication,handing,shipment and Installation of components. necessary. Is pr p 6.This design Is furnished subject to the limitations set forth by 8.PlatDeses shell be located ppn assumes uloaaneboth faces of truss,and placed so their center �rl nt center 111111111111111 IN 1111 MTekUSA,IncCA In ./CompuT s Software 7.6.6(1 L)-E I,copies of which will be furnished upon request 10 Folinr basic cionnectorde with ctplate design values see ESR-1311,ESRA988(MiTek) 9.Digits Indicate size of to in Inches. EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0" IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF g18BTR LOAD DURATION INCREASE = 1.15 1-2=( 0j 86 2.4=(0) 0 BC: 2x4 KDDF 816BTR SPACED 24.0' O.C. 2.3= •99 174 TC LATERAL SUPPORT <= 1210C. UON. LOADING BC LATERAL SUPPORT <= 1210C. UON. LL( 25.0)+DL7.0) ON TOP CHORD= 32.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA k ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SO IN. (SPECIES, OVERHANGS: 12.0' 0.0' TOTAL LOAD a 42.0 PSF 01- O.O' -170/ 327V -261 82H 5.50' 0.52 KDDF ( 625) 01- 10.8' -74/ 166V 0/ OH 1.50' 0.27 KDDF ( 625 Connector plate prefix des.1nators: LL = 25 PSF Ground Snow (Pg) 61• 0.0' 0/ 48V 01 OH 5.50' 0.08 KDDF ( 625 C,CN,CIB,CN18 (or no prefix) = CompuTrus, Inc M,M20HS,Ml8HS,M16 = MiTek Mt series LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL ICOND. 2: Design checked for net(-5 psf� uplift at 24 'ac sma'cing-.1 REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP MAX LL DEFL = -0.002' @ -1'- 0.0' Allowed = 0.100' AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX TC PANEL LL DEFL = 0.001' @ 0'- 8.2' Allowed = 0.059' MAX TC PANEL TL DEFL = -0.001' @ 0'- 7.9' Allowed = 0.088' MAX BC PANEL LL DEFL = 0.007' @ 2'• 8.6' Allowed a 0.254' MAX BC PANEL TL DEFL = •0.020' @ 3'- 3.8' Allowed a 0.339' 0-11-09 MAX HORLL DEFL a •0.001' @ 0'- 8' Z. TL DEFL = 0.00@ 0 - 0.8MAX HORI 12 NOTE:Design assumes moisture content does 14.00 not exceed 19% at time of manufacture. Design conforms t0 main windforce•resisting system and components and cladding criteria. ANCHOR TO RESIST UPLIFT Wind: 140 aph h=19.8ft, TCOL=4.2,BCOL=6,0, ASCE 7-10 lAl.l Heights), Enclosed, Cat.2, Exp.B, MWFRS(D1r), oad duration factor=l,6 Truss designed for wind loads in the plane of the truss only. 0 r` 0 v o 0 0� - N o 4 3x4 1-00 PROVIDE FULL BEARING Jta:2 3 4 6-00 �o JOB NAME : 5-A POLYGON NH - J1 � PRfiQFF Scale: 0.6505 G�N WARNINGS: GENERAL NOTES,unless otherwise noted: 9Wf P(7E, 9 1.Bulkier and erection contractor should be advised of al General Notes I.This design Is based only upon the parameters shown and Is for an Individual 92 92 ♦' Truss: J 1 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+, Incorporation of wrnponent Is the responsibility of the building designer. 3.Additional temporary bracing to insure stability during eonstructlon 2•Design assumes the top and bottom chords to be laterally braced at DES. BY: E E Is the responsibility of the erector.Additional pennarrerd brecirg of 2'o.c.and at 10'o.c.respectively unless braced throughout their length by Don Ry continuous sheathing such as plywood sheathing(TC)and/or drywall(BC). DATE: 8/22/2014 the overall structure is the responsibility of the building designer. 3.2z Impact bridging or lateral bracing required where shown++ Cr 4.No bad should be applied to any component until after all bracing and 4.InstaNation of truss Is the responsibility of the respective contractor. y OREGON SEQ. : 6037181 fasteners are complete and at no time should any loads greater than S.Design assumes trusses are to be used In a non-corrosive environment, design beds be appled to any component and are for"dry condition"of use. /^ '9 '4 rLQ. .♦K. TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the S.Design assumes full beadng at all supports shown.Shim or wedge If V �Q fabrication,handl necessary. ng,shipment and installation of components. 7,Design assumes adequate drainage Is provided. e`FiR 0- 6.This design Is famished subject to the Imitations get forth by 8.Plates shall be located on both faces of truss,and placed so their center IIIIII VIII VIII VIII VIII VIII VIII IIII IIII TPIANTCA In BC51,copies of which will b.furnished upon request. pies coincide with Joint center Ines. 9.Digits Indicate size of plats In Inches. MiTek USA,Inc./Com uTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311,ESR-1988(MiTek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF kt&BTA LOAD DURATIONINCREASE = 1.15 1. 2=( 0) 86 2. 8=(-50) 53 8. 7=( 0) 18 BC: 2x4 KDDF q1&BTR SPACED 24.0' O.C. 2. 3=(-446) 269 7. 9=(-60) 63 7. 3=( O) 52 WEBS: 20 KDDF STAND 3. 4=(-411) 287 3. 9=(-77) 73 LOADING 4. 5= -237) 93 TC LATERAL SUPPORT - 1210C. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 5. 6=� -83) 0 BC LATERAL SUPPORT - 1210C. UON. DL ON BOTTOM CHORD = 10.0 PSF TOTAL LOAD = 42.0 PSF OVERHANGS: 12.0' 11.6' BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA LL = 25 PSF Ground Snow (Pg) LOCATIONS REACTIONS REACTIONS SIZE SQ,IN. (SPECIES Connector pplate prefix designators: 01- 0.0' 0/ 287V -133/ 325H 5.50' 0.46 KDDF ( 625` C,CN,CI8,CN18 (or no prefix) = CompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 2'- 10.8' -159/ 259V 0/ ON 1.50' 0.33 KDDF ( 625) M,M20HS,M18HS,M16 MiTek MT series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. 51- 8.8' 0/ 65V 0/ OH 5.50' 0.10 KDDF ( 625) BOTTOM CHORD CHECKED FOR 10 PSF LIVE LOAD. TOP 51- 11.8' -209/ 221V 0/ OH 1.50' 0.28 KDDF ( 625) AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. ICOND, 2s Design checked o a 'o VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' 6-11-09 MAX LL DEFL = -0.003' @ 61- 11.6' Allowed 0.096' MAX TL CREEP DEFL = -0,003' @ 6'- 11.6' Allowed = 0.128' MAX TC PANEL LL DEFL = 0.007' @ 1'- 2.4' Allowed = 0.196' MAX TC PANEL TL DEFL = 0.007' @ 1'- 2.4' Allowed 0.295' MAX TC PANEL LL DEFL = 0.011' @ 4'- 8.8' Allowed = 0.290' MAX TC PANEL TL DEFL = -0,012' @ 4'- 7.5' Allowed = 0.434' MAX HORIZ. LL DEFL = -0.006' @ 51- 10.8' MAX HORIZ. TL DEFL = -0.006' @ 5'- 10.8' 12 NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. 14.00[;7 Design conforms to main windforce-resisting o system and components and cladding criteria, Wind: 140 mph, h=23.3ft, TCDL=4.2,BCDL=6.0, ASCE 7.10, r (All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), M 4X6 co load duration factor=1.6, o Truss designed for wind loads in the plane of the truss only. 0 7 LrI0 n Ln 9 o o N e M-1.5x3 M-3x4 M-3x4 M 3x4 2-03-12 3-08-04 1-00� 2-05-08 4-06-01 L 6-00 0-11-09 P OVIDE FULL BEA G'J s:2 4 9 5 JOB NAME: 5-A POLYGON NH - VCO PRp�Fs Scale: 0.2881 � N�'p- s�O WARNINGS: shown and Is for an Individual GS: GENERAL NOTES,unless otherwise noted: � {ty IWWII�Ijy 1.BuZer and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters92 PE 9{ Truss: J 7 C and Warnings before construction commences. building component.Applicability of design parameters and pro early 2.2z4 cortgrecelon web bracing must be installed whore shown+, 2.ID ggnorasaunin t Tot p it bottom heresc orris toybef laterally braced at nen. 3.Additional temporary bracing to Insure stability during construction 2'o.c.end at t0'o.c.respectively unless braced tat hoot a el DES. BY: EE is the responsibility of the erector.Additional permanent bracing of os.ancontinuous t I sheathing such as ty length by DATE: 8/22/2014 responsibility ng g bridging plywood here)owndrywaN(BC). the overall structure la the rea nalbi of the bulla designer. 3.lir Impact bri I or lateral bred required where shown and/or+ 4.No bad should be applied to any component unfit after as bracing and 4.Installation of truss lathe responsibimy of the respective contractor. -�` 1 EG` O�should any bmc SEQ. : 6037182 fasteners are complete and at no time ads greater than S.Dealpn assumes trusses are to be used Ina noncorrosive emlrenmera, 0Rd (V 7 r design bads be applied to any component and are for"dry condition"of use. TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes fug bearing at all supports shown.Shim or wedge If fabrication,handing,shipment and Instaaafion of components. 7. Design assumes adequate drainage is provided. MF 1 v 6.This design is furnished subject to the Imitations set forth by 8.Plates shall be locatedonboth faces of buss,and placed so their center nished nt center Ines. IIIIII VIII VIII IIII IIII VIII IIII IIII IIII MTiTpekU SA,Inc.CA In /CompuTrus s of which Sofwarea+7.6.6(1 L)E Uect 10.For basic connector. Ones coindds with iplate design values see ESR-1311,ESR-1988(MiTek) 9.Digits Indicate size of late in Inches. EXPIRES:12/31/2015 IIIIIIIIIIII�I This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KOOF k11BTR LOAD DURATION INCREASE = 1.15 1.2= 0) 86 2.7= -32 52 7-6=( 0 18 BC: 2x4 KDDF M1&BTR SPACED 24.0' O.C. 2.3=5.372) 267 6-8= -39 62 6.3=( Oi 52 WEBS: 20 KDDF STAND 3.4=(-338) 286 3.8=(-76) 48 LOADING 4.5=(-112) 82 TC LATERAL SUPPORT <= 1210C. LION. LL( 25.0)tDL( 7.0) ON TOP CHORD = 32.0 PSF BC LATERAL SUPPORT - 12'OC. UON. DL ON BOTTOM CHORD = 10.0 PSF TOTAL LOAD = 42.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BAG AREA OVERHANGS: 12.0' 0.0' LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES) LL = 25 PSF Ground Snow (Pg) 01- 0.0' 0/ 268V -119/ 265H 5.50' 0.43 KDDF ( 625) Connector pplate prefix designators: 2'- 10.8' -205/ 274V 01 OH 1.50' 0.35 KDDF ( 625) C,CN,CI8,CN18 or no prefix) = CompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 51- 8.8' 01 61V 01 OH 5.50' 0.10 KDDF ( 625) M,M20HS,M18HS,M16 = MiTek MT series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. 5'- 11.6' -83/ 100V 01 OH 1.50' 0.16 KDDF ( 625) BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP 1COND. 2l Design checked for net(-5 s 'o s AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002' @ -11- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX TC PANEL LL DEFL = -0.004' @ 1'- 5.6' Allowed = 0.196' MAX TC PANEL TL DEFL = 0.007' @ 1'- 2.4' Allowed = 0.295' 5-11-09YAX TC PANEL LL DEFL = 0.016' @ 4'- 7.5' Allowed = 0.290' MAX TC PANEL TL DEFL = 0.015' @ 4'- 7.5' Allowed = 0.434' MAX HORIZ. LL DEFL = -0.004' @ 5'- 10.8' MAX HORIZ. TL DEFL = -0.004' @ 5'- 10.8' NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. Design conforms to main windforce-resisting 12 system and components and cladding criteria. 14.00 Wind: 140 mphh=22.7ft, TCDL=4.2IBCDL=6.0, ASCE 7.101 (All Heights), Enclosed, Cat.2, Exp.B, YWFRS(Dir), o load duration factor=1.6 Truss designed for wind loads M-06 in the plane of the truss only. v ro 0 ao 0 8 0 o M-1.5x3 C) M-3x4 M-73x4 0 M-3x4 2-03-12 3-08-04 1-00 2-05-08 3-06-O� 6-00 FP-ROVIDE FULL BEAR PR JOB NAME: 5-A POLYGON NH - J6C IN s Scale: 0.3244 � ` GZZ�/7' WARNINGS: GENERAL NOTES,unless otherwise noted: LCt /ry4.4/�!X7 1.Builder and erection contractor should be advised of all General Notes 1.This design is based only upon the parameters shorn and Is for an Individual 9G PE f Truss: J 6 C and Wamings before construction commences, building component.Applicability of design parameters and proper 2.D14 compression web bracing moral be installed where shown i. Incorporation of component Is the responsibility of the bWldIng designer. 3.Additional temporary bracing to Imurs stability during construction 2.Design assumes the lop and bottom chords to be late NY braced at DES. BY: EE ts the responsibility of the erector.Additional permanent bracing of c ntin and al 10'hin suchresprivet unless braced throughout their length by DATE' 8/22/2014 responsibility 9 b continuousa lisping sucheaplywoodgheathwherCs own drywaA(BC). the overall structure Ili the re meld of the buskin designer. 3.�Imp ad b Ir or lateral Wed required where shown,+ Q 4.No bad should be applied to any component unfit after all bracing and 4.Ingle of Wss is the responsibility of the respective contractor. '}7 OREGON SEQ. : 6037183 fasteners are complete and at no time should any loads greater then 5.Design assumes busses are to be used In a non-corrosive environment, design beds be applied to any component, and are for"dry coni on"of use. / Q TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6. Design assumes full beefing at ell supports shown.Shim or wedge If c F 14 fabrication,handling,shipment and Installation of components, necessary. 7.Design assumes adequate drainage Is provided. �ry y�`„ 6.This design Is furnished subject to the ImAtations set forth by 6. Plates shall be locatedonboth faces of buss,and Placed so their center rl f-1 nished upon th joint center Ines. IIIIII VIII VIII VIII VIII VIII VIII IIII IIII MiiTPekU SA, nc./CompuT 9 SofwareCA In BCSI,copies of which will be n+7.6:(1 L)-E request. 10.For basicccconnecttor of design alias see ESR-1311,ESR-1999(MITeW a. Digits Indicate size of late in Inches. EXPIRES:12/31/2015 IIII IIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF N16BTR LOAD DURATION INCREASE = 1.15 1.2=( 0) 86 2.7=(-32) 52 7.6=( 0) 18 BC: 2x4 KDDF N18BTR SPACED 24.0" O.C. 2-3=1•372� 267 6-8=(•39) 62 6.3=( O) 52 WEBS: 2x4 KDDF STAND 3.4= •338 288 3.8= -76) 48 LOADING 4.5=(-112) 82 TC LATERAL SUPPORT <= 12'OC. UON, LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF BC LATERAL SUPPORT - 1210C. UON. DL ON BOTTOM CHORD = 10.0 PSF TOTAL LOAD = 42.0 PSF BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA OVERHANGS: 12.0' 0.0' LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES) LL = 25 PSF Ground Snow (Pg) 01- 0.0' 0/ 268V -119/ 265H 5.50' 0.43 KDDF ( 625) Connectorplate prefix designators: 2'- 10.8' -205/ 274V 0/ OH 1,50' 0.35 KDDF ( 625) C,CN,CI8,0N18 (or no prefix1 = CompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 5'- 8.8' 0/ 61V 0/ OH 5,50' 0.10 KDDF ( 625) M,M20HS,M18HS,M16 = MiTek MT series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. 5'- 11.6' -83/ 100V 0/ OH 1,50' 0.16 KDDF ( 625) BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = •0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'• 0.0' Allowed a 0.133' MAX TC PANEL LL DEFL = -0.004' @ 1'- 5.6' Allowed a 0.196' MAX TC PANEL TL DEFL = 0.007' @ 1'- 2.4' Allowed = 0.295' AX TC PANEL LL DEFL = 0.016' It 4'- 7.5' Allowed = 0.290' 5-11-09 M MAX TC PANEL TL DEFL = 0.015' @ 4'- 7.5' Allowed = 0.434' MAX HORIZ. LL DEFL = -0.004' @ 5'- 10.8' MAX HORIZ. TL DEFL = •0.004' @ 5'- 10.8' NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. Design conforms to main windforce-resisting 12 system and components and cladding criteria. 14.00 Wind: 140 mph h=22.7ft, TCDL=4.2,BCDL=6,0, ASCE 7.101 (All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), o loadduration factor=l.6 Truss designed for wind loads in the plane of the truss only. M•4x6 to 0 m 6 0 _ 8 7 M-1.5x3 M-3x4 M-3x4 M-3x4 2-03-12 3-08.04 1-00 L 2-05-08 3-06-08 L 6-00 JOB NAME: 5-A POLYGON NH - J5C ���EO PR Scale: 0.3224 GIN WARNINGS: GENERAL NOTES,unlemotherw (ZZ isenoted: 4/ 1.Builder and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and is for an Ind W ual 92 P E Truss: J 5 C and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing mut be installed where shown�. Incorporation of component Is the responsibility of the building designer. 3.Additional temporary bracing to insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE is the responsibility of the erector.Additional permanent bradng of 2'o.c.and at 10'o.c.respectively unless braced throughout their lent,by continuous sheathing such as plywood sheathing(TC)andlor drywall C). DATE• 8/22/2014 the overall structure Is the responsibility of the bulking designer. 3.2x Impact bridging or lateral bracing required where shown++ 4.No bad should be applied to any component unfit after as bracing and 4.Installation of truss is the responsibility of the respective contractor. '�7 OREGON .y SEQ. : 6037184 fasteners are complete and at no time should any loads greater than 5.Design assumes trusses are to be used In a noncomosive environment, L �a design bads be applied to any component. and are for"dry condition"of use. y TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the S.Design assumes NN bearing at all supporta shown.Shim or wedge If fabrication,handl necessary. ng,shipment and Installation of components. 7,Design assumes adequate drainage Is provided. Iu' S.This design is furnished subject to the Irritations set fold by 8.Plates shall be locatedonboth faces of twos,and placed so their anter nished IIIIII IIII VIII VIII VIII VIII VIII IIII IIII MiTek SA,IncCA In ./CompuTrus s I,copies of which Softw ea+7 6.6(1 upon E request. 10.For basic lines connector plate design akies see ESR-1311,ESR-1988(MiTek) e with joint center In . 9.Dlpts indicate size of late In Inches. EXPIRES:12/31/2015 This design prepared from computer input by IIIIIIIIIIIIII PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/ODF/Cq=1,00 Tc 2x4 KODF #11BTR BC: 2x4 KDDF M168TR LOAD DUSPACED INCREASE C 1 15 2-3=1-2=�-15OC 80 6.8=�-70) 98 6-3=82 � Oj 18 52 WEBS: 2x4 KDDF STAND 3.4=� -14� 44 3-8=(•119) 86 LOADING 4.5= 0 0 TC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL 7.0) ON TOP CHORD = 32.0 PSF BC LATERAL SUPPORT <= 12'OC, UON, �L ON BOTTOM CHORD = 10.0 PSF TOTAL LOAD = 42.0 PSF BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA OVERHANGS: 12.0' 0.0' LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES) LL = 25 PSF Ground Snow (Pg) 01- 0.0' -341 317V -63/ 154H 5.50' 0.51 KDDF ( 625) Connectorplate prefix designators: 2'- 10.8' •1011 127V 01 OH 1.50' 0.16 KDDF ( 625) C,CN,CI8,CN/8 (or no prefix) = CompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 6'- 0.0' 0/ 88V 0/ OH 5.50' 0.14 KOOF ( 625) M,M20HS,M18HS,M16 = MiTek M series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP ICOND, 24 Design ch f) uplift at 24 *0C j"jEjj AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.002' @ -11- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX TL CREEP DEFL = -0.004' @ 2'- 3.8' Allowed = 0.159' MAX LL DEFL = 0.000' @ 0'- 0.0' Allowed = 0.129' MAX TC PANEL LL DEFL = 0.006' @ 1'- 2.4' Allowed = 0.196' 3-11.09 MAX BC PANEL TL DEFL = -0.008' @ 3'- 9.4' Allowed = 0.201' MAX HORIZ. LL DEFL = 0,005' @ 5'- 8.8' MAX HORIZ. TL DEFL = 0,006' @ 5'- 8.8' NOTE:Design assumes moisture content does 12 not exceed 19% at time of manufacture. 14.00 Design conforms to main windforce-resisting system and components and cladding criteria. M-4X6 Wind: 140 mph, h=21.5ft, TCDL=4.2,BCDL=6.0, ASCE 7.101 o (All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), load duration factor=l.6 r; Truss designed for wind loads o in the plane of the truss only. v v N O O 0 6 -- co 1 18 U) - o M-1.5X3 o `� M73X4 0 M-3x4 M-30 2-03-12 3-08-04 1-00 4 2-05-08 3-06-08 6-00 PROVIDE FULL BEARING•Jts:2 4 8 JOB NAME: 5-A POLYGON NH - J4C EO PRpxF�s Scale: 0.072 (A�j �jGIN�' / WARNINGS: GENERAL NOTES,unless otherwise noted: VJv ✓I�ZI Oy'9 1.Builder and erection contractor should be advised of all General Notes 1.This design is based only upon the parameters shown and is for an Individual 92 PE Truss: J 4C and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be installed where shown+. Incorporation of component is the responsibility of the building designer. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE ie the responsibility of the erector.Additional pemrenent bradnp of 2'o.c.and at 10'o.c.respectively unless braced throughout their len th by continuous sheathing such as plywood sheathing(TC)and/or drywall C). DATE' 8/22/2014 the overall structure Is the responsibility of the building designer. 3.2x Impact bddging or lateral bracing required where shown++ Q 4No bad should be applied to any component until after all bracing and 4.irate ation.nitrate is the responsibility of the raspecdw.e contractor. OREGON SEQ. : 6037185 fasteners are compote and at no time should any bads greater than 5.Design assumes bc trusses are to be used In a noncorrosive environment, ��, design bads be applied to any component and are for"dry condition"of use. TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at all supports shown.shim or wedge if O 14 P fabrication,handing,shipment and Installation of components. necessary. 7.Design assumes adequate drainage Is provided. 6.Thls design Is furnished subject to the imitations set forth by 9.Plates shag be located on both aces of truss,and placed so their center IIIIII IIII VIII VIII(IIII VIII VIII IIII IIII TPIIWfCA in BCSI,copies of which will be furnished upon request. Anes coincide Iwith joint center Ines.IIA 9. Digits Indicate of plate In Inches. MiTek USA,Inc./CompuTrus Software+7.6.6(1L)-E 10.For basic connector plate design values see ESR-1311,ESR-1g88(MITak) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF g1&BTR LOAD DURATION INCREASE = 1.15 1-2-(( 0 86 2.6=(-58) 82 6.5=( 0) 18 BC: 2x4 KDDF N16BTR SPACED 24.0" O.C. 2.3=(•150 0 5-7=(-70) 98 5.3=( O� 52 WEBS: 2x4 KDDF STAND LOADING 3.4=11 14 44 3-7=(•119 86 TC LATERAL SUPPORT <= 12"0C. UON. LL( 25.0)+DL 7.0) ON TOP CHORD = 32.0 PSF BC LATERAL SUPPORT <= 12'OC, UON. �L ON BOTTOM CHORD = 10,0 PSF BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA TOTAL LOAD = 42.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SQ,IN, (SPECIES OVERHANGS: 12.0' 0.0" 01- 0.0' -33/ 317V •62/ 153H 5,50" 0.51 KDDF ( 625I LL = 25 PSF Ground Snow (Pg) 2'- 10.8' -108/ 72V 0/ OH 1.50" 0.11 KDDF ( 825 Connector plate prefix designators: 6'- 0.0' 0/ 88V 0/ OH 5.50' 0.14 KDDF ( 625) C,CN,CIB,CN18 (or no prefix) = CompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL M,M20HS,M18HS,M16 = MiTek MT series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. ICOND, 2, Design checked for net(-5 psf) uplift at 24 *oc spacing.] BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 2-11-09 AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY, MAX LL DEFL = -0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX TL CREEP DEFL = -0.004' @ 2'- 3.8' Allowed = 0.159' MAX LL DEFL = 0.000" @ 0'- 0.0' Allowed = 0.129' 12 MAX TC PANEL LL DEFL = 0.006" @ 1'• 2.4' Allowed = 0.196' M-4X6 MAX BC PANEL TL DEFL = •0,008' @ 3'- 9.4' Allowed = 0,201' 14.00 MAX HORIZ. LL DEFL = 0.005' @ 5'- 8.8' MAX HORIZ, TL DEFL = 0.006' @ 5'- 8.8' NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. Design conforms to main windforce-resisting v� system and components and cladding criteria. Wind: 140 mph, h=21ft, TCDL=4.2,BCDL=6.0, ASCE 7-10, Cl) (All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), load duration factor=l.6 Truss designed for wind loads o in the plane of the truss only. o 5 ti - " M-1.5x3 CD V-30'0 M-3x4 M-3x4 2-03-12 3-08-04 1.00 2-05-08 3-06-08 6-00 FPR-OVIDEFULL BEARING•Jts: 4 7 JOB NAME : 5-A POLYGON NH - J3C tiU PROF�tS Scale: 0.5570 � GIN WARNINGS: sed WARNINGS: GENERALNOTES,union otherwise noted: 4Gr / /AlI7 1.Builder and erection contractor should be advised of all General Notes 1.This design is based only upon the parameters shown and Is for an Individual 2 PE Truss: J 3 C and Warnings before construction commences. building component.Applicability of design parameters and proppesr 2.2z4 compression web bracing must be Installed where shown+. Incorporation of component is the responsibility of the building de ner. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced e[ DES. BY: EE Is the responsibility of the erector.Additional permanent bradng of 2'o.c.and at to'o.c.respectively unless braced throughout their Is M by DATE: 8/22/2014 responsibility g b continuous sheathing such as plywood sheathing(TC)and/or drywo;r'). the overal structure Is the res nsibi of the building designer. 3.2x ImmppeaAc1 I or lateral bracing required where shown++ Q 4.No bad should be applied to any component until after al bracing and 4.Installation of truss is the responsibility of the respective contractor. '� OREGON SEQ. : 6037186fasteners are complete and at no Units m should any loads greater than 5.Design assumes Mines are to be used In a noncorrosive environment, �, X design bads be applied to any component and are for"dry conditlon"of use. / n0 TRANS I D: 406556 S.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at as supports shown.Shim or wedge If N necessary. fabrication,handing,a pment and Installation of components. 7,Design assumes adequate drainage ie provided. 6.This design Is furnished subject to the Dons set forth by 8.Plates shall be locatedonboth faces of buss,and placed so their center f7 CA In ished upon Ones IIIIII VIII VIII IIID VIII VIII VIII IIII IIII MiTek USA,Inc./CompuTrus Software 7I,copies of which will be m6 6(1 L)-Z request. A. For ba is connector plate design values see ESR-1311,ESR-1988(MiTek) joint center lines. 9.Digits Indicate size of late In Inches. EXPIRES:12/31/2015 111111111111This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 6'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 20 KDDF A16BTR LOAD DURATION INCREASE = 1.15 1.2=( 0) 86 2.6=(-30) 39 6.5=( 0 8 WEBS: 2x4 KODF STAND 3-4= SPACED 24.0' O.C. 2-3=3.4=�-33` 35 5.7=(-43) 53 3-7=�-56� 45 LOADING TC LATERAL SUPPORT <= 1210C. UON. LL( 25.0)+DL7.0) ON TOP CHORD = 32.0 PSF BC LATERAL SUPPORT <= 1210C. UON, 6L ON BOTTOM CHORD = 10.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRIG AREA TOTAL LOAD = 42.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SQ,IN, (SPECIES) OVERHANGS: 12.0' 0.0' 01- 0.0, -33/ 281V -44/ 117H 5.50' 0.45 KDDF 625 LL = 25 PSF Ground Snow (Pg) 11- 10.8' -144/ 97V 0/ OH 1.50' 0.16 KDDF ' 625` Connector plate prefix desi rotors: 6'- 0.0' 0/ 62V 0/ OH 5.50' 0.10 KOOF ( 625) C,CN,CI8,CN18 (or no prefix4 =Co�puTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL M,M20HS,M18HS, 16 MiTek Mt series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 1-11-09 AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX LL DEFL = -0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX LL DEFL = 0.001' @ 1'- 4.2' Allowed = 0.069' 12MAX LL DEFL = 0.000' @ 5'- 4.7' Allowed = 0.179' MAX TC PANEL TL DEFL = 0,004' @ 0'- 10,4' Allowed = 0.140' 14.00 MAX BC PANEL TL DEFL = -0.013' @ 3'- 4.2' Allowed = 0.222' MAX HORIZ. LL DEFL = -0.002' @ 5'- 4.7' M-4x6 MAX HORIZ. TL DEFL = 0.002' @ 5'- 4.7' NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. o Design conforms to main windforce-resisting M system and components and cladding criteria. Wind: 140m hl h=20.4ft, TCDL=4.2,BCDL=6.0, ASCE 7-10, N (A11 Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), v load duration factor=l.6 Truss designed for wind oasis oin the plane of the truss only. Cl) 0 5 - 17,711 7 C _ N M-3x4 o M•1.5x3 0 6 0 M-3x4 M-3x4 1-03-12 4-00-15 0-07-05 1-00 1-05-08 4-06-08 IPROVIDE FULL BEARING'Jts:2 4 7 6-00 JOB NAME : 5-A POLYGON NH - J2C DPR�FFss Scale: 0.6194 � GIN WARNINGS: WARNINGS: GENERAL NOTES,union otherwise noted: 41J G A !7 �] 1.Builder and erection contractor should be advised of all General Notes 1.This design is based only upon the parameter;shown and is for an Individual 92 PE { Truss: J 2 C and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+. incorporation of component is the responsibility of the building designer. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE Is the responsibility of the erector.Additional permanent bracing of 2'continuous end at 10'hin suchrespas ply unless Laced throughout their lenpth by the overall structure is the responsibility of the builds d contlnuoua sheathing such as plywood aired here)own drywal(BC). r DATE: 8/22/2014 po ltty n9 designer. 3.Insta Imp ad br dglrp s lateral bracing required where shown+. Q 4.No bad should be applied to any component until load ep bracing and 4.Design assumes of truss Is the re t responsibility un of the respective contractor. ')7 OREGON L(/ SEQ. : 603 7187 laatenere are compble and et no time,should any bads greater then 5.Design assumes trusses are to be used In anon-corroaNe environment, j, � �Q design bads be applied to any component and are for"dry condition"of / TRANS I D: 406556 5.CompuTrus hes no control over and assumes no responsibility for the 8.necessary.Design assumes full bearing atuselle.supporta shown.Shim or wedge If Q 14 fabrication,handling,shipment and installation of components. n 7.Design assumes adequate drainage Is provided. furnished `L`„ AM 8.This design is furnished alibied to the limitations eel forth by 8. Plates shall be located on both laces of fuse,and placed Rted so their center i-5 IIIIII IIII VIII VIII VIII VIII VIII IIII IIII TPIfCA In SCSI,copies of which will be furnished upon request. Ines coincide with I )ocanter Ines.9. Digits Indicate Nze off plate late in Inches. MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-Z 10.For basic connector plate design values we ESR-1311,ESR-1988(MITek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 7'- 11.8' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF #18BTR LOAD DURATION INCREASE = 1.15 1.2=( 0) 114 2.4=(0) 0 BC: 2x4 KDDF #18BTR SPACED 24.0' O.C. 2-3= -159) 91 TC LATERAL SUPPORT - 12'OC. LION. LOADING BC LATERAL SUPPORT - 12'OC. UON. LL( 25.0)+DL� 7.0) ON TOP CHORD= 32.0 PSF BEARING MAX VERT MAX HORZ BAG REQUIRED BRG AREA L ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SG.IN. ((SPECIES OVERHANGS: 24.0' 0.0' TOTAL LOAD = 42.0 PSF 01- 0.0' -82/ 513V -57/ 192H 5.50' 0.82 KDO ( 625 1'- 9.2' -113/ 294V 0/ OH 5.50" 0.47 KDDF 825 Connector plate prefix desi nators: LL = 25 PSF Ground Snow (Pg) 7'- 11.8' -101/ 192V 0/ OH 1.50' 0.31 KDDF 625 C,CN,CIB,CNIB (or no prefix = CompuTrus, Inc M,M20HS,M18HS,M16 M1Tek M series LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP MAX LL DEFL = -0.036" @ -21- 0.0' Allowed = 0.200' AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = -0.043' @ -2'- 0.0' Allowed = 0.267' MAX BC PANEL LL DEFL = 0,007' @ 1'- 0.1' Allowed = 0.054' MAX BC PANEL TL DEFL = -0.008' @ 1'- 0.1' Allowed = 0,072' MAX HORIZ. LL DEFL = -0.001' @ 7'- 11.1' MAX HORIZ. TL DEFL = -0.001' @ 7'- 11.1' NOTE:Oesign assumes moisture content does not exceed 19% at time of manufacture. 12 Design conforms to main windforce-resisting 7.00 system and components and cladding criteria. Wind: 140 mph h=21.6ft, TCDL=4.2,BCDL=6.0, ASCE 7.101 lAll Heights), Enclosed, Cst.2, Exp.B, MWFRS(Dir), oad duration factor=l.6 Truss designed for wind loads in the plane of the truss only. 0 ,n o 0 0 71 U" 0 0 2 4 M-3x4 2-00 2-00 5-11-13 PROVIDE FULL BEAR ING'Jts:2 4 3 0 PR JOB NAME: 5-A POLYGON NH - SJ2 Scale: 0.4859 �`�J GINE WARNINGS: GENERAL NOTES,unless otherwise noted: 9/' P E 1.Bulkier and erection contractor should be advised of all General Notes 1.This design Is based only upon the parameters shown and is for an Individual9r Truss: S�2 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+. Incorporation of component is the responsibli ty of the building designer. 3.Additional temporary bracing to insure stability during construction 2.2' % assumes the top and bottom chorda c be muggy braced at DES. BY: EE Is the responsibility of the erector.Additional permanent bracing of 2'o.e,and et io'o.e.respectively union braced throughout their IarrpM by coo.( sheathing such as plywood sheathing(TC)and/or drywasal(BBC). DATE: 8/22/2014 the overall structure Is the responsibility of the building designer. 3.2x Impact bridging or lateral bracing required where shown++ 4.No bad should be applied to any component unfit seer all bracing and 4.Insta f ton of truss Is the responaibiRy of the respective contractor. "� OREGON SEQ. : 6037188 fasteners are complete and at no time should any loads greater than 5.Design assumes trusses are to be used In a noniorroaNe ernironment, ,�b design bads be applied to any component. and are for us r"dry condition"of e. /^ h TRANS I D: 406556 5.CompuTrus hes no control over and assumes no responsibility for the 6.Design assumes fug bearing at as supports shown.Shim or wedge If Q ;!4 2 fabrication,handl necessary. f- ng,shipment end Installation of component. 7.Design assumes adequate drainage is provided. R`�� 6.This design Is furnished subject to the knitations set forth by 8.Plates shas be located on both faces of buss,and placed so their center I/VVTCA In 1,copies of ch will be furnished upon Ines IIIIII VIII VIII VIII IIII VIII IIII IIII IIII MTek SA,Inc.6/CompuTrus(Software 7.6 6(1 L)-E request. 10.For basic connect r lits design values see ESR-1311,ESR-1988(MiTek) Ont center Inn. 9.Digit Indicate size of a In Inches. EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 3'- 11.8' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF p16BTR LOAD DURATION INCREASE = 1.15 1-2=( 0) 114 2.4=(0) 0 BC: 2x4 KDDF III 1✓EBTR SPACED 24.0' D.C. 2.3= -90) 48 TC LATERAL SUPPORT <= 12'OC. UON. LOADING BC LATERAL SUPPORT - 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF BEARING MAX VERT MAX HORZ ERG REQUIRED BRG AREA DL ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SO IN. SPECIE$ OVERHANGS: 24.0' 0.0' TOTAL LOAD = 42.0 PSF 01- 0.0' -1601 578V -301 119K 5.50' 0.92 KD�F ( 625` 1'- 9.2' .1231 62V 0/ OH 5,50' 0.10 KDDF 625 Connector plate prefix designators: LL =25 PSF Ground Snow (Pg) 3'- 11.8' -44/ 94V O/ OH 1.50' 0.15 KDDF 625 C,CN,CI8,CN/8 (or no prefix' = CompuTrus, Inc M,M20HS,M18HS,M16 = M1Tek M4 series LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL COND. 2: Dosion ch cked for net(-5 pif) uplift at 24 'oc soacincD REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. II VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L1180 BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP MAX LL DEFL = -0.036' @ -21- 0.0' Allowed = 0.200' AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = -0.043' @ -2'- 0.0' Allowed = 0.267' MAX BC PANEL LL DEFL = 0.003' @ 1'- 0.1' Allowed = 0.054' 12 MAX TC PANEL TL DEFL = 0.007' @ 1'- 5.1' Allowed = 0.407' 7.00(7 MAX HORIZ. LL DEFL = -0.000' @ 3'- 11.1' MAX HORIZ. TL DEFL = -0.000" @ 3'- 11.1' NOTE:Design assumes moisture content does not exceed 19% at time of manufacture. Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 140 mph h=20.4ft, TCDL=4.2,BCDL=6.0, ASCE 7.10 (All Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), 0o load duration factor=1.6 0 Truss designed for wind loads o in the plane of the truss only. 47 N cf 0 Cl) O - V7 O 2 4 M-3x4 1 I L L L 2.00 2-00 1-11-13 PROVIDE FULL BEARING•Jts:2 4 3 PRO JOB NAME : 5-A POLYGON NH - SJ 1 �0 INIF s Scale: 0.6869 {� C/?�N �p �0, WARNINGS: GENERAL NOTES,unless o9rerwise noted: 4�y r Z c� 1.Builder and erection contractor should be advised of al General Notes 1.This design Is based only upon the parameters shown and Is for an Individual 92 P E Truss: SJ 1 and Warnings before construction commences, building component.Applicability of design parameters and pro ori ner. 2.2x4 compression web bracing must be Installed where shown�. Incorporation of on Is the recponsldYty of the%bra bidet g 3.Additional temporary bracing to insure stability during construction 2.Dedgn assumes the top am bottom chords to be kterally braced at by DES. BY: EE Is the responsibility of the erector.Additional permanent bracing of 2'continuous and et 10'o.c.suchrespas ply unless bathed throughout their length). continuous aheething such as plywood sheathing(M)andlordrywa8(BC). DATE: 8/22/2014 the overall structure Is the responsibility of the bulking designer. 3.2x Impact bridging or lateral bracing required where shown++ Q 4.No bad should be applied to any component unlit after all bracing and 4.Installation of truss Is the responsibility of the respective contractor. "y7 A_OREGON b, SEQ. : 6037189 fasteners are complete and at no time should any bc ads greater than 5. Design assumes trusses are to be used In a nonomoslve environment. �. -+7 R design bads be applied to any component and are for-dry condMon'of use. TRANS I D: 406556 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at al show.supports sho .Shim or wedge If O 14 0P fabrication,handl necessary. ng,shipment and Installation of components. 7•Design assumes adequate drainage is provided. 6.This design is furnished subject to the Imitations set forth by 8.Plates shall be located on both faces of truss,and placed so their center IIIIII IIII VIII VIII VIII ILII VIII IIII IIIITPIANTCA in SCSI,copies of which will be famished upon request. Imes coincide with Joint center Ines. 9. gess Indicate size of to In Inches. MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector ate design values see ESR-1311,ESR-1988(MITek) EXPIRES:12/31/2015 IIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 5'- 9.5' IBC 2012 MAX MEMBER FORCES 4WR/DOF/C =1.00 TC: 20 KDDF N16BTR LOAD DURATION INCREASE = 1.15 1-2= 0) 72 2.5=(-37) 50 3.5=(-178) 140 BC: 2x4 KDDF N18BTR SPACED 24.0' O.C. 2-3=I.82) 64 WEBS: 2x4 KDDF STAND 3-4= 7 3 LOADING TC LATERAL SUPPORT <= 12'00. UON. LL( 25.0)+DL 7.0) ON TOP CHORD = 32.0 PSF BC LATERAL SUPPORT <= 12'OC. LION. �L ON BOTTOM CHORD = 10.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA TOTAL LOAD = 42.0 PSF LOCATIONS REACTIONS REACTIONS SIZE 80 IN. (1SPECIES) OVERHANGS: 24.0' 0.0' 01- 0.0' -128/ 546V -22/ 80H 5.50' 0.87 KDOF 625 LL = 25 PSF Ground Snow (Pg) 5'- 9.5' -27/ 235V 0/ OH 5.50' 0.38 KDDF } 625` Connector prefix designators:pplate C,CN,Cl8,CN18 (or no prefix) = CompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL M,M20HS,M18HS,M16 = MiTek MT series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. IGOND, 2l Design checked for net' VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD, TOP MAX LL DEFL = 0.040' @ -21- 0.0' Allowed = 0.200' AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = -0.043' @ -2'- 0.0' Allowed = 0.267' MAX TC PANEL LL DEFL = 0.059' @ 3'- 1.6' Allowed = 0.318' 5-05-12 0-03.12 MAX TC PANEL TL DEFL = -0.072' @ 2'- 11.4' Allowed = 0.476' 12 MAX HORIZ. LL DEFL = 0.000' @ 5'- 5.8' MAX HORIZ. TL DEFL = 0.000' @ 5'- 5.8' 4.00 - NOTE:Design assumes moisture content does not exceed 194 at time of manufacture. M-1.5X3 Design conforms to main windforce-resisting 3 a system and components and cladding criteria. Wind: 140 mphh=20.1ft, TCDL=4.2,BCDL=6.0, ASCE 7-tO lAll Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), oad duration factor=1.6 Truss designed for wind loads N in the plane of the truss only. 0 v � 0 O N N LO (7l O O 2 5 1 M-3x4 M-1.50 7 5-05-12 0-03-12 -L .L 2-00 5-09-08 JOB NAME : POLYGON PLAN 5A NH - H2tig PRpFFss Scale: 0.6156 CJ I Ng WARNINGS: GENERAL NOTES,union otherwise noted: 4;r� v r pa//I O� H2 1.Builder and erection contractor should be advised of all General Notes 1.This design is based only upon the parameters shown and is for an Individual �' 92 PE Truss: I L1 2 and Warnings before construction commences. building component.Applicability of design parameters and proppeer 2.2x4 compression web bracing must be Installed where shown+. Incorporation of component is the responsibility of the building desfpner. 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at DES. BY: EE is the responsibility of the erector.Additional permanent bracing of 2'o.c.and at 10'o.c.respectively unless braced throughout their length by the overall structure le the responsibility of the building designer. continuous sheathing such as plywood sheathing(TC)and/or drywal(BC). DATE: 9/3/2014 po ty g g 3.2x In2Dact bridging or lateral bracing required where shown++ Q 4.No load should be applied to any component until after all bracing and 4.Inst dation of truss la the responaibiny of the respective contractor. 'j7L OREGON �(!� SEQ. : 604 8198 fasteners are compote and at no time should any bads greater than 5.Design assumes trusses are to be used In a noncorrosive environment, 1b, design bads be applied to any component and are for"dry condition"of use. TRANS I D: 407311 5.CompuTrus has no control over and assumes no responsibility for the 6.Design assumes full bearing at all supports shown.Shim or wedge If p f' 14 fabrication,handling,shipment and installation of components. necessary. 7. Design assume adequate drainage Is provided. R R y S.This design Is furnished subject to the Imitations set forth by 8.Plates shall be located on both faces of truss,and placed so their center IIIIII IIII VIII VIII VIII VIII IIII IIII IIII TPINVTCA In SCSI,copies which will be Nmished upon request. Ines coincide wJoint center Anes. 9.Digits Indicate size o/Wate In Inches. MiTek USA,Inc./CompuTrus Software 7.6.6(1 L)-E 10.For basic connector plate design values see ESR-1311,ESR-1988(MITek) EXPIRES:12/31/2015 IIIIIIIIIIIII) This design prepared from computer input by ' PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 2'- 7.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 20 KDDF N16BTR LOAD DURATION INCREASE = 1,15 1-2-( 0) 72 2.4=(0) 0 BC: 20 KDDF M1d8TR SPACED 24.0' O.C. 2.3=(-57) 13 TC LATERAL SUPPORT <= 12'OC. UON. LOADING BC LATERAL SUPPORT <= 12'OC. UON" LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA DL ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SO.IN. SPECIES OVERHANGS: 24.0' 0.0' TOTAL LOAD = 42.0 PSF 01- 0.0' -144/ 476V 0/ 48H 31.00' 0.76 KOOF ( 625` 2'- 6.2' -29/ 61V 0/ OH 1.50' 0.10 KDDF 6251 Connector plate prefix designators: LL = 25 PSF Ground Snow (Pg) 2'- 7.0' -70/ 22V OI OH 0.00' 0.00 KDDF 625 C,CN,CI8,CN1B (or no prefix) = CompuTrus, Inc M,M20HS,M18HS,M16 = M1TeIt M series LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL GOND. 2: Desion ch REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP MAX LL DEFL = 0.040' @ -2'- 0.0' Allowed = 0.200' AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = -0.043' @ -2'- 0.0' Allowed = 0.267' 12 MAX HORIZ. LL DEFL = -0.000' @ 2'- 6.2' 4.00 i7 MAX HORIZ. TL DEFL = -0.000' @ 2'- 6.2' NOTE:Design assumes moisture content does not exceed 19� at time of manufacture. Design conforms to main win dfarce-resisting system and components and cladding criteria. Wind: 140 m ht h=15ft, TCDL=4.2 BCDL=6.0, ASCE 7.10, All Heights), Enclosed 6at.2, Exp.B, MWFRS(Dir), 3 load duration factor11 6 Truss designed for wind loads in the plane of the truss only. 0 N O Cl) O O 4 M-3x4 2-00 2-07 PR OFfiS JOB NAME: POLYGON PLAN 5A NH - H1 1qNaEA� si Scale: 0.7788 � WARNINGS: GENERAL NOTES,unless otherwise noted: 79/2 PTE, H1 1.Builder and erection contractor should be advised of al General Notes 1.This design Is based only upon the parameters shown and Is for an Individual Truss: 1 I 1 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be installed where shown+. Incorporation of component Is the responsibility of the building do liner. 3.Additional temporary bracing to insure stability during construction 2.Design assumes the top and bottom combs c d t muggyaterally braced at DES. BY: EE Is the responsibility of the erector.Additional permanent bracing of 2'ritn and at t0•hin suchrespas ply ood s braced throughout their length by corImpact sheathing such as plywood aired where s and/or dryweA(BC). DATE' 9/3/2014 the overall structure Is the responsibility of the building designer. 3.an Impact bridging or lateral Mednp required where show++ Q 4.No bad should be appled to any component until after all bracing and 4.Installation of Kusa Is the responslbilty of the respective contractor. '� OREGON SEQ. : 604819 9 fasteners ere complete and at no time should any bads greater than 5.Design assumes trusses are to be used In a nonrorroslve environment, design bads be appled to any component. and are for"dry condition"of use. TRANS I D: 407 311 5.CorrpuTms has no control over and assumes no responsibility for the 6.Design assumes fuN bearing at all supporta shown.Shim m wedge If Q 14 fabrication,handing,shipment and Installation of components. necessary. � �� 7.Design assumes adequate drainage Is provided. 6.This design le fu subject to the Imitations set forth by 8.Plates she#be located on both faces of truss,and placed so their center INVTCA BCSI,copies of which wil be furnished upon nt center Inn. IIIIII VIII VIII VIII 111111111111111 IIII IIII MTTP6SAInlnc./CompuTrus Software 7.6.6(1 L)E request. 10.For baeicconectowith rolplate design values see EBR-1311,ESR-1688(MITek) 9.Digits Indicate size of late In Inches. EXPIRES:12/31,2015