Specifications UMPWU ENGINEERING INC. DEC 2 23 2015
Email: ppwuengineeringCcDcomcast.net (, i •. , ;, ,, _..�
Ph: (503) 810-8309
Structural Calculations:
Job # LEN 15439
Date: 12/14/15
Project: Mulberry A Master Reuse
Garage Left
Lot 35, Oak Crest, Tigard, OR
Lennar Homes
G N IFFss�o
ct. 19421PE 9 2
EGON
22 10,91
'°HILIP
Expires: 06/30/2016
The following calculations are for lateral wind and seismic engineering and gravity loading of the beams and columns.
Non-prescriptive foundations are outside the scope of this design and require approval from a geotechnical engineer. If
the project is located on a sloping lot, the foundation system needs to be approved by a geotechnical engineer prior to
construction. Failure to do so invalidates this design. The need for retaining walls for the project is the sole responsibility
of the builder and a design will be included only if information provided by the builder,such as sections and drawings,are
provided indicating where they are needed. All retaining wall designs should be verified by the geotechnical engineer of
record for the subdivision or lot prior to construction. Failure to do so invalidates their design. The design is based on
information provided by the client who is solely responsible for its accuracy. The engineering represents the finished
product. Discrepancies from information provided by the client invalidate this design. PWU Engineering shall have no
liability (expressed, or implied), with respect to the means and methods of construction workmanship or the actual
materials used in construction.
PWU Engineering Inc.shall have no obligation of liability, whether arising in contract(including warranty), Tort(including
active, passive, or imputed negligence) or othervnse, for loss or use, revenue or profit, or for any other incidental or
consequential damage.
r
�PWU ENGINEERING INC.
Ph: 503 810-8309, Email: pwuengineering@comcast.net
The following calculations are for the Mulberry A Master Version stock plans for Plan
approvals.
Wind Loading: Per ASCE 7.
Fig 6-2
See attached elevations for wind loading breakdown per level.
136mph Ultimate 3-sec gust Exposure B for Category I and II structure,
Which is equal to 105mph ASD per the 2012 IBC and IRC with state amendments
The mean roof height of the house
h =28' approximately.
D
` C
MWFRS A
Direction �Ernd Zones
2a
C
A MVVFRS
Direction
2a
End Zones
Nate: End zone may occur at any corner of the
building.
a= .10*40' =4'
or for h =28'
a=A(h)=.4(28')= 11.2'
a=4' controls
a must be larger than .04(40')= 1.6' and 3'
Therefore:
2a= 8' see Fig 6-2 ASCE 7, and Figure above.
Seismic Loading: Dt seismic design category per the latest edition of the state adopted
code based on the 2012 IBC and IRC
SDs= .76, R= 6.5, W=weight of structure
V= [1.2 SDs/(R x 1.4)] W
V= .100 W
Roof Dead load = 15 psf
Floor Dead load= 15 psf
Interior Wall Dead load=6 psf
Exterior Wall Dead load= 12 psf
Veneer=40 psf
A
N
Wind per ASCE 7 <tl)pWU ENGINEERING INC.
Project Mulberry A \VV
Direction Front to Back
3s Gust EAngle
oof A 21.3 s
S eed Ex A B 6.8 s105mph B26.6 1.00 15.8 ps
D j
6:12 D 6.0 psi
a
Least a= 4.0 ft
L(ft) I hAVO(ft) or a= 11.2 ft /
CRs
oo-mio
40.01 28.01 and a> 1.6 ft z,'x-
and a> 3.0 ft
huldg.
2a 8.0 ft
WR
L(ft) 8.0 12.0 12.0 8.0
hA(ft) 4.0 4.0
he(ft) 5.0 8.0
he(ft) 4.0 4.0
hD(ft) 5.0 8.0
W(plf) 0.0 118.9 93.2 111.1 139.2 0.0 0.0 0.0 0.0 0.0
50.0
WRAVc 112.9 p!f 100.0 g+
50.0
0.0
W2
L(ft) 8.0 12.0 12.0 8.0
IIA(ft) 10.0 10.0
he(ft)
he(ft) 10.0 10.0
hD(ft)
W(plf) 0.0 212.6 158.4 158.4 212.6 0.0 0.0 0.0 0.0 0.0
300.0
W2AVG 180.1 plf 200.0
100.0 "
0.0
W1
L(ft)
hA(ft)
hB(ft)
he(ft)
hD(ft)
W(plf) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10
WIAVGI #DIV/0!
0.5
0.0 ,
e
D•
rw run
e
e
a
e
m-u
rorrun
eN a iCC.�i[
n
FRONT (ELEVATION A) w•.ra
���� pWU ENGINEERINA
Wind per ASCE 7 �c»1G INC.
Project Mulberry A VV
Direction Side to Side
3s Gust IRoof A 21.3 psf
Seed I Exp. An le A 8 6.8 psf
105mphl B 26.6 1.00 C 15.8 ps
6:12 D 6.0 psf
precTon y6W Zonei
k]e/
Least a = 4.0 ft
W(ft) hnvc lft) or a= 11.2 ft / f
40.01 28.01 and a> 1.6ft 21
and a> 3.0
2a 8.0 ft
WR
L(ft)l 8.0 20.0 8.0
hA(ft) 4.0 8.0
he(ft) 6.0
he(ft) 8.0
hD(ft) 2.0
W(plt) 0.0 125.7 138.6 170.1 0.0 0.0 0.0 0.0 0.0 0.0
200.0
WR AVG 142.7plf 100..0
0o
m
W2
L(ft) 8.0 20.0 8.0 11.0 8.0
hA(ft) 10.0 5.5 4.5
hB(ft) 7.0
he(ft) 10.0 4.5 4.5
hD(ft) 7.0
W(plf) 0.0 212.6 158.4 188.2 113.1 143.1 0.0 0.0 0.0 0.0
300.0
W2AVGJ 159.3 plf 200.0
100.0
0.0
W,
L(ft)
hA(ft)
he(ft)
he(ft)
hD(ft)
W(plf) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
W1 AVG #DIV/0! .0
0.5
0.0
0
iQ Ml[
Y
yi MCAIR
iQ Ml�
b
}
h
I TI
lIOAR
RIG4T SIDE (ELEVATION A) �.•. •a
It uu 11 BLI 11 UIA 11 1111 It 11111]] 111 It[I I III 1111 11 IJU It uu III
�R <
}
i
f
iGr R•R
b
i
t
llft l
REAR (ELEVATION A) w•. Q
Lill 111111 111]ILUMUiLung
LM
It flu it Hit R HU I III
It H fill HU If
TOI.ILR
I Bull Hull 11111111
A,
lilt Hull Bill]HitY
MFRA
TCT RAR
G
1
4p
L �
n
LEFT SIDE (ELEVATION A) w•.TQ
Seismic & Governing Values VVV�pWU ENGINEERING INC.
Project MulberryA
Seismic Loading per latest edition of state adopted code based on 2012 IBC and IRC
Design
V= [1.2 SDs/(R x 1.4)]W Category R SDs
D1 6.5 0.76
Roof Dead Load: 15psf
Floor Dead Load: 15psf
Interior Wall Dead Load:6psf V= 0.100*
Exterior Wall Dead Load: 12psf
Veneer:40psf
Check Seismic Front to Back vs Wind
Seismic Wind
WR = [0.100 * (15+5+3) * 36 ft] = 83.0 pl < 112.9 pl Wind Governs
W2 = [0.100 . (15+5+3+4+4) ' 55 ft] + 83.0 pl = 253.9 pl < 293.0 pl Wind Governs
W = [0.100 ' (15+5+3+4) + 253.9 pl = 253.9 pl #DIV/0! #DIV/0! #DIV/0!
Check Seismic Side to Side vs Wind
Seismic Wind
WR = [0.100 * (15+5+3) 40111 = 92.2 pl < 142.7 pl Wind Governs
Wz = [0.100 * (15+5+3+4+4) * 40 ft] + 92.2 pl = 216.5 pl < 302.1 pl Wnd Governs
W, _ [0.100 * (15+5+3+4) + 216.5 pl = 216.5 pl #DIV/0! #DIV/0! #DIV/01
Redundancy factor= 1.0 per ASCE 7 section 12.3.4.2
Line Loads \VVVV� ENGINEERING INC.
Project Mulberry A
High Roof Diaphragm -Upper Floor Walls
Line A
P = 1.13 11'
LTOTAL = 10-Oft v = 1.13 k / 10.0 ft = 113 plf JTypeAWall
h = 8.0 ft LWORST = 10.0 ft MOT = 113 plf 8.0 ft 10.0 ft = 9.03 kft
MR = (15 psf ' 2.0 ft + 12 psf 8.0 ft) * (10.0ft)' / 2 ' 0.6 = 3.78 kft
+ (Olb 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 3.78 kft = 3.78 kft
T = 9.03kft - 3.78kft / 10.0 ft = 0.53 k + 0.00 k = 0.53 k No hd req'd
Line B
P = 2.26 k LTOTAL = 53.0 ft v = 2.26 k / 53.0 ft = 43 plf Type A Wall
h = 8.0 ft LWORST = 12.0 ft MOT = 43 plf 8.0 ft ` 12.0 ft = 4.09 kft
MR = (15 psf * 2.0 ft + 12 psf ' 8.0 ft) * (12.Oft)2 / 2 0.6 = 5.44 kft
+ 0 Ib ` 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 5.44 kft = 5.44 kft
T = 4.09kft - 5.44kft / 12.0 ft = 0.00 k + 0.00 k = 0.00 k No hd req'd
Line C
P = 1.13 k LTOTAL - 34.0 ft v = 1.13 k / 34.0 ft = 33 plf Type A Wall
h = 8.0 ft LWORST = 16.0 ft MOT = 33 plf * 8.0 ft 16.0 ft = 4.25 kft
MR = (15 psf 2.0 ft + 12 psf ` 8.0 ft) * (16.Oft)' / 2 * 0.6 = 9.68 kft
+ 0 Ib 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 9.68 kft = 9.68 kft
T = (4.25k-ft - 9.68kft / 16.0 ft = 0.00 k + 0.00 k = 0.00 k No hd req'd
Line 2
P = 1.07 k LTOTAL = 12.0 ft v = 1.07 k / 12.0 ft = 89 plf Type A Wall
h = 8.0 ft LWORST = 12.0 ft MOT = 89 plf ' 8.0 ft * 12.0 ft = 8.56 kft
MR = (15 psf 10.0 ft + 12 psf * 8.0 ft) * (12.Oft)2 / 2 ` 0.6 = 10.63 kft
+ (Olb 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 10.63 kft = 10.63 kft
T = 8.56kft - 10.63kft / 12.0 ft = 0.00 k + 0.00 k = 0.00 k No hd req'd
Line 3
P = 2.57 k LTOTAL = 13.0 ft v = 2.57 k / 13.0 ft = 198 plf Type A Wall
h = 8.0 ft LWORST = 13.0 ft MOT = 198 Of ' 8.0 ft 13.0 ft = 20.56 kft
MR = (15 psf 8.0 ft + 12 psf 8.0 ft) * (13.0ft)' / 2 0.6 = 10.95 kft
+ 0 Ib 0.0 ft + 500 Ib * 7.0 ft = 3.50 kft + 10.95 kft = 14.45 kft
T = 20.56kft - 14.45kft / 13.0 ft = 0.47 k + 0.00 k = 0.47 k No hd req'd
Line 4
P = 1.50 k LTOTAL = 19.5 ft v = 1.50 k / 19.5 ft = 77 plf IType A Wall
h = 8.0 ft LWORST - 2.8 ft MOT = 77 plf * 8.0 ft ' 2.8 ft = 1.69 kft
MR = (15 psf * 2.0 ft + 12 psf 8.0 ft) * (2.8ft)' / 2 * 0.6 = 0.29 kft
+ 0 Ib 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 0.29 kft = 0.29 kft
T = 1.69kft - 0.29kft / 2.8 ft = 0.51 k + 0.00 k = 0.51 k No hd req'd
Low Roof I Upper Floor Diaphragm -Main Floor Walls
Line A
P = 2.93 k LTOTAL = 49.0 ft v = 2.93 k / 49.0 ft = 60 plf Type A Wall
h = 9.0 ft LWORST = 17.0 ft MOT = 60 plf 9.0 ft ' 17.0 ft = 9.15 kft
MR = (15 psf 2.0 ft + 12 psf 9.0 ft) * (17.0ft)' / 2 0.6 = 11.96 kft
+ 0 Ib 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 11.96 kft = 11.96 kft
T = 9.15kft - 11.96kft / 17.0 ft = 0.00 k + 0.00 k = 0.00 k No hd req'd
Line B
P = 5.86 k LTOTAL = 32.0 ft v = 5.86 k / 32.0 ft = 183 plf IType A Wall
h = 9.0 ft LWORST = 12.0 ft MOT = 183 plf 9.0 ft * 12.0 ft = 19.78 kft
MR = (15 psf 2.0 ft + 12 psf * 9.0 ft) * (12.0R)' / 2 0.6 = 5.96 kft
+ 0 Ib 0.0 ft + 500 Ib * 12.0 ft = 6.00 kft + 5.96 kft = 11.96 kft
T = 19.78kft - 11.96kft / 12.0 ft = 0.65 k + 0.00 k = 0.65 k No hd req'd
Line C
P = 2.93 k LTOTAL = 42.5 ft v = 2.93 k / 42.5 ft = 69 plf IType A Wall
h = 9.0 ft LWORST = 5.0 ft MOT = 69 plf ' 9.0 ft ' 5.0 ft = 3.10 kft
MR = (15 psf 2.0 ft + 12 psf ' 9.0 ft) * (5.0ft)' / 2 0.6 = 1.04 kft
+ 0 Ib * 0.0 ft + 0 Ib * 0.0 ft = 0.00 kft + 1.04 kft = 1.04 kft
T = 3.1 Okft - 1.04kft / 5.0 ft = 0.41 k + 0.00 k = 0.41 k No hd req'd
Line 1
See FTAO Calc
Line 3
P = 7.55 k LTOTAL = 11.5 ft v = 7.55 k / 11.5 ft = 656 plf Type C Wall
h = 9.0 ft LWORST = 11.5 ft MOT = 656 plf ' 9.0 ft ' 11.5 ft = 67.94 kft
MR = 05 psf ' 8.0 ft + 12 psf 9.0 ft) * (11.5ft)' / 2 0.6 = 9.05 kft
+ 0 Ib ' 0.0 ft + 500 Ib * 11.5 ft = 5.75 kft + 9.05 kft = 14.80 kft
T = 67.94kft - 14.80kft / 11.5 ft = 4.62 k + 0.00 k = 4.62 k Use type 3 hd
Line 4
P = 3.17 k LTOrnL _ 9.5 ft v = 3.17 k / 9.5 ft = 334 plf Type A Wall
h = 9.0 ft LWoasr = 1.5 ft MOT = 334 plf 9.0 ft * 1.5 ft = 4.51 kft
MR = (15 psf 2.0 ft + 12 psf 9.O ft) (1.5ft)' / 2 ' 0.6 = 0.09 kft
+ 0 Ib * 0.0 ft + 500 Ib ' 1.5 ft = 0.75 kft + 0.09 kft = 0.84 kft
T = 4.51 kft - 0.84kft / 1.5 ft = 2.44 k + 0.00 k = 2.44 k
See FTAO Calc Use type 1 hd on garage piers only
r
-*PWU ENGINEERING INC.
Force Transfer Around Opening Method (FTAO)
@ Main Floor Line 1 Worst Case
L1 = 7.0 ft Lo = 8.5 ft L2= 3.0 ft
4-
V= 2.45 k
vp= 132 plf vp= 132 plf vp= 132 plf hu = 1.0 ft
v= 245 plf v= 245 plf
F1 = 1.18k F2= 0.51 k
ho= 5.0 ft
F1 = 1.18k F2 = 0.51k
v= 245 plf v= 245 plf
4- 4 -> >
F-
vp= 132 plf vp= 132 plf vp= 132 plf hL= 3.0 ft
T= 0.42k T= 0.42k
vp= 2.45 k/ 18.5 ft= 132 plf H:W Ratios
v= 2.45k/ 10.0ft= 245 plf Use: TypeAWall 5.Oft : 7.Oft = 0.7 : 1
5.Oft : 3.Oft = 1.7 : 1
F1 = (245plf- 132p1f) * 7.Oft* 1.5= 1.18k
F2= (245 plf- 132 plf) * 3.0 ft* 1.5= 0.51 k Use: (2) Bays BLKG
MOT= 2.45 k* 9.0 ft= 22.01 kftl
MR= [( 15psf* 2ft+ 12psf* 9.Oft) *
(18.5 ft)^2 * 0.6/2] + ( 0.0 ft *5001b) = 14.17 kft
T= ( 22.01 - 14.17 )/ 18.5 ft= 0.42 k Nohdreq'd
1.0 - 0.51 k
0 0.5 -
0.0
-0.5 -
-1.0 -
-1.5 - -1.18 k
�PWU ENGINEERING INC.
Force Transfer Around Opening Method (FTAO)
@ Main Floor Line 4
L1 = 3.0 ft Lo= 6.5ft L2= 3.0 ft
V= 2.00 k
vp= 160 plf vp= 160 plf vp= 160 plf hu = 1.0 ft
v= 334 If v= 334 plf
F� = 0.78 k F2= 0.78 k
ho= 6.0 ft
F� = 0.78k F2= 0.78k
v= 334 plf v= 334 plf
<-- 4-- 1- f--- F- 4-
vp= 160 plf vp= 160 plf vp= 160 plf hL= 2.0 ft
1' T
T= 0.20k T= 0.20k
vp= 2.00 k/ 12.5 ft= 160 plf H:W Ratios
v= 2.00k/ 6.0 ft= 334 plfUse: Type A Wall 6.Oft : 3.Oft = 2.0 : 1
6.Oft : 3.Oft = 2.0 : 1
F1 = ( 334 plf- 160 plf) * 3.0 ft* 1.5 = 0.78 k
F2 = ( 334 plf- 160 plf) * 3.0 ft* 1.5 = 0.78 k Use: (2) Bays BLKG
MOT= 2.00 k* 9.0 ft= 18.04 kftl
MR= [( 15psf* 6ft+ 12psf* 9.Oft) *
(12.5 ft)^2 * 0.6/2 ] + ( 12.5 ft *5001b) = 15.53 kft
T= ( 18.04- 15.53 )/ 12.5 ft= 0.20 k Nohdreq'd
1.0 0.78 k
a. 0.5
0.0
x -0.5 -
a
:
1.0 �.
/n� a
7 �
c -
Ik
o T o
rap — ra} d
UPPER FLOOR LATERAL PLAN
qxo
�J
F W i
�i,�Api3� D
zdo g§
y�.7• i'-Y d-1Y p'j•
a
1
� J I
_ e �
z I
nownw D
a
UPPER FLOOR LATERAL PLAN
4'�ro
R
it
Jill
D (�
m �P81 I b
4Z
TH
gra•.
HOLDOWN SCHEDULE
MARK Boundary Tension of DF Tension of HF Anchor Anchor nchor Tensio
NUMBER HOLDOWN Studs Allowable Lbs Allowable Lbs Mono Pour Two Pour End Corne
S=2550, S=2550,
1 HDU2-SDS2.5 (2)2x 3075 2215 SSTB16 SSTB20L w=3610 w=3610
2 HDU4-SDS2.5 (2)2x 4565 3285 SB%X24 SB 8X24
S=5730,= w=667
3 HDU5-SDS2.5 (2)2x 5645 4065 SB/X24 SB/X24 =57 =5730,
5 5
w=6675 w=6675
_SST28 (N 6.) SSTB34(NOTE 6.) S=6395, S=7315,
4 HDU8-SDS2.5 (3)2x 7870 5665 8"MIN STEMWALL 8" MIN STEMWALL w=7615 lw=8710
8 HDU 11-SDS2.5 (1)6x 9535 6865 PAB8-36, 10"min PAB8-36, 10"min
embed into 32'min embed into 32"min
9 HHDQ14-SDS2.5 (1)6x 14445 10350 width footing. If at width footing. If at
retaining wall lap retaining wall lap
anchor with vert reinf anchor with vert rein
bar hooked to Ftg. bar hooked to Ftg.
5 MSTC28 (2)2x 3000 2590 N/A N/A
6 MSTC40 (2)2x 4335 3745 N/A N/A
7 MSTC66 (2)2x 5660 5660 N/A I N/A
Notes:
1 . Install all holdowns per manufactureer specificaiton per C-2011 Simpson Strong Tie catalog.
2. Match studs on schedule for walls below on all wall to wall holdowns.
3. (2)2x studs nailed together with (2) rows of 16d @ 3" o.c. staggered. Trimmer stud may be used as
part of boundary member.
4. Refer to shearwall schedule and typical shearwall details for wall locations and configurations.
5. Refer to Simpson catalog for minimum embed of anchors into concrete.
6. Increase footing depth or stemwall height as required for 28%" minimum embedment depth.
SHEARWALL SCHEDULE (a-m) ONLY REQ'DON
INTERIOR SHEARWALLS.
MARK REF NOTES: (a,i) Note: (b) EDGE NAILING FIELD NAILING SILL TO CONCRETE SILL TO WOOD SHEAR TRANSFER CAPACITY CAPACITY
NUMBER SHEATHING NAIL SIZE SPACING SPACING CONNECTION. Note: (c) CONNECTION. Note (g) CLIPS (h) Lb/Ft(SEISMIC) Lb/Ft(WIND)
A6'OSB (1) SIDE 8d 6" 12" " Dia.A.B. @ 30"o/c 16d @ 4"o/c A35 @ 24"o/c 255 357
B 6'OSB (1) SIDE (f) 8d 4" 12" 2'Dia.A.B. @ 18"o/c (m) 1 Ed @ 22"o/c A35 @ 15"o/c 395 553
C -s" OSB (1) SIDE (e,f) 8d 3" 12" Z'Dia.A.B. @ 12"o/c (m) 16d @ 2"o/c A35 @ 12"o/c 505 767
D 16" OSB (1) SIDE (e,f) 8d 2" 12" 2"Dia.A.B. @ 11"o/c(m) 16d @ 2"o/c A35 @ 9"o/c 670 938
E6'OSB (2) SIDE (d,e,f) 8d 6" 12" 2"Dia.A.B. @ 12"o/c (m) 16d @ 2"o/c A35 @ 12"o/c 510 714
F 6"OSB (2) SIDE (d,e,f) 8d 4"Staggered 12" 2"Dia. A.B. @ 8"o/c (m) 16d @ 3"o/c(2) rows staggeredA35 @ 6"o/c 790 1106
G 6 OSB (2) SIDE(d,e,f) 8d 3"Staggered 12" 2"Dia.A.B. @ 7"o/c (m) 16d @ 2"o/c(2)rows staggered HGAI0KT @ 8"o/c 1010 1414
H is"OSB (2) SIDE (d,e,f) Sd 2"Staggered 12" z'Dia.A.B. @ 5z'o/c (m) 16d @ 12"o/c(2)rows staggeredl HGAI0KT @ 6"o/c 1340 1876
Notes:
a) All wall construction to conform to SDPWS Table 4.3A.
b) Use Common Wire Nails for all wood sheathing and cooler nails for gypboard sheathing.
c) A.B. minimum 7"embed into concrete. 3"x3"xY"plate washers req'd at all shear wall A.B. in seismic zone D, E, F.
d) Panel joints shall be offset to fall on different framing members or framing shall be 3x or thicker and nails on each side shall be staggered.
e) 3x or Dbl 2x framing at all panel edges and nails shall be staggered.
f) All edges blocked.
g) Common Wire Nails.
h) Clip to be attached from continuous blocking to top of continuous top plates.
Clips are not required at Gyp Ed walls but blocking is attached per the toenailing schedule.
i) See attached typical shearwall details.
j) Sheathing to be Structrual I Sheathing.
k) Values are for framing of H-F.
m) 3x, Dbl 2x, or 2x Flat at panel edges. Stagger nails.
See note C for plate washers and details for plate washer edge distance.
On sill plates of all walls use a single 2x sill and 2x blocking in between the studs for plywood edge nailing surface.
PWU ENGINEERING INC.
Ph: 503 810-8309, Email: pwuengineeringgcomcast.net
E1
L= a, v. wo� Law 2nerP RAJ
R�c M- ayr
2 ( LA 9 D�
g� I
L, Use, 4Ixg DF''2 we,
- `cnk
271k 1Z=mak M�2.3o1�r .
1se'4xf� DF��
T
7.57k
k 12
3.3ok —1
2�k �k 12k
Y PWU E
NGI1VEEi4ING IIVG
Ph: 503 810-8309, Email: pwuengineeringowmCM.W
4z
p= 1:isk r'J• l.cs� R'6gyk rt= 3.g7k4
r ' Tz4w-228;,,'1
t � ( k,. -
Z�ly ..��►►.CC(1) Z.ILf pf#z
a.L 1, zL:ys` „�• t45�+�
y, R=037k N- ankh+
T � S�
(Wok n�k
IlkG61 t31'I '
�7-
1f7w -IAW;I4 La 751 W' 1459
Ow h"x21"G7L o R=OZA H4.104
x 20" v 2
2x14( pF*2
LR=oZ-Pk N1• ( - L= t r' w= 32GPIQ
to f80;Ay
( �Sr• 4f DF42 MSN
p.9vk M=.ss.y` F;cr
W411
fl,r 67L
9.71k
AWU ENGINEERING INC.
Ph: 503 810-8309, Email: pwuengineeringdcomcast-net
.71k 2YA
159k
7A- .ZI °
TIs9k 5' (•SX Y2-1" " • 4-R,• 4k.
331k- 140 llypsi ISa/r�
3.a2k4
Z Vq D{4t2
Use:
St1 #rc� �r
Uk L= l9 =
b R=�t1ak S6 k#
r 101 r,,'1
71�1kI "x n
L 7AA
�o Mate
s..T....�. _
S' 'xIgGL eR 6/y'�,c16"�.L2aEau�
AOR
.A `'I /2
�1.59k
R' d. • ?r.-/oe IG' 9Z o9k
K9 OPA Mg
lik 7MAV.
2'
�PWU ENGINEERING INC.
Ph: 503 810-830g, Email: pwuengineeringocomcastnet
LZ L4 ury
g= ask meaW4 R`lk
( 160
S
R_ay M= R:L73k tl-I.S4
Dr,2 )v_ 4k9 DF'92
L= 14 Gyd rl
"Y4
R= r.29k n- lz9 �l'+ d� abWR E;
4x:,aDF�2
?► O
--
92X lulu
L,,= S' w=I96PL�
omk t6 9c o.4sk
M-Omk4
Use= 4-.8 12