LATERAL CALCULATION S
CITY
�1cI),
FOR
McDonald Street Residence
10375 SW McDonald St
Tigard, OR
CITY OF TIGARn O PRUVI OFFS'
GtN� d'i
RFOR CODS
Approved; 19 E `~
OTCs
Permit o O Qec. 12,2c`�
Address0170 Sv -I�c. 1Jon�la M, mc��'J
Suite#s
B .....�...r.r IRONWOOD"
ENGINEER WAS RETAINED IN A
LIMITED CAPACITY FOR THIS
• PROJECT. DESIGN IS BASED UPON
INFORMATION PROVIDED BY THE
CLIENT WHO IS SOLELY RESPONSIBLE
FOR ACCURACY OF THAT
INFORMATION. NO RESPONSIBILITY
AND/OR LIABILITY ARE ASSUMED BY,
OR ARE TO BE ASSIGNED TO,THE
ENGINEER FOR ITEMS BEYOND THAT
SHOWN IN THESE CALCULATIONS.
Project: McDonald Street Lateral
NCO C;� J
STRUCTURAL Client: Zilka Desigm Proj.No.: I5-580
ENGINEERS Date. 12/15 By: RMM Sheet No.: COVER
2700 SE HARRISON STREET.,MILWAUKIE OR,97222,503-607-0481,FAX 503-667-0486, wbco@bkengin=s.com
>.
f
74
k4 ' 6'Ckt^A 70. - .
{
a
i
Project: McDonald Street Lateml
� LI.
' STRUCTURAL Client: Z►1ka�ign Proj.No.: 1s-58th
ENGINEERS Date: , 12/15 By: RMM sheet No.: t
NOOSE IIARRISON STRErT.,MtLWAU!(W OA.972721. A-601.0451.FAX)03-OV-0416.wtvat'bkcnl�rtrrrYwm
2 Y
EJ J
GRAD
NORT14 ELEVATION
SCALE 3/18"1'0"
r � o Project: McQonald Street Latent
a
STRUCTURAL
client: Prflj.No.. 15-580
ERS
Date: 12,115 By: RMM Sheet No.. ..
2700 SE HARRIS04 STREET..MILWAtAIrt OP.,91272,W-6:39-04S€,FAN Sv3 4UT.0�6. rpber d�ik�+g+rtctr3.ec�i
S
--....._._-.—
..._------
-- � _ _,_.. _._._............ .._ � �^��
_
.___
..____.__.............._.._.........._. t ;o; a i
HEZ E
almim Gj
RISE 7.5-
j o
WN 9- 111
_
4X 16 ROGE FYI.......
.4
., F ? Uvuz NM i 4
VAYirED IEnRROd.
t
ds
(1RRY O �
-----------
I----
- A
` Y , INC* Project: McDonald Street Lateral
STRUCTURAL
E P1 ° Client: Zilka Design Proj.No.: I5-580
tlA `' ��� ENGINEERS Date: 12115 By: RMM Sheet No.: 3
2700 SE HARR]SON STREET.,MILWAUKIE OR,97222,503.607.0481,FAX 503-607-0486. robertCbkenginem,com
Wind Loads for Main Wind Force Resisting System (MWFRS)
Using ASCE 7-10 Method 2 for all heights (gableJhipped roofs)
Project: McDonald St Lateral
Project No.: 15-580
Date: 12/14/2015
V„Jt: 120 mph
V,ld: 93 mph
Building Dimensions Vasd: 93 Cp N-S wind E-W wind
N-S (ft): 44.67 Exposure B Windward Wall 0.80 0.80
E-W (ft): 27.2 Iw: 1.00 Leeward Wall -0.37 1.17 -0.50 1.30
hR,(ft): 15 Kd: 0.85 Windward Roof -0.08 0.39 -0.18 0.33
Roof Pitch: 3:12 G: 0.85 Leeward Roof -0.47 -0.51
Roof Angle (deg) 14.0
NORTH -SOUTH WIND EAST-WEST WIND
g,,(psf) 10.8 WALLS ROOF WALLS ROOF
LW"-P": -3.4 LW "-P -4.4 LW "-P": -4.6 LW "-P": -4.7
Height K q,(psf) WW TOTAL WW TOTAL WW TOTAL WW TOTAL
iut "+P" (psf) "P" (psf) "+P" (psf) "P"(psf) "+P"(psf)I "P"{ sf) "+P" sf "P" (psf)
0-15 0.57 10.8 7.3 10.8 -0.8 3.6 7.3 11.9 -1.7 3.1
20 0.62 11.7 8.0 11.4 -0.8 3.5 8.0 12.6 -1.8 2.9
25 0.67 12.5 8.5 11.9 -0.9 3.5 8.5 13.1 -1.9 2.8
28 0.69 12.9 8.8 12.2 -0.9 3.4 8.8 13.4 -2.0 2.7
35 0.73 13.8 9.4 12.8 -1.0 3.4 9.4 14.0 -2.1 2.6
40 0.76 14.3 9.7 13.1 -1.0 3.3 9.7 14.3 -2.2 2.5
45 0.79 14.8 10.1 13.5 -1.1 3.3 10.1 14.6 -2.3 2.4
50 0.81 15.2 10.4 13.8 -1.1 3.3 10.4 15.0 -2.3 2.4
55 0.83 15.7 10.7 14.1 -1.1 3.2 10.7 15.2 -2.4 2.3
60 0.85 16.1 10.9 14.3 -1.2 3.2 10.9 15.5 -2.5 2.2
65 0.87 16.4 11.2 14.6 -1.2 3.5 11.2 15.8 -2.5 2.2
Sheet No.: (J
'�' 1 iv,r r\.t�.f�lr> .�p'L.�.TF1w.r.d L3 .`�Mc..r yV T'�.VS... .5�s 1J'"^„•.wJ9
civ 1
f dor
. _�-rte•�.� � . �
}
L�1 � '�F.�,..5+.4 C.�� ��J t��a�"��`�' �� ."�(f^t� /J+'L3��[�i' '. d�C.T g�� �•..•.-•w."'w,'``.,.. —...-*..._.-r"r
?
' -
VS) I -
gE
LID 51
WE I CO Project: McDonald Street Lateral
STRUCTURAL
Client: Lilka Desi Proj. yo.: 15-580
UP` ENGINEERS Date: 12/15 By:_.R.MM Sheet Nb.:
2700SF,HAP RR9CM S`TRLEI'..MILWAVKIE(W,97222,543,607.0481,FAX SO,Wi 0436.ro?scrc5�3hkcr�j�tcrrstorr
Page
Rroject: HARRIS MOHAMMAD r Jonathon Zilka /
Location: HEADER OVER WEST WINDOWS AND DOOR Zilka Design
Roof Beam ii 2421 SE Ash Street or
[2009.International Building Code(2005 NDS)] Portland,OR 97214
3.5 IN x 5.5 IN x 4.0 FT
#2--'Douglas-Fir-Larch(North)-Dry Use StruCalc Version 8.0.111.0 11/30/2015 10:12:40 AM
Section Adequate By: 219.1% LOADING DIAGRAM
REQVIVEp
Controlling Factor:MomentDEFLECTIONS Center
Live Load 0.01 IN L/3698
Dead Load 0.01 in DE
1 Total Load 0.02 IN U2210 ?0 1.5
j`Live Load Deflection Criteria: L/240 Total Load Deflection Criteria: L/180
REACTIONS A B �gr���g�����(��J
Live Load 350 Ib 350 Ib al d U p(p
Dead Load 236 Ib 236 Ib ��tlYDJ'
Total Load 586 Ib 586 Ib
I Bearing Length 0.27 in 0.27 in
_E.:'AM DATA —
Span Length 4 ft
I Unbraced Length-Top 0 ft
j Unbraced Length-Bottom 0 ft
Roof Pitch 5 :12 ROOF LOADING
*Roof Duration Factor 1.15 Side One:
Roof Live Load: LL= 25 psf
MATERIAL PROPERTIES Roof Dead Load: DL= 15 psf
#2-Douglas-Fir-Larch(North) Tributary Width: TW= 5 ft
Base Values Adjusted Side Two:
Bending Stress: Fb= 850 psi Fb'= 1271 psi Roof Live Load: LL= 25 psf
Cd=1.15 CF=1.30 Roof Dead Load: DL= 15 psf
Shear Stress: Fv= 180 psi Fv'= 207 psi Tributary Width: TW= 2 ft
Cd=1.15 Wall Load: WALL= 0 pif
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi
Min. Mod.of Elasticity: E_min= 580 ksi E_min'= 580 ksi SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Comp.L to Grain: Fc-L= 625 psi Fc--L'= 625 psi Adjusted Beam Length: Ladj= 4 ft
Beam Self Weight: BSW= 4 plf
Controlling Moment: 586 ft-Ib Beam Uniform Live Load: wL= 175 plf
2.0 ft from left support Beam Uniform Dead Load: wD_adj= 118 plf
Created by combining all dead and live loads. Total Uniform Load: wT= 293 plf
Controlling Shear: 457 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Reg'd Provided
Section Modulus: 5.53 in3 17.65 in3
Area(Shear): 3.31 in2 19.25 in2
Moment of Inertia(deflection): 3.95 in4 48.53 in4
Moment: 586 ft-Ib 1869 ft-Ib
Shear: 457 lb 2657 lb
page
Project: HARRIS MOHAMMAD Jonathon Zilka
Location: HEADER OVER WEST WINDOWS AND DOOR Zilka Design
Roof Beam � t # 2421 SE Ash Street of
[2009 International Building Code(2005 NDS)] Portland,OR 97214
3.5 IN x 5.5 IN x 4.0 FT
#2-Douglas-Fir-Larch(North)-Dry Use StruCalc Version 8.0.111.0 11/30/2015 10:12:44 AM
Section Adequate By: 219.1%
Controlling Factor: Moment
VMD DIAGRAM
600 586 lbs @ 0 ft
300—
'tear(Ibs)
00'tear(Ibs)
.
0-
-300-
-600
-300-600 -586 lbs @ 4 ft
• 600 586 ft-lbs 2 ft
300
i nt(ft-Ib)
0
i
-300
i
-600
I
-0.03
-0.01
ction(in)
0
i
0.01
I
0.03 0.022in@2ft
$ ..x":-;, .,'1��.;",s� .`r�'�,y" Tai.3i;;; ','.`c=` "X.:' -= :. '_.'a;:=
4 ft
I
A
Project: HARRIS MOHAMMAD page
Jonathon Zilka
Location: ROOF RAFTER MAIN LIVING ROOM(VAULTED) ZilkaDesign
Roof Rafter � 2421 SE Ash Street
of
[2009 International Building Code(2005 NDS)] Portland,OR 97214
1.5 INx7.25INx14.OFT(12+2)@24 O.C.
#2.-Douglas-Fir-Larch(North)-Dry Use StruCalc Version 8.0.111.0 11/30/2015 10:15:53 AM
Section Adequate By: 1.7%
LOADING DIAGRAM
Controlling Factor: Moment
DEFLECTIONS Center Riqht
Live Load 0.36 IN U434 0.02 IN 2U2172
Dead Load 0.22 in 0.00 in
Total Load 0.58 IN U270 0.00 IN 2L/Infinity
Live Load Deflection Criteria: L/240 Total Load Deflection Criteria: U180
RAFTER REACTIONS
LOADS REACTIONS
Upper Live Load @ A 150 plf 300 Ib
Upper Dead Load @ A 95 plf 190 Ib
Upper Total Load @ A 245 plf 490 Ib
Lower Live Load @ B 204 plf 408 Ib m
Lower Dead Load @ B 133 plf 265 35 12 ft — zn�
Lower Total Load @ B 337 plf 674 Ib
RAFTER SUPPORT DATA
A B RAFTER LOADING
Bearing Length 0.52 in 0.72 in Uniform Roof Loading
RAFTER DATA Interior Eave Roof Live Load: LL= 25 psf
Roof Dead Load: DL= 15 psf
Span Length 12 ft 2 ft
Slope Adjusted Spans And Loads
Rafter Pitch 5 12 Interior Span: L-adj= 13 ft
Roof sheathing applied to top of joists-top of rafters fully braced. Eave Span: L-Eave-adj= 2.17 ft
Roof Duration Factor 1.15
Peak Notch Depth 0.00 Rafter Live Load: wL-adj= 43 plf
Base Notch Depth 0.00 Eave Live Load: wL-Eave-adj= 43 plf
Rafter Dead Load: wD-adj= 28 plf
MATERIAL PROPERTIES Rafter Total Load: wT-adj= 70 plf
#2-Douglas-Fir-Larch(North) Eave Total Load: wT-Eave-adj= 70 plf
Base Values Adjusted
Bending Stress: Fb= 850 psi Fb'= 1349 psi
Cd=1.15 CF=1.20 Cr=1.15
Shear Stress: Fv= 180 psi Fv'= 207 psi
Cd=1.15
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi
Min. Mod. of Elasticity: E_min= 580 ksi E_min'= 580 ksi
Comp.-L to Grain: Fc-1= 625 psi Fc--L'= 625 psi
Controlling Moment: 1453 ft-Ib
5.88 Ft from left support of span 2(Center Span)
Created by combining all dead loads and live loads on span(s)2
Controlling Shear: -433 Ib
At a distance d from right support of span 2(Center Span)
Created by combining all dead loads and live loads on span(s)2,3
Comparisons with required sections: Reg'd Provided
Section Modulus: 12.92 in3 13.14 in3
Area(Shear): 3.14 int 10.88 in2
Moment of Inertia(deflection): 31.72 in4 47.63 in4
Moment: 1453 ft-Ib 1477 ft-Ib
Shear: -433 lb 1501 Ib
Project: HARRIS MOHAMMAD page
Jonathon n /
Location: ROOF RAFTER MAIN LIVING ROOM(VAULTED) " Zilka Design
Roof Rafter � t 2421 SE Ash Street of
[2009 International Building Code(2005 NDS)]
` Portland, OR 97214
1.5 IN x 7.25 IN x 14.0 FT(12+2)@ 24 O.C.
#2-.Douglas-Fir-Larch(North)-Dry Use StruCalc Version 8.0.111.0 11/30/2015 10:15:58 AM
Section Adequate By: 1.7%
Controlling Factor: Moment
VMD DIAGRAM
500 444lbs @ o ft
250
ear(Ibs)
0
-250
-500
- -070 lbs @ 12 k
2000 1453 ft-lbs @ 6 ft
1000
int(ft-Ib)
0
-1000
-2000
-65 ft-lbs @ 12 k
-06 -0.301 in@14ft
I
-0.3
tion(in)
0
i
0.3
0.6
0.577 in@6ft
12ft 2ft—�
Project: HARRIS MOHAMMAD page
Jonathon n /
Location: RIDGE BEAM AT LIVING ROOM VAULTED CEILNG t � Zilka Design
Roof Beam �, f 2421 SE Ash Street
[2009 International Building Code(2005 NDS)] Portland, OR 97214 or
3.5 IN x 15.25 IN x 13.5 FT
#1 a Btr-Douglas-Fir-Larch(North)-Dry Use StruCalc Version 8.0.111.0 11/30/2015 11:29:57 AM
Section Adequate By: 32.9%
LOADING DIAGRAM
Controlling Factor: Moment
DEFLECTIONS Center
Live Load 0.12 IN U1346
Dead Load 0.08 in
Total Load 0.20 IN U817
Live Load Deflection Criteria: U240 Total Load Deflection Criteria: U180
REACTIONS A_ B
Live Load 2025 Ib 2025 Ib
Dead Load 1308 Ib 1308 Ib
Total Load 3333 Ib 3333 Ib
Bearing Length 1.52 in 1.52 in
BEAM DATA l issn
j Span Length 13.5 ft
Unbraced Length-Top 0 ft
Unbraced Length-Bottom 0 ft
Roof Pitch 2 :12 ROOF LOADING
Roof Duration Factor 1.15 Side One:
MATERIAL PROPERTIES Roof Live Load: LL= 25 psf
#1 &Btr-Douglas-Fir-Larch(North) Roof Dead Load: DL= 15 psf
Base Values Adiusted Tributary Width: TW= 6 ft
Bending Stress: Fb= 1150 psi Fb'= 1323 psi Side Two:
Cd=1.15 CF=1.00 Roof Live Load: LL= 25 psf
Roof Dead Load: DL= 15 psf
Shear Stress: Fv= 180 psi Fv'= 207 psi Tributary Width: TW= 6 ft
Cd=1.15 =
Modulus of Elasticity: E= 1800 ksi E'= 1800 ksi Wall Load: WALL 0 plf
Min. Mod.of Elasticity: E_min= 660 ksi E_min'= 660 ksi SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Comp.-L to Grain: Fc-1= 625 psi Fc--L'= 625 psi Adjusted Beam Length: Ladj= 13.5 ft
Beam Self Weight: BSW= 11 plf
Controlling Moment: 11250 ft-Ib Beam Uniform Live Load: wL= 300 plf
6.75 ft from left support Beam Uniform Dead Load: wD_adj= 194 plf
Created by combining all dead and live loads. Total Uniform Load: wT= 494 plf
Controlling Shear: -2733 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Read Provided
Section Modulus: 102.08 in3 135.66 in3
Area (Shear): 19.81 in2 53.38 in2
Moment of Inertia(deflection): 227.77 in4 1034.42 in4
Moment: 11250 ft-Ib 14951 ft-Ib
Shear: -2733 lb 7366 lb
page
Project: HARRIS MOHAMMAD Jonathon Zilka
Location: RIDGE BEAM AT LIVING ROOM VAULTED CEILNG p Zilka Design
Roof Beam �14, 2421 SE Ash Street
(2009 International Building Code(2005 NDS)] Portland,OR 97214
3.5 IN x 15.25 IN x 13.5 FT
#1 &Btr-Douglas-Fir-Larch(North)-Dry Use StruCalc Version 8.0.111.0 11/30/2015 11:30:01 AM
Section Adequate By: 32.9%
Controlling Factor: Moment
VMD DIAGRAM
4000 3333 lbs @ 0 ft
2000
ear(Ibs)
0-
-2000-
-4000—
-2000-4000
-3333 lbs @ 14 ft
20000 11250 ft-lbs @ 7 ft
10000
-nt(ft-Ib)
0-
-10000—
I -10000I
-20000-
-0.2-
-0.1—
tion
20000-0.2-0.1tion(in)
i
0-
0.1-
0.2-
0.198 in @ 6.8 ft 0.10.2 0.198in@6.8ft
s•'....a .:;f,_
13.5 ft
i
"roject: HARRIS MOHAMMAD page
. Jonathon Zilka
Location: DECK BEAM AT WEST DECK i ,# Zilka Design
Uniformly Loaded Floor Beam �k - ; 2421 SE Ash Street or
[2009 International Building Code(2005 NDS)] Portland, OR 97214
3.5 INx9.25INx9.OFT
#2-Douglas-Fir-Larch(North)-Dry Use StruCalc Version 8.0.111.0 11/30/2015 11:31:44 AM
Section Adequate By: 24.4% LOADING DIAGRAM
Controlling Factor: Moment
DEFLECTIONS Center
Live Load 0.10 IN U1126
j Dead Load 0.04 in
Total Load 0.13 IN U802
.Live Load Deflection Criteria: U360 Total Load Deflection Criteria: L/240
REACTIONS A B
Live Load 1080 Ib 1080 Ib
Dead Load 436 Ib 436 Ib
Total Load 1516 Ib 1516 Ib
Bearing Length 0.69 in 0.69 in
BEAM DATA _ Center 9n
t Span Length 9 ft
Unbraced Length-Top 0 ft
Floor Duration Factor 1.00
Notch Depth 0.00 FLOOR LOADING
Side 1 Side 2
MATERIAL PROPERTIES Floor Live Load FLL= 40 psf 40 psf
#2-Douglas-Fir-Larch(North)
Base Values Adjusted Floor Dead Load FDL= 15 psf 15 psf
Bending Stress: Fb= 850 psi Fb'= 1020 psi Floor Tributary Width FTW= 4 ft 2 ft
Cd=1.00 CF=1.20 Wall Load WALL= 0 plf
Shear Stress: Fv= 180 psi Fv'= 180 psi BEAM LOADING
Cd=1.00 Beam Total Live Load: wL= 240 plf
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi Beam Total Dead Load: wD= 90 plf
Min. Mod.of Elasticity: E_min= 580 ksi E_min'= 580 ksi Beam Self Weight: BSW= 7 plf
Comp.-L to Grain: Fc-L= 625 psi Fc--L'= 625 psi Total Maximum Load: wT= 337 plf
Controlling Moment: 3411 ft-Ib
4.5 ft from left support
Created by combining all dead and live loads.
Controlling Shear: 1273 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Reg'd Provided
Section Modulus: 40.13 in3 49.91 in3
Area(Shear): 10.61 int 32.38 int
Moment of Inertia(deflection): 73.8 in4 230.84 in4
Moment: 3411 ft-Ib 4242 ft-Ib
Shear: 1273 Ib 3885 Ib
• page
Project: HARRIS MOHAMMAD Jonathon Zilka
Location: DECK BEAM AT WEST DECK Zilka Design
Uniformly Loaded Floor Beam � + ' 2421 SE Ash Street of
[2009 International Building Code(2005 NDS)] ' Portland, OR 97214
3.5 IN x 9.25 IN x 9.0 FT
#2-Douglas-Fir-Larch(North)-Dry Use StruCalc Version 8.0.111.0 11/30/2015 11:31:47 AM
Section Adequate By:24.4%
Controlling Factor:Moment
VMD DIAGRAM
2000 1516lbs @ 0 ft
1000
ear(Ibs)
0-
1000-
-2000
1000-2000
-1516 lbs @ 9 ft
4000 3411 ft-lbs @ 4 ft
I 2000
int(ft-Ib)
0
I
! -2000
-4000
-0.1
I
-0.05
tion(in)
0-
0.05-
0.1—
0.050.1 0.096 in @ 4.5 ft
� 9ft
-I
GUARDRAIL REQUIREMENTS
Decks less than 30" above grade are not required to have a guardrail; however, if one is
installed, you must follow these requirements. All decks and stairways over 30" above
grade require guardrails. All guardrails shall be constructed in strict conformance with
the figures herein; any deviations require a plan submission.
4 X 4 POST, TYP, 4'-0" MAX SPACING 2 X 2 PICKET, TYP.
DO NOT NOTCH 2 X 6 OR 5/4 BOARD
RAIL CAP
2
2 X 4 AT TOP
co Z
ATTACH PICKETS AT TOP
OPENINGS SHALL NOT AND BOTTOM WITH
SEE GUARD POST ALLOW THE PASSAGE 2-#8 SCREWS OR 2-8d
ATTACHMENT DETAILS OF A 4" DIA SPHERE SPIRAL SHANK NAILS EACH.
Figure 23—Typical Guardrail Detail
Any prefabricated wood, plastic, or manufactured guardrail system purchased from a
home center store, lumber company, or somewhere similar will also require a plan
submission. The guardrail shall be designed to withstand a concentrated load of 200
pounds anywhere along its length, and the infill area is designed to withstand a load of
50 pounds on a square foot area.
Guardrail Post Attachment: There are three options for guardrail attachment provided,
you may choose one that suites your needs or provide a design for approval. Guardrail
posts shall be spaced per Figure 23 and attached per Figures 24, 25 or 27 and 26, 29.
Note: 2x8 minimum joists are required for Figures 24 and 25, and minimum 2x10
joists for Figure 27.
Holdowns, tie plates, bolts, nuts and washers must be hot dipped galvanized with 1.85
oz/sf of zinc (G-185 coating) or shall be stainless steel. Look for products such as
"Zmax" from Simpson Strong-Tie or "Triple Zinc" from USP.
Typical Deck Details revised 2/08 Page 21 of 27